Loading...
HomeMy WebLinkAboutLUA-07-020_MiscTRAFFIC IMPACT ANALYSIS FOR YOUNKER NISSAN (REVISED) March,2007 Prepared by GARRY STRUTHERS ASSOCIATES, INC. 3150 Richards Road. Suite 100 Bellevue. W A 98005 (425) 519-0300 LV A 01 -Ci7I 0 g4j cJerK, REcoeYvED APR 0 6 2iJ!17 BU/W/NGO/VISION , Traffic Impact Analysis Younker Nissan TABLE OF CONTENTS EXECUTIVE SUMMARy ............................................................................... .i CONCLUSIONS ..................................................................................... .i INTRODUCTION .......................................................................................... 1 PROJECT DESCRIPTION ......................................................................... 1 EXISTING CONDITIONS ............................................................................................. 1 Existing facilities .................................................................................... I Roadways ............................................................................................. 1 Transit. ...................................................................................................... 5 Non-motorized Facilities ........................................................................... 5 Traffic Volumes ...................................................................................... 6 Level of Service ...................................................................................... 8 Traffic Safety ........................................................................................ 9 Planned and Programmed Improvements ........................................................ 9 FUTURE CONDITIONS WITHOUT PROJECT .................................................. .10 Background Traffic Volumes ........................................................................... 1 0 Level of Service ..................................................................................... 10 FUTURE CONDITIONS WITH PROJECT .................................................... 12 Traffic Volumes ..................................................................................... 12 Project Trip Generation ............................................................................ 12 Trip Distribution/Traffic Assignment. ........................................................... 12 Level of Service ..................................................................................... 12 OTHER ISSUES .................................................................................... 15 CONCLUSIONS ......................................................................................... 15 RECOMMENDATIONS ........... . . ....................................................... 15 Traffic Impact Analysis Younker Nissan APPENDICES Traffic Count Data ..................................................................... Appendix A Capacity Analysis ....................................................................... Appendix B -Capacity Analysis Existing Conditions -Capacity Analysis Future Conditions without Project -Capacity Analysis Future Conditions with Project Trip Generation ......................................................................... Appendix C LIST OF FIGURES Page Figure 1 Future Younker Nissan Location ..................................................... 2 Figure 2 Project Vicinity Map ........................................................................................ .3 Figure 3 Preliminary Site Plan ............ _ .. _____ .................................................. .4 Figure 4 Transit Service Routes in the Vicinity of Younker Nissan ......................... 5 Figure 5 2004 Traffic Volumes ................................................................... 6 Figure 6 Existing Traffic Volumes ............................................................... 7 Figure 7 Future Traffic Volumes without Project ............................................. 11 Figure 8 Project Traffic Assignment. ...... _ .................................................... 13 Figure 9 Future Traffic Volumes with Project. ............................................... 14 LIST OF TABLES Page Table 1 Level of Service Criteria ............................................................. 8 Table 2 Existing PM Peak-Hour Level of Service .......................................... 9 Table 3 Three Year Accident History Data ................................................... 9 Table 4 2007 PM Peak-Hour Level of Service without Project. ......................... l 0 Table 5 Project Trip Generation .............................................................. 12· Table 6 2007 PM Peak-Hour Level of Service with Project.. ............................ 15 EXECUTIVE SUMMARY The purpose of this analysis is to evaluate the traffic impacts of commercial development proposed to be constructed on the comer of East Valley Road and SW 34th Street in Renton. The current site plan calls for the development of a Younker Nissan car sales, automobile part sales and car servicing. Younker Nissan is currently located on the east side of East Valley Road, south of new proposed site. This study was prepared in order to evaluate the traffic impacts of the project and to address access needs for the proposed development. The proposed development plan consists of a 29,458 square feet facility, which will include new car sales, used car sales, automobile part sales and car servicing. Access for the Younker Nissan Site is provided by three driveways, two on East Valley Road and one on SW 34th Street. The capacity analyses were conducted for the existing traffic volumes and total projected traffic volumes at the completion of Younker Nissan project. The results of these analyses indicate that the intersection within the study area will operate at a good level of service and will satisfy standard requirements. This study was prepared in accordance with City of Renton Policy Guidelines For Traffic Impact Analysis For New Development in order to evaluate the traffic impacts of the project and to address access needs for the proposed development. CONCLUSIONS The proposed Younker Nissan site will not create any significant adverse conditions on the surrounding transportation network. The new site will generate approximately 982 daily, 69 AM peak and 80 PM peak hour new vehicle trips to the transportation network. The new site will replace the existing Younker Nissan site. Since the existing Younker Nissan site generates approximately 508 daily, 50 AM peak and 56 PM peak hour trips, the net impact of the new site will be approximately 474 daily, 19 AM peak and 24 PM peak hour trips. The existing intersections will operate at an acceptable level of service (D, C and C) in the 2007 PM peak hour with project volume scenario. The intersections of exiting streets and proposed site access driveways will operate at B, B and A level of service in the 2007 PM peak hour. The accident rates at intersections in the vicinity of Younker Nissan location are below the statewide Average Accident Rate for similar intersections. Based on the analysis presented in this study, no off site roadway improvements will be needed to mitigate the traffic impacts of this project. Trame Impact Analysis Younker Nissan INTRODUCTION The following report was prepared to address the traffic impact analysis guidelines of the City of Renton for the proposed Younker Nissan facilities located between East Valley Road and SW 34th Street in the southwest area of the City of Renton. The future location of Younker Nissan is shown in Figure I; a vicinity map is presented in Figure 2. The City of Renton Policy Guidelines for Traffic bnpact Analysis for New Development requires a traffic analysis of the project when estimated vehicular traffic generated from proposed development exceeds 20 vehicles per hour in either the AM (6:00 -9:00) or PM (3 :00 -6:00) peak periods. The proposed Younker Nissan facility is estimated to generate 24 new PM peak hour trips. This report summarizes the process, findings, conclusions and recommendations of the traffic analysis. PROJECT DESCRIPTION The proposed location of Younker Nissan is currently 4.51 acres of undeveloped property. The new facility will have a 29,458 SF. The new location is expected to be fully occupied by the end of 2007 which, for the purposes of this analysis, is assumed to be the horizon year. The proposed site plan indicates three access points to the existing streets with all project trips generated by Younker Nissan accesses East Valley Road and SW 34th Street. A preliminary site plan is presented in Figure 3. EXISTING CONDITIONS The Existing Conditions analysis provides a statement of the traffic-related conditions within the study area at the time of the writing of this report. The statement includes a discussion of the existing Younkers Nissan, existing roadway, transit, pedestrian and bicycle facilities serving the site; identification of existing peak hour traffic volumes and accident history at the analysis intersections; and identification of proposed transportation improvements in this area. Existing Facilities The existing Younkers Nissan site is located on the eastside E. Valley Road and south of SW 41 st Street. The existing facility is 15,249 SF. The trip generation of this facility is 508 daily trips, 52 AM peak hour and 56 PM peak hour trips. Roadways The roadways directly impacted by the proposed development include East Valley Road and SW 34 th Street. The roadways indirectly impacted by the proposed development include SW 41 st Street and Lind Avenue SW. These roadways are discussed in the following sections. 1 Traffic Impact Analysis Younker Nissan East Valley Road East Valley Road is a collector arterial rulll1ing north-south from SW 16th Street to SW 43 rd Street. In the vicinity of Younker Nissan, East Valley Road has three lanes with one lane in each direction and a center two-way left tum lane, which converts into a designated left tum lane at the major intersections. There is a five-foot sidewalk on the west side of the road extending from SW 43 ni St north through the limits ofthis site. The pavement is in fair condition. Traffic control along the East Valley Road includes a traffic signal at the intersection of East Valley Road and SW 41 st Street/On-OffSR 167 Ramps and has stop sign control on the west side of the intersection of East Valley Road and SW 34th Street. The posted speed limit on the adjacent streets is 35mph. Figure I Future Younker Nissan Location SW 34th Street SW 34th Street is collector arterial running east-west from Oakesdale Avenue SW to East Valley Road. In the vicinity of proposed Younker Nissan site SW 34th Street is a four- lane roadway. At the intersection with East Valley Road one lane converts to an exclusive left turn lane. Traffic control along this street includes stop signs at intersection with East Valley Road and intersection with Lind Ave SW. 2 Trafflc Impact Analysis Figure 2. Vicinity Map 1 • : t 1 , 1 • l t t1 SW 41" Street ~ 34th St Sw 39th St SW415tst YOUNKER NISSAN Younker Nissan S'15~: ,f ,-S17"'· S 18t1i St S'1911rSt SJ6thst Smn$t , .. , j .... &. ... SW 41 st Street is a collector arterial running east-west from Oakesdale Avenue SW to East Valley Road. In the vicinity of the proposed Younker Nissan site S W 41 st Street has five lanes with two lanes in each direction and a center two-way left tum lane, which converts into a designated left-turn lane at the major intersections. There is a five-foot wide sidewalk on the south side of the road with a five-foot landscaping median separating the sidewalk from the roadway. The posted speed limit is 35 mph. Lind Avenue SW Lind Avenue SW is a minor arterial running north-south from SW 7th Street to SW 43 ffi Street. In the vicinity of the proposed Younker Nissan site, Lind Avenue SW has five lanes with two lanes in each direction and a center two-way left turn-lane, which converts into a designated left-turn lane at major intersections. There is a five-foot wide sidewalk on the east side of the street separated from traffic by a five-foot wide median. 3 Traffic Impact Analysis ==r ====F===F=~'~ EAST V ALLEY ROAD SITE PLAN FIGURE Younker Nissan L I I Ii \\ , -........... _- NOT TO SCALE YOUNKER NISSAN 4 Traffic Impact Analvsis Younker Nissan Transit King County Metro provides transit service to within approximately Y, mile of the proposed site. Three routes (IS3, 161 and 247) provide transit service along Lind Avenue SW. King County Metro route # 155 travels east-west on-SW 43'd Street and Carr Road. Transit service routes in the vicinity of Younker Nissan are presented in Figure 4. Figure 4. Transit service routes in the vicinity of Younker Nissan in Renton Route 163 was recently discontinued. Segments of this route were incorporated into the new Route 161, which provides five morning runs northbound during the AM peak and five evening runs southbound during the PM peak. Route 161 serves North Meridian Park, Glencarin, East Hill, Tukwila Sounder Station, Tukwila Park and Ride and downtown Renton. The nearest park and ride lot to the site is the South Renton Park and Ride, located at 20S S 7th Avenue, S. in downtown Renton. Non-Motorized Facilities Five-foot wide sidewalks are provided on all the roadways surrounding the proposed site. There are no bike lanes in the vicinity of project site. 5 Traffic Impact Analysis Younker Nissan Traffic Volumes Traffic volumes in the vicinity of Younker Nissan were obtained from the City of Renton Department of Publics Works. 2004 traffic volumes are shown in Figure 5. Oakesdale Ave SW E Vallev Rd. SW 34"' St 1,300 Lind Ave SW SW 41". St 7,600 SW 43"' St E 180" St Figure 5. 2004 Traffic Volumes -Vehicles per Day (Source: City of Renton, Department of Public Works) SR-167 Existing P.M. peak-hour turning movement traffic volumes were collected on January 7, 10 and 14, 2007 from 4:00 PM -6:00 PM at the following intersections: • • • East Valley RoadfSW 41" Street/SR-167 On-Off Ramps East Valley Road/SW 34th Street SW 34th Street/Lind Avenue SW The count at the East Valley Road/SW 41" Street intersection was adjusted to account for the fact that the count was taken during a major snow storm and the intersection was impacted by adjacent construction in the area and on the streets/interstate. Existing P.M. peak-hour volumes are presented in Figure 6. 6 ~S';; L:50 .. -,. J Il ,'a ~-1 II ( 111, ~g:! .... :::J Z ~ C z :::J SW 341li ST. sw 4'ST ST. EXISTING TRAFFIC VOLUMES FIGURE 6 -'" -,. JI '5.-1 II 110 .. 0"0 -.. " 167 ~~S; L 88 ,,--'28 J Il ,"'" L XX -PM PEAK HOUR ruRNING MOVEMENT VOLUMES YOUNKER NISSAN Traffic Impact Analysis Younker Nissan Level of Service Level of Service (LOS) is used to qualify the degree of traffic congestion and driver comfort on a street or at an intersection. The Highway Capacity Manual (HCM) describes the methodologies for calculating Level of Service on street segments and at signalized and unsignalized intersections. According to the 2000 HCM, there are six Levels-of Service by which the operational performance of the roadway system may be described. These levels range from LOS A, which indicates a relatively free-flowing condition to LOS F, which indicates operational breakdown. The LOS criteria are presented in Table 1. Table 1. Level of Service Criteria Level of Service Expected Delays A LittlelNo Delays B Short Delays C Average Delays D Long Delays E Very Long Delays F Extreme Delays Source: 2000 HIghway CapacIty Manual, Report 209, Fourth Edloon The LOS for a two-way stop-controlled intersection is determined by the computed or measured control delay and is defined for each minor movement. LOS is not defined for the intersection as a whole. Average control delay less than or equal to 10 seconds per vehicle is defined as LOS A. For LOS F, the average control delay is greater than 50 seconds per vehicle. The LOS for an all-way stop-controlled intersection is defined in terms of average control delays per vehicle. LOS is defined for the intersection as a whole. An average control delay of less than or equal to 10 seconds per vehicle is defined as LOS A. For LOS F, the average control delay is greater than 50 seconds per vehicle. The LOS for signalized intersections is defined in terms of average control delay per vehicle. The criterion for LOS A is an average control delay ofless than or equal lo 10 seconds per vehicle. The criterion for LOS F is an average control delay of greater than 80 seconds. The City of Renton Policy Guidelines for Traffic Impact Analysis for New Development notes that LOS analysis should be comlucted to determine the ability of existing facilities to handle the new development traffic volumes. The new development is expected to maintain the same LOS with the development that would be anticipated without the development. Level of Service for the analysis intersection was calculated using SynchroTM 5.0 computer software program based on the 2000 Highway Capacity Manual. The result of the existing condition Level of Service analysis is shown in Table 2. 8 Traffic Impact Analysis Younker Nissan Table 2. Existing P.M. Peak-Hour Level of Service Intersection Existing LOS East Valley RoadiSW 41" St. D East Valley RoadiSW 34'" st. . B SW 34'" StreetILind Ave. SW C Traffic Safety Traffic safety is measured in tenns of accident history. Oftentimes a roadway may appear unsafe because of specific physical features in the road such as restricted sight distance, reduced radius curves, and narrow lanes. However, a significant accident history may not result as alert drivers respond to the "unsafe conditions" and drive accordingly and reduce the potential for accidents. In some situations, the conditions may be such that the driver is not alert to the hazard and crash result. These locations must be evaluated to determine necessary safety improvements. The latest three-year accident history at the analysis intersection was obtained from the City of Renton Transportation Systems Division. The latest three-year crash history included the period from January 1, 2004 to December 31, 2006. A summary of the three-year accident history is presented in Table 3. Table 3. Three-Year Accident History Data ----- Accident Average Accident Intersection 2004 2005 2006 Total Rate' Rate' East Valley RoadiSW 41" St. 3 7 2 12 0.51 0.90 East Valley RoadiSW 34'" St. 0 0 0 0 0.00 0.90 SW 34'" StreetILind Ave. SW 1 2 0 3 0.23 0.90 1 -Accidents per million entering vehicles 2 -Average Accident Rate for similar intersections per WSDOT As shown in Table 3, the accident rates at the three analyzed intersections are below the statewide Average Accident Rate for similar intersections. Planned and Programmed Improvements The following transportation and related improvement projects are planned within the next five years in the vicinity ofthe Younker Nissan development site: • WSDOT/City of Renton Wetland Project. This involves enhancement of existing and creation of new wetlands. Anticipated completion date is spring 2008. Will require considerable volume of large truck movements to and from various wetland bank sites west of Lind Avenue SW. Primary truck haul routes will be SW 27th Street via Oakesdale Avenue SW and Lind Avenue SW. • SW 34th Street Culvert Replacement Project. This project is located at the Springbrook Creek crossing ofSW 34 th Street west of Lind Avenue SW. 9 Traffic Impact Analysis Younker Nissan • Anticipated completion date is December 2007. Project will involve full closure ofSW 341h Street west of Lind Avenue SW. • SW 27th StreetiStrander Boulevard Connection. Project involves new roadway, with grade separated crossing of the Union Pacific-and Burlington Northern Santa Fe railroad tracks, between Oakesdale Avenue SW in Renton and West Valley Highway in Tukwila; and HOV improvements on SW 27 1h Street between Oakesdale Avenue SW and East Valley Road. Relocation of UPRR and BNSF tracks required for grade separation anticipated to be completed by 2008. New roadway and HOV improvements anticipated to be completed by 2013. • Lind Avenue SW Improvement Project. Involves widening of Lind Avenue SW to five lanes, where required, between SW 16th Street and SW 43,d Street. Anticipated project completion date is 2010. However, short sections may be completed sooner if abutting private development projects warrant widening as traffic impact mitigation. • SR 167 @ SW 41·t /SW 43 rd Interchange Improvement Pr?ject. WSDOT project involving HOV improvements at SW 41"/SW 43 interchange. Anticipated completion date is spring 2007. FUTURE CONDITIONS WITHOUT PROJECT The future conditions without project analysis provide a discussion of the traffic-related conditions in the horizon year without the proposed project. This section includes a discussion of background traffic volumes and Level of Service at the analysis intersection. The new Younker Nissan location is expected to be fully occupied by the end of 2007. Therefore, 2007 for the purposes of this analysis is considered to be the horizon year. Background Traffic Volumes Background traffic volumes for 2007 without project condition include the 2004 existing traffic volumes presented in Figure 5, existing P.M. turning movement traffic volumes plus area-wide traffic growth. A growth of 1.8 percent per year was used based on the area-wide historical growth provided by WSDOT's Annual Traffic Report. The future traffic volumes without project are presented in Figure 7. Level of Service The 2007 background without project PM peak hour level of service is shown in Table 4. The existing Level of Service is shown for comparison purposes. Table 4. 2007 P.M. Peak-Hour Level of Service without Project 2007 LOS Intersection Existing LOS Without Project East Valley RoadJSW 4\" St. D (53.3) D (593) East Valley Road/SW 34~ St. B(15.1) B (\5.8) SW 34~ Street/Lind Ave. SW C (22.0) C (23.2) (x x) -Ma:r:imllm delay at the intersectioll approach in seconds 10 • ARRY STRUTHERS AsSOCIATES. INC • l1SORoenan:lsRGBd 5urte200 _""' .... , WA 9&lOo;......o..;. "",,one (42515'9·0)00 • f •• ' (.25) 519·0309 E_~ \I.a@II~-"",,,,,,,, "",,',_ g .... soac·+n<:.com ~ '" :> z ~ 0 z ::J SW 34TH ST. 0 (§ '" ~ ...J ~ ~ sw 41ST ST. 2007 FUTURE TRAFFIC VOLUMES WITHOUT PROJECT FIGURE 7 167 '"''"' -oo ~ jl 1.-1 '20, .,-1 321- ':IS , it 0_ oo'" '"' L XX -PM PEAK HOUR TURNING MOVEMENT VOLUMES YOUNKER NISSAN Tramc Impact Analysis Younker Nissan FUTURE CONDITIONS WITH PROJECT The future condition with project analysis provides a statement of what traffic related conditions will be like in the horizon year with the Younker Nissan project. The analysis simply adds anticipated project impacts to the horizon year background conditions. The analysis defines anticipated project trip generation and evaluates impact through a level of service analysis at each of the analyzed intersections. Traffic Volumes Traffic volumes for 2007 with project condition include 2007 without project volumes discussed above plus expected traffic to be generated by Younker Nissan. Project Trip Generation Trip generation for Younker Nissan was calculated using the ITE Trip Generation, 7'h Edition, Land Use Code 841, New Car Sales, (Page 1476-1478). The trip generation calculation is presented in Appendix C. The new site will replace the existing Younker Nissan site. The new site will generate approximately 982 daily trips. Since the existing Younker Nissan site generates approximately 508 daily trips, the net impact of the new site will be approximately 474 daily trips. The formula for calculating A.M. peak hour trip generation is adjusted according to the ratio of A.M. and P.M. average trip generation rate. A summary of the anticipated trip generation for Younker Nissan is presented in Table 5. Table 5. Project Trip Generation A.M. Peak Hour PM. Peak Hour Land Vs. Total In Out Total In Out Proposed 69 51 18 80 31 49 Existing 50 37 13 56 22 34 Net Impact 19 14 5 24 9 15 As shown in table 5, Younker Nissan is estimated to generate 69 A.M. peak-hour and 80 P.M. peak-hour trips. The net impact of the project, calculated by deducting the existing site trips generated from the existing Younker Nissan site from the total project trip generation, is 19 A.M. peak-hour and 24 P.M. peak-hour trips in 2007 Trip DistributionfI'raffic Assignment Trip distribution percentages for Younker Nissan were based on the turning movement counts collected at the analysis intersection. The trips that will be generated by the new Younker Nissan site were added to the roadway system using the directional distribution shown in Figure 8. A summary of the 2007 with project PM peak hour volumes are presented in Figure 9. Level of Service The summary of 2007 PM peak hour Level of Service and existing Level of Service at the analyzed intersection is shown in Table 6. 12 .. ., l "" -r .x- 5X, SW 34TH ST. SW 41ST ST. PROJECT TRAFFIC ASSIGNMENT FIGURE 8 xx~ -EmER (XX~) -EXIT YOUNKER NISSAN ~"I'", L,. ","N -17 J Il ,'2 ~~ ltr 113, ~ '" w " z ~ 0 z ::; 1J2-2, -27 ,5 SW 34TH ST. ....:cESS 1 SW 41ST ST. 0 <'!i 0: ~ .... ~ I-~ 2007 FUTURE TRAFFIC VOLUMES WITH PROJECT FIGURE 9 17 --.J 121, ACCfSS 2 :;: ..,'" JI :il ..,'" JI .--.J 20, It ~:g .., It "'0 --.., L XX -PM PEAK HOUR TURNING MOVEMENT VOLUMES YOUNKER NISSAN Traffic Impact Analysis Younker Nissan Table 6. 2007 P.M. Peak-Hour Level of Service Summary 2007 LOS 2007 LOS .' Intersection Existing LOS Without Project With Project East Valley Road/SW 41" SI. D (533) D (59.3) D (59.3) East Valley Road/SW 34'" St. B (15.1) C (15.8) C (15.9) SW 34"' StreetILind Ave. SW C (nO) c (23.2) C (23.5) Site Access I-East Valley Rd. N/A N/A B (12.8) Site Access 2 -East Valley Rd. N/A N/A B (12.8) Site Access 3 -SW 34"' St. N/A N/A A(9.1) (xx) -Maximum delay at the intersection approach in seconds OTHER ISSUES The proposed site has three driveways providing access from the street network. The nmnber and location of these driveways were developed with the uses of the site to minimize conflicts at the access points and within the site. The service area is separated from the car sales area to provide safer access for people dropping off their vehicles. The car sales area provides for the flow of the public to enter the site without competing with these more directed trips to the service area. The driveways are also located away from the intersection to minimize their impact on the operations of the intersection while still providing the desired flow patterns within the site. CONCLUSIONS The new Younker Nissan site will not create any significant adverse conditions on the surrounding transportation network. The new site will generate approximately 982 daily, 69 AM peak hour and 80 PM peak hour new vehicle trips to the transportation network. The new site will replace the existing Younker Nissan site. Since existing Younker Nissan site generates approximately 508 daily trips with SO AM peak hour and 56 PM peak hour trips, the net impact of the new site will be approximately 474 additional daily trips with 19 AM peak hour and 24 PM peak hour trips. The analyzed existing intersections will operate at an acceptable Level of Service (:E>, C and C) in the 2007 PM peak hour with the projected volume scenario. The intersections of exiting streets and proposed site access driveways will operate at Level of Service B, B and A in the 2007 PM peak hour. The accident rates at the intersections in the vicinity of Younker Nissan location are below the statewide Average Accident Rate. RECOMMENDA nONS Based on the analysis presented in this study, no off site roadway improvements will be needed to mitigate the traffic impacts of this project. 15 APPENDICES APPENDIX A TRAFFIC COUNT DATA Location: East Valley Rd and SW 41 st St CityfTown: Renton Checker: DLN & JCN Weather: Cold and snow Job: Younker Nissan Date: 10-Jan-07 Start Time: 4:00 PM Pk Hr: I 4:30 PM 5:30 PM 15 Min. Adj Factor; F(adj}= 1.0714 (15 min/# of minutes counted) END TIME 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM 6:00 PM PKHR Adj HR END TIME 4:15 PM 4:30 PM 4:45PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM 6:00 PM PKHR Adj HR FROM: NORTH RIGHT THRU LEFT 12 0 0 - -------- 15 0 0 ~--.. ---------_.-- 10 0 0 ------ 7 0 0 -------------.~ 9 0 0 .. _--_.- 8 0 0 ._-- 4 0 0 1 0 0 ----~---- 34 o o 36 o o FROM: SOUTH RIGHT THRU LEFT 95 66 7 -- 95 75 7 ----- 90 66 1 -- 81 69 14 ------. --_._- 100 80 7 91 91 10 73 74 4 r--------------- 70 60 3 -----'- 362 306 32 388 328 34 END 15 Min TIME TOTALS 16:15 437 16:30 434 16:45 443 17:00 455 17:15 520 17:30 513 17:45 369 18:00 304 TOTAL 12 15 10 7 9 8 4 1 34 36 TOTAL 168 177 157 164 187 192 151 133 700 750 FROM: EAST TRUCKS RIGHT ., THRU LEFT TOTAL 11 4 57 54 115 -------. 9 2 56 47 105 -- 8 9 59 52 120 - 1 4 70 56 130 -"-. 4 4 80 84 168 _. 6 3 78 70 151 ~---. 0 4 62 37 103 ----- 1 3 45 33 81 19 20 287 262 569 20 21 308 281 610 FROM: WEST TRUCKS RIGHT THRU LEFT TOTAL 3 28 76 9 113 _.-'----- 5 34 65 9 108 -----. - 2 34 90 2 126 --~---.- 3 33 83 8 124 ---- 3 35 84 2 121 ---------1--.-_. 5 41 81 6 128 ... _, --_ . 3 86 4 25 58 --1-------.. ---. -- 3 13 54 2 69 ----.-------- 13 143 338 18 499 14 153 362 19 534 Time Start -End hrvol pk hr? 16:00 17:00 1769 no 16:15 17:15 1852 no 16:30 17:30 1931 YES 16:45 17:45 1857 no 17:00 18:00 1706 no DN Traffic Enterprises TRUCKS 5 -- 2 4 6 3 3 -----~-- 3 1 16 17 TRUCKS 5 3 0 1 1 3 2 0 5 5 INTERSECTION: PEAK HOUR: DATE: SOURCE: 19 I 534 362 153 Peak Hour Factors: Percent Trucks & Buses: East Valley Rd and SW 4151 SI 4:30 PM 5:30 PM 10-Jan-07 ON Traffic PEAK HOUR DIRECTIONAL LEG VOLUMES 36 368 378 610 534 750 434 750 PEAK HOUR APPROACH VOLUME MOVEMENTS 36 36 0 0 RIGHT THRU LEFT LEFT NORTH RIGHT THRU WEST EAST THRU RIGHT SOUTH LEFT LEFT THRU RIGHT 34 328 388 750 ADJUSTMENT FACTORS DERIVED FROM COUNT From North: 0.84 SB From South: 0.91 NB From East: 0.85 WB From West 0.97 EB Total 0.93 From North: 55.6% SB From South: 1.9% NB From East: 2.8% WB From West: 0.9% EB 21 308 610 I 281 ON Traffic Enterprises Location: E Valley and SW 34th St Checker: DLN Weather: Cludy Date: 14-Jan-07 Start Time: 4:00 PM 15 Min. Adj Factor; F(adj)= 1.0714 (15 minl# of minutes counted) END TIME 4:15 PM 4:30 PM 4:45PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM 6:00 PM FROM: NORTH RIGHT THRU LEFT 2 68 0 c--~~ --------------- 3 68 0 4 115 0 o 80 0 -~------------- 3 115 0 -- 3 77 0 1 88 0 '. -- 2 67 0 TOTAL TRUCKS RIGHT- 70 0 0 .---- 71 4 0 119 ---------f---5 0 -- 80 1 0 ---- 118 6 0 ----, .. 80 4 0 89 3 0 69 1 t--0 CityfTown: Renton Job: Younker Nissan Pk Hr: I 4:30 PM 5:30 PM FROM: EAST THRU LEFT TOTAL TRUCKS 0 0 0 0 0 0 0 0 --_._-._-- 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 -~-- 0 0 0 0 0 0 0 0 PK HR 10 387 0 397 16 0 0 0 0 0 A~HR L-_1~1~~~4~15~~~0~~ __ 4~2~6 __ ~_1~7 __ ~~0~-L __ ~0 __ ~ __ ~0 __ ~ __ 0~~ __ ~0~~ END TIME 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM 6:00 PM PKHR Adj HR RIGHT 0 0 0 0 0 0 --------=-0 0 o o END TIME 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 FROM: SOUTH THRU LEFT 52 3 --,--. 66 4 61 6 71 5 61 1 74 6 _ ..... 63 6 .--. ,,--~------. 62 7 267 18 286 19 15 Min TOTALS 154 164 223 179 250 205 184 160 TOTAL TRUCKS RIGHT 55 8 16 --- 70 4 10 - 67 4 19 76 3 10 62 6 f---46 -- 80 6 28 69 6 12 ---- 69 6 f--_1O -------- 285 19 103 305 20 110 Time Start -End 16:00 17:00 16:15 17:15 16:30 17:30 16:45 17:45 17:00 18:00 FROM: WEST THRU LEFT TOTAL TRUCKS 0 3 19 3 -- 0 2 12 0 0 3 22 3 0 1 11 0 ------- 0 7 53 3 0 3 31 3 0 2 14 1 ----~.---- 0 1 11 1 ._---.- o 14 117 9 o 15 125 10 hrvol pk hr? 720 no 816 no 857 YES 818 no 799 no DN Traffic Enterprises INTERSECTION: PEAK HOUR: DATE: SOURCE: 15 125 0 110 Peak Hour Factors: Percent Trucks & Buses: E Valley and SW 34th St 4:30 PM 5:30 PM 14-Jan-07 DN Traffic PEAK HOUR DIRECTIONAL LEG VOLUMES 426 301 30 0 125 0 525 305 PEAK HOUR APPROACH VOLUME MOVEMENTS 426 11 415 0 RIGHT THRU LEFT LEFT NORTH RIGHT THRU WEST EAST THRU RIGHT SOUTH LEFT LEFT THRU RIGHT 19 286 0 305 ADJUSTMENT FACTORS DERIVED FROM COUNT From North: From South: From East: From West: Total From North: From South: From East: From West: 0.84 0.89 nla 0.55 0.86 4.0%) 6.6% nfa 8.0% SB NB WB EB SB NB WB EB 0 0 0 0 DN Traffic Enterprises Location: Lind Ave & SW 34th St City/Town: Renton Checker: DLN Weather: Cludy Job: Younkers Nissan Date: 7-Jan-07 Start Time: 4:00 PM Pk Hr: I 4:30 PM 5:30 PM 15 Min. Adj Factor; F(adj)= 1.0714 (15 minl# of minutes cOtJnted) END TIME 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM 6:00 PM PKHR Adj HR END TIME 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM 6:00 PM PKHR Adj HR FROM: NORTH RIGHT THRU LEFT 4 114 7 ------ 7 77 9 ------.----- 6 102 7 ---------- 3 99 2 ----------------.. _ .. _. 3 126 5 ------------_. 2 84 6 ---- 2 91 4 ---------- ~ 80 2 14 411 20 15 440 21 FROM: SOUTH RIGHT THRU LEFT 0 62 3 4 46 4 -~----- 1 77 5 1----------- r--_4 56 3 3 90 4 4 63 1 ~---- 0 57 5 ------.. ,.-.. 3 47 6 --------------- 12 286 13 13 306 14 END 15 Min TIME TOTALS 16:15 246 16:30 195 16:45 263 17:00 229 17:15 332 17:30 234 17:45 207 18:00 179 TOTAL 125 93 I 115 104 134 92 97 84 445 476 TOTAL 65 54 83 63 97 68 62 56 311 333 FROM: EAST TRUCKS RIGHT '. THRU LEFT TOTAL 9 7 2 3 12 --- 4 0 1 1 2 ----_._------ 2 4 1 4 9 ----- 2 6 4 1 11 4 15 6 2 23 -._- 6 3 2 2 7 ----._------- 2 4 1 1 6 6 1 2 1 4 -_. -,-"-. 14 28 13 9 50 15 30 14 10 54 FROM: WEST TRUCKS RIGHT THRU LEFT TOTAL 4 12 9 7 28 4 16 9 8 33 ------ 4 22 7 9 38 7 17 6 13 36 1 35 14 7 56 --. -. 3 30 14 7 51 r-20 2 ------ 6 6 28 !--------- 1 9 7 7 23 ----c----. 15 104 41 36 181 16 111 44 39 194 Time Start -End hrvol pk hr? 16:00 17:00 933 no 16:15 17:15 1019 no 16:30 17:30 1058 YES 16:45 17:45 1002 no 17:00 18:00 952 no ON Traffic Enterprises TRUCKS 4 0 2 -----0,-- 0 1 0 ---- 0 0 3 3 TRUCKS 4 6 2 4 -- 0 3 2 2 9 10 INTERSECTION: PEAK HOUR: DATE: SOURCE: 39 194 44 111 Peak Hour Factors: Percent Trucks & Buses: Lind Ave & SW 34th St 4:30 PM 5:30 PM 7-Jan-07 DN Traffic PEAK HOUR DIRECTIONAL LEG VOLUMES 476 375 43 54 194 78 561 333 PEAK HOUR APPROACH VOLUME MOVEMENTS 476 15 440 21 RIGHT THRU LEFT LEFT NORTH RIGHT THRU WEST EAST THRU RIGHT SOUTH LEFT LEFT THRU RIGHT 14 306 13 333 ADJUSTMENT FACTORS DERIVED FROM COUNT From North: From South: From East From West: Tolal From North: From South: From East: From West 0.83 0.80 0.55 0.81 0.80 3.2% 4.8% 5.6% 5.2% SB NB WB EB SB NB WB EB 30 14 54 10 DN Traffic Enterprises APPENDIXB CAPACITY ANALYSIS END 2007-PM-EXISTING SW41st St.&East Valley Road Volume (vph) -+- 4/3/2007 t Turn Type pm+pt Perm pm+pt Perm pm+pt Prot pm+pt Penm Protected Phases 7 4 3 8 5 2 2 1 ·.6 Permitted Phases 4 4 8 8 2 6 6 Dete~ij:!rnase!l 7 4 4 3 8 . 5 2 2 16 6 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 MinimlJtll.8j:)lit(s} . >.8.0 20.0. 20.0 8.0 20.02U".O·· "8,61;iYMf9.~~"20.o, .8.0,,; 20;Q ,20.0 Total Split (s) 8.0 20.0 20.0 23.0 35.0 35.0 8.0 21.0 21.0 16.0 29.0 29.0 TotaISplit(-%) .10;0%25,0%;~5.0% 28.8% 43.80/0."4a,8%'10lO%,;26' .. 3%.'26.3%lf~~~~~36;3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 AlH~edTim80.(s) 0.5 0:5., ;·0.5 0.5~.5; 0.5 .;Q'~;"';JO.50:5 0.5 . fl5i(Pf,();q LeadlLag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag LE!l'ifl-lagOptimizB.? ~'frf0¥esc¥~ Yes Yes V:es Yes~*i;;'Y!ls "fyf;JS· Yes Yes;" Yes Recall Mode ~EffctGreen (s)., : .. Actuated glC Ratio ,,"'I!l' Ii ' ~,!l1;!3 CI Control Delay Qtl6ire~j~~t;~7l. Total LOS Approach Delay ~~,~f;::; .. CyCle l.etlQ"(ll1it80 i None None None 19;6';;~~;~f~;6 0.24 0.20 0.20 0.13, 0;880':82 14.5 55.4 7.6 .0;0;";;;0;0:,· 0.0 14.5 55.4 7.6 B .E A 39.0 D:.. Actuated Cycle Length; 79.6 NaturaICycle:.sO ;~'~2'.7jf;';i; .. ;, Control Type: Actuated-Uncoordinated Maximum vtc:Ratio: 1.00;;' Intersection Signal Delay: 42.4 In.tE!l:seqti(m7~a(:lty Utili~\WJ.n.~,7% Analysis Period (min) 15 GSAI None 38.6 0048 1.00 61.5 0.0 61.5 E None None None Max Max None 33.8 33.821;0. 11'.0 ,;'n;O.;i;33,O 0.42 0.42 0.26 0.21 0.21 0.41 (M9 0;14 .. 0.24.0.94·· --,0.62;::: 1;00: 16.3 4.2 17.8 66.6 7.7 82.1 0.0 .;~~4:~~~;;l'O,O::~.¥:T";OJ);: '0.0 . 16.3 4.2 17.8 66.6 7.7 82.1 B , 44.7 D. Intersection LOS: 0 ICU Level"<!H~erviceE;''';·.: Max Max 2&7; /26';7 0.34 0.34 0.78"'l.1iQi·16 41.0 7.0 ; ala , "0;0 41.0 7.0 ·,·:ft A 53.3 Synchro 6 Report END 2007-PM-EXISTING SW 34th St.&East Valle~ Road 4/3/2007 .,? ~ '" t l Lane Sign Control Stop Free Free Grade 0% 0% 0% VoI!:Ime (ve1:tlh) 15 110 19 286 415 11 Peak Hour Factor 0.55 0.55 0.89 1.00 0.84 0.84 Hourly "oW rate (vph) 27 200 21 286 494 13 Pedestrians Lane W-i/illtWt) Walking Speed (ft/s) Percent Blockage, Right turn flare (veh) Median .type None Median storage veh) Upstream signal (ft)'-' . pX, platoon unblocked Y!ih,qp llfiic!ift9>MQlurne 823 494 507 vC 1 , stage 1 conf vol vC2,stllge2 confv&F vCu, unblocked vol 823 494 507 tC"s~.{.s) .6.;5 6'.3· ':.4.1 """" ,",. tC, 2 stage (s) tF (s) 3.6 3;4,· 2.2 pO queue free % 92 64 98 cMcapacity. (YEl~) " 329 56'3 1058 Volume Total 27 200 21 286 ~94 13 '"'3>:.7"' '~= 0"''0:~' " f'?) Volume Lett 27 0 21 0 0 0 V.oJOme Ri9bh, 0 200 0 0 0 ~3 cSH 329 563 1058 1700 1700 1700 Volume to Capacity , 0;08 '0.36 0;,02 0.17 0.29· 0.01 Queue Length 95th (tt) 7 40 2 0 0 0 C()J\trol~ll'ty,(s ) 16'.9 14.9 8.5 0.0 0;,0 "',·'0;0 Lane LOS C B A Approach Delay (s) 15.1 0.6 0.0 Approach LOS C Average Delay Intersection Capacity Utilization 35.3% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Report GSAI END 2007-PM-EXISTING SW 34th St.& Lind Ave SW Lane Configurations Sign Control Grade Volume (velhlh) Peak Hour Factor Hourly flow rate (vph) Pedestrians laF)8 Width (tI) Walking Speed (fils) f!ercent Blockage 39 0.81 48 -.. 111 0.81 137 Right turn fiare (veh) Median type ,N.OIle. Med ian storage veh) Upstream signal. (til pX, platoon unblocked - Slop;''.;;';'' 0% 10 14 ',,,(30 14 0.55 0.55 0.55 0.80 18 25 55 18 NOlle v:C,(l()ntlicting',lfliIltl~!l~~;£~O:~4, <539 1162 1()16,,38:~~, vC 1, stage 1 conf vol vC2,'stag~2~~~~Ir vCu, unblocked vol 1075 tC,sl~~~"f;5r~;"'. 7i2' tC, 2 stage (s) tF(s}S'Cc<,'cC . 3;5 pO queue free % 70 1024 539 ·6,6 6.2 4.0 3.3 76 74 ~itY'(17eM1) ;,< :158, ·,)2g~'Ci· §37 Volume Total Volume Left Volume Righi cSH Volume to Capacity Queue Length 95th (ft) C'9Rtr!ll Delay (s) Lane LOS A,pjJr~chDelay (s) Approach LOS 48 '36 48 0 :0:, 0 158 224 0.30 ,0.1,6 30 14 37A:~,2 E C .22.0 C Average Delay Inters~~~UtiliZ<ttlpn . Analysis Period (min) GSAI 1.55 o j37 461 0.34 37 16.7 C 5.8 39.6% 15 1162 7.2 3.6 82 99 18 o 99 0.18 16 49.3 E 21.2 C 1016 lUI':, 89 0 0 225 0.11 9 23:0 C 382 548 98 0 18 55:, 0 656 1006 0.08 0.02 7 1 '1}.0· 8,6 B A -0.4- t 0% .300 13 0.80 0.80 382 16 0 0 0 16 1700 1700 0.23 0,01 0 0 0.0 1).1) A 21 0.83 25< 399 4;1 2.2 98 25 ' .,0;. 1154 0.02 2 8,2 A n:4 4/3/2007 0% 440 15 0.83 0.83 '530 18 0 c1~ 1700 0.32 0 O;{} Synchro 6 Report END 2007-PM-FUTURE WIO PROJECT SW 41st St. & East Valley Road 4/3/2007 Lane Configurations Volume (vph) Turn Type Protected Phasl3s Permitted Phases Detector Pha$!lS Minimum Initial (s) Minimum Split (s), Total Split (s) Total Split (%) Yellow Time (s) All-Red TilTJI3.(s) Lead/Lag Lead-Lag Optimize'r.';' Recall Mode Act EffctGfflefl,(~,iz/;' Actuated glC Ratio vIc Ratio. Control Delay QueueDeiay Total Delay LOS Cycle Length:'w -t 43 321 135 439 130 90 68 34a:, ..• 374. .c208 273 53 pm+pt Perm pm+pt Perm pm+pt Prot pm+pt Perm 7 4 38 5 2 2 1 6· 4 48 82 6 6 7 4. 4 38. 8 5 2 . 2 1 6 A .• Q 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 . 8.0 2Q,fj.. 20.0 8.0 20;0. 20.0 8.0· 20,0l;:; 20.0.:,: ,,:!to 20.0 . 20.0 8.0 20.0 20.0 27.0 39.0 39.0 8.0 23.0 23.0 20.0 35.0 35.0 aJ,l% 22.2% 22.2% 30.0% 43.3%> 43.3% a.9%25.6JII,,/!!5.6%'·22,2%38.9%;'68;l9o/6 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 . ·,015:Q.'5 '(,[5 0.5 Qi~ 0.5 0.5 O:~·· 0l~;dl1~§ Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag ~s;,:;~~;;;~es Yes Yel; Yes yes~q.;X~Y;if~·'Y~' y~ None None None 2W.O. ;.:1~;O .df'!!·O 0.21 0.18 0.18 0.:15 ',Oi99,,?~35 17.3 86.2 8.6 ·O,Q"l\'(jc;Q:,iz:iilJ.O 17.3 86.2 8.6 ,'B F A 59.3 None 43.0 0,48 0.97 57.5 0.0 57.5 E None ~'" 0,42 0.21il 18.2 .0.0 18.2 B 42.5 f)' None None Max Max None Max Max 38.2 .23;O··'~~1r.J.a;<P';l~,()32~§' ;~ 0,42 0.25 0.21 0.21 0,43 0.36 0.36 0;15 0.25 O'97;0.El2f;t~~~O.~;+;;;~$ 4.3 19.5 76.2 8.0 70.6 37.8 6.6 0.0 0.0 . !!t,g,; ; 'It,'O;~~~:, '&;0· ;.~O 4.3 19.5 76.2 8.0 70.6 37.8 6.6 A B .·.;E... . A . D . .A 39.0 47.5 Actuated Length: 90 Natura! Cyc:le: '90' ;: f;' Control Type: Actuated-Uncoordinated Maximum v/c'RatiQr'i0,99 Intersection Signal Delay: 45,6 Intersection CapacityUtillzalion 84.4% ,Y Analysis Period (min) 15 and Phases: GSAI Intersection LOS; D ICU LeVel of Service E Synchro 6 Report END 2007-PM-FUTURE WIO PROJECT SW 34th St. & East Valle::t:: Road Lane Configurations Sign Control Grade Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians LaneWidth eft) Walking Speed (fils) P.e~cent. BlOckage Right turn flare (veh) Median type Median storage veh) Vjl$tream 'signal (ft) pX, platoon unblocked vC,;;¢M~;VOIu01e vC 1 , stage 1 cenf vol VC2,;stageQ;1lpnfc!/ol' vCu, unblocked vol tC,·$ingfll;{$.}.:~i,·c " tC, 2 stage (s) Ins) pO queue free % ~iIY.(vehlh} Y8IOirteTOIaI Volume Left VQlume.R!ghl cSH Volume to Capacity Queue Length 95th (ft) ~ontrol Delay(s) Lane LOS Approach Delay (s) Approach LOS Average Delay ..J- Stop 0% 16 0.55 29 None ~8 838 6.5 3.6 91 321 29 29 o 321 0.09 7 17.3 C 15.8 C interseCtion capacity Utilization Analysis Period (min) GSAI .. '\ 120 20 0.55 0.89 218 22 502· St? 502 517 6,3 ·A.l 3A 2.2 61 98 '007 .1049 218 22 o 22 2.18,- 557 1049 0.39 ·;IMB:? 46 2 ;1S.6;2"~;5 C A 0.6 3.8 36.3% 15 t Free 0% 291 1.00 291 291 o o 1700 0.17 o 0.0 + Free 0% 422 0.84 502 o i.',O 1700 0.30 o 0,0'>' 0.0 '~ii ;' 0,'fE>;:;1N~ 12 0.84 14 14 o 14 1700 0.01 o 0,0 ICU Level of.,Service 4/3/2007 A Synchro 6 Report " END 2007-PM-FUTURE WIO PROJECT SW 34th St. & Lind Ave SW .,J--,. Lane Configurations Sign Control Stop Grade 0% Volume (veh/h) 40 45 113 Peak Hour Factor 0,81 0.81 0,81 Houriyflow rate (vph) 49,{/ .56 ''''40 Pedestrians Lw'!e\tYidth (ft) Walking Speed (fils) Percent Blockage Right turn flare (veh) Median,~e None Median storage veh) UpStream signal (tt) pX, platoon unblocked vC;confli¥t[ng volume )flOl ,1047 549 vC 1, stage 1 conf vol vC2, stage 2 confvol vCu, unblocked vol te. single ($~::,';" tC, 2 stage (s) tFes) pO queue free % ct,.t~city (v~#",·", Volume Total Volume Left VoIume;~ight cSH Volume tocCapacity Queue Length 95th (ft) ~trol~{s) Lane LOS Approach Delay (s) Approach LOS Average Delay 1101 ',7·,2, 3.5 67 .!lif,8"';' .4~f; 49 ,0 148 0",33 34 '40,9 E 23.2 C Intersection Capacity Utilization Analysis Period (min) GSAI 1047 549 6:6' 6,2 ,4.0 //:: 3.3 74 74 216 '529 3-11',1'58 o 0 ° 140 216 452 0,17, ',0,35 15 39 25.1 17.2 D C 6.2 40.4% 15 ~ 11 0,55 20 1188 1188 7.2 3,6 78 93 20 20 o 93 0.22 19 54.2 F 22,8 C -..... Stop 0% 16 3L 0,55 0,55 29 56 N~I),e 1 1040 390 4.1 " 3.4 87 91 2'\·7;,,'; ,-65Or, 2956, o 0 217 650 0:13 ... 0;09 11 7 .... 0,80 ',;49 559 ''02.2 98 ,~ 19 19 O· 997 0.02, 1 ~~'r,~'~~i"i B.7 C B A 0.4 ICU Level of Service 4/3/2007 t I" '" ~ ~ Free Free 0% 0% 312 14 22 448 16 0,80 0,80 0,83 0,83 0.83 390 48 2r1c, .,540' 19 408 98 ,,,,,"'11<l6' ,. ",'(:-- 390,.'],?-':" 27J'!£ (559, --' . o 0 27 0 018 0., 19 1700 1700 1146 1700 0.23011)1 ' 0,!l~~.33- o 0 2 0 0.0 0.0 ·B.Z'i'O,O , A A Synchro 6 Report ·' END 2007-PM-FUTURE WITH PROJECT 8W 41st 8t. & East Valley Road 4/3/2007 Lane COlnfigluraltiorls Volume (vph) Turn Type Protected Phases Perm itted Phases Detector Phases Minimum Initial (s) Minimum Split (s) Total Split (s) TotatSplit (%) Yellow Time (5) AII-RedTime (s) Lead/Lag Lea(i'LagOptln)l~ • Recall Mode AotEffct Green (5) Actuated glC Ratio v/cRatio Control Delay Queue Delay ' .. Total Delay LOS Approach Delay Approach LOS +-t 44 321 68 350 55 pm+pt Perm pm+pt Perm pm+pt Prot pm+pt Perm 7 4 3 8 5 2 2 16 4 48 82 6 6 . 7 4 4 3 8 5 2 2 1 '6 6 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 ~.!l 20.0 20.0 8.0 20.0~O' 'S,:O:2OCi):: 20.:0 8'iO,2OiO 20.0 8.0 20.0 20.0 27.0 39.0 39.0 8.0 24.0 24.0 19.0 35.0 35.0 .&9% 22.2% 22.2% 30.0% 43,3%~~~.8.9O;o .26,1% 26m~&·~.;f~:.a6~38:9% 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 0'.5 0.5 0.5 0.5 O;5.}~t;~g:· .• 0,5 0,5 0:5<~~~ ':0,5.0.5 Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag ~sYes Yes Yes Ye5"~¥es;" • Yes:; Yes Y.es'1~~.· Yes Yes None None None None None None None Max Max None Max Max ':2!)iO;'if{~;!l .16.0 43.0 38.2".\38.2;, 24.0 20.0 2~[.~!lt;;:.j.~i6 32;6 0.21 0.18 0.18 0.48 0.42 0.42 0.26 0.22 0.22 0.43 0.36 0.36 0:16. <~.0.35 0.97 o.zll;·~"o.t5::.; 0.25 0.93 O;6t'OC~i~~{:.6.16 17.3 86.2 8.6 57.5 18.2 4.3 19.2 65.9 7.6 78.2 38.9 6.6 .:rt~l':A~~O '0.0 O.O{t~li:J).,9"~\J).O 0.0 .Q:t) O1Q"i;f~~ ';'::D:O 17.3 86.2 8.6 57.5 18.2 4.3 19.2 65.9 7.6 78.2 38.9 6.6 A E B ;>-A' B .. A 42.4 34.4 C Cycle Lerigth:90 Actuated Cycle Length: 90 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum vIc Ratio: 0.99'. Intersection Signal Delay: 44.8 tJltE1tsectiQn CapacHy,l1tRizatiOll'84,2% Analysis Period (min) 15 GSAI Synchro 6 Report " END 2007-PM-FUTURE WITH PROJECT SW 34th St. & East Valley Road Sign Grade Volumfit'Cvehlh ) 121 Peak Hour Factor 0.55 Hou~'i'ate(vpl)} 220 Pedestrians Lane Width(ft) Walking Speed (!Us) PercentBlockage Right turn flare (veh) MerlilmiWe None Median storage veh) Upstreamsig~'Eft~ pX, platoon unblocked v(;;oonflicting \/OIuIlle " ,~, 504. vC 1, stage 1 conf vol vC2istage2confvol vCu, unblocked vol 842 504 te, single, (5) 'l;6;5, 6.3 tC,2 stage (s) tF(5) 3.6' '.&.4 pO queue free % 90 60 eM Cli\paCity (vehlh) ,32Wi i,;556 '31 '220 31 0 Volume Tolal'4' Volume Lelt Volume Hight cSH " '"ii, 'Q;;,i220 Volume to Capacity Queue Length 95th (It) Can'trol Delay (5) Lane LOS Approach Delay (5) Approach LOS Average Delay 320 556 0.10 ·0.40, 8 47 17.5 15.6 C C 15.9 C 20 0.89 22 ic519 519 4.1 2.2 98 1,047 22 22 o 1047 tt02 2 '8.5 A 0.6 3.B t Free 0% 293 1.00 293 293 o o 1700 0.17 o 0.0 0% 423 1& 0.84 0.84 504 ",. 1700 1700 0.30,i· 0.01 o 0 a:o Intersection capacity Utilization Analysis Period (min) 36.4% 15 ICUJ.evel,~§ervice GSAI 4/3/2007 A Synchro 6 Report END 2007-PM-FUTURE WITH PROJECT SW 34th St. & Lind Ave SW ..J--.,. ~ Lane Configurations Sign Control Stop Grade 0% Volume (vehlh) 40 45 113 12 Peak Hour Factor 0.81 0.81 0.81 0.55 Hourly flow rate (vph) 49 56 140 22 Pedestrians Lane Width (ft) Walking Speed (fils) PercentBI()(:I(a~:·:£,.", • Right turn flare (veh) Median·~·, •.. :~, . ~ ~''.-:. ~ • Non~. ">;'"';"'~; Median storage veh) Upstream'signal:.(ft)~':.,( pX, platoon unblocked vC,conflicling.\l(JI!lm;~'·.:l:1P7 vC 1 , stage 1 conf vol vC2, staga2 conf.vol -"i' vCu, unblocked vol 1107 !C, single (5) .,' . tC, 2 stage (s) IF (5) 31.5 pO queue free % 66 cM capacilY'(~)"'~~~,l'II~fj Volume TOlar'," ':";'f.:..~ ,I ~ " , Volume Left 49 Volume Right .;.,;:.,ft·~"?t:!';;O cSH 145 Volume to Capacity,,?,,,,/; l'f.34 Queue Length 95th (ft) 35 Control D8IayJ~Y ;-"'S:lI;2:3 Lane LOS E Approach Delay:{s}· '23.5 Approach LOS C lM~ 1049 6.6 4.0 74 215 :37 0 0 215 OeW 15 25.1 D ;;49 1188 549 1188 6.2 7.2 3.3 3.6 74 76 529 93 158 22 0 22 140 0 452 93 1E35 0.24 39 21 17.2 55.4 C F 23.1 C 1,1,,' ;..," -~, -" ·t.f~!"~-",-.".,,"--. -""'~~~- 2;;:::;-15:/. . ,- I~'\_ • Average Delay Intersection Capacity Utilization Analysis Period (min) GSAI 6.4 41.2% 15 -...... Slop 0% 17 34 0.55 0.55 31 62 None 1040 390 1040 390 6.6 6.3 4.1 3.4 86 90 217 650 31 62 0 0 O· 62 217 650 0.14 0.10 12 8 24.3 11.1 C B "\ t /" \. Free 0% 15 312 15 ,'92 0.80 0.80 0.80 0.83 19 390 19 27' .5Q9 ;·.40.9 559 409 4~1 .,", ,:J.1 2.2 2.2 98 98 .997,' ,i,; • ·"'\~;'-.''''.¥·,~;:~;1iI45 ,19 ';39,(},:'X'jg5:;,' "27 19 0 0 27 o ,0, '~9:.;~O 997 1700 1700 1145 0:02' :0.23' )o,P1:;;:O;(12 1 0 0 2 S.7,t);o:·,·zlEq:("'S.2 A A 0.4 . .,. ;,·0.4 . _. 41312007 + 0% 448 0.83 :540 559 o 19 1700 0.33 o 0.0 ~ 16 0.83 19 • ,-, --,=-,~,~",,,,,,,,",,,. ICU Level of Service Synchro 6 Report " END 2007-PM-FUTURE WITH PROJECT Access-1 & East Valley Road Sign Control Grade Volume (veh/h) Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane WiPth (II) Walking Speed (fils) PercentiQlockage' ' Right turn flare (veh) ~edian'~ Median storage IiJPStreamsignal(lI) " " pX, platoon unblocked .0% 4 .0,55 7 20 12 .0,55 .0,89 36 ,13 vC. C!,lnflicting,volume '" ,1032 32~ ,,;'658 vC 1 , stage 1 conf vol vC2. ,stage 2conf vol vCu, unblocked vol te, Single (5) tC, 2 stage (s) tF(s) pD queue free % cM capaGiIH".ehlh) 1.032 329 658 7;0,)7, ~, ,,"'~"" 1 Volume Tolal "7: "'(36',,113 Volume Left 7 .0 13 VolulI}eBight .0 cSH 216 649 925 Volti~toCapacity,,{!,'O.03 'O.~lj)i01 Queue Length 95th (ft) 3 4 1 Conlror'J)elay{s) ,22.3 {'4~.9ll~~,9 Lane LOS C B A Approach,Delay (8) 12$';;,;(j,3 Approach LOS B t Free .0% 31.0 .0,89 348 348 o .0 17.0.0 .0.2.0 .0 .0,.0 Free .0% 55.0 .0,84 655 437 .0 .0 17.0.0 .0.26 .0 0.0 0,0 3 .0,84 4 222 o 4 > ",'" ,,"',,': ,',;;: 1700 0.13 o 0.0 , - 4/3/2.0.07 ""'j";'21cV ",.fi tri1;l:Hi::" ~ .. _.,,",,,",,'O •• ,.. • " ",." *, "~'" Average Delay Intersection Capacity Utilization Analysis Period (min) GSA I 0,6 26.3% 15 ICU Level of Service Synchro 6 Report END 2007-PM-FUTURE WITH PROJECT Access-2 & East Valley Road Sign g~~:~~un3tions Grade Valume (vetl/h) Peak Hour Factor HOIlIiy flow rate (vph) . Pedestrians 4il!~?~ldth (ft) Walking Speed (fils) f'el'eet)t,Blockage Right turn flare (veh) Median;.' Median storage veh) Upstrea~llnal;(ft) pX, platoon unblocked ve, cenfli~OONolume vC 1 , stage 1 conI vol vC2,stllQe'·~Conf vol vCu, unblocked vol lG,sirigie (s1"'" tC, 2 stage (s) !'S{S') pO queue free % cM·capaPity(velTlh)· . Volume rotal Volume Left Val~!lErRigl1t cSH VOlu~to Capacity Queue Length 95th (ft) C.onIralDelay. (s) Lane LOS Approac~Delay (s) Approach LOS t Stop Free Free 0% 0% 0% 3 .. 12 6 308 541 0.55 0.55 0.89 0.89 0.84 5 22;.2 7 346 644 1005 7:0:' •• "'7.1 3.6 3:4:.,.;,2;2 98 97 99 226 Q~j;'~ 5 ;':z~;' -;~ ." 7 346 5 0 7 0 0 0 226 655 934 1700 1700 0.02 O:OP_~1 0.20 0.25 2 3 1 0 0 21;3 . 10,7"';;8:9 0.0 0.0 C B A 12.8 '0.2 0.0 B ":;lS",'-:';!::: :-: 0'2/'/: . _~,.= -.x>;;;/!; . 3 0.84 4 Average Delay 0.4 Intersection Capacity UtilizatiOl).. . .... ·;i26.2% Analysis Period (min) 15 ICU Level of Service GSAI 4/3/2007 A Synchro 6 Report END 2007-PM-FUTURE WITH PROJECT Access-3 & SW 34th St. Lane Configurations Sign Control Grade Volume (vehlh) Peak Hour Factor Hourly flow rate {vpll¥ Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstr~~l1ali(ft) pX, platoon unblocked vQ,COflflilJlil'lg volume vC 1, stage 1 conf vol vC2. stage 2conf vol vCu, unblocked vol tC.:-Single ($)',,; tC, 2 stage (s) tl±{S) pO queue free % cMeapacity(yeIl!h) Volllme.Total':- Volume Left VolL!rlWi,Right cSH Voh.lril~toCapacity Queue Length 95th (ft) ControtOetay (s) Lane LOS Approach Delay (s) Approach LOS Average Delay Free 0% 132 0.84 157 105 o o 1700 0.06 o 0,0 0.0 2 0.S4 2 55 5 0.S9 6 160 160 4.1 o 6 2 ;:-;;;9 1700 1417 0.03 moo o 0 0.0 7.6 A 1,2 - Free 0% 27 0.S9 30 0 0 1700 0.02 0 0.0 Stop 0% 3 7 0.55 0.55 5 13 None 200 SO .6.8;;'6:9 ~.5 99 99 4/3/2007 ~7 . 964 'i:-i;",~;> 5 0 13 767 964 0.01' 0.01 1 1 9.7 L;8:8 A A 9.1 A ~,. _ ~ r ~ • ~ r~' ."~~ .. "~"" ~.,,""= "" """".~~_ Intersection Capacity Utilization Analysis Period (min) 14.2% 15 IC ULevel of Serl/ice. A Synchro 6 Report GSAI APPENDIXC TRIP GENERATION TRIP GENERATION YOUNKER NISSAN Existing Site -15,249 Square Foot Proposed Site - 29,458 Square Foot Use ITE Land Use Code 841 Daily Trips Existing -15.249 x 33.34 = 508 Proposed -29.458 x 33.34 = 982 PM Peak-Hour Traffic T = 1.72 (X) + 29.61 Existing -1.72 (15.249) +29.61 = 56 In = 22, Out = 34 Proposed· 1.72 (29.458) + 29.61 = 80 In ~ 31, Out = 49 AM Peak-Hour Traffic T= 1.34[1) (X) + 29.61 Existing -1.34 (15.249) +29.61 = 50 In = 37, Out = 13 Proposed -1.34 (29.458) + 29.61 = 69 In = 51, Out = 18 [I] Adjusted according to the AMlPM Peak-Hour trip generation rate AM Trip Generation Rate = 2.05 PM Trip Generation Rate = 2.64 AMlPM Trip Generation Rate = 2.05/2.64 = 0.78 T = 0.78 x 1.72 = 1.34