Supplemental Agreement OrganizationandAddress
Number 3 KPG, inc.
Original Agreement Number 753 9th Ave North, Seattle, WA 98109
CAG-]5-223 Phone: 206-267-1049
Project Number Exscution Date Completion Dafe
15171 November 23, 2015 December 31, 2016
Project Title New Maximum Amount Payable
Couplet Conversion $ 67,802.O1
Description af Work
The City of Renton desires to convert the one-way couplet system through downtown into a two-way street
system. To achieve this goal,the City must identify project principles and goals,prioritire project phasing,
determine urban design elements, and identify relative order of magnitude costs for funding purposes.
The Local Agency of.�itv of Renton
desires to suppiement the agreement entered in to with KP r' Inc.
and executed on 1_1/23/2015 and identified as Agreement No. CAG-15-223
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
The PURPOSE of this Supplemental Agreement is as follows:
To develop preliminary channelization,cost estimate,a�id to provide grant support for converting Williams Avenue to two-way operations Uetween Grady
Way and lst Street.This work also consists ofanalyzing traftic operations for a one-week construction closure ofMain Avenue from 2nd Street to 3rd
Street,and preparing a technical memor�idmn."Phe additional scrvices are described in the at[ached and incorporated Exhibit A-1,Scope of Work.
��
The TIME FOR EXECUTION AND COMPLETION of this project is amended as fo{lows:
The is no change in completion date
III
PAYMENT shall be amended as follows:
"Thc original maximum amount payable was$31,855.28.Additional services in Supplement 1 inereased the maximum amount payable by$13,473A6.
Additional services added by this Supplemental Agreement increase the maximum amount payable by$22,473.67,making thc new maximum amount
payable$67,St12.01.The basis for the increase in the maximum amount payable is detailed within the attached and incorporated F,xhibits A and B.
as set forth in the attached Exhibit(s), and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By: _ By:
�
u ant �na ute proving t o gna ure
����I���
ate
DOT Form 140-063
Revised 09/2005
Exhibit"A"
Summary of Payments
Basic+ Supp 1, 2 Supplement Total
Agreement #3
Direct Salary Cost 16,126 8,563 24,689
Overhead 21,204 11,2b0 32,464
(Including Payroll Additives)
Direct Non-Salary Costs 3,160 82 3,242
Fixed Fee 4,838 2,569 7,4Q7
Total 45,328 22,474 67,802
DOT Form 140-063
Revised 09/2005
EXHIBIT A-1
SCOPE OF WORK
AGENCY: CITY OF RENTON
CONSULTANT: KPG,INC.
CONTRACT:
PROIECT: COUPLET CONVERSION PROJECT—COUNCIL RETREAT
SUPPLEMENT 3
A. PROIECT DESCR{PTION
The City of Renton desires to convert their one-way couplet system through downtown into a two-way
street system in order to revitalize and create a vibrant town center. To bring this goal to fruition, the
City must first identify project principles and goals, prioritize project phasing, determine urban design
elements,and identify relative order of magnitude costs for funding purposes.
B. PURPOSE
The purpose of this supplement is develop a preliminary channelization and cost estimate for converting
Williams Avenue and Wells Avenue to two-way operations between Grady Way and 1st Street.This work
includes assisting the City of Renton to prepare a PSRC/FHWA TIP grant application for the Williams
Avenue and Wells Avenue 2-way conversion. Supplement 3 also consists of analyzing traffic operations
for a one week construction closure of Main Avenue from 2nd Street to 3rd Street, and preparing a
technical memorandum documenting the findings and recommendations.
C. ASSUMPTIONS
➢ Urban design amenities shall be defined through the document prepared by MAKERS Architecture
+ Urban Design. Downtown Renton Streetscape Design Guidelines 2015.
➢ Concrete intersections will not be shown on the revised layouts at this time.
D. DELIVERABLES
All deliverables to be prepared and produced by the Consultant, as part of this scope of work, are
identified at the end of each task listed below.
City of Renton Page 1 of 3 April 7,2016
Couplet Conversion Project
SA3—Supplement 3
E. SCOPE OF WORK
TASK 6—Williams Avenue and Wells Avenue Two-Way Conversion and Main Avenue Traffic Study
This task will include the following:
6.1 —WILLIAMS AVENUE AND WELLS AVENUE CHANNELIZATION WITH TWO-WAY OPERATIONS
• Develop preliminary channelization for converting Williams Avenue and Wells Avenue to two-way
operations between Grady Way and 1st Street.
• Prepare aerial scroll plot showing two-way operations on Williams Avenue and Wells Avenue.
6.2—COST ESTIMATE FOR WILLIAMS AVENUE AND WELLS AVENUE CONVERSIOIV
• Develop a planning level cost estimate for converting Williams Avenue and Wells Avenue to two-
way operations between Grady Way and 1st Street, including signal and ADA improvements at 5
intersections and railroad crossing improvements at 2 locations.
6.3 —GRANT APPLICATION SUPPORT—WILLIAMS AVENUE AND WELLS CONVER510N
• Assist the City to write a PSRC/FHWA Countywide Process grant application to add the Williams
Avenue and Wells Avenue Conversion Project to the Regional TIP. Applications are due May 6.
� Support the City to develop a PowerPoint presentation for the grant application. This includes
developing the following graphics: Photo Simulation showing project improvements,Street Cross
Section showing existing conditions and with project improvements, and a 3D Sketchup model
showing plan view and perspective view.
• Calculate the reduction in vehicle miles traveled and benefits to air quality that would result from
the project improvements.
• Research existing right-of-way mapping along Williams Avenue and Wells Avenue between Grady
Way and 1st Street using King County Assessor maps. Document locations where additional right-
of-way may be needed. This work does not include acquiring or reviewing title reports.
6.4—TRAFFIC ANALYSIS FOR CONSTRUCTION CIOSURE OF MAIN AVENUE
• Analyze traffic operations for a one week closure of Main Avenue from 2nd Street to 3rd Street
for construction of the Heritage Apartments.The analysis will be done for the PM peak hour and
use existing traffic volumes.This segment of Main Avenue has southbound one-way operations
and the primary detour route is planned to be westbound 2nd Street to southbound Williams
Avenue. The primary traffic volumes will then be routed to westbound Grady Way and
southbound Benson Road.
+ Prepare a technical memorandum documenting traffic operations during the closure and
recommendations to improve operations, including temporary signal timing and channelization
changes, and the use of uniformed police officers to direct traffic at unsignalized intersections.
City of Renton Page 2 of 3 April 7,2016
Couplet Conversion Project
SA3—Supplement 3
DELlVERABLES
The following deliverables are included in Task 6.
➢ Williams Avenue and Wells Avenue Couplet Conversion scroll plot(on aerialJ
➢ Planning level cost estimate
➢ Photo Simulation showing project improvements,Street Cross Section showing existing conditions and
with project improvements, and a 3D Sketchup model showing plan view and perspective view
➢ Documentation of any additional right-of-way needs for the improvements
➢ Technical memorandum for the construction closure of Main Avenue
City of Renton Page 3 of 3 April 7,2016
Couplet Conversion Project
SA3—Supplement 3
EXHIBIT B
FEE SUMMARY �����,,
, A.�cntre�„x+e .
L.aru}scape Architeccame
Project: City of Renton � e'v'i�$��,ng �
Couplet Conversion -Supplement 3
April 11, 2016
Description Estimated Fee
Task 6-Williams Avenue and Wells Avenue Two-Way Conversion and Main Avenue Traffic Study $22,473.67
Total Estimated Fee $22,473.67
City of Renton '
Couplet Conversion-Council Retreat Page 1 of 4 KPG
Supplement 3 April 11, 2016
EXHIBIT 8
HOUR AND FEE ESTIMATE
���
Project: City of Renton . w.�n;«�.,.� •
Couplet Converslon-Supplement 3 x..,,�,�.a e.,rn„«.�.c
April 11,2016 • `;"'"�"�`:""r;"�` •
Labar Hour Estimata Totai Fee
Senior Pro�ect Lead Traffic Arch Design �esign Urban
Task DescAptlon Engineer Manager Engineer lead Lead Urb Engineer Destgn Admin Direct �CR Profit EffecUve Multiptier
S 64.42'$ 64.42�S 64 42 $ d6 88 8 40 38 $ 28 80 $ 23 08 $ 29 81 Nours Labor Cost 73�49% 30% 2 6149
Task B-YMflitams Avanuo and WNis Avenue Two•Wa Conversion antl Main Avenue Traffic Sudy
6 1 Williams Avenue and Weils Avenue Channelization 0 2 1a 4 0 52 0 0 72 2.�16 3,57� 815 S �101 65
6 2 Cost Estimate for Wiiliams Ave and Wells Ave Co�version D 1 4 0 0 16 0 0 <^t 783 1,029 235 5 2,047 21
6 3 Grant ApplicaGon Support 4 4 D 24 6 16 38 2 94 3,286 4,313 484 5 8 57�q5
6 4 Traffc Andlysis fof Canstroction Ciosure of Main Avenue 0 1 D 28 0 10 0 A 43 1,784 2 3a6 535 $ d,665 77
RecrtfburSeW�ex nses-see breakdown for tletaiis 5 81 60
Taak Toia�s 4 8 18 56 6 94 38 6 2�0 S 6.563 S N.280 S 2.569 S 22.di3.67
Joe Phuong Matt
Paul Jason Sessyle Michael Sarah Casey Yaxin Georgeanne
TQTP1.HOURS AND TOTAL ESTIMATED FEE 4 8 18 'SS 6 94 38 6 230 $ 8,563 S N,260 # 2,569 S 22,473.67
C71y o(Renton
Couptet ConverSion• Page 2 of 4 KFG
�upp�ement 3 Apr,l 71,2016
EXHIBIT B
HOUR AND FEE ESTlMATE
Project: City of Renton �'� ����'
Couplet Conversion -Supplement 3 + .�h�c�u� .
Aprll 11, 2016 i�c`�,�;i�.,g�ne�,'�g i
Reimbursable Breakdown
Task 6-Williams Avenue and Wells Avenue Two-Way Conversion and Main Avenue Traffic Study
Mileage(est. 40 miles x 0.54 cents/mile) $ 21.60
Reproduction $ 60.00
Task 1 -Total $ 81.60
TOTAL REIMBURSABLES $ 81.60
City of Renton
Couplet Conversion- Page 3 of 4 KPG
Supplement 3 Apri! 19, 2016
EXHIBIT B
Employees in Propoaal Tltle DSC ICR(131.49°k) fes(30°k) Rate
Paul Fuesel Principal lA!Facihtator $89 18 $117 26 $26 75 $233 20
Joe Giacobazzi QA/QC Manager S64 42 $B4 71 S19 33 $169 45
Jason Frilzfer Projed Manager $64 42 $84 71 $19.33 $168 45
Sessyie Asato Enginesring Lead $64 42 $84 71 $19 33 $168.45
Michael Laphem Tralflc Analysis Lead $46 Ba_ $61.54 $14 06 $122 59
Sarah Fischer Arc�decturaf Design $41 71 $54 84 $12 51 $109 67
Phuong Nguyen Urbe�Design Lead $40 3B $53 10 $12.11 $105.59
Keisey Anderson Des+gn Engineer $31 25 $41 09 $9 38 $81.72
Bryce Corrigan Design Engmear $28 44 $34 77 $�93 $69 14
Yazin Shi Urban Des�gn $23 OB 330 35 SS 92 $60 35
Georgeanne Smit� Admin $28 69 $39 20 $8 9d $77 95
Others
John Dawes Traffic $45 91 $60 37 $13 77 $120 05
Mett Desmaries Traffic $26 08 $34.29 $7.82 $6B 20
Bryce Ccmgan Design Enginaer $26 44 $34 77 S7 93 $69 14
Casey Jeszeck Design Engine9r $2524 $33 1 S $7 57 $66 00
TerriSimms Atlmin $2895 $3793 5866 $7544
Deniel Winklemenn Admin $31 25 $41.�9 $9.38 $01 72
Ke6yStallman CAD $5092 $6590 51504 $73106
Vonni Stockman CAD $39.06 $51 36 $11 72 $102 14
City o/Renfon
Couplat Conversion- Page 4 of 4 KPG
Suppiement 3 ApA/17,2016