HomeMy WebLinkAboutAdden 4 CAG-14-112, Adden #4-16
�
Washington State
�� Departmer�t of Transportation
Supplemental Agreement Organization andAddress
Number 4 David Evans and Associates, Inc.
1115 West Bay Drive NW,Suite 3Q1
Original Agreement Number Olympia,wA 98502
CAG-14-112 Phone: (360}705-2185
Project Number Execution Date Completion Date
8/21/2014 12/31/2016
Project Title Engineering Support Services New Maximum Amount Payable
Bridge Inspection and Repair Program � gg,720.81
Description of Work
Provide Engineering Support Services for the City of Renton's Bridge Inspection and Repair Program.
The Local Agency of City of Renton
desires to supplement the agreement entered into with David Evans and Associates,Inc.
and executed on August 21,2014 and identified as Agreement No. CAG-14-112
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows
I
Section 1, SCOPE OF WORK, is hereby changed to read
See attached Exhibit A-1.
��
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read No change.
I11
Section V, PAYMENT, shall be amended as fotlows:
See attached Exhibit E-1.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By. David Evans and Associates,Inc. By; Gregg Zimmerman,Public Works Administrator
,,/ ��/.. ���_�.�` �
Consultant Signature Ap ving Au ority Signature
DOT Form 140-063 EF ate
Revised 9/2005
Exhibit A �
Summary of Payments
Engineering Support Services, Bridge Inspection and Repair Program
Agreement No. CAG-14-112
Basic Agreement Supplement#1 Supplement#2 Supplement#3 Supplement#4 Total '
Direct Salary Cost 11,283.80 11,785.15 Date change only 2,207.00 1,095.00 26,370.95
Overhead
(Including Payroll Additives) 19,127.17 19,977.00 Date change only 4,016.00 1,993.00 45,113.17
Direct Non-Salary Costs
(includes Subconsultant
charges) 1,051.00 274.00 Date change only 0.00 0.00 1,325.00
Fixed Fee 3,385.14 3,535.55 Date change only 662.00 329.00 7,911.69
Management Reserve Fund Date change only 8,000.00 8,000.00
Total 34,847.11 35,571.70 0.00 6,885.00 11,417.00 88,720.81
EXHIBIT A-1
SCOPE OF WORK
Supplement#4
AGENCY: CITY OF RENTON
CONSULTANT: David Evans and Associates, Inc.
CONTRACT: CAG-14-112
PROJECT: Engineering Support Services, Bridge Inspection and Repair Program
The City of Renton (Agency) is requesting professional services from David Evans and Associates, Inc.
(Consultant)as part of the Engineering Support Services, Bridge Inspection and Repair Program Project
(Project).This Scope of Work (Scope) includes development of overload permit ratings for the Houser Way
Bridge (RENTON-05).
A. DESIGN CRITERIA
The permit ratings performed for this Scope shall be in accordance with the criteria used in the original load
ratings.
B. GENERAL ASSUMPTIONS:
The following scope and associated costs are based on the assumptions outlined below:
• No fatal flaws found in review of existing load rating reports
• Live load model for the girder will be created using the parameters from existing load rating report.
• All parameters for creation of Live load model can be readily extracted from the existing Load Rating
reports.
� Rating factors for the permit vehicle will be calculate by multiplying the rating factor of the Overload 2
vehicle with the ratio of Overload 2 demand divided by permit vehicle demand determined from DEA's
live load model from the existing load rating report. Bridges will be analyzed assuming only permit
truck is on the bridge.
� The deliverables are not full load rating reports, but a short memo summarizing the rating factors for
each bridge based on calculations provided in appendix.
C. DELIVERABLES:
All deliverables to be prepared and produced by the Consultant, as part of this scope of work, are identified at
the end of each task listed below.
D. SCOPE OF WORK:
TASK 1—PROJECT MANAGEMENT
The following items are to be performed by the Consultant, under this task.
Assumptions for Task 1:
Page 1 of 2
• The budget shown in Exhibit E-1 assumes this task is one (1) month in duration.
1.1 —Overall Project Management
• Supervision of personnel and activities for compliance with contract scope and schedule and proper
charging of time against the contract.
1.2 —Invoicing
• Preparation of one invoice that include the following:
o Spreadsheet summary of budget, expenses to date, expenses for invoice period for each task.
o Summary of work accomplished for the invoice period.
o Summary of outstanding issues to be resolved by the Agency.
o Backup detail that includes the name,direct salary rate and hours charged,for each individual
charging time to this contract,for the work period.
o Backup detail of all direct non-salary costs included in the invoice for the work period.
DELIVERABLES
The following deliverables and delivery times are included in Task 1.
• Monthly progress report and invoice with backup documentation.
TASK 2—Houser Way Road Bridge Permit Rating
The following items are to be performed by the Consultant, under this task:
• Review of existing load rating calculations
� Create a girder model for live load
� Develop controlling rating factors for permit truck
� Prepare Summary Memo
� Perform a Quality Assurance/Quality Control review of the summary memo.
DELIVERABLES
The following deliverables and delivery times are included in Task 2.
• Summary memorandum including supporting calcufations and assumptions to be delivered to the
client by March 9`h, 2016 at 2:00 P.M.
Management Reserve Fund
A Management Reserve Fund (MRF) has been provided to account for unanticipated needs outside of the
above listed Scope.These funds may only be utilized with advance written authorization by the AGENCY.
Page 2 of 2
Exhibit E-1
City of Renton
Overload Rating, Houser Road Bridge (RENTON-05)
CAG-14-112, Supplement 4
David Evans and Associates, Inc.
Direct
Classification Hrs. x Rate = Cost
1 Project Manager(PMGR) Rich Hovde 4 $ 61.00 244
3 Sr. Bridge Engineer(SBEN) Eric Ferluga 10 $ 48.66 487
4 Sr. Bridge Engineer(SBEN) Robert Fulton 3 $ 52.80 158
5 Design Engineer(DEEN) Anne Petrich 0 $ 29.00 0
17 Administrative Assistant(ADMA) Brenda Alongi 1 $ 20.00 20
18 Project Administrator(PADM) Jodi Wills 6 $ 31.00 186
Total Hrs. 24
Salary Cost 1,095
Salary Escalation Cost(estimated)
Escalation-% of Labor Cost 0°/a per year @ 0 year(s) 0
Total Salary Cost 1,095
Overhead Cost @ 181.98% of Direct Labor 1,993
Net Fee @ 30.0% of Direct Labor 329
Total Overhead 8� Net Fee Cost 2,322
Direct Expenses No. Unit Each Cost
Reproduction Costs
Copies 0 pages @ $0.06 /page $ -
Reports 0 reports @ $15 /report $ -
Plans 0 sets @ $2 /set $ -
Parking 0 @ $8 $ -
Mail/DeliverieslFed Ex 0 @ $20 $ -
Mileage 0 miles @ $0.540 /mile $ -
Subtotal p
David Evans and Associates Total 3,417
Management Reserve Fund 8,000
Total Amount Authorized for Supplement#4 11,417
Exhibit E-1
City of Renton
Overtoad Rating,Houser Road Bridge(RENTON-05)
CAG-14112,Supplement 4
David Evans and Associates,Inc. � a e s n �e
z z �
O
� " a
U' � N W N
� � o
° `w `m w m
w m y
c c
`m .�' .m � aai �
`m ul ul m '— E
c � a
� rn 01 w ¢
G 9 � � �a 2'i
Work o m m � E p o
Element p Work Element a` in r`n o ¢a a` DEA %of
direct retes. $si oa Sae se Ssz eo 3zs.00 Ezo.oa 83i ao
Total ToWI Total Total Total Total Total Total
hrs hrs hrs hrs hrs hrs S Hours
Task 12:Overload Ratings,Houser Road Bridge
12.1 Project Management&Quallty Control
12.1.1 Pro�ed Management 2 1 $q77 12.50%
12.1.2 Monthly Progress Reports and Invoices 2 $�g3 8.33%
Work demeM 12,1 Total 2 3 j671 20,83%
12.2 Houser Way Bridge Pertnit Rating
Review Existing Load Ra6ng Calculations 2 $304 8.33%
Create Girder Model for Permit Truck 2 $304 8.33%
Develop Rating Factors for Permit Truck 2 $304 8.33%
Prepare Summary Memo 1 2 1 2 $75p 25.00%
QualRyAssurence/QualityControlReview 1 2 3 1 $1,085 z9.���
Work ElemeM 12.2Total 2 10 3 1 3 52,745 �9•»y
EXPENSES
SALARY ESCALATION
PROJECT WORK ELEMENTS TOTALS 4 10 3 1 6 $3,417 100.00%
Management Reserve Fund $8,000
Total Amount Authorized for Supplement t14 $11,417