CONTRACT CHANGE ORDER#02 (10/30/2015)
PROJECT: Kenyon-Dobson Survey CONTRACT#: CAC-15-165
CONTRACTOR: Mr.David Fulton,PACE Engineers,Inc.
ADDRESS: 11255 Kirkland Way,Suite 300
Kirkland,WA 98033
The following changes shall be made to the above referenced contract:
Total of CO#02(Includes tax)Not to exceed $2,320.00
TIME EXTENSION: YES(X) NO 0
Mays below are to physical completion]
Original contract work days: Original substantial completion date: September 1,2015
Original physical date: September 1,2015
Contract work days added by prior C/O: 60 Revised substantial completion date due to prior C/O:Nov. 1,2015
Revised physical completion date due to prior C/O:N/A
Contract work days added by this C/O: 30 Revised substantial date due to this C/O:December 1,2015
Total revised contract work days: 90 Revised physical completion date due to this C/O: 12/1/015
MODIFICATION:The work covered by this change order must be performed under the same terms,conditions,and costs as that
included in the original contract.
Approved by: �±�trr /�,� Nf�v /'l /...'-
Contractor Date
Reason for Change: Owner Request(X) Unforeseen 0 Other( ) Specify: Insufficient time to record the survey by the
revised November 1,2015 deadline. Additional cost due to request for additional survey information along Lincoln Drive NE
STATEMENT: Show all deductive amounts in parenthesis(-).
Original contract with sales tax $ 19,546.00
Amount this change(with sales tax) $2,320.00
New Contract Total(with Sales Tax): $21,866.00
Source of Funds: Contingency() M&O(X) Supplemental( )-Ordinance#
AP ROVED:
31LPr14 8 //z//J t..._. ti^ 1‘,) v.5)1.5-
Project
oject Ma ger Date Community Services Administrator Date
N/A
Architect/Engineer Date
chgord.fi•m 8/30/04