Loading...
HomeMy WebLinkAboutCO 09Date: RENT 0 14' Federal Aid: ActLar: or I 11 r,aevL State Contract. 1055 South Grady Way Contract: Renton, WA 98057 Projects: ResidentEgr. Change Order. ❑x CONTRACTOR: Atkinson Construction 707 S. Grady Way Ste 500 Renton, WA 98057 PROJECT- Strander Blvd, SW 27th St Extension Phase 1 November 30. 2013 Review ❑O Documentation UL- 1276(004).HPP1276(0051 ❑x ResidentEgr. N/A ❑x Materials Appr Engr. CAG 1 1 -133 © City Project Monger 09 O Finonce(>10016) RECAPITULATION ORIGINAL CONTRACT: $ 11,381,158.70 PREVIous ADDITIONS: $ 732,538.24 PREVIOUS DEDUCTIONS: $ 0.00 PREVIOUS TOTAL-- $ 12,113,696.94 $ 15.995.62 THIS CHANGE (ADD.): (DED.): $ 0.00 ADJUSTED TOTAL• $ 12.129,692.56 Sections 1 -04.4 and 1 -04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall constitute the complete and final settlement for all costs of labor, material, equipment, overhead, profit, permit fees, damages (whether direct or indirect), and all other claims by the contractor as a result of this change. The time for completion is not changed by this Change Order; 0 worldng days are hereby added to the contract. (CONTINUED NEXT PAGE... Your proposal and this acceptance shall constitute and become part of the contract, subject to all conditions contained therein, as modified is Otange Order. Accepted ore j2 �� f 11 Approved by: Date City of Renton rartsportation Design Supervisor Date tsy: � i�L.� �� ✓ IC..F �tlrT > 0...+..7T— Atkinson Construction Acknowledged by: Surety Surety Seat (if Applicable) Page 1 of 2 Logged (City of Renton use only) r. . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . 12.3.2013 ..........................................._..............._......._. .................._...._......_ ...................... ......I........................ Atkinson Construction Strander Blvd., SW 271, St Extension Change Order No. 9 October 30, 2013 Reason for Change: Atkinson Construction to provide 400 LF of 6" RGS conduit which was originally to be provided by PSE for the utility trench south of abutment No. 3. PSE could not provide the material in time for the work to be completed, so Atkinson purchased the material from Platt Electric. Description: This change compensates Atkinson Construction for their purchase of the conduit from Platt Electric per invoice 3688130. Four hundred lineal feet of conduit at $3,018.1545 per hundred lineal foot, equals $12,072.62 plus 9.5% tax and proper force account material mark up for a total of $15,995.62 Add the Following New Items to Contract CAG 11 -133: New Bid Item SA -150 "RGS 6 inch Conduit' ' represents full compensation to Atkinson Con- struction for all costs both direct and indirect for all labor, equipment, and materials. This rep- resents full and final compensation for all work described in this change order. No further compensation will be allowed. New Item SA -151: RGS 6 inch Conduit By Lump Sum @ $15, 995. 62 ................ ............................... .....................$15,995.62 Total this Change Order ............................ ............................... .....................$15,995.62 Page 2 of 2 CA M 7* O N U 0 N r d CD z E O z � a E d D N M N U. Y O M p W v m viz =_ � =LL CL a L) M M I I A u O O O m r O J ap O pp CO CCU O CCU (O ~ z O C) O LL z O U O U N u 5 ~ m 3 'O a 00 1- 00 M EA CCU bq r N r 64 1H> N M� M CO ti O M m m J C � v Z Z Z Z Z Z Z Z Z C ~ z O C) O LL z O U O U O U co c '� O u 5 ~ m 3 'O a E � cv D E ' J m C U % D y c u) E C= C C U � U � E O ~ :3 c`c m � E v c >,» -0 U m M cnn o a n u L V Ll J J v O 3 V C � U C 3 N O 00 CA CD OMON to Cn >_ h O co C`M p O C` O Cfl LO LO It � r- NM0) OO — co CO CO y Q r M C70 0 a) Cn 't O CCU O 00 't N V) O'0 N d M Cl N N N r N— v N 3 O EA va Efi 64 69 c bH 69 64 (.9 t>3 N M� M CO ti O M m G v Z Z Z Z Z Z Z Z Z ~ z O C) O LL z O U O U O U co c '� O - N N N N N N -- a O O 6.. a 0 0 0 0 0 0 0 0 0 rn rn rn rn rn rn rn rn rn c c c c c c c c c L L L L L L L L L U U U U U U U U U 5 ~ m 3 'O a