HomeMy WebLinkAboutCO 1 CAG-15-118, CO #1-16 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG-15-118 Central Renton Sewer Interceptor Reline&Upsize C.O.# 1 CONTRACTOR: Road Construction Northwest, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price 27. NEW ITEM:Additional time and materials per force account work performed on LS 1 $57,206.39 $57,206.39 8/11/2016,8/15/2016,8/16/2016,8/17I2016,8/18/2016,8/19/2016,9/6/2016, 9/7/2016 as outlined in the documentation provided by the contractor to work around and remove extensive,unknown,and buried concrete,asphalt and construction debris surrounding existing utilities and within the new sewer alignment. 28. NEW ITEM:Additional time and materials per force account work performed on LS 1 $19,561.22 $19,561.22 9/8/2016 as outlined in the documentation provided by the contractor to work around and remove buried concrete construction debris between the new sewer manhole and an existing water main to allow connection of the new manhole to an existing sewer main adjacent to the railroad tracks. 29. NEW ITEM:Additional time and materials per force account work perFormed on LS 1 $30,945.27 $30,945.27 9/12/2016 and 9/13/2016 as outlined in the documentation provided by the contractor to remove buried concrete construction debris and work around an unmarked/unknown gas main that was eventually determined to be abandoned. 30. NEW ITEM:Additional time and materials per force account work performed on �S 1 $27,493.03 $27,493.03 9l14/2016 and 9/15l2016 as outlined in the documentation provided by the contractor to remove extensive concrete around existing poured-in-place saddle manhole to allow connection of new 24"sewer main. 31. NEW ITEM:City requested compaction testing in Sunset Blvd N per force account LS 1 $3,040.13 $3,040.13 work performed on 9/15/2016 and 9l16/2016 as outlined in the documentation rovided b the contractor. Sub Total $138,246.04 Sales Tax (9.5%) $13,133.37 Total $151,379.41 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $393,970.05 $393,970.05 $151,379.41 $545,349.46 SIGNATURES: �,/ Contractor: �-- Jeffrey M.Kanyer Date: 11/11/2016 Project Engineer: Date: // / � Approved By: Date: %� / / �lys Hor by,U 'ry SVscems Di� or � ,I� Approved By: � Date: �1�� Gregg me�m o,P Adminis[ tor � H:\File Sys\WWP-WasteWater\WWP-27-3712 Central Renton Sewer Interceptor Reline&Upsize\Pay Estimates\Change Orders\Change Order#1-Cental Renton Sewer Interceptor.doc