HomeMy WebLinkAboutAdden 2 CAG-17-066, Adden #2-18
•
'r�
AMENDMENT NO. 2 TO AGREEMENT FOR THE DOWNTOWN
UTILITY IMPROVEMENTS PROJECT, PHASE 1 CONCEPTUAL
ANALYSIS AND DESIGN CAG-17-066
THIS AMENDMENT, dated February 1, 2017, is by and between the City of Renton (the "City"),
a Washington municipal corporation, and Murraysmith, Inc. ("Consultant"j, an Oregon
corporation. The City and the Consultant are referred ta�ollectively in this Amendment as the
"Parties." Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-17-066, dated
April 3, 2017, to provide necessary services for the Downtown Utility Improvements project,
Phase 1 Conceptual Analysis and Design (referred to herein as the "Agreement");
Whereas,the Parties wish to amend the Agreement to change the time of performance in order
to allow for successful completion of the tasks identified in the original scope of work.
NOW THEREFORE, It is mutually agreed upon that CAG-17-066 is amended as follows:
i. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit B-1. All Work shall be performed by no later than April
30, 2018.
2. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTANT
By: By:
Gregg Zim r , P.E. Jeffrey . , P. .
Public Wor s dministrator Principal Engineer
� a �'�� 2��9 _�,,,,�.-� �Co,'Z��L�'
Date Date
Approved as to Legal Form
,��e %��
�Shane Moloney
Renton City Attorney
Contract Template Updated 12/29/2017
•
�
PAGE Z OF 2
murraysm�rth
EXHIBIT B-1
TIME SCHEDUL.E OF COMPLETION
{*Revised/Extended)
City of Renton �
Downtown Utility lmprovements Project
Phase I: Conceptuat Analysis & Design
PRELIMINARY ESTIMATED SCHEDULE
MSA shail begin work immediately upon receipt of Notice to Proceed from the City and proceed
according to the preliminary estimated schedule presented below. However,the schedule may
change due to factors beyond MSA's control,such as additional time required for permitting,
public outreach, etc.
Preliminary Design Tasks Estimated�let�e�Start
Notice to Proceed �e�y Apri12017
Task I - Project Management �e�-�April 2017-
Task 2- Commanication/Coordination/Meetings �-3�Apri12017-
Task 3- General Information Collection&Review �el�e�y--�4e�e�April 2017
Task 4- Water System Improvements �re�---3��e Apri12017-
Task 5- Sewer System Evaluation �4a��—�4e}�April 2017-
Task 6- Stormwater(Conveyance)System Evaluation �e�--A��Apri12017-
Task 7- Survey Control and Data Coliection �4��--A4��June 201�-
Task 8- Preliminary Geotechnical&Environmental Review �r�-�a�y June 2017-
Task 9- Environmental Pemutting Assessment ��July 2017-
Task 10- C�Itural Resources Review/Assessment ���June 2017-
Task 11 - Coordination with Others �A�-�e June 2017-
Task 12- Sewer System Improvements,Altematives Analysis ���e July 2017-
Task 13 - Stormwater(Conveyance)System Improvements, ��July 201?-
Alternatives Analysis
Task 14- Downtown Utility Improvements Preferred ��November 2017-
Alternatives,Conceptual(10%)Design
Task 15- Phase I Documentation 3t�e�y November 201�-
Task 16- Public Information and Outreach �-3��A�January 2018-
Task 1'7- Phase t1(Pre-Design)Scope Development '..',• ",.�'n„January 2018-
* All engineering services to be completed by Contract Completion Date:de��e�y-3�April 30,2018
City of Renton MURRAYSMITH,INC. Dow�ntown Utiliry Improvement Project
January�2018 Conceptual Malysis&Design
Page 1
murraysmlth
16-1883
January 10, 2018
Mr. Dave Christensen
Wastewater Utility Enginee�ing Supervisor
City of Renton
1055 South Grady Way
Renton,WA 98057
Re:Time of Performance, Extension Request
tOR: Down#own Utility tmprovements Project
Phase 1 Conceptual Analysis& Design(CAG-17-066)
Dear Mr. Christensen,
Pursuant to that discussed during our recent phone conversation, i'd like to request an extension
�egarding the 7ime of Perfarmance associated with the City of Renton Downtown Utility
lmprovements Project,Phase 1 Conceptual Analysis&Design(CAG-17-066). More specifically, I'd
like to request the completion date be revised from January 31,2018 to Apri130,2018. The reason
for this request is to accommodate both a delayed notice to proceed as well as some p�ot�'acted
efforts associated with the analyses. I've attached a revised/updated version of the original exhibit
— Exhibit B-1 Time Schedule of Completion reflecting the desired time extension for your
information and use.
Again, we appreciate the opportunity to work with you and the City of Renton on this important
project. If you have any questions or would like to discuss further, please let me know.
Sincerely,
MUR H
Jeff Kreshel, PE
Principa) Engineer
JSK:jsk
Enclosure: