Loading...
HomeMy WebLinkAboutAdden 1 CAG-17-124,Adden#1-17 : CITY OF ��� 1 �'"� � �J� �►►.!�l.1 � � � AMENDMENT N0. 1 TO AGREEMENT FOR GENE COULON PARK FACILITY STRUCTURAL REPAIRS THIS AMENDMENT, dated December�-�,2017, is by and between the City of Renton (the "City"), a Washington municipal corporation, and PND Engineers, Inc. ("Consultant"). The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties,this Amendment is effective as of the last date signed by both parties. Whereas,the City engaged the services of the Consultant under Agreement CAG-17-124, dated June 13, 2017,to provide necessary services for the�ene Coulon Park Facility Structural Repairs (referred to herein as the "Agreement"); ' Whereas, the Parties wish to amend the Agreement to change the scope of work and ' compensation in order to provide additional design services for various elements of the structural repairs project. NOW THEREFORE, It is mutually agreed upon that CAG-17-124 is amended as follows: . . 1. Scope of Work: Section 1, Scope of Work, is amended to add work: 1. Repairs to the boat launch wave break; 2. Additional design elements for Ivar's deck; and 3. Supplemental permitting support, as specified in Exhibit A-1 which is attached and incorporated herein. 2. Campensation: Section 4, Compensation A Amount, is amended so that the maximum amount of compensation payable to Consultant is increased from $204,000.00 to � $219,655.00, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actual performed according to the rate(s) or amounts specified in Exhibit A-1 which is attached and incorporated herein. 3. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF,the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. ' CITY OF RENTON CONSULTANT � ; By: — B Kelly Beyme Jim Campbell, .E. Community Services Administrator Pre�ident �������� - �-� t -��-� Date Date Attest !� �� lason A.Seth � City Clerk . • Approved as to Legal Form .���'�� �� i Shane Moloney � Renton City Attorney Contract Template Updated OS/30/20ll � �:.:_.. �" s ; ° ` ; ' �4I' Page 2 ot 2 • � ENC�INEERS,IN<;. �'',X�11}�1t pi- 1 � � Engineering Services: NOV2111I�2C 2H�2�17 CAG- 17 - 12 4 Amend 1V 0 . l c���i PND No. 174041 r Planning � Surveying Todd Black, Capital Project Coordinator s""`c�ral parks Planning&Natural Resources s: Pecmitting � City of Renton Hydrology Geotechnical 1055 South Grady Way En�uonmeacal Renton,WA 98057-3232 Transportation Maz;ne Fa�;litres Subject: Gene Coulon Park Facility Structural Repairs ' CoastalEngineering Amendment#1—Additional Design Elements Contract Administsation Construction En�.Support Dear Todd: Offices: seat�e Additional design services have been requested for various elements of the i�s�Fo�ch n�en�e s structural repairs project in Gene Coulon Park.The following list outlines the areas Seatde,Washington 98134 of additional effort: � • Phone:206.624.1387 1. Repairs to the Boat Launch Wave Break per the DNR Lease agreement Pozt�ana 2. Additional design elements for Ivar's Deck zzortws�nVea�e 3. SupplementalPermittingSupport Portland,Oregon 97209 ' Phone:503.915.9337 The wave break is located adjacent to the �ublic boat launch facility. The wave � break consists of horizontal treated timber supported by steel beams spanning Anchocage between vertical and battered steel piles. In accordance with the DNR Lease iso�west3�thA�eaue Agreement, all treated timber on the wave break structure, within DNR's Lease Anchorage,Alaska 99503 area,will be replaced with non-toxic materials. Phone:907.5611011 Additional design elements have been requested by the City for the Ivar's Deck Juneau area. Design loading changes to accommodate delivery access and additional 9360 Glacier Hwy,Suite 100 Juneau,Alaska 99801 �nformation for the deck area, decking pattern and configuration adjustments, Phone:907.586.2093 replacement of non-structural elements such as bollards, and reinstallation of the wave skirt along the southern portion represent the bulk of the requested xou5con additional items. 10497 Town&Country Way su�teaio Additional requests for permitting information have been generated by the Houston,reXas��o2a review agencies. This task is to supplement the existing permitting effort to Phone:832.930.4837 support the City in addressing these requests. One of the additional requests is the addition of gaps in the wave break and the wave skirt at Ivar's Deck. The www.pndengineers.com a�J�Jltl011 of gaps in wave attenuating structures allows transmittance of wave energy beyond the attenuating structure. PND will perform the necessary analysis and engineering to determine the maximum gap size. The gap will be sized so as to not impart additional wave energy to the structure beyond the existing condition. � Page 2 November 28, 2017 j. i , Deliverables: � The contract deliverables will remain unchanged.The wave break structural repair will be included as an additional facility in the drawing package. f` � 4 Assumptions: All assumptions as defined in the original scope of work will remain. „ E Schedule Following approval of this proposal by the City of Renton, PND agrees to perform the above-described services and to diligently pursue the project and make every reasonable effort to finish all items in a timely manner. The following is an update to the originally proposed schedule for the project. PND will refine this schedule based on further discussion with the City. General Amendment#1 Approval(NTP) Week of November 27, 2017 100%Design December 15, 2017 Bid Opening(S weeks) January 19, 2018 Construction NTP(5 weeks) February 23, 2018 Final Completion &Closeout(Approx.7 months) September 21, 2018 Fee• The total compensation for the work on this project shall be adjusted with this amendment.The work associated with this amendment will be completed on a time and expenses basis.As noted in the • attached fee breakdown,the remaining budget amountfor the bulkhead repair will be reallocated as • part of this amendment.The Amendment total noted below accounts for the reallocation of existing budget. Total Base Contract Amount(Hourly,Not-to-Exceed NTE) $204,000.00 Amendment No.1-Additional Design(Hourly,NTE) $15,655.00 Total Fee $219,655.00 We look forward to perForming this work for the City. If there are any questions regarding this Amendment proposal, please call anytime. Sincerely, PND Engineers,Inc. � Seattle Office tM-. "�'L � Jo Ru , P.E. Ji Campbe I, P.E. Senior Engineer President � � � � � � {- � PROJECT 1'I1'I,E:-Gene Coulon Park Svuctural Repairs . � 1��Zg��� CLIENT:Ciry of Renton-Parks Planning&Natural Resources PHASE: JOB NilMBER�174041 � ' � LABOR: k Task Item Total Labor €� No. Task(Scope of Services) 190.00 0.00 150.00 0.00 0.00 I20.00 125.00 0 00 ll5 00 0 00 85 00 Hours Cost 1 BoatLaunchWaveBreakDesign 2 8 16 S 1 35 4,505.00 2 Ivar's Deck Addifional Design 4 32 40 . 16 2 94 12,370.00 3 Supplemental Permitfin,g Support 2 36 24 2 64 8 950 00 Labor Subtotal 8 0 76 0 0 56 24 0 24 0 5 193 25,825.00 R� TOTAL LABOR 25,825.00 " � EXPENSES: °� Cost Expenses Item Quantiry Unit OerUnit Markup Cost . Mdeage 0 Mile 0.540 1.1 0.00 Per Diem 0 Day 135.000 L( 0 00 Miscellaneous All Req'd. I.1 0.00 Courier Service 0 Units , 25.00 1.1 0.00 Plotting/Printing 0 All 200.00 1.1 0 00 TOTAL EXPENSES 0.00 � SUBCONSULTANTS: • � SubconVact Subcon. � Amount Markuo Cost 0.00 1.1 0.00 - � TOTAL SUBCONSULTANTS � 0.00 Total-Labor 25,825.00 Badget to Transfer out of Bulkhead Design -10,170.00 �-�� Total-Expenses 0.00 Total-Subconsultan[s • '0.00 TO'CAL- 15,655.00 Notes. 1 2 3 4 k