HomeMy WebLinkAboutCO 3 v, CAG-13-088, CO #3-15 CONTRACT CHANGE ORDER NO. #03 (FAA-Eligible) or SUPPLEMENTAL AGREEMENT NO. AIRPORT Renton Municipal Airport DATE 12-Feb-15 LOCATION Renton,WA AIP PROJECT NO. 3-53-0055-024 CONTRACTOR Gary Merlino CITY OF RENTON Construction Co., Inc. PROJECT NO. CAG-14-088 You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the engineer: Item Unit No. Description Unit Price Ouantity Amount 01 Additional charges for incurred delays LS 1,764.33 1 1,764.33 due to Archaeological Inadvertent Discover 12/3/14& 12/11/14 Sub-Total $1,764.33 Sales Tax 9.5% $167.61 This Change Order Total $1,931.94 Previous Change Orders Total $ 98,550 Revised Contract Total $1,155,947.14 The time provided for completion in the contract is (unchanged) (decreased) (increased)by 0 working days. This document shall become an amendment to the contract and all provisions of the contract will apply. Changes are shown on Drawing(s)No. dated , three copies attached. Recommended by: �'t {„� Q��i q f io►,'' En eer Date Approved by: /��i'% �,`/sc� Ag'L3-Ii S" Owner Date Accepted by: /(, J/j 911 Co ractor Date Concurred by: Stat ;nenautics1if applicable) /Do' Approved by: s deral Avia ioAdministration / ate ✓o�4� bo46414 �� -�' B1A 11*V`T`j�'l Page 1 of 2 NOTE: Change Orders and Supplemental Agreements require FAA approval prior to construction, otherwise no Federal participation can be granted. State Aeronautics concurrence is required when state participation is anticipated. JUSTIFICATION FOR CHANGE 1. Brief description of the proposed contract change(s) and location(s). CO#03 is a result of Field Directive#02 - Stop Work at Archaeological Site. An Inadvertent Discovery occurred within the work area, at the west end of the existing blast fence. Please see the attached plan sheet, C3.01, for Inadvertent Discovery location. 2. Reason(s) for the change(s) (Continue on reverse if necessary) SEPA(Washington State Environmental Policy Act) requirements and DAHP (Deparment of Archaeological and Historic Preservation)procedures were established for the Renton Municipal Airport -Runway Blast Wall Replacement project. An Inadvertent Discovery activated DAHP procedures necessary to fulfill the SEPA requirements. The resulting suspension of work, as required by the Inadvertent Discovery Plan and General Provision 70-20,resulted in both Contractor delay and additional work. Backup for the delay and additional work are attached as Appendix I. 3. Justifications for unit prices or total cost. Unit prices for labor are per the current labor wage rates. Unit prices for equipment are per the current year equpiment rental rates. 4. The sponsor's share of this cost is available from: 90% 5. If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the latest wage rate decision? Yes ❑ No ❑ Not Applicable Z. 6. Has consent of surety been obtained? Yes ❑ Not Necessary ®- 7. Will this change affect the insurance coverage? Yes ❑ No ®. 8. If yes, will the policies be extended? Yes ❑ No E. 9. Has this (Change Order) (Supplemental Agreement)been discussed with FAA officials? Yes ❑ No ® When With Whom Comment Submit 4 copies to the FAA Page 2 of 2 LEGE*0 EXISTING CONTOURS Storm Drain Trench, CB7 to CBS, PROPOSED CONTOURS affected by rain events. PROPOSED GRADING LIMITS Z EXISTING STORM DRAIN PIPE DRi EXISTING EDGE DRAIN EXISTING SANITARY SEWER PIPE II o EXISTING CLEANOUT # EXISTING MANHOLE 6 EXISTING CATCH BASIN X ADJUST EXISTING DRAINAGE STRUCTURE RIM 0 NEW CATCH BASIN SD—SD— NEW 6" D.I.P. EXITING FIRE WATER LINE 4 DRAINAGE STRUCTURE — SEE 7 OSCHEDULE ON C3.02 BLAST WALL # STRUCTURE CUT ON PROFILE V 4 { 1 7-00 +0 NOTES: 1. FOR BLAST WALL DIMENSIONS AND DETAILS SEE Inadvertent Discovery Site at CB7 SHEET C5.01. 7, 2. FOR BLAST WALL FOUNDATION ELEVATION SEE SHEET C5.01. 3. ENGINEER TO PROVIDE FINISH D.T.M. SURFACE TO CONTRACTOR AT TIME OF CONSTRUCTION. i gg Ali NEW LANDSIDE GRADING c4i;l M j�"[ E- NUAN 0�T—J T 2- EXISTING BLASTWALL rl 6+0 .00 7+0 .00o+0b.00 L Obi a 04 00 a, ui 40 0 40 8 SCALE IN FEET HORIZONTAL SCALE EXI ----� DESIGNED: AC FAA AIP NO.: BLAST WALL REPLACEMENT DRAWN: AC COR PROJECT NO.: CENTURY SOAURE 1501 4TH AVENUE. SUITE 1400 CHECKED: im AND DRAINAGE PLAN SHEET NO.: SEATTLE, WA 98101 PHONE: (206)438-2700 A-1101 FAX: (206)438-2699 APPROVED: AC 06-05-2014 C3.01 `wale Appendix I __........_ . --. .. . .._._.�._. _ _. ..............._....- GARY MERLINO CONSTRUCTION RENTON MUNICIPAL AIRPORT BLAST WALL REPLACEMENT I ARCHEOLOGICAL.DELAY COSTS SUMMARY 1213/2014 $_._._._..687.18 12/11/2014 $� 1077.15 I I $ 1,764.33 Extra Work Order Gary Merlin Construction Co. IClLstnmer DATE ,108# E VV O# "` ENTON MUNICIPAL .._ AIRPORT r _-_ -11.1111 , .__.. .......i...2�-r2oia zoi4-oo7 ` x RUNWAY BLAST WALL REPLACEMENT W2rh Descr1. tlo . _ t>OWNTTME COSTS WAITING FOR A-PC HL"OLQGIC AL)VALUATION OF EXCAVATED AREA 0 Ao L'f�.�„�,, - "" ....: HOURS RATE TOTAL EMP[,OX..RS ON PROJFCT r CLASS REGULAR I M--TIME. REG OT COST KAMI'BELL,JOHN C_ 14BOPRGRP772 2.5 1 65.91 164.78 DYKE PAUL 14BLAB/PIPE 2.5 `. 51.74 70.61 129.35 BROWN PAUL G_ 14BLAB 2.5 E_ �_ _ 50.84 69.27 127.10 PARSONS'BRUCEO 14BOPRGRPII OS ! 63 84.94 31.82 __., _ _ T..___. _ _ .. _ . ... _ __........................................... .... .. ............ _...._ _ _..:. - _..._..................... ........... .....___ _.._._._.._.. . - - TOTAL LABOR COST 453.05 6111 x .° s .����<..� ✓aa� D.. IMO!i LNI'I NO. HOURS RATE TOTALCOST DESCRIPTION iM .i QTY : UNET COST TOTAL CAT 314D EXG 24,735 „ 2.50 ' 68.72171.80 - - CAT 938G LOADER_._. . 2 50 . 17.87 44,68 _�. ..... 580L,4 x 4_ 24,054 2.50 , 3L75 79.38 - _ ..._........ _ F250 4x 2 22,067 2 50 ' 17.14 42.85 - _ FORD E450 BOX VAN 22 574 230 27.40 68.50 _ _._._.._._ ._. ......._ . _.._._ --.. -- - - - _ .._. - - _ .____...._...._ i TOTAL MATERIALS TOTAL EQUIPMENT 407.2111 ,A ". �,. . :.:„.., v %'. ,, S TOTALLABOR 453.05 nrsclu nox MTNO. HOURS i RATE TOTALCOST TOTAL GMCCEQUIPMENT l 407.21 - _ ..............I--. .- TOTAL MATERIALS _,....., TOTAL SUBCONTRACTORS TOTAL.RENTAL EQUIP ___.__. ....... _ TOTAL DIRECT 860.26 ..................__...... :.v......._ ... ._ LABOR 29.00% V85.51 37.38 TOTAL RENTAL EQUIPMENT - EQUIPMENT 21.00% MATERIALS SURCONTRACTORS COST cNiT TorAI.CoST SUBCONTRACTOR 12.00%; RENTAL EQUIPMENT 21.00% - SUBTOTAL 1 1,077.15 ! MATERIAL USE TAX9.50% - TOTAL SUBCONTRACTORS - TOTAL THIS EWO 1`,077.15' Owners Rep.Signature: Date: Forman's Signature: Date: GARY MERLINO rnNSTRUCTION COMPANY ORDER 9125 '10th Aaen ,outh, Seattle, WA 98108 lEX,%WORK `ORDER 206.762 . 91'25 Pne 206. 763:4178 Fax Customer Date Job# EWO# t w ° Project Employees ori Project Class Hours Rate Total Description of Work : w_ F 3 Materials Qty Unit Cost Total GMCC Equipment GM# Hours Rate Total F t 1. s" yt" ! ry'�x" Y o..✓'f,.��5 � f'"f �4_,f B.`:.. 6.a. y Totals Rental Equipment No. Hours Rate Total Total Labor SotaI Materials Total GMCC Equipment Total Rental Equipment Total Subcontractors Total Direct Labor Markup Equipment Markup Subcontractors Cost Unit Total Materials Markup Subcontractor Markup TOTAL THIS EWO Owner's"Represen�tative Signature: Date Foreman's Signature: w Date I a WHITE-CUSTOMER YELLOW-FIELD' PINK-OFFICE EHUIPMENT L_......�WATCH www,equipmentwatch.com Adjustments for 22-574 in 2015 1 st Half February 2,2015 100/100 On-Highway Light Duty Trucks Miscellaneous Models Size Class: Net Hp 300 HP&Over Configuration for On-Highway Light Duty Trucks Power Mode Diesel Cab Type Conventional Axle Configuration 4X2 Ton Rating1/2 f„ Horsepower 360.0 Blue Book Rates ,. "FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimatetl+rrpeeratng cast. Ownership Costs Estimated FHWA Rate" Operating Costs Monthly Weekly Daily x Hourly Hourly Hourly Published Rates $1,120.00 $315.00 $7900 $12.00 $21.65 $28.01 Adjustments Region ($19.04) ($5.36) ($134)` ($0.20) (Washington: Model Year(2005: ($89.18) ($25.08) ($6.29) ($0.96) 91.9%) Ownership(100%) - „ Operating(100%) s Total: $1,011.78 $2 64, $71.37 $10.84 $21.65 $27.40 Rate Element Allocation Element Percentage Value Depreciation(ownership) 88% $649.60/mo Overhaul(ownership) 28% $313.60/mo CFC(ownership) 4% $44.80/mo Indirect(ownership) 10% $112.00/mo Fuel(operating)@'-$3.96 79% $17.19/hr Revised Date:;2nd Halt 2014 All material herein©2003-2015 Penton All rights reserved. Page 539 of 1473 *.r EQUIPMENT --WATCH www.equipmentwatch.com Adjustments for 28-219 in 2015 1st Half February 2,2015 100/100 Caterpillar 938G SERIES 11(disc.2008) 4-Wd Articulated Wheel Loaders Size Class: Net Hp 150-174 HP Weight: 29,657lbs. Y.. Configuration for 938G SERIES 11 Power Mode Diesel Bucket Capacity t. p y-Heaped ' - 3.65 cy Net Horsepower 160.0 hp Operator Protection; EROPS Equipment Notes: includes General Purpose bucket and RODS,unless otherwise noted. d Blue Book Rates _. " FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated FHWA Rate" Operating Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates $4,405.00 $1,235.00 y X10.00 $4700 $35.80 $60.83 Adjustments Region ($96.91) ($27.17) ($6.82) ($1.03) (Washington: 97.8%) Model Year(2005: ($133.55) ($37.44) ($9.40) ($1.42) 96.9%) Ownership(100%) Operating(100%) Total: $4,174.54 $1,170.39 $293.78 $44.55 $35.80 $59.52 Rate Element Allocation Element Percentage Value Depreciation(ownership) 43% $1,894.15/mo Overhaul(ownership) 38% $1,673.90/mo CFC(ownership) 7% $308;35/mo Indirect(ownership) „ 12% $528.60/mo Fuel(operating)10-$3:98 57% $20:38/hr Revised Date: 2nd Half 2014 All material herein 0 2003-2015 Penton All rights reserved. Page 881 of 1473 **AW "`rr✓ tGUIPMENT ' -WATCH www.equipmentmtch.com Adjustments for 24-735 in 2015 1 st Half February 2,2015 100/100 Caterpillar 314D LCR Crawler Mounted Hydraulic Excavators ...x... Size Class: Operating Weight 14.1-16.0 MTons Weight: 31,085 Ibs. �r 24-735Aw-Caterpillar 314D LCR Crawler Mounted Hydraulic Excavators Power Mode Diesel Bucket Capacity-Heaped .56 cy Operating Weight 14.1 t Net Horsepower ,;z 90.0 hp Equipment Notes: Bucket included in rate,unless otherwise noted. x'--hydraulic thumb,50 size -Miscellaneous Hydraulic Bucket Thum-b - Power Mode Hydraulic Recomm,kt4ed Machine Weight 6.0-8;0 t Type Narrow Equipment Notes: Includes hydraulic installation kit.Wide thumbs are linkage style;narrow thumbs are non-linkage style,unless otherwise noted. x-plumb package-null plumb package Custom plumb packa9e NIA Blue Book Rates *'FHWA Rate is equal to the monthly ownership co" ,!ided by 176 plus the hourly estimated operating cost. ;Ownership Costs Estimated FHWA Rate** Operating Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates $7,625.00 4 $2,137.00 $534.00 $81.00 $37.00 $80.32 Adjustments Region* ($149`58 . ($41,90) ($10.48) ($1.58) Model Year* ($187i'1,7 ($52.45) ($13.12) ($1.98) Ownership` Operating' a Total: $7,288.33 $2,042.65 $510.40 $77.44 $37.001 $78.41 Blue Book Reties=24-735A-Caterpillar 314D LCR Crawler Mounted Hydraulic Excavators FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated FHWA Rate** Operating Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates $6,355.00 $1,780.00 $445.00 $67.00 $34.25 $70.36 Adjustments Region ($127.10) ($35.60) ($8.90) ($1.34) (Washington:98%) Model Year(2008: ($161.93)' ($45.35) ($11.34) ($1:71) 97.4%) Ownership(100%) - Operating(10011%) Total: $6,065.97 $1,699.05 $424.76 $63.95 $34.25 $68.72 All material herein 0 2003-2015 Penton All rights reserved. Page 719 of 1473 Extra Work Order Gary Merlino Construction Co. Cus omen DATE JOB## E # RENTON MUNICIPAL AIRPORT 12/3/2014 2014-007 `mO'12 � r0 Ct RUNWAY BLAST WALL REPLACEMENT ___.........__......._._............._.__ _................_._„i.. Work'D eri do RIs DIG STORM DRAIN TRENCH THAT FILLED WfrHMUD DLIE TO BACKFILL DELAY WAITING FOR ARCI[EOLOGICAL EVALUATION £ lq E HOURS RATE TOTAL EMPLOYEES ON PROJECT CLASS REGULAR OV TJMF. REG OT COST KAMPBELL,JOHN C_ _. _._._._..... _...._14BOARGRP II2 ._. _._Ix5.. 65 91 _.. _,.88.37 98.87 DYKE„PAUL 14BLAB/PIPE 1.5 51.74 ;_ 70.61 BROWN PAUL G. _ .W.._. 1'4BLAB _._.... 1.5 _ 50 84 ' 69.27 76.26 PARSONS,BRUCE O. 14BOPRGRPII 1.5 1 - 63.63 84.94 95.45 _ TOTAL LABOR COST 348.19, .7. �� w+-'�. it 72LIM, DESCRIPTION UNI'CNQ II RATE ; TOTAL COST DE' P7JON UNIT COST a TOTAL. CAT 314D EXC _.... .__ 24,?35 1.50 68.72 103.09 CAT 938G LOADER.......:....................... t........ 28 219 I 1.50 17.87 26.81 F250 4x 2 22.067 1 5017 14 25.71 . FORD E450"BOX VAN22 574 j 1.50 27.40 41.10 - - TOTAL MATERIALS TOTAL EQUIPMENT 1900 TOTAL LABOR 348.19 DESCRIPTION tTmTSM HOURS RATE TOTAL COST TOTALGMCC.EQUIPMENT 196.70 TOTAL MATERIALS TOTAL SUBCONTRACTORS TOTAL RENTAL EQUIP. - TOTAL DIRECT _ .,.. 544:84 LABOR _ 29.00% 100.98 TOTAL RENTAL EQUIPMENT EQUIPMENT_ 21.00% 41.31 ,; SXlt3GNTR�4iXG1Er __.. x, �, % MATERIALS - - 21.00% suxcDNTRAGrgxs ? COST UNIT TOTALcosr SUBCONTRACTOR 12.00°10 RENTAL EQUIPMENT j 21.00% — , . _ SUBTOTAL .... i— fi871A T MATERIAL USE TAX TOTAL SUBCONTRACTORS TOTAL THIS EWO 687.18' Owners Rep.Signature: Date: Forman's Signature: Date: vow va o �Z 04 Uy : p R 0 2 ty r C M ] 00000000 w w mss, C7 O tv y a a o C: 00000000 = _ ... o 0 0 0 031 0 0 0 0 • 0 '11 ,� ...6X a E E y ` d 0 0 0 O 0 0 Co 0 U A x LOMLOLOLoLOtoU) ;a CA 70 V 3 � N 012 C7 U a m maw C7 y o � O m m mm v U v �r v rid.. N xi J Z. U. ' w O E j i CL 2 CCde Z as ci " s oY OXY c o 0 Nw05. 0C vU _ ,x m m C) LL! 4 Y ' " 0 q liftH = LO = Lo 5 5 ,�,• 4) ISO E v 3 0 � .�. a � u awamvrn Z z O ' ca p r CL Cl CL o ;. .. U m i s TM� LO 0o r¢• 0 Itt CL ' 0 0 0 W 1� ;2 N - rNNNLoc54cb .. ro V: LI. rNONO �- NN O GARY MERLINO rnNSTRUCTION COMPANY 9125 10th Avenouth. Seattle, WA 98108 EXTRA. WORK ORDER 206 762.9125 Pne 206-. 763 .4178 Fax Customer - Date orb# EWO# Project � a..n N � �.".may � '.iR'"' /`�.... Q. r.r".,: ,,.•sx 4.r f �..r'Y;m'! dy.'.. Employees on Project Class Hours Rate Total Description of Work Materials Qty Unit Cost Total GMCC Equipment GM# Hours Rate Total Totals Rental Equipment No. Hours Rate Total Total Labor Total Materials Total GMCC Equipment Total Rental,Equipment Total Subcontractors' _ Total Direct _....._ Labor Markup Equipment Markup Subcontractors Cost Unit Total Materials Markup Subcontractor Markup TOTAL THIS EWO Owner's Representative Signature: Date Foreman's Signature: Date ._..-WHITE-CUSTOMER YELLOW-FIE�D PINK-OFFICE