Loading...
HomeMy WebLinkAboutCO 2-r: It CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 12 -150 2012 Sewer Telemetry Upgrades C.O.# 2 CONTRACTOR: Systems Interface, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: Additional Items Under This Change Order Unit Quantity Unit Price Total Price ITEM 012: Change Order #2 LS 1 $594.65 $594.65 Additional work necessary to upgrade the wastewater radio repeater antenna at the West Hill Reservoir Site from the specified Omnidirectional pole antenna to a specialized Dipole Array version as described in attached Change Order Request S11-2a. Total ITEM 012 Sales Tax (9.5 %) Total Additional Work $594.65 $56.49 $651.14 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $299,924.49 $308,198.55 $651.14 $308,849.69 SIGNATURES: Contractor: Project Engine Approved By: H: FileSyslW W P -W astewateAW W P- 27- 36561CO -2 -2012 sewer telem.doc /MB Date: �I2,f-'2,4 i3 Date: Date: Z t Purchase Order No: Contract Change Order No: SII -2a Customer: City of Renton Date Issued: 4/22/2013 Project Name: Telemetry System Upgrades SII Project No: S1 2L01 C:\Documents and Setlln s \Mbenoit\Locat SetiingsiTemparary Reason for Change: Upgrade the Radio Telemetry Antenna at the West Hill Reservoir site from a common Omnidirectional pole antenna to a specialized Dipole Arrany version (Telewave ANT450D3). discussed previously, this antenna will be installed on a 10 foot mast. Additional scope of work includes updating electrical schematics, bill of materials, purchase orders, Hardware Design Submittals, along with the change control revision logs for each of these Items. Our engineers and managers also need to review the requested changes, understand the implications, archive the revisions as a new (version, and provide a detailed cost analysis. Summary and Expenses Manager Engineer Shop / Field Wire Tech Electrical Sub - Material Electrical Sub -Labor $491.10 Telewave ANT450133 Dipole Array Antenna (includes credit for THREE original omni antennas) $57,5010.5 hrs to research, revise our scope of work, process the change order, & manage changes. $49.0010.5 hours to update drawings, BOM, POs, & project dots for new antenna $O.00I ' $30.00 0.5 hrs to process and document the change, issue revisions $0.00 hrs for no install +0.75 hr due to new antenna heavier and larger. Cost of This Change: Plus(Minus) $594.85 EXCLUDING SALES TAX Total of Previous Changes: $7,55622 Original Purchase Order Value: $273,303.84 EXCLUDING SALES TAX Current Purchase Order Value: $282,054,51 EXCLUDING SALES TAX Approvals Systems Interface Inc. Robert H. Schommer, P.E. 04/23/2013 Name Print Signature Date Purchaser Authorized Representative Name Print Si nature Date Revision: G 6113M2 CNGRE ,XLS