Loading...
HomeMy WebLinkAboutCO 1 '� CITY OF RENTON �+' COMMUNITY SERVICES DEPARTMENT CONTRACT CHANGE ORDER#Ol (05/15/091 '� � � ����'- PROJECT: Coulon Park Bathhouse Sidewalk Replacement CONTRACT#: CAG-09-001 PW#: �(��, � ���v � CONTRACTOR: Coby Construction �1 ' ADDRESS: P.O.Box 8589 Covington,WA 98042 The following changes shall be made to the above referenced contract: Total of CO#Ol (Includes taz)Not to exceed 515,139.47 TIME EXTENSION: YES Q NO(X) �Davs be[ow are to nhvsical completion� Original contract work days: 180 Original substantial completion date: July 9,2009 Original physical date:July 9,2009 Contract work days added by prior C/O: 0 Revised substantial completion date due to prior C/O:N/A Revised physical completion date due to prior C/O:N/A Contract work days added by this C/O: 0 Revised substantial date due to this GO:N/A Total revised contract work days: 0 Revised physical completion date due to this C/O: 0 COST MODIFICATION:Fifteen Thousand One Hundred Thirty-nine dol(ars and Forty-seven cents$15,139.47(which includes State of Washington Sales Tax)added to the original construction contract amount: the sum of Forty-eight Thousand Eight Hundred Eighty-six Dollars and Fifly Cents ($48,886.50)(which incWdes State of Washington Sales Tax). All other conditions of the original contract are a part of this change order. The payments and/or additional time specified and agreed to in this change order include every claim by the contractor for any extra payment or extension of time with respect to the work described herein, including delays to the overall project. The work covered by this change order must be performed under the same terms and conditions as that included in the original contract. Approved by:f�j,�,�,� $'1 B-D°� Contractor�� Date Reason for Change: Owner Request(X) Unforeseen Q Other O Specify:Remove additional sections of damaged concrete adjacent to walks originally designated in the Scope of Work;to incorporate drinking fountain and telephone pads for a uniform appearance and;to install utility sleeves beneath the new sidewalks for future use. Amount includes thickened concrete to match existing where it occurs,re-bar for reinforcement of all sections,demolition,4-inch PVC conduit,concrete and other materials to match the original Scope of Work. STATEMENT: Show all deductive amounts in pazenthesis(-). Original contract with sales ta�c $48,886.50 Amouat this change(with sales tax) $ 15,139.47 New Contract Total(with Sales Tax): $64,025.97 Source of Funds: Contingency Q M&O(X) Supplemental( )-Ordinance# (Original approved Project budget for 2008&Carried Forward to 2009:$189,629.31 in CIP 316.000000.020.5940.0076.63.000000) AP'I"�OVED: � ,� � _._-. .� - � _-- � `'� s1�zolo� �ect Manager Da � Community Services Administrator Date N/A Architect/Engineer Date chgord.frm 8/30/04