CONTRACT CHANGE ORDER#01 (08/28/2015)
PROJECT: Kenyon-Dobson Survey CONTRACT#: CAG-15-165
CONTRACTOR: Mr.David Fulton,PACE Engineers,Inc.
ADDRESS: 11255 Kirkland Way,Suite 300
Kirkland,WA 98033
The following changes shall be made to the above referenced contract:
Total of CO#01 (Includes tax)Not to exceed $0
TIME EXTENSION: YES(X) NO 0
[Days below are to physical completion]
Original contract work days: 16 Original substantial completion date: September 1,2015
Original physical date: September 1,2015
Contract work days added by prior C/O: N/A Revised substantial completion date due to prior C/O:N/A
Revised physical completion date due to prior C/O:N/A
Contract work days added by this C/O: 44 Revised substantial date due to this C/O:November 1,2015
Total revised contract work days: 60 Revised physical completion date due to this C/O: 11/1/015
MODIFICATION: The work covered by this change order must be performed under the same terms,conditions,and costs as that
included in the original contract. /�/—��/�
Approved by: ` : � /�f:''t�'7"'"` Aug 27, 2015
Contractor Date
Reason for Change: Owner Request(X) Unforeseen 0 Other( ) Specify: Insufficient time to record the survey by the
original September 1,2015 deadline.
STATEMENT: Show all deductive amounts in parenthesis(-).
Original contract with sales tax $ 19,546.00
Amount this change(with sales tax) $0
New Contract Total(with Sales Tax): $ 19,546.00
Source of Funds: Contingency 0 M&0 0 Supplemental( )-Ordinance#