Loading...
HomeMy WebLinkAboutAdden 9 Aft Washlngtoln stab AGENCY` CAG-00-045 , Adden #9-14 IN Washington of Trans Local Agentay"Agreement Supplement Agency City of Renton Supplement Number Federal Aid Project Number Agreement Number 8 STPUL-STPD-FMSIB-1276(004) LA 5541 CFDA No. 20.205 The Local Agency desires to supplement the agreement entered into and executed on 05/07/2003 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name SW 27th St/Strander Blvd.Connection Length 0.6 miles Termini West Valley Highway to Oakesdale Ave SW Description of Work No Change Revision to supplement 7 Q� Reason for Supplement P'F-$ ae(efej PC/ 9-0.7w..4 Does this change require additional Right of Way or Easements? ❑ Yes E No Estimate of Funding Type of Work (1) (2) (3) (4) (5) PREVIOUS AGREEMENT/ SUPPLEMENT ESTIMATED TOTAL ESTIMATED ESTIMATED SUPPLEMENT PROJECT FUNDS AGENCY FUNDS FEDERAL FUNDS P.E. a. Agency: $19,000 $19,000 $1,350 $17,650 % b. Other-Consultant $958,851 $958,851 $129,445 $829,406 Federal Aid c. Other_Consultant $846,446 $846,446 $846,446 c1. FMSIB $700,000 $700,000 $700,000 0.00 c2. Other Non-Participation $857,591 $857,591 $857,591 0.00 d State $10,000 $10,000 $675 $9,325 e Total PE Cost Est.(a thru e) $3,391,888 $0 $3,391,888 $1,689,061 $1,702,827 Right of Way f Agency % g Other-Non-Participation $562,221 $562,221 $562,221 0.00 Federal Aid h Other Participation i State Ratio for Rw j Total R/W Cost Est.(f thru j) $562,221 $0 $562,221 $562,221 $0 Construction k Contract $5,317,919 $5,317,919 $717,919 $4,600,000 k1. Contract $1,385,173 $950,000 $2,335,173 $315,248 $2,019,925 I. Other-Non Participation $930,301 $930,301 $930,301 m. Other-Consultant $1,400,000 41,050,000 $350,000 $47,250 $302,750 n. FMSIB-Contract $1,795,000 $165,915 $1,960,915 $1,960,915 n1. Consultant(FMSIB) $1,400,000 -$165,915 $1,234,085 $1,234,085 n2. Agency(FMSIB) $100,000 $100,000 $100,000 % n3. State(FMSIB) $5,000 $5,000 $5,000 Federal Aid o Agency $100,000 $50,000 $150,000 $20,250 $129,750 Participation p State $5,000 $50,000 $55,000 $7,425 $47,575 Ratio for CN q Total Const.Cost Est.(k thru p) $12,438,393 $0 $12,438,393 $5,338,393 $7,100,000 r.Total Project Cost Estimate(e+j+q) $16,392,502 $0 $16,392,502 $7,589,675 $8,802,827 The local agency further stipulates that pursuant to said Title 23,regulations and policies and procedures,and as a condition to payment of the Federal funds obligated,it accepts and will comply with the applicable provisions. AGENCY OFFICIAL Washington Stat partment of ransportation By g-�A By Title Denis a w, Ma o r Director of Highways aid Local Programs ATTEST: t ! fl Date Executed FEB 2 8 2014 Jason A. e Deputy City Clerk