HomeMy WebLinkAboutCO 1 CITY OF RENTON Now CITY OF RENTON FEB 13 K'62 Public Works Department RECEIVED CITY CLERK'S OFFICE CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 11044—Benson Road 16" Water Main Replacement Project C.O.#1 CONTRACTOR: R.L.Alia Company SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Total Price C01 Change order for delay, downtime, and redesign due to LS 1 $16,595.97 $16,595.97 mismarked and mislocated utilities in Main Ave. S., breaking and hauling off excavated material from extra depth pavement section beyond 12", shift hour reduction for River Days, and additional ductile iron water main fittings. Subtotal $16,595.97 9.5%Sales Tax $1,576.62 Total $18,172.59 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET ESTIMATED CONTRACT AMOUNT AMOUNT CHANGE THIS ORDER TOTAL AFTER CHANGE $591,738.00 $591,738.00 $18,172.59 $609,910.59 Cost Allocation Water Utility 425.455596. .5 .34.63.000 $18,172.59 SIGNATURES: Contractor: Date: ` ► �� Project Engineer: /G. ��►�,.� Date: M/0—ow Approved By: 6=" 64yi. Date: 1 Z� (Water Utility Supervisor) I j HAFile Sys\WTR-Drinking Water Utility\WTR-27-Water Project Files\WTR-27-3551-Benson Rd 16in Water Main Replacement\Construction Contract\Pay Estimates\Changeorderl 09-06-11.DOC/AW ah