Loading...
HomeMy WebLinkAboutCO 2 CITY ON 1ZE:NTON CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT FEB 1.3 RECEIVED CONTRACT: CAG 11-044—Benson Road 16" Water Main Replacement Project city.=FTS OFFICE CONTRACTOR: R.L.Alia Company SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITE Additional Quantities Under This Change Order Unit Quantity Unit Total Price CO2 Change order for delay and downtime for sawcutting extra LS 1 $16,595.97 $16,544.55 depth asphalt and for breaking rock. Subtotal $16,544.55 9.5% Sales Tax $1,571.73 Total $18,116.28 ORIGINAL CURRENT ESTIMATED NET ESTIMATED CONTRACT CONTRACT CHANGE THIS CONTRACT TOTAL AMOUNT AMOUNT ORDER AFTER CHANGE $591,738.00 $609,910.59 1 $18,116.28 $628,026.87 Cost Allocation Water Utility 425.45559 . 95.34.63.000 $18,116.28 SIGNATURES: Contractor: Date: Project Engineer: // Date: 11117111 Approved By: WM4/ C°3 Date: W194 Q (Water Utility Supervisor) CADocuments and Settings\Gary\Local Settings\Temporary Internet Files\OLK13\ChangeOrder2_11-15-11.DOC/AWah