Loading...
HomeMy WebLinkAboutCO 30CHANGE ORDER Ower Architect COR Form {This form is to be executed in Iriaiicate and each party is to retain an original.) y Cantrado- Project Name: RENTON SENIOR HOUSING Change OntPr Na.: Cha December d, , �C92 ThiAy (30) Project Address: 3151 NE %th Street Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Project IJc.: COR Project No.: 9007 CAG 095-91 r3 Address 1002 - 10th Street Snohomish, Washinglen 98290 Contract For. General Construction Contract Data" October 31, 1991 The Contract is hereby amended as follows: Per Kirtley-Cole Modification proposal #73R, 11!24/92 (copy attached): Add $250.24 `Additional clearing ref. tree remov,-1 and catch basin relocatlun.` Per COR Proposal Request #58R, 10121/92 and Kirtley-Cote Modirication. Proposal No. 110, 11/4102 (copies allached): "Delete (14) 1" Cat. Marshall Ash Add $499.55 Trees: add (10) 1.5" Prunus Padus (Mayday) trees." Per Kirtloy-Cole Modification Proposal #114, 11r24/92 (copy attached): Add $1,382.43 "Add (4) Tire alarm zones for now valves per Fire Marshal.' TOTAL CONSTRUCTION COST IMPACT OP THIS CHANGE c;RDER:.................... overhead, profit, i. -d all diad and/or indirect costs associated ......Add $2,132.22 The Change Order shall include all Contrador(s) labor, material with the Change in Scope of Work. This Change Order is not valid unless signed by the Owner, Architect, and Contractor. . #4,620,785.00 The Original Contract Sum was ... ............. .................. .......... ........... .........,........,.......................,........................ 663,808.03 Nei Change by previously authorized Chang^ Order(-,) was ............... .... .... ............................5,284.573.03 The Contract Sum prior to this Change Order was ....... ............. .... .............................................. ..... ............. 2,132,27. The Contract Sum will be revised by this. Change Order in the amount of ............................................ .................... ...............•................................................ 5,288,705.25 The new Contract Sum incorporating this Change Order will ............ SEE ' BELOW.............. . + 1 day The Contract Time Oil be changed by ............. . Janurry 27. 1993 The ,vubstantial Completion Date including ttii-- Change Order is . see e.e-............Order......s ..ff...12,...18 8 19 for TB.....T............ ( Change D items.) NOTE: The above summary does not include any changes in the Contract Sum or Contract Time wNch have been applroved by ORB Form 301 - Construdion Change Direciive or Owner's Field Directives. 8 R DEPT THE ORB ORGANIZATION, INC. 607 SW Grady Way, Suite 210 Renton,. Washington 98055 , AIA KIRTLEY-COLE ASSOCIATES 1002 - i01h Street Snohomish, Washington 98290 71Gordan Cole CITY OF RENTON, r- 200 Mill Avenue South Renton, Washington 98055 Vincent Lee ✓ ..n _/S /2/ Z Date Dale ate •,1�OTE: Acceptance of the additional days on this Change Order is conditional pending receipt of K.C.'s critical path method schedule review. —4E �I m Qaj 52 MODIFICATION PROPOSAL NO. 73 RE'V'ISED KIRTiEY COLE • Project'. RENfON SENIOR HOUSING - Jas 1315 ASSOCIATES, INC t♦i1� m Dom: November 24, 1992 eonttractms p.o. box 1179 To: THE ORB ORGANIZATION, INC. 1002 - 10th srrohoea4ah wash. "M Initiated by: (M 569.3175 Modification Proposal: Additional clearing performed not in original scope of work: A.L. Reicon, Inc. WSST on equipment ($83.79 X 8.2%) Subtotal Overhead tit Profit 0 15% .. . • .. • • ... . Bonding a 2% ... ... ... ............ Total...... I ............ ............ Rrason for Mod'if'ication: Coat: Additional: 3254.24 Credits: S-0- Net: Chance in Calendar Days: -0- Approved Reject Recamtnendatlon: for C.O. Architect General Contractor Owner, ModiiPaation Praposal InrorpomW Into C1wWe Order Number. Attachments: A. L. Reicon. Inc. - ALR 01135.13 No action wiU be taken mprding thu ircm until wr receivc written a,xho-ization directing us to do so. AU contract work wdl proceed on its normA schoduk. PROPOSAL NO, 11YUMLiSJ 206.46 6.87 3213.33 532.00 54.91 S250.24 0 M II 1 A. 1,, Ill:irurl, IT I;t)ICI'iy1t1171:(J Munroc, Wnsh. 9827E z O 0 m =i *fi rn m 0 m 0 �z oO WF �N 0 T N z O 0 m Modification Proposal lt>Icorporated Into Change Ordr Nu nber: 30. ,tttachtneltt,q: Olympic Underg=round - proposal dated 10129192 No action will be taken regarding this iters until Yn receive written authorization directing us to do so. All contract work will proceod on iU normal schedule. PROPOSAL NO. 9�J il.ems - MODIFICATION PROPOSAL NO. 110 KIRTLEY COLE • Project: RENTON SENIOR HOUSING -106 +x315 ASSOCIATES, INC genera Date: November 4, 1992 contractors p.o. box 1179 To: THE ORB ORGANIZATION, INC. 1002 - loth snobomuh wash. 98290 Initiated by: Architect (206) 568-3175 Modification Proposal: Delete (14) Cal. Marshall Ash trees, add (10) 1,5" Prunus Padus (Mayday trees): z 0 -j 0 M -945.00 1.339.75 N 2 WSSP on materials (5379.50 X 8.2%) 31.1 2 vrn M 0 0C Subtotal ... ................ ..... - $425,87 rn M D Overhead & Profit 0 15%................................ $63.88 � z 59.80 d 5i Bonding a 296 .. .. . ................. Total ... ................ ... $499.55 � O 'n 091 Reason for Modification: as per PROPOSAL REQUEST a58 REVISED Cost: Additional: 549n.55 Credits: S-0- Net: 5499.55 Change In Calendar Days: -0- Approved Reject Recommendation: far C.O. Architect t" General Contractor qyM Owner m Modification Proposal lt>Icorporated Into Change Ordr Nu nber: 30. ,tttachtneltt,q: Olympic Underg=round - proposal dated 10129192 No action will be taken regarding this iters until Yn receive written authorization directing us to do so. All contract work will proceod on iU normal schedule. PROPOSAL NO. 9�J il.ems - l S'K'I --- RAY �'1 GOR©Y 0040 ESTIMATOR Per 4 / ARCHITECT -- SUPERINTENDENT rte' ACCOUNTING DEBBIE v DIANE 'rr .D_ - COMMENTS 1 J L�k- OLYWIC I.JNDERGROLTmD & LANDSCAPE NN., INC. 176i6 15TH AV. S.E. SUITE 103-8, O THELL, WA. 98012 pHs (206) 481-8016 / 1=AX` (206) 481-6202 FAX BID COVER SHEET I ' , DATE I�r2?'9c a � ; PRO-lEG'I' hSH 1 TOR E-,, COMPAH7 NAME Kn"njLri-COLE PHONE;— FAX $ 277-y591 3NOCQ 5+5&7919 XOFE OF WORK i ^;ErmoNS BID FRop REQ'ST*58 RE7'ISED !AYD CAPE DEDUCTS- 14 1,I ` CAL. MARSHALL� 9 $67. 0 F & I EA. LE SS WSSI' F _ R :A TIL OF L-AmsCAPE ADDS 10 1 1.5' PRUIgUS PADUS tl $133.97 F & I FA_ LES59ro"SI'ON HATFORATTLGF 44 , ?�-2-VEA. $1,339.75 MI SC. -H Fri GREG AND DEB BM-sORRY I CAN'T BE MORE EyJiUA-,rM HUT I'M A13 0jj'2 47EEKS 0ERM ON MT WHOLE LEMI11111111111 QUES ol4 r r : r i '� T7iII►I GALL ME MD Mp +WA.� iiNG EMYONEi' S M4E I I I1 NUMBER OF FAAE3 HQNt3 SENTTNN REPLY NET�L'DY RE'1-Y REOUES i'FD EM MATOR ROBTREED a.:)I,t A10 WET Z6, 6Z Tao I '.a z 0 m vm mQ -40 0" c �T. 0�CJ i 0 'n mm W CEn K N Z-4 in z 0 r� m r