Loading...
HomeMy WebLinkAboutAdden 2 CHANGE ORDERe ,,m SAG-02-148 Adden #2-03 OWNER City of Renton CITY OF RENTON CONTRACTOR Mr.Irrigation Project Name Highlands Park Irrigation Project Address 800 Edmonds Ave.NE Renton,WA 98056 Date 3-Feb-03 Change order No.: 2 Contractor Name: Mr.Irrigation &Address 3620 54th Ave. E City CAG No.: CAG-02-148 Fife,WA 98424 Contract For: 316.000000.020.5940.0076.63.000001 The Contract is hereby amended as follows: 1)Replace one(1)rotor head(not identified on original irrigation plan) (see total below) near northeast corner of parking lot. 2)Add rotor head and piping for an additional head(located between (see total below) heads identified on the head layout plan between heads#146,#149 and#150 at north end of playing field. 3)Add one(1)two-inch(2")ball Isolation valve at north point of connection. (see total below) 4)Add one(1)three-inch(3")ball isolation valve to machine near head#161. (see total below) 5)Upgrade seven(7)ball isolation valve access sleeves and access boxes (see total below) from six-inch(6")diameter sleeves with ten-inch(10")round boxes to twelve-inch(12")diameter sleeves with twelve-inch(12")standard valve boxes. Subtotal Add $755.05 Washington State Sales Tax at 8.8% $66.44 TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER........................... Add $821.49 The change order shall include all Contractor(s) labor, material,overhead, profit, and all direct and/or indirect costs allocated with the Change in Scope of Work. Excluding Bond Premiums. This Change Order is not valid unless signed by the Owner and Contractor The original Contract Sum was ..................................................................................... $58,580.80 Net Change by previously authorized Change Order(s)was ............................................. $9,204.48 The Contract Sum prior to this Change Order was........................................................... $67,785.28 The Contract Sum will be revised by this Change Order in the amount of .......................... $821.49 The new Contract Sum incorporating this Change Order will be........................................ $68,606.77 The Contract Time will be changed by .......................................................................... 51 days The Substantial Completion Date including this Change Order is ...................................... February 7,2003 NOTE:The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by Construction Change Directive or Field Directive forms. OWNER CONTRACTOR City of Renton Mr.Irrigation Community Services Dept. 3620 54th Ave. E 1055 South Grady way !" Fife,WA 98424 �.Y,..-eni,on'.Wishingrt9a-1?8055 ` Date r Date 2003-020aa *E011und I n T E S I N C Landscape Architecture January 27,2003 Request for Proposal i j IRRIGATION MODIFICATIONS Highlands Park Irrigation Project Mr.Irrigation and the City of Renton, Contract dated October 29,2002 The following RFP originated by Edlund Associates, inc. landscape architect on behalf of the City of Renton. Please state the amounts to accomplish changes to the original scope of work. Installation shall i conform to details and specifications contained in the Base Contract Documents. COP#3: (a)Replace(1)rotor head(not identified on original irrigation plan)near northeast corner of parking lot. (b)Add rotor head and piping for an additional head(located between heads identified on the head layout plan between heads #146,#149 and#150at north end of play field). i (c)Add (1)2""ball isolation valve at north point of connection. (d)Add(1)3" ball isolation valve to mainline near head#161. (e) Upgrade(7) ball isolation valve access sleeves and access boxes from 6"diameter sleeves With 10"round boxes to 12"diameter sleeves with 12"standard valve boxes. The Contract Sum (including WSST)will be(increased)(decreased)(unchan ed) y COP#1 by the amount of: COP#3 will(increase)(decrease)(not change)the Contract Time by_�days. The Contractor, Mr. Irrigation agrees to provide the services described above for the specified amounts, and times subject to written Change Order Authorization by the Owner,the City of Renton. I Signed Mr. Irrigation by: S i Dated jo.17,—O j --=- J 15005 SE 171"P.O.Box 58099,Renton,WA 98058(425)-255-5726 o(425)-255-4270 f edlund @foxintemet.net U-5 e ��