Loading...
HomeMy WebLinkAboutAdden 2 CAG-17-066, Adden #2-18 • 'r� AMENDMENT NO. 2 TO AGREEMENT FOR THE DOWNTOWN UTILITY IMPROVEMENTS PROJECT, PHASE 1 CONCEPTUAL ANALYSIS AND DESIGN CAG-17-066 THIS AMENDMENT, dated February 1, 2017, is by and between the City of Renton (the "City"), a Washington municipal corporation, and Murraysmith, Inc. ("Consultant"j, an Oregon corporation. The City and the Consultant are referred ta�ollectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-17-066, dated April 3, 2017, to provide necessary services for the Downtown Utility Improvements project, Phase 1 Conceptual Analysis and Design (referred to herein as the "Agreement"); Whereas,the Parties wish to amend the Agreement to change the time of performance in order to allow for successful completion of the tasks identified in the original scope of work. NOW THEREFORE, It is mutually agreed upon that CAG-17-066 is amended as follows: i. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit B-1. All Work shall be performed by no later than April 30, 2018. 2. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT By: By: Gregg Zim r , P.E. Jeffrey . , P. . Public Wor s dministrator Principal Engineer � a �'�� 2��9 _�,,,,�.-� �Co,'Z��L�' Date Date Approved as to Legal Form ,��e %�� �Shane Moloney Renton City Attorney Contract Template Updated 12/29/2017 • � PAGE Z OF 2 murraysm�rth EXHIBIT B-1 TIME SCHEDUL.E OF COMPLETION {*Revised/Extended) City of Renton � Downtown Utility lmprovements Project Phase I: Conceptuat Analysis & Design PRELIMINARY ESTIMATED SCHEDULE MSA shail begin work immediately upon receipt of Notice to Proceed from the City and proceed according to the preliminary estimated schedule presented below. However,the schedule may change due to factors beyond MSA's control,such as additional time required for permitting, public outreach, etc. Preliminary Design Tasks Estimated�let�e�Start Notice to Proceed �e�y Apri12017 Task I - Project Management �e�-�April 2017- Task 2- Commanication/Coordination/Meetings �-3�Apri12017- Task 3- General Information Collection&Review �el�e�y--�4e�e�April 2017 Task 4- Water System Improvements �re�---3��e Apri12017- Task 5- Sewer System Evaluation �4a��—�4e}�April 2017- Task 6- Stormwater(Conveyance)System Evaluation �e�--A��Apri12017- Task 7- Survey Control and Data Coliection �4��--A4��June 201�- Task 8- Preliminary Geotechnical&Environmental Review �r�-�a�y June 2017- Task 9- Environmental Pemutting Assessment ��July 2017- Task 10- C�Itural Resources Review/Assessment ���June 2017- Task 11 - Coordination with Others �A�-�e June 2017- Task 12- Sewer System Improvements,Altematives Analysis ���e July 2017- Task 13 - Stormwater(Conveyance)System Improvements, ��July 201?- Alternatives Analysis Task 14- Downtown Utility Improvements Preferred ��November 2017- Alternatives,Conceptual(10%)Design Task 15- Phase I Documentation 3t�e�y November 201�- Task 16- Public Information and Outreach �-3��A�January 2018- Task 1'7- Phase t1(Pre-Design)Scope Development '..',• ",.�'n„January 2018- * All engineering services to be completed by Contract Completion Date:de��e�y-3�April 30,2018 City of Renton MURRAYSMITH,INC. Dow�ntown Utiliry Improvement Project January�2018 Conceptual Malysis&Design Page 1 murraysmlth 16-1883 January 10, 2018 Mr. Dave Christensen Wastewater Utility Enginee�ing Supervisor City of Renton 1055 South Grady Way Renton,WA 98057 Re:Time of Performance, Extension Request tOR: Down#own Utility tmprovements Project Phase 1 Conceptual Analysis& Design(CAG-17-066) Dear Mr. Christensen, Pursuant to that discussed during our recent phone conversation, i'd like to request an extension �egarding the 7ime of Perfarmance associated with the City of Renton Downtown Utility lmprovements Project,Phase 1 Conceptual Analysis&Design(CAG-17-066). More specifically, I'd like to request the completion date be revised from January 31,2018 to Apri130,2018. The reason for this request is to accommodate both a delayed notice to proceed as well as some p�ot�'acted efforts associated with the analyses. I've attached a revised/updated version of the original exhibit — Exhibit B-1 Time Schedule of Completion reflecting the desired time extension for your information and use. Again, we appreciate the opportunity to work with you and the City of Renton on this important project. If you have any questions or would like to discuss further, please let me know. Sincerely, MUR H Jeff Kreshel, PE Principa) Engineer JSK:jsk Enclosure: www.murraysmfth.us