Loading...
HomeMy WebLinkAboutAdden 2 CAG-17-125,Adden#2-18 lb CD AMENDMENT NO. 2 TO AGREEMENT FOR BOARDING FLOAT DESIGN, RENTON BOATHOUSE THIS AMENDMENT, dated g , is by and between the City of Renton (the "City"), a Washington municipal corporation, and PND Engineers, INC. ("Consultant"), a Washington Corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-17-125, dated June 14, 2017, to provide necessary services for the Boathouse Float Design (referred to herein as the "Agreement"); Whereas,the Parties wish to amend the Agreement to change the scope of work,and change the L compensation in order to add additional services.. NOW THEREFORE, It is mutually agreed upon that CAG-17-125 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-2, which is attached and incorporated herein. 2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit A-2. All Work shall be performed by no later than September 1, 2018. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of !' compensation payable to Consultant is increased from $ 45,698.08 to$ 65,644.34, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actual performed according to the rate(s) or amounts specified in Exhibit A-2 ,which is attached and incorporated herein. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT Mr ' /%ji B r", Kelly Beym r / Jim Campbell Administrator President iglig z • 3 . 20 t g Date Date Approved as to Legal Form Shane Moloney Renton City Attorney Contract Template Updated 12/29/2017 0 PAGE 2 OF 2 EXHIBIT A Fil ® D l;. ciINN.ltltti, INt:. Engineering Services: February 2, 2018 PND No. 174053 Civil Planning Robert Ebert,Capital Project Coordinator sune,ying Facilities Division Structural City of Renton Permit ting 1055 South Grady Way iydndttgy Renton,WA 98057-3232 (;cotcchnical Iinvironnxntal hransportatitin Subject: Renton Rowing Club Float Replacement—Amendment#02 Marine Facilities Environmental Mitigation Modifications Coastal lin}ineering Contract Administration Dear Robert: Construction I?ngr.Support Offices: Additional services have been requested to address required modifications to the Seattle environmental mitigation plan.Updates to the plan are required by the Washington 1736 Fourth Avenue s Department of Fish and Wildlife (WDFW) based on the updated float grating Seattle,Washington 98134 configuration.The following is a description of the additional services requested: Phone:206.624.1387 1. Mitigation Plan Addendum—Based on correspondence PND has held with the Portland WDFW,the City will need to produce a Mitigation Plan Addendum that assesses 220 NW 8th Avenue all design impacts to the aquatic habitat. WDFW provided several additional Portland,Oregon 97209 options for mitigation per correspondence provided to PND by the City. At the Phone:503.915.9337 direction of the City, PND will work with a landscape architect (HBB) sub- consultant to address the mitigation modifications necessary to satisfy the Anchorage requirements of WDFW. Modifications to the existing mitigation plan are 1506 West 36th Avenue Anchorage,Alaska 99503 anticipated to include: an increased area of native plantings, debris removal, Phone:907.561.1111 and/or the incorporation of fish mix into the shoreline armoring. Juneau 2. Landscaping Construction Documents—Based on the approved Mitigation plan 9360 Glacier I Iwy,Suite 100 by WDFW,PND,with our sub-consultant HBB,will work to develop construction Juneau,Alaska 99801 drawings suitable for a City approved Contractor to install the mitigation Phone:907.586.2093 solution. Construction drawings will include necessary demolition plans, planting plans and sections as well as specifications on the drawings. I louston 10497 Town&Country Way Suite 210 Deliverables: Ilouston,Texas 77024 Design drawings will remain unchanged from the current scope. Modifications Phone:832.930.4837 noted herein will not be reflected in the design drawings. All landscaping construction drawings, including demolition,will be issued as a standalone package "-w,".p°d°nlin`er,.`°m for completion by a small works contractor approved by the City. All additional submittals below to be provided in 11x17 (PDF). • Mitigation Plan Addendum to WDFW • Landscaping Construction Drawings February 2, 2018 I Page 2 is Assumptions: All assumptions as defined in the original scope of work will remain. Additional assumptions are noted below and as outlined in the attached HBB scope of work. • Existing soils in planting areas will need to be removed and replaced with suitable fill to support sustained vegetative growth including removal of noxious weeds in the planting area only. • Planted vegetation will not exceed approximately twelve (12) feet in height when mature so as to not impact adjacent Boeing operations or other City requirements. • Mitigation solutions will occur within the project vicinity. • Plan&attend three(3)design meetings with City and WDFW staff in preparation of Mitigation Plan and Construction Documents. • Attend preconstruction meeting and one(1)site visit to verify substantial completion of the planting work.Additional construction site visits are assumed to be completed by City staff with photos and necessary documentation of progress provided to PND. Schedule: Following approval of this proposal by the City of Renton, PND agrees to perform the above-described services and to diligently pursue the project and make every reasonable effort to finish all items in a timely manner. The following is a proposed schedule for the landscaping effort of project. PND will refine this schedule based on further discussion with the City. General Notice to Proceed Week of February 12, 2018 Permit Submittal to WDFW Week of March 05, 2018 90% Design Drawings Week of March 26, 2018 HPA Approval Week of May 07, 2018 100% Design Week of May 21, 2018 Construction NTP(2 weeks) Week of June 04, 2018 Final Completion &Closeout(approx. 2 weeks) Week of June 18,2018 Note: Planting construction may occur simultaneously with float replacement construction, later in 2018. Fee: The total compensation for the work on this project shall be adjusted with this amendment. Note that work associated with this amendment will be completed on a time and expenses basis. Amendment No.02-Engineering&Agency Coordination(Hourly, NTE) $8,155.00 Amendment No.02-Sub-Consultant(Hourly, NTE) $11,791.26 Amendment No.02 Total $19,946.26 We look forward to performing this work for the City. If there are any questions regarding this Amendment proposal, please call anytime. Sincerely, PND Engineers, Inc. I Seattle Office 141 r t Jo 1 Ru 11P.E. Ji Camp be I, P.E. Senior Engineer President 111 � ® 13 PROJECT TITLE. Renton Rowing Club float Replacement-Amendment 5102 02/02/18 ('LI1NT('ity of Renton . 3 PIIASI/ 1011 NUMBER 174051 LABOR: ;777-1 �77 x 7.17 A t. "mo i 5^y, ,r173747-7 4� r77.7:t11477-'.. : 17 „", ' "t ,r Ylia � u �. } J srr � }) a,-, F+'(ia. 4 q�(" ytCl t}" '�,Task Item „ �.Nsni..d.., ;1 aa. is 3 ,kFa s; .49,-Atl'„re V 4 9.,D'A',44, ,.404".41A'il Total Labor No Task(Scope of Services) 190 00 0 00 150 00 120 00 0 00 0 00 0 00 125 00 115 00 0 00 0 00 flours Cost 1 Mitigation Plan(Permitting) Mitigation Plan Addendum I 2 4 7 $ 990 Agency Coordination/Meetings I 4 4 9 S 1.290 2 Engineering&Landscaping Construction Documents 2 4 4 8 18 $ 2,380 City C'oordination/Meetings I 8 9 $ 1.390 Construction Support(Submittals.!Ms.Etc) 2 8 4 14 $ 2,060 Labor Subtotal 7 0 26 8 0 0 0 8 8 0 0 57 $ 8,110 TOTAL LABOR $ 8,110 EXPENSES: Task Cost Expenses No Item Quantity Trips Unit per Unit Markup Cost I&2 Mileage 25 3 Mile 0 545 1 I $ 45 00 Per Diem 0 Day 135 000 I I $ - Miscellaneous All Req'd I I $ - Courier Service 0 Units 25.00 I $ - Plotting/Printing 0 All 200 00 I 1 $ - TOTAL EXPENSES S 45.00 SII BCONSULTA NTS: Task Subcontract Subcon No Amount Markup Cost I HBB-Landscape Architecture HBB Task I&50%of Task 2 $ 4,387 43 1.I $ 4,826 17 2 HBB-Landscape Architecture HBB 50%of Task 2,Tasks 3&4&Expenses $ 6,331 90 I I $ 6,965 09 TOTAL SU BCONSIILTA NTS $ 10,71933 $ 11,791.26 Total-Labor $ 8,110 00 Total-Expenses $ 45.00 Total-Subconsultants $ 11,791 26 '1'O'1 A L- 5 19,946.26 Notes I 2 3 4 HBB , LANDSCAPE ARCHITECTURE Mr. John Rupp, P.E. 31 January 2018 Senior Engineer PND Engineers, Inc. 1736 Fourth Avenue South, Suite A Seattle, WA 98134 RE: Renton Rowing Center Float Replacement; City of Renton, Washington o Dear Mr. Rupp. 0. co Hough Beck & Baird Inc. (HBB) is pleased to submit this proposal for landscape architectural C services to support the mitigation requirements for the over water float replacement at the Renton o. 00 Rowing Center. Also, I wish to thank you for your time in reviewing the project with me and your follow-up email with additional information. n I understand that the existing dock and floats are being upgrading in order to continue to provide rs access and operability to the Renton Rowing Center. I understand that the mitigation planting requirement to the east of the mouth of the Cedar River has increased in area in order to meet current environmental regulations. In the upland landscape strip across from the row house, 0.7 existing vegetation consists of invasive species which may potentially require additional removal or n control requirements. CD The main goal for the landscape will be to coordinate with Washington Dept. of Fish and Wildlife, z City of Renton, and Rowing Center regarding a planting strategy to meet mitigation requirements for o the upland landscape strip and mitigation planting area. I envision that mitigation may involve all or o0 a combination of invasive and nonnative plant removal, replanting with shrubs for overhanging C vegetation, interplanting with live stakes to out shade invasive plants, or other planting strategies FT- that maintain the stability of the shoreline while providing habitat function. D CO The design of an automatic irrigation system is not included. The contractor and/or City of Renton o will need to provide hand water/water truck during the plant establishment period and potentially throughout a monitoring period. Any in-water work below the Mean Higher High Water (MHHW) line will be designed, stamped, and signed by others. o 0 N SCOPE o Based upon our knowledge of this project, background documents, and previous discussions with 1 you, the following professional services are proposed for your consideration. CD N O T TASK 1 PRELIMINARY INFORMATION GATHERING a, 1.1 Obtain background documents, any as-builts, base files, survey files, aerials, any code and/or permit requirements or conditions, and confirm the criteria for upland T landscape improvements. . 1.2 Prepare for and attend one (1) project kick-off meeting with the design team and City of Renton staff to confirm design direction for the mitigation planting plan. The kick- off meeting will include a visit and walk-through of the site with City staff and/or N CD design team members to evaluate existing upland, site conditions for potential mitigation improvements. Access to fenced areas will be provided by the City for the 0 site visit. 3 Renton Rowing Center Float Replacement 31 January 2018 Page 2 of 3 TASK 2 90% SUBMITTAL (PERMIT SET) 2.1 Provide 90% landscape construction documents based on comments received from City and permit review agency. Documents will include a 1) mitigation planting plan, 2) a plant schedule, 3) site preparation notes and details, and 4) planting notes and details to illustrate the soil and site preparation and planting of the upland landscape strip for use in permit applications. One (1) section graphic will be prepared as part of the submittal to illustrate the cross section of mitigation planting for permitting review. 2.2 Review site demolition drawings prepared by PND; provide redline comments and notes regarding potential removal or control of invasive weed species including noxious weed-infested soils. 2.3 Prepare construction cost estimate for planting based on 90% submittal permit set. 2.4 Prepare for and attend up to three (3) meetings with design team, City of Renton, and/or Washington Department of Fish &Wildlife. Provide written responses to permit comments. Consolidation of written comments will be prepared by others. 2.5 Provide one (1) Quality Assurance/Quality Control review of internal draft deliverable and one (1) interdisciplinary Quality Assurance/Quality Control review. Quality Assurance/Quality Control reviews will be by a senior landscape architect not involved in the project. TASK 3 FINAL CONSTRUCTION-READY CONTRACT DOCUMENTS 3.1 Prepare final stamped and signed construction documents based on permit agency review and City review comments. One (1) additional round of revision is included. 3.2 Revise revised and updated construction cost estimate based on the final construction documents. 3.3 Provide one (1) Quality Assurance/Quality Control review of internal draft deliverable and one (1) interdisciplinary Quality Assurance/Quality Control review. Quality Assurance/Quality Control reviews will be by a senior landscape architect. 3.4 Prepare final documents for delivery to PND for final packaging. TASK 4 CONSTRUCTION ADMINISTRATION SUPPORT SERVICES 4.1 Provide support to the design team and City staff in answering Requests-for- Information, reviewing Submittals, and evaluating potential Change Orders, regarding mitigation site preparation and planting. Communication will be via teleconference, video conference (such as Go-to-Meeting), and/or email and limited to six (6) hours total of HBB support time. 4.2 Provide one (1) field visit to provide a substantial completion punch list for design team and City staff use. EXPENSES Travel expenses, reproduction, printing, and other project related costs (billed at 1.10). Ara: ; Renton Rowing Center Float Replacement 31 January 2018 Page 3 of 3 FEE SUMMARY In consideration of the above services, we are proposing the following estimated fee (see Exhibit A) that will be billed hourly and not to exceed the Total Cost of Services: TASK 1. Preliminary Information Gathering $1,598.58 TASK 2. 90% Submittal (Permitting Set) $5,577.70 TASK 3. Final Construction-Ready Contract Documents $1,846.04 TASK 4. Construction Administration Support Services $1,447.01 Expenses $250.00 Total Cost of Services $10,719.33 Our proposed standard hourly rates for the work described above and for additional work (if requested) are as shown in HBB's fee spreadsheet (see Exhibit A). The above fee is an estimate of how HBB expects to allocate our time. HBB reserves the right to move time between tasks as needed to accomplish the overall goals of the project. ASSUMPTIONS The above scope and fee is based on the following assumptions: 1. Separate specification documents will not be provided. Notes on drawings and details will be provided. 2. A geotechnical report or other site data will provide existing soil information for the upland areas including infiltration rates, drainage quality, and soil types. 3. HBB participation in or production of deliverables for public process or outreach to stakeholders is available as additional services. 4. Development of color hand-rendered, watercolor illustrated, or photo-realistic presentation graphics is available as additional services. 5. HBB involvement in Permitting phase for agency meetings or additional exhibits beyond those described in the scope for these permits will be additional services. 6. Interpretive, wayfinding, and regulatory signs will be by others. HBB involvement in the design of interpretive signs will be additional services. 7. Construction administration will be led by City staff. We are prepared to negotiate any adjustments in design services and/or fees to meet the requirements of the project. If you have any questions regarding the above proposal, feel free to call. Best regards, HOUGH BECK& BAIRD INC. Dean W. Koonts, ASLA Principal Attachments: Exhibit A. HBB Fee Spreadsheet Y !s-Ham: EXHIBIT A Renton Rowing Center Float Replacement 26 January 2018 HBB Fee Spreadsheet HOUGH BECK&BAIRD INC. PRINCIPAL LA/PRJ.M'G DESIGN. CAD/TECH. SCOPE OF WORK 191.78/hr 139.47/hr 83.15/hr - 71.08/hr TOTAL TASK 1 PRELIMINARY INFORMATION GATHERING 1.1 Background Documents and Project Orientation 1 2 2 1 1.2 Project Kick-off Meeting&Site Visil 4 4 _ SUBTOTAL(HRS) 1 6 6 1 14 SUBTOTAL(1) $ 191.78 $ 836.82 $ 498.90 $ 71.08 $ 1,598.58 TASK 2 90%SUBMITTAL(PERMIT SET) 2.1 90%Contract Documents 0.5 2.5 9 21.5 2.2 Review&Comment Demolition Plans 0.5 2 2.3 Prepare Cost Estimate 0.5 3 0.5 2.4 Meetings with Permit,City,and/or Team(3) 2.5 10 2.5 Internal&Interdisc.QA/QC(2) 4.5 1 1 SUBTOTAL(HRS) 5 7 25 22 59 SUBTOTAL($) $ 958.90 $ 976.29 $ 2,078.75 $ 1,563.76 $ 5,577.70 TASK 3 FINAL CONSTRUTION-READY CONTRACT DOCUMENTS 3.1 Final Contract Documents(incl. 1 Revision) 1 3 5 3.3 Cost Estimate 0.5 3 0.5 3.4 Internal QA/QC(1) 2 1 1 3.5 Prepare Final Documents 0.5 1 SUBTOTAL(HRS) 2 3 7 6.5 18.5 SUBTOTAL(1) $ 383.56 $ 418.41 $ 582.05 $ 462.02 $ 1,846.04 TASK 4 CONSTRUTION ADMINISTRATION SUPPORT SERVICES 4.1 RFI,Submittal Review,Change Order review 0.5 5.5 4.2 Field Visit(Substantial Completion Punch-List) 0.5 3.5 SUBTOTAL(HRS) 1 9 0 0 10 SUBTOTAL($) $ 191.78 $ 1,255.23 $ - $ - $ 1,447.01 SUMMARY TASK 1 PRELIMINARY INFORMATION GATHERING $ 1,598.58 TASK 2 90%SUBMITTAL(PERMIT SET) $ 5,577.70 TASK 3 FINAL CONSTRUTION-READY CONTRACT DOCUMENTS $ 1,846.04 TASK 4 CONSTRUTION ADMINISTRATION SUPPORT SERVICES $ 1,447.01 OUT-OF-POCKET EXPENSES $ 250.00 TOTAL HBB FEE $ 10,719.33 1 of 1 0:1MarketingtProposalslProposals118-006 Renton Rowing Center Float ReplacementIRenton Rowing Center Float Replacement-I-18B Fee 2018_0126.xlsx "s I