AMENDMENT NO. 2 TO AGREEMENT FOR BOARDING FLOAT
DESIGN, RENTON BOATHOUSE
THIS AMENDMENT, dated g , is by and between the City of Renton
(the "City"), a Washington municipal corporation, and PND Engineers, INC. ("Consultant"), a
Washington Corporation. The City and the Consultant are referred to collectively in this
Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as
of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-17-125, dated
June 14, 2017, to provide necessary services for the Boathouse Float Design (referred to herein
as the "Agreement");
Whereas,the Parties wish to amend the Agreement to change the scope of work,and change the L
compensation in order to add additional services..
NOW THEREFORE, It is mutually agreed upon that CAG-17-125 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-2, which is attached and incorporated herein.
2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit A-2. All Work shall be performed by no later than
September 1, 2018.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of !'
compensation payable to Consultant is increased from $ 45,698.08 to$ 65,644.34, plus
any applicable state and local sales taxes. The additional compensation shall be paid
based upon Work actual performed according to the rate(s) or amounts specified in
Exhibit A-2 ,which is attached and incorporated herein.
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTANT Mr
' /%ji B r",
Kelly Beym r / Jim Campbell
Administrator President
iglig z • 3 . 20 t g
Date Date
Approved as to Legal Form
Shane Moloney
Renton City Attorney
Contract Template Updated 12/29/2017
0
PAGE 2 OF 2
EXHIBIT A
Fil ® D
l;. ciINN.ltltti, INt:.
Engineering Services: February 2, 2018 PND No. 174053
Civil
Planning Robert Ebert,Capital Project Coordinator
sune,ying Facilities Division
Structural City of Renton
Permit ting 1055 South Grady Way
iydndttgy
Renton,WA 98057-3232
(;cotcchnical
Iinvironnxntal
hransportatitin Subject: Renton Rowing Club Float Replacement—Amendment#02
Marine Facilities Environmental Mitigation Modifications
Coastal lin}ineering
Contract Administration Dear Robert:
Construction I?ngr.Support
Offices: Additional services have been requested to address required modifications to the
Seattle environmental mitigation plan.Updates to the plan are required by the Washington
1736 Fourth Avenue s Department of Fish and Wildlife (WDFW) based on the updated float grating
Seattle,Washington 98134 configuration.The following is a description of the additional services requested:
Phone:206.624.1387
1. Mitigation Plan Addendum—Based on correspondence PND has held with the
Portland WDFW,the City will need to produce a Mitigation Plan Addendum that assesses
220 NW 8th Avenue all design impacts to the aquatic habitat. WDFW provided several additional
Portland,Oregon 97209 options for mitigation per correspondence provided to PND by the City. At the
Phone:503.915.9337 direction of the City, PND will work with a landscape architect (HBB) sub-
consultant to address the mitigation modifications necessary to satisfy the
Anchorage
requirements of WDFW. Modifications to the existing mitigation plan are
1506 West 36th Avenue
Anchorage,Alaska 99503 anticipated to include: an increased area of native plantings, debris removal,
Phone:907.561.1111 and/or the incorporation of fish mix into the shoreline armoring.
Juneau 2. Landscaping Construction Documents—Based on the approved Mitigation plan
9360 Glacier I Iwy,Suite 100 by WDFW,PND,with our sub-consultant HBB,will work to develop construction
Juneau,Alaska 99801 drawings suitable for a City approved Contractor to install the mitigation
Phone:907.586.2093 solution. Construction drawings will include necessary demolition plans,
planting plans and sections as well as specifications on the drawings.
I louston
10497 Town&Country Way
Suite 210 Deliverables:
Ilouston,Texas 77024 Design drawings will remain unchanged from the current scope. Modifications
Phone:832.930.4837 noted herein will not be reflected in the design drawings. All landscaping
construction drawings, including demolition,will be issued as a standalone package
"-w,".p°d°nlin`er,.`°m for completion by a small works contractor approved by the City. All additional
submittals below to be provided in 11x17 (PDF).
• Mitigation Plan Addendum to WDFW
• Landscaping Construction Drawings
February 2, 2018 I Page 2
is
Assumptions:
All assumptions as defined in the original scope of work will remain. Additional assumptions are noted
below and as outlined in the attached HBB scope of work.
• Existing soils in planting areas will need to be removed and replaced with suitable fill to support
sustained vegetative growth including removal of noxious weeds in the planting area only.
• Planted vegetation will not exceed approximately twelve (12) feet in height when mature so as to
not impact adjacent Boeing operations or other City requirements.
• Mitigation solutions will occur within the project vicinity.
• Plan&attend three(3)design meetings with City and WDFW staff in preparation of Mitigation Plan
and Construction Documents.
• Attend preconstruction meeting and one(1)site visit to verify substantial completion of the planting
work.Additional construction site visits are assumed to be completed by City staff with photos and
necessary documentation of progress provided to PND.
Schedule:
Following approval of this proposal by the City of Renton, PND agrees to perform the above-described
services and to diligently pursue the project and make every reasonable effort to finish all items in a timely
manner. The following is a proposed schedule for the landscaping effort of project. PND will refine this
schedule based on further discussion with the City.
General
Notice to Proceed Week of February 12, 2018
Permit Submittal to WDFW Week of March 05, 2018
90% Design Drawings Week of March 26, 2018
HPA Approval Week of May 07, 2018
100% Design Week of May 21, 2018
Construction NTP(2 weeks) Week of June 04, 2018
Final Completion &Closeout(approx. 2 weeks) Week of June 18,2018
Note: Planting construction may occur simultaneously with float replacement construction, later in 2018.
Fee:
The total compensation for the work on this project shall be adjusted with this amendment. Note that
work associated with this amendment will be completed on a time and expenses basis.
Amendment No.02-Engineering&Agency Coordination(Hourly, NTE) $8,155.00
Amendment No.02-Sub-Consultant(Hourly, NTE) $11,791.26
Amendment No.02 Total $19,946.26
We look forward to performing this work for the City. If there are any questions regarding this
Amendment proposal, please call anytime.
Sincerely,
PND Engineers, Inc. I Seattle Office
141 r
t
Jo 1 Ru 11P.E. Ji Camp be I, P.E.
Senior Engineer President
111 � ®
13
PROJECT TITLE. Renton Rowing Club float Replacement-Amendment 5102 02/02/18
('LI1NT('ity of Renton .
3
PIIASI/
1011 NUMBER 174051
LABOR:
;777-1 �77 x 7.17 A t. "mo i 5^y, ,r173747-7
4� r77.7:t11477-'.. : 17 „", ' "t ,r
Ylia � u �. } J srr � }) a,-, F+'(ia. 4 q�(" ytCl t}" '�,Task Item „ �.Nsni..d.., ;1 aa. is 3 ,kFa s; .49,-Atl'„re V 4 9.,D'A',44, ,.404".41A'il Total Labor
No Task(Scope of Services) 190 00 0 00 150 00 120 00 0 00 0 00 0 00 125 00 115 00 0 00 0 00 flours Cost
1 Mitigation Plan(Permitting)
Mitigation Plan Addendum I 2 4 7 $ 990
Agency Coordination/Meetings I 4 4 9 S 1.290
2 Engineering&Landscaping
Construction Documents 2 4 4 8 18 $ 2,380
City C'oordination/Meetings I 8 9 $ 1.390
Construction Support(Submittals.!Ms.Etc) 2 8 4 14 $ 2,060
Labor Subtotal 7 0 26 8 0 0 0 8 8 0 0 57 $ 8,110
TOTAL LABOR $ 8,110
EXPENSES:
Task Cost Expenses
No Item Quantity Trips Unit per Unit Markup Cost
I&2 Mileage 25 3 Mile 0 545 1 I $ 45 00
Per Diem 0 Day 135 000 I I $ -
Miscellaneous All Req'd I I $ -
Courier Service 0 Units 25.00 I $ -
Plotting/Printing 0 All 200 00 I 1 $ -
TOTAL EXPENSES S 45.00
SII BCONSULTA NTS:
Task Subcontract Subcon
No Amount Markup Cost
I HBB-Landscape Architecture HBB Task I&50%of Task 2 $ 4,387 43 1.I $ 4,826 17
2 HBB-Landscape Architecture HBB 50%of Task 2,Tasks 3&4&Expenses $ 6,331 90 I I $ 6,965 09
TOTAL SU BCONSIILTA NTS $ 10,71933 $ 11,791.26
Total-Labor $ 8,110 00
Total-Expenses $ 45.00
Total-Subconsultants $ 11,791 26
'1'O'1 A L- 5 19,946.26
Notes
I
2
3
4
HBB ,
LANDSCAPE ARCHITECTURE
Mr. John Rupp, P.E. 31 January 2018
Senior Engineer
PND Engineers, Inc.
1736 Fourth Avenue South, Suite A
Seattle, WA 98134
RE: Renton Rowing Center Float Replacement; City of Renton, Washington o
Dear Mr. Rupp. 0.
co
Hough Beck & Baird Inc. (HBB) is pleased to submit this proposal for landscape architectural C
services to support the mitigation requirements for the over water float replacement at the Renton o.
00
Rowing Center. Also, I wish to thank you for your time in reviewing the project with me and your
follow-up email with additional information. n
I understand that the existing dock and floats are being upgrading in order to continue to provide
rs
access and operability to the Renton Rowing Center. I understand that the mitigation planting
requirement to the east of the mouth of the Cedar River has increased in area in order to meet
current environmental regulations. In the upland landscape strip across from the row house,
0.7
existing vegetation consists of invasive species which may potentially require additional removal or n
control requirements. CD
The main goal for the landscape will be to coordinate with Washington Dept. of Fish and Wildlife, z
City of Renton, and Rowing Center regarding a planting strategy to meet mitigation requirements for o
the upland landscape strip and mitigation planting area. I envision that mitigation may involve all or o0
a combination of invasive and nonnative plant removal, replanting with shrubs for overhanging C
vegetation, interplanting with live stakes to out shade invasive plants, or other planting strategies
FT-
that maintain the stability of the shoreline while providing habitat function. D
CO
The design of an automatic irrigation system is not included. The contractor and/or City of Renton o
will need to provide hand water/water truck during the plant establishment period and potentially
throughout a monitoring period. Any in-water work below the Mean Higher High Water (MHHW) line
will be designed, stamped, and signed by others. o
0
N
SCOPE o
Based upon our knowledge of this project, background documents, and previous discussions with 1
you, the following professional services are proposed for your consideration. CD
N
O
T
TASK 1 PRELIMINARY INFORMATION GATHERING a,
1.1 Obtain background documents, any as-builts, base files, survey files, aerials, any
code and/or permit requirements or conditions, and confirm the criteria for upland T
landscape improvements. .
1.2 Prepare for and attend one (1) project kick-off meeting with the design team and City
of Renton staff to confirm design direction for the mitigation planting plan. The kick-
off meeting will include a visit and walk-through of the site with City staff and/or N
CD
design team members to evaluate existing upland, site conditions for potential
mitigation improvements. Access to fenced areas will be provided by the City for the 0
site visit. 3
Renton Rowing Center Float Replacement
31 January 2018
Page 2 of 3
TASK 2 90% SUBMITTAL (PERMIT SET)
2.1 Provide 90% landscape construction documents based on comments received from
City and permit review agency. Documents will include a 1) mitigation planting plan,
2) a plant schedule, 3) site preparation notes and details, and 4) planting notes and
details to illustrate the soil and site preparation and planting of the upland landscape
strip for use in permit applications. One (1) section graphic will be prepared as part of
the submittal to illustrate the cross section of mitigation planting for permitting review.
2.2 Review site demolition drawings prepared by PND; provide redline comments and
notes regarding potential removal or control of invasive weed species including
noxious weed-infested soils.
2.3 Prepare construction cost estimate for planting based on 90% submittal permit set.
2.4 Prepare for and attend up to three (3) meetings with design team, City of Renton,
and/or Washington Department of Fish &Wildlife. Provide written responses to
permit comments. Consolidation of written comments will be prepared by others.
2.5 Provide one (1) Quality Assurance/Quality Control review of internal draft deliverable
and one (1) interdisciplinary Quality Assurance/Quality Control review. Quality
Assurance/Quality Control reviews will be by a senior landscape architect not
involved in the project.
TASK 3 FINAL CONSTRUCTION-READY CONTRACT DOCUMENTS
3.1 Prepare final stamped and signed construction documents based on permit agency
review and City review comments. One (1) additional round of revision is included.
3.2 Revise revised and updated construction cost estimate based on the final
construction documents.
3.3 Provide one (1) Quality Assurance/Quality Control review of internal draft deliverable
and one (1) interdisciplinary Quality Assurance/Quality Control review. Quality
Assurance/Quality Control reviews will be by a senior landscape architect.
3.4 Prepare final documents for delivery to PND for final packaging.
TASK 4 CONSTRUCTION ADMINISTRATION SUPPORT SERVICES
4.1 Provide support to the design team and City staff in answering Requests-for-
Information, reviewing Submittals, and evaluating potential Change Orders,
regarding mitigation site preparation and planting. Communication will be via
teleconference, video conference (such as Go-to-Meeting), and/or email and limited
to six (6) hours total of HBB support time.
4.2 Provide one (1) field visit to provide a substantial completion punch list for design
team and City staff use.
EXPENSES
Travel expenses, reproduction, printing, and other project related costs (billed at 1.10).
Ara: ;
Renton Rowing Center Float Replacement
31 January 2018
Page 3 of 3
FEE SUMMARY
In consideration of the above services, we are proposing the following estimated fee (see Exhibit A)
that will be billed hourly and not to exceed the Total Cost of Services:
TASK 1. Preliminary Information Gathering $1,598.58
TASK 2. 90% Submittal (Permitting Set) $5,577.70
TASK 3. Final Construction-Ready Contract Documents $1,846.04
TASK 4. Construction Administration Support Services $1,447.01
Expenses $250.00
Total Cost of Services $10,719.33
Our proposed standard hourly rates for the work described above and for additional work (if
requested) are as shown in HBB's fee spreadsheet (see Exhibit A). The above fee is an estimate of
how HBB expects to allocate our time. HBB reserves the right to move time between tasks as
needed to accomplish the overall goals of the project.
ASSUMPTIONS
The above scope and fee is based on the following assumptions:
1. Separate specification documents will not be provided. Notes on drawings and details will be
provided.
2. A geotechnical report or other site data will provide existing soil information for the upland
areas including infiltration rates, drainage quality, and soil types.
3. HBB participation in or production of deliverables for public process or outreach to
stakeholders is available as additional services.
4. Development of color hand-rendered, watercolor illustrated, or photo-realistic presentation
graphics is available as additional services.
5. HBB involvement in Permitting phase for agency meetings or additional exhibits beyond those
described in the scope for these permits will be additional services.
6. Interpretive, wayfinding, and regulatory signs will be by others. HBB involvement in the design
of interpretive signs will be additional services.
7. Construction administration will be led by City staff.
We are prepared to negotiate any adjustments in design services and/or fees to meet the
requirements of the project. If you have any questions regarding the above proposal, feel free to
call.
Best regards,
HOUGH BECK& BAIRD INC.
Dean W. Koonts, ASLA
Principal
Attachments: Exhibit A. HBB Fee Spreadsheet
Y !s-Ham:
EXHIBIT A Renton Rowing Center Float Replacement 26 January 2018
HBB Fee Spreadsheet
HOUGH BECK&BAIRD INC. PRINCIPAL LA/PRJ.M'G DESIGN. CAD/TECH.
SCOPE OF WORK 191.78/hr 139.47/hr 83.15/hr - 71.08/hr TOTAL
TASK 1 PRELIMINARY INFORMATION GATHERING
1.1 Background Documents and Project Orientation 1 2 2 1
1.2 Project Kick-off Meeting&Site Visil 4 4 _
SUBTOTAL(HRS) 1 6 6 1 14
SUBTOTAL(1) $ 191.78 $ 836.82 $ 498.90 $ 71.08 $ 1,598.58
TASK 2 90%SUBMITTAL(PERMIT SET)
2.1 90%Contract Documents 0.5 2.5 9 21.5
2.2 Review&Comment Demolition Plans 0.5 2
2.3 Prepare Cost Estimate 0.5 3 0.5
2.4 Meetings with Permit,City,and/or Team(3) 2.5 10
2.5 Internal&Interdisc.QA/QC(2) 4.5 1 1
SUBTOTAL(HRS) 5 7 25 22 59
SUBTOTAL($) $ 958.90 $ 976.29 $ 2,078.75 $ 1,563.76 $ 5,577.70
TASK 3 FINAL CONSTRUTION-READY CONTRACT DOCUMENTS
3.1 Final Contract Documents(incl. 1 Revision) 1 3 5
3.3 Cost Estimate 0.5 3 0.5
3.4 Internal QA/QC(1) 2 1 1
3.5 Prepare Final Documents 0.5 1
SUBTOTAL(HRS) 2 3 7 6.5 18.5
SUBTOTAL(1) $ 383.56 $ 418.41 $ 582.05 $ 462.02 $ 1,846.04
TASK 4 CONSTRUTION ADMINISTRATION SUPPORT SERVICES
4.1 RFI,Submittal Review,Change Order review 0.5 5.5
4.2 Field Visit(Substantial Completion Punch-List) 0.5 3.5
SUBTOTAL(HRS) 1 9 0 0 10
SUBTOTAL($) $ 191.78 $ 1,255.23 $ - $ - $ 1,447.01
SUMMARY
TASK 1 PRELIMINARY INFORMATION GATHERING $ 1,598.58
TASK 2 90%SUBMITTAL(PERMIT SET) $ 5,577.70
TASK 3 FINAL CONSTRUTION-READY CONTRACT DOCUMENTS $ 1,846.04
TASK 4 CONSTRUTION ADMINISTRATION SUPPORT SERVICES $ 1,447.01
OUT-OF-POCKET EXPENSES $ 250.00
TOTAL HBB FEE $ 10,719.33
1 of 1 0:1MarketingtProposalslProposals118-006 Renton Rowing Center Float ReplacementIRenton Rowing Center Float Replacement-I-18B Fee 2018_0126.xlsx