Loading...
HomeMy WebLinkAboutAdden 3 0 0 CAG-11-105, Adden #3-12 � Washington State WI/ Department of Transportation Supplemental Agreement Organization and Address KBA, Inc. Number 3 11000 Main Street Original Agreement Number Bellevue, WA 98004 CAG-11-105 Phone: 425-455-9720 Project Number Execution Date Completion Date 011013-01 5/19/11 12/31/14 Project Title Rainier Ave S(SR 167) -S Grady Way New Maximum Amount Payable to S 2nd St- Const. Mgmt and Inspection Services $ 2,338,157.00 Description of Work No change to the scope of work or contract amount. Supplement No. 3 corrects error on "Exhibit G-1 Subconsultant Fee Determination -Summary Sheet" for subconsultant, Envirolssues. The Local Agency of City of Renton desires to supplement the agreement entered into with KBA Inc. and executed on 5/19/11 and identified as Agreement No. CAG-11-105 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: No change. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No change. III Section V, PAYMENT, shall be amended as follows: No change to Maximum Amount Payable. Replace"Exhibit G-1 Subconsultant Fee Determination-Summary Sheet"for subconsultant, Envirolssues,with attached. as set`--" :_the atteehe' E-"o"f* ^, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above,please sign in the appropriate spaces below and return to this office for final action. By. Kristen A. Betty, President By: Gregg Zimmerman, Public Works Administrator I i nsultant Si ature A roving uthority Signature �11�I ZoIZ, DOT Form 140-063 EF �� Date Revised 9/2005 Exhibit G-1 Subconsultant Fee Determination - Summary Sheet (Mandatory when Subconsultants are utilized) Project: Rainier Ave S (SR 167) -S Grady Way to S 2nd St. Sub Consultant: Envirolssues, Inc. Direct Salary Cost (DSC): Classification Man Hours Rate = Cost Senior Associate 20 X $ 60.00 $ 1,200.00 Associate III 101 X $43.00 4,343.00 Associate 1 450 X $29.00 13,050.00 Project Coordinator 451 X $19.00 8,569.00 Sr. Graphic Designer 40 X $35.00 1,400.00 Graphic Designer 100 X $19.00 1,900.00 X X X Total DSC = $ 30,462.00 Overhead (OH Cost -- including Salary Additives): OH Rate x DSC of 155.36 % x $ 30,462.00 = 47,325.76 Fixed Fee (FF): (DSC+OH) 12.00 0 77,787.76 = 9,334.53 FF Rate x BS�af /o x $ Reimbursables: Itemized = 12,876.50 SubConsultant Total = 99,998.79 Prime Mark-Up 0.00 % X 0.00 = 0.00 Grand Total = 99,998.79 Prepared By: Envirolssues, Inc. Date: March 15,2012 DOT Form 140-089 EF Exhibit G-1 Revised 8/07