Loading...
HomeMy WebLinkAboutAdden 1 FORM: AT-2010 CAG-14-041, Adden #1-15 ADDENDUM NO. 1 ENGINEERING CONSULTANT AGREEMENT FOR PROFESSIONAL SERVICES for N 30th St / Burnett Ave N Storm System Project, CAG-14-041 This Addendum is made and entered into this 2 i , day of DL-.,2CI5 by and between the City of Renton, hereinafter called the "City", and PACE Engineers, Inc. whose address is, 11255 Kirkland Way, Suite 300, Kirkland, WA 98033, hereinafter called the "Consultant". WITNESSETH THAT: WHEREAS, the City engaged the services of the consultant under Engineering Consultant Agreement CAG-14-041, dated March 27, 2014,to provide engineering services necessary for the N 30th St/ Burnett Ave N Storm System Project; and WHEREAS, the City and consultant have determined that additional time is needed to complete the work for the N 30th St/Burnett Ave N Storm System Project; NOW, THEREFORE, in accordance with Section V Time of Beginning and Completion of the Master Agreement CAG-14-041, dated March 27, 2014, it is mutually agreed upon that Engineering Consultant Agreement CAG-14-041, is amended to include a time extension as follows: 1. The Time of Completion (Section V of the Master Agreement CAG-14-041)for the above referenced contract is extended until December 31, 2016. All other provisions of Consultant Agreement CAG-14-041, dated March 27, 2014, shall apply to this addendum. EXECUTION IN WITNESS WHEREOF, the parties have executed this Addendum No. 1 to ENGINEERING CONSULTANT AGREEMENT CAG-14-041 as of the day and year first above written. CONSULTANT CITY OF RENTON Q� / Dec 10, 2015 94e;zi,m7#4. /Z. 2/ /c Signature Date Gregg Zerm'an D e Public Work“dministrator David R. Fulton Type or Print Name Sr. Principal Surveyor Title H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3716 N 30th St-Burnett\1000 Corrspd-City\Pace Contract Extension\Contract Extension.docx\JFtp