CONTRACT CHANGE ORDER NO. #02 (Non FAA-Eligible)
or
SUPPLEMENTAL AGREEMENT NO.
AIRPORT Renton Municipal Airport DATE 12-Feb-15
LOCATION Renton,WA AIP PROJECT NO. 3-53-0055-024
CONTRACTOR Gary Merlino CITY OF RENTON
Construction Co., Inc. PROJECT NO. CAG-14-088
You are requested to perform the following described work upon receipt of an approved copy of this
document or as directed by the engineer:
Item Unit
No. Description Unit Price Quantity Amount
01 Removal of Schedule III(Blast Wall Art LS 90,000 1 (90,000)
Work and Blast Wall Lighting)from the
contract
Sub-Total $ 90,000
Sales Tax 9.5% $ 8,550
This Change Order Total $ 98,550
Previous Change Orders Total $NA
Revised Contract Total $1,154,015.20
The time provided for completion in the contract is (unchanged) (decreased) (increased)by 0 working
days. This document shall become an amendment to the contract and all provisions of the contract will
apply. Changes are shown on Drawing(s)No. dated , three copies attached.
7 r, n
Recommended by:
gin er/� ate
Approved by: /�/ ,�✓ice s�• ! z,/z:1- i=
_
Owner Date
Accepted by: /_ /,-;,
Co actor D te
Concurred by: Zo
3 S
ISO Aeron ics (if applicable) ate
Approved by:
Federal Aviation Administration Date
Pagel of 2
NOTE: Change Orders and Supplemental Agreements require FAA approval prior to construction,
otherwise no Federal participation can be granted. State Aeronautics concurrence is required when
state participation is anticipated.
JUSTIFICATION FOR CHANGE
1. Brief description of the proposed contract change(s) and location(s).
CO#02 reduces the scope of work by removing Schedule III (Blast Wall Artwork and Blast Wall
LIghting) from the contract. This reduction of scope would not change the duration of the project.
2. Reason(s) for the change(s) (Continue on reverse if necessary)
An allowance of$90,000 was allocated for Schedule III. However, the cost estimated by the
Contractor(Gary Merlino Constructions)was in excess of$200,000 making this part of the project
unfeasible.
3. Justifications for unit prices or total cost.
Since this change order is being issued before any costs were incurred by the contractor for this part of
the project, Schedule III has been eliminated in its entirety from this project.
4. The sponsor's share of this cost is available from:
NA
5. If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the
latest wage rate decision? Yes ❑ No ❑ Not Applicable H.
6. Has consent of surety been obtained? Yes ❑ Not Necessary Z.
7. Will this change affect the insurance coverage? Yes ❑ No Z.
8. If yes, will the policies be extended? Yes ❑ No Z.
9. Has this (Change Order) (Supplemental Agreement)been discussed with FAA officials?
Yes ❑ No ® When With Whom
Comment Though this is an AIP funded project, Schedule II & III of the project are being funded by
the City of Renton. Hence removal of Schedule III was not discussed with the FAA. City
of Renton reserves its rights to perform this work as an independent project at a later date.
Submit 4 copies to the FAA
Page 2 of 2