HomeMy WebLinkAboutRES 4532 CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4532
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AMENDING THE
2023/2024 CITY OF RENTON FEE SCHEDULE.
WHEREAS, on November 23, 2009, the Council adopted Ordinance No. 5509, which
removed many fees from the Renton Municipal Code and consolidated them into the 2010 City
of Renton Fee Schedule brochure, which has been subsequently amended; and
WHEREAS, on November 14, 2022,the City Council passed Resolution No.4484, adopting
an amended fee schedule for 2023 and 2024; and
WHEREAS,the fee schedule for 2023 and 2024 was subsequently amended by Resolution
Nos. 4492, 4501, 4513 and 4526; and
WHEREAS, it is necessary to approve an amended fee schedule to make periodic updates
as part of the City's 2"d Quarter Budget amendment;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The fee schedule is amended and replaced with the 2023-2024 City of
Renton Fee Schedule brochure, which is attached hereto and adopted by this reference ("Fee
Schedule"). An updated copy of the Fee Schedule shall at all times be filed with the City Clerk as
required by Ordinance No. 5509.
SECTION II. The amended Fee Schedule adopted by Section I of this resolution shall be
effective on July 22, 2024 and thereafter act as the City of Renton's Fee Schedule for all fees or
changes referenced therein. The Fee Schedule shall remain in effect until amended or otherwise
1
RESOLUTION NO. 4532
replaced by the City Council. In the event the Fee Schedule is not amended prior to the year 2025,
the fees specified for the year 2024 shall continue to apply into and beyond 2025 until amended by
the City Council.
PASSED BY THE CITY COUNCIL the 8th day of July 2024.
ronA. Set y Clerk
APPROVED BY THE MAYOR this 8th day of July 2024.
Art5ddlavone, Mayor
Approved as to form:
.�'Se 0F RFN
AL 2 .
Shane Moloney, City Attorney = * SEAL
RES-FI N:24RES015:06/10/2024
09p
0R4TE �D SE?",
2
City of Renton Fee Schedule
2023-2024
2023-2024�
City of Renton Fee Schedule
Y�
Rev.May 2024
City of Renton Fee Schedule
2023-2024
Table of Contents Page
SECTION I. MISCELLANEOUS FEES 1
SECTION II. MAPLEWOOD GOLF COURSE 2
SECTION III. CITY CENTER PARKING FEES 2
SECTION IV.AQUATIC FEES 3
SECTION V. CARCO THEATER (REPEALED) 3
SECTION VI. PARKS AND FACILITIES USE AND RENTAL 3
SECTION VII. COMMUNITY CENTER PASS CARD& FEES 4
SECTION VIII.AIRPORT CHARGES 4
SECTION IX.ANIMAL LICENSES FEES- RMC 5-4-2 4
SECTION X. BUSINESS LICENSES 5
SECTION XI.ADULT ENTERTAINMENT LICENSES 5
SECTION XII. DEVELOPMENT FEES 6
Building Fees: 6
Land Use Review Fees: 8
Site Work, Utilities,and Right of Way Fees: 10
Technology Surcharge Fee 14
Impact Fees: 14
Miscellaneous Fees: 15
SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES(RFA) 15
SECTION XIV. MONETARY PENALTY SCHEDULE FOR INFRACTIONS ISSUED UNDER 17
THE AUTHORITY OF CHAPTER 7.80 RCW
City of Renton Fee Schedule
2023-2024
SECTION
I. Maps: t
a. Zoning maps-standard 11 z 17
$4 54
Is. Zoning maps-large 24 z 36
$
c. Comprehensive Plan map-standard 11 x 17 $
$4 $4
d. Comprehensive Plan map-large 24x 36 $12 $12
e. Precinct maps $5 SS
2. Plat:
a. First page $2 52
Is. Each additional page 51 $1
3. Phofocoll
A. Each 8.5 x 11 or 8.5 x 30 $0.15 $0 15
Is. Each 11"x 17" $0.20 S0 20
c. Each 8.5"x11"or 8.5"x14"color $0.25 $025
4. Budget:
a. City's Budget $to $10
Is. City Budget to other municipality or quasi-municipal corporation or other nonprofit charitable or education organization N/C N/C
S. Audio or Video Recording Copies:
a. Audio recording,each copy $2 $2
It. Video retarding,each copy S2 52
6. Regulations and Plans:
a. Comprehensive Plan and Map $30 $30
b. Title IV,Development Regulations:
(i) text and Zoning Map
$1 $1
(ii) Text only 0
$to00 p $100
c. Individual Chapters of Development Regulations $10 $20
d. Renton Municipal Code(two volumes) $400 5400
e. Code supplements,per year:
(i( Titles l-ill and Vl-X
570 $70
Title IV
570 $70
7. Miscellaneous Services:
a. Certification and Notary Fees-Clerk's Certification $to SID
b. Notary Public Attestation or Acknowledgement or as $to SID
otherwise provided for in RCW 42.28,090,per signature
c. H old Harm less Agreem ents an d oth er similar documents
520 $20
not otherwise provided for
d. Lamination of licenses,pictures 56 $6
e. Community Development Block Grants(CDBG)Loan Program:
0) Application Fee
$zao $200
Loan Origination Fee $150 or 0.25%of loan amount,5150 or0.25%of loan amount,
whichever is greater whichever is greater
Closing Costs including any legal fees) 50%of total actual costs 50%of total actual costs
8. Miscellaneous Charges for Police Services:
a. Police Reports per page
$0 $
b. Record Checks(Written Response) SS5 $S$5
c. Photographs-Digital on CD $2 $2
d. Photographs-black&white or color-Cost of developing film Cost Cost
e. Fingerprint Cards $5 $5
(i) Each additional card $1 $1
9. Charges for Fire Documents:
a. Fire reports per page $0.15
b. Fire investigative report on CD $2 52
c. First copy-black&white or color-Cost of developing film Cost Cost
d. Additional copy-black&white or color-Cost of developing film Cost Cost
10. Computer Listings:
a. City of Renton new business list
$ 0
b. List of all business licenses $
c. Copies requested to he faxed,loml number $20 $2
$3 $3
d. Copies requested to 6e fazed,long distance number
(d Multi-family:2 units,Duplexes,&Accessory Dwelling Unit(ADU)s SID sic
(ii) Six(6)or more pages(ten(10)page limit)
$20 $20
11. Utility Fee.
a. Special Request Water Meter Reading $30 $30
Is. Utility New Account Setup S25 $25
c. Utility Billing Account Transfer)tenant billingform) $5 $5
d. Water utility outstanding balance search requested by $25 $25
fax,messenger,or letter
e Water turn pR and turn on fee $60 $60
f Water utility shutoff list processing fee $60 $60
g Water delinquent late fee of 10%of past due charges but not less than fifty cents 10% 10%
h Water after hours service charge to turn on water after 3 p.m.(additional fee) $90 $90
I Tenant notification fee for impending shutoff of water per tenant $5 $5
I Petition filing fee for stormwater appeal from category determination and assessment $75 $75
k Meter Accuracy Reading-For testing 3/4"through 2"meter $40 540
1 Meter Accuracy Reading-For testing meters larger than 2" Time&Materials,requires Time&Materials,requires
a S60 refundable deposit a$60 refundable deposit
12 Schedule of Fines for False Alarms-Scarify/Burglar:(effective Febrwryl,2019) prior to test p a Ip test
a. One-time Registration Fee $25 $25
b. Annual Registration Renewal N/C N/C
c. First False Alarm in a registration year' N/C N/C
d. Second False Alarm in a registration year' $100 $100
!. Third or more False Alarm in a registration year' $250 $250
f. Late Payment Fee 525
25
g. Unregistered Alarm System Fee $
$50 $5050
'A registration year shall mean January 1 thru December 31 each year.
13. NSF Check Fees 525 $25
14. Veteran Park Tile.Three lines $75 S75
City of Renton Fee Schedule
2023-2024
SECTION • • ■ 2023 2024
15. Electronic Records"
a. Photocopies or printed copies of electronic records,per page $0 15 SO 15
b. Scanning paper records,per page $0.30 $0 10
C. Electronic files or attachments u ploaded for electronic delivery(email,cloud-based data storage service,or other means of electronic 5005 $005
delivery),for each four(4)files
d. Transmission of records in an electronic format or for the use of agency equipment to send the records electronically,per gigabyte(GB) $010 5010
e. Body worn camera footage redaction,per minute of documented staff time,plus other documented costs of redact on $0 64 50 64
'The charges identified in RCW 4256.1211(31(b)(and referenced above)may be combined to the extent that more than one type of charge applies to copies produced In response to a particular request.The
actual cost of any digital storage media or device provided by the agency.Alternatively,the City may charge a Rat fee of up to$2 for the entire request as long as the cost of uploading and trans mixing the
electronic records is reasonably estimated to equal or exceed that amount.Only one$2 Rat fee per request is authorized for electronic records produced in Installments.When records are provided electronically
on a CO,DVD,thumb drive,flash drive,or other electronic device,the requester will be charged for the cost of the electronic storage device.The City may charge an actual-com service charge for requests that
require use of IT expertise to prepare data compila tons or provide customized electronic access services when not used by the City for other purposes.A cost estimate and explanation will be provided to the
requester before incurring the costs.
'Option to waive charges.The City may waive charges associated with fulfilling a request.The decision will be based on various factors,including the volume and format of the responsive documents,The
decision to assess fees for full a public records request shall be made on a consistent and equitable basis,dependent primarily upon the amount of stall time required for copying,scanning,shipping,
uploading,and/or transmitting the records associated with fulfilling a request.
'Certified copies.If the requester Is seeking a certified copy of a City record,an additional charge of$2.00 per each complete document maybe applied to cover the additional expense and time required for
certification.
16. Document Recording Fees:
a. The applicant shall pay all document recording fees charged by King countyand all administrative fees charged by the title company for Actual Casts Actua Costs
processing.Payment in full shall by submitted to the City before documents are sent for recording,
b. Miscellaneous charges associated with documentrecording such as courier fees Actual Costs Actual Costs
17. Publication Fees:
The applicant shall pay all Publication fees charged by publication outlet used by the Clty(The Seattle Times or equiva ent)Payment in full shall be Actual Costs Actual Costs
made to the City prior to public hearing permit approval or issuance whichever comes first
Should Section I fees due total less than 54.00 and no other fee is due to the City at the same time,the department administrator may authorize to waive the entbe amount due at their discretion.
�5tCTION 11,MAPLEWOOD GOLF COURSE 2023 2024
1. Green Fees:
a. Weekday:
(1) 18 Hale
IS) 9 Hole $43
$32
(111) 18 Hole,Senior 32 $34
$26
(N) 9 Hole,Senior $
1v) 18 Hole,Junior 26 $26
S2
(vl) 9 Hole,Junior $2
b. Weekend Sig9 $20
(i) 18 Hole
$
(ii) 9 Hole $32 $3355$
For purposes of this section,"weekend"shall mean Friday,Saturday,and Sunday."Weekday"shall mean the remaining four days of the week."Junior'shall mean ages 17 and under,"Smi l'shall mean
ages 62 and over.
OH-season and promotional rates determined by management;posted on website.
2. Club Rental:
a. Regular S30 $35
b. Premium
$60 $65
3. Golf Cart Fees.
a. 18 Hole $36
b. 18 Hole Single Rider $38
c. 9 Hole 52 $2
$24 $26
d. 9 Hole Single Rider $18 $18
e. Trail Fee $15 S15
I. Half Cart,18 Hole $18 $19
g. Half Cart,9 Hole 512 S13
4. Whiling Range Fees:
a. Large Bucket $13 $14
b. Small Bucket S10 $11
C. Warm-up Bucket
$6 $7
S. lesson Fees:
a, 112 Hour rivate SSS
b. 1 Hour Private 0
$55 $6 S6
c. 1/2 Hour Series Private $ 0
00 $220
d. 1 Hour Series Private 5300
e. Group Series $140 $160
160
If. 1/2 Hour Private,tun or $35 $40
S. Playing Leswr(3-hole minimum/9-hole maximum)per hole 525 S30
�SECTION 111.CITY CENTER PARKING FEES 2023 2024
1. City Center Parking Garage Fees':
Parking rates for retail parking will be as follows:
a. Zero(0)-two(2)hours N/C N/C
Is. Two(2)-four(4)hours $2 $2
c. Four(4)-six(6)hours $4 $4
d. Six(61-(10)h—rs 56 $6
e. 10 hour:or more 510 slo
I. Monthly pass-holders,tax included $35 S35
s Parking garage fees for periods of up to 30 hours are waived by Ord 6131 until 12/31/2024.
2
City of Renton Fee Schedule
2023-2024
!SECTION
e
r
1. Admission forthe Aquatic Centershall beesfoliows:
a. Regular Session
(i) Infants-under 1 year N/C N/C
(il) Youth-1 to 4 years 58 $8
(III) Ages 5 and up $16 516
(iv) Lap swim-water wa king on'y SS $7
(v) Locker Rental 5025 $025
b. Canopy Rental Fees'(includes can opy and admission for one leisure swim seas on)
(I) Henry Moses Party Tent 41
(IV x 20'far up to twenty-ive f 25)guests on wave pool)
(1) Resident Rate,per session $600 S600
(2) Non-resident Rate,per session $700 $7DO
fill Henry Moses Party Tent 42
(10'x 20'for up to twenty-five(251 guests):
(1) Resident Rate $500 $500
(2) N—Resident Rate $600 $600
phl Henry Moses Party Tent x3
(10'a 10'for up to ten(10)guests(:
(1) Resident Rate,per session $250 $250
(2) Non-resident Rate,per session $30D $300
c. Resident Rate all inclusive' $3,800 S3,800
d. Non-resident Rate all inclusive' 54,800 $4,800
e. Swim Lesson Program-Fees and associated descriptionsare published in the"Let's Go Renton-Renton Acbv ties Gwde
I. End-of-year School Party Rentals
0) Renton School D strict
(1) 001-299students $1,900 $1,900
(2) 300-3993tudents $2,250 $2,250
(3) 400-499students $2,400 $2,400
(4) 500-599 students S2,550 $2,550
Other Schools and D striets
11) 001-299 students $2,450 $2,450
12) 300-399students $2.850 $2.850
13) 400-499students $3.150 $3,150
(4) 500-S99 students $3.360 $3,360
'Sales tax not Included In the rental fee
2. Boat Launch Rates:
a. Dairy resident-7 days a week $20 $20
Is. Daily Nam resident-7 days a week $25 $25
C. Overnight resident-7 days a week S25 $25
d. Overnight Non-resdent-7 days a week S45 $45
e. Annual parking boat launch permit-resident $70 $70
I. Annual parking boat launch permit-non-resident $130 $130
I. Fishing Tournaments at Coulon Beach(additional rental fee if using the Pavilion area forwe,gh m and or electricity at the current rental rate)per
event
(i) Resident rate $110 $130
Non-resident rate $115 $115
SECTION 4 1 1
SECTIONa FACILITIES USE AND RENTAL 2023 2024
1. Outlying Picnic Shelters(Cedar River Trail,Libefty Park,Philip Arnold Park,Teasdale Park and Herltage Parkl Maximum of 50 people:
a. Resident 10am-7pm $150 $150
b. Non resident 10am-7pm S290 $290
2. Gene Coulon Beach Park Shelters(South el,South x2 and Creekside)Maximum of 75 people:
a. Resident 10am-7pm $350 $ISO
b. Non-resident 10am-7pm $290 $290
e. South Shelters 1&2 Resident rate 5310 S310
I. South Shelters 1&2 Non-resident rate S610 $610
3. Gene Coulon Beach Park Shelters(North Shelter):
a. Resident 10ari $200 S200
It. Non-resident loam-7pm $360 $360
4. Basketball court at.per hour(Tournament Play Only):
a. Resident rate $2$ $25
b. Non-resident rate $30 $30
S. pen Space Area in t e Parks(Cascade,Teasdale,Philip Arnold,Cedar River,Earlington,Gene ou on, encoe, enny a e ions,Sunset,an
Riverview Parks):
a. Resident rate per hour 525 $25
It. Non-resident rate per hour S30 $30
c. Temporary Event Permit Fee sits $as
6. Plain Park Open Space Event Rental
a. Full day rental 10am-71 $500 $500
7. Photo Shoots per hour:
a. Commercial Film and Photo Shoots per hour $300 $300
8. Electrical Spider Box rental:
a Electrical spider box rental per box,per event,with speaal event approval
200 200
3
City of Renton Fee Schedule
2023-2024
4 • • • r
9. Athletic Field Rental,Lights and Prep Fees:
Sports Field rental per hour-resden;
$30 $30
b. Sports field rental per hour-non.resident $36 $36
c. Renton Area Youth Sports Agencies,per hour
$8 58
d. Field prep for softball/baseball-resident perocarrence $35 $35
e. Field prep for soccer-resident peroccurrence $50 S50
f. Custom Field prep-resident per occurrence
$300 $100
X. Field prep for softball/baseball-non-resident per occurrence $35 $40
h. Field prep for soccer-non-resident per occurrence $SO S55
I. Custom Field prep-non-resident per occurrence $IDO $100
j. Field lights all sports.resident per hour $30 $30
it. Field lights all sports-non-resident per hour $36 536
10, Banquet&Classroom Rental-Community Center&Senior Activity Center:
a. Friday evening 5 hour minimum-resident $750 5750
b. Weekend Rates 10 hour minimum-resident $1,500 S1,S00
c. Extra hours-per hour-resident $ISO 5150
d. Friday 5 hour minimum-non-resident
$900 $9D0
e. Weekend Rates 10 hour minimum-non-resident $1,800 $1,800
f. Extra hours-per hour-non-resident
$I80 SIBO
g Banquet Room-Mon-Fri-daytime-res-clar hr 3 hour min
5300
Is S22IOD
Banquet Room-Mon-Fri-daytime-non-resident/hr3 hour m.n $90 $120
I. Damage deposit $550 $550
1 Cancellation Fee-Less than 90 days SS50 $550
11. Classroom and Gymnasium Rental-Renton Community Center:
a. Resident single gym athletic-per hour 550 $50
b. Non-resident single gym athletic-per hour $60 S60
c. Resident double gym athletic-per hour
5300 $100
J. Non-resident double gym athletic-per hour $120 $120
e. Resident single gym non-athletic 51,000 $1,D00
I. Non-resident single gym non-athletic $1,200 51,200
g. Resident double gym non-athletic
52,000 $2,000
h. Non-resident douh a gym non-athletic $2,400 52,400
I. Carpet fee s ngle gym-resident&non- sident
$ $325
1. Carpet fee daub a gym-resident&non-revd $650 $
650em 50 50
It. C assroom resdem $40 $40
I. C assroom Non-resident S48 548
12. Facility Rental-Neighborhood Center.
a. Meeting room-resident
$35 5411
b. Gymnas um-resident
535 $40
c. Meet ng room-non-resident
d. Gymnasium-non-resident $40 S48
$40 548
13. Farmer's Market
a. 1Ox10 Lot
$40 $40
b. Ha f Lot
$20 $20
c. ApPllcat on fee S30 $30
d. Electr cal fee $5 $5
14. Parklet Rental,
a Parklet Rental mauding Insta lanon per Occurrence" $500 $73/month,5876/year
'Lang-Term Right of Way Permit will he required if looted within the City Right of Way.See Section KII,Development Fees,of the City of Renton Fee Schedule Brochure:Subsection a of subsection 3,Site Work,
Utilities,and Right of Way Fees
'Parklet rental Is subject to sates tax
15. Outlying Park Buildings(Tiffany Park Buliding,Kennydale Park Building,Teasdale Park Building)
a. 6-hour block-resident
$zw $200
b. 6-hour h rick-non-resident 5240 $240
c. Deposit resident&non-res dent $250 5250
d. Non-profit fee-per hour(no depas t required) S40 $40
36. Renton History Museum
a Adult(18 yrs.up)
SS
to Chdd(9 yrs.17 yrs)
S2
SECTION a a, FEES r
Fees and associated descriptions are published and available in the"Let's Go Renton"Recreation Gulde.
SECTION •••• 2023 2024
1. Airport Fuel Flow Charge:perpaon SO08 $BOB
2. letA Fuel Flow Charge:per gallon Salo 50 10
3. T.Hangar Waitllst,one time fee 5300 $100
4 T-Hangar,Move-in Fee(non-refundable) $250 $250
5 T-Hangar Rema,Space(monthly))plus leasehold excise tax) 5409 43 5409 43
6 Tie-down Waid st.one time fee
$25 525
7 Tie-down Rental Space(monthly)(p us leasehold excise tax)
B. Penalty for violation of Minimum Standards/Airport Rues&Regulations)each occurrence) $500 $500
S. Penalty for Movement Area Into rs ions leach occurrence),assessed to sponsor/tenant S5D0 5500
10 Lost gate card fee per occurrence $SO 550
11 Trans.ent airplane parking(dady) $a 58
SECTION IX.ANIMAL LICENSES FEES'-RMC 5A-Z 2023 2024
1. Altered An mad Ann License 530 530
2. Unaltered Animal Annual License 550 $50
3. Economically Qualified Res dent Specal Wet,me L-cense 50 $0
4. Duplicate Tag 510
$10
'Please note,Impounded animals are subject to license fees,microchlpping costs,and other out-al-packet costs as specified In RMC&&2.
4
City of Renton Fee Schedule
2023-2024
�SECTION X.BUSINESS LICENSES 2023 2024
1. General Business License:
a. Registration Fee
Appeal of Bu b. siness License Decision MO $150
5250 $250
2. Penalties:
a. The penalty to reinstate an expired business tense
$50 5so
Is. The penalty for failure to obtain a business cense $250 $250
c. Faiture to pay the license fee within one day after the day on which it Is due and payable pursuant to subsection C7 of Chapter 5 of the AMC
shall render the business enterprise subject to a penalty of^of the amount of the license fee for the first month of the delinquency and an
additional penalty of S%I for each succeeding month of delinquency,but not exceeding a total penalty of iof the amount of such license 5%-15%
fee.
,SECTION X1.ADULT ENTERTAINMENT LICENSES 2013 2024
1 Everyperson applying fora adult entertainment license shall paythe applicable nonrefundable application fee:
Adult Entertainment Business License $750 $750
b. Entertainer $75 $7s
c. Manager
$75 $75
d. License Replacement
530 $10
2. Penalties:
a. Civil Penalty,per violation $1,000 $1,000
LJ
Crty of Renton Fee Schedule
2023-2024
SECTION DEVELOPMENT s
1. Building Fees:
a. Building and Demolition Permit Fees:'
(1) Base Fee/Valuation$1.00 to$500.00 $42 $42
(III Valuation$501.00 to$2,000.00 $42+$4,70 x each $42+$4.70 x each
$100 value $100 value
(iii) Valuation$2001.00 to 25,000.00 $112.57+$21.63 x each $112.57+$21.63 x each
$1,000 value $1,000 value
(iv) Valuation$25,DO1.00 to$50,000.00 $610.06+$15.57 x each $610.06+515.57 xeach
$1,000 value $1,000 value
(VI Valuation$50,001.00 to$100.000.00 $999.31+$10.85 xeach $999.31+$10.85 x each
$1,000 value $1,000 value
(vi) Valuation$100,DO1.00 to$500,000.00 $1,541.81+$8.63 x each $1,541.81+$8.63 x each
$1,000 value $1,DDO value
(Vii) Val uat ion$SDD,001.00 to$1,D00,000.00 $4,993.81+$7.33 x each $4,993.91+$7.33 x each
$1,13DO value $1,000 value
(vili) Valuation$I,000,0O1.00 and up 58,659.81+$5.66 x each $8,659.81+$5.66 x each
$1,000 value $1,D00 value
s This fee shall be$0 for Accessory Dwelling Units(ADUI.
b• Combination Building Permit Fees'''
(1) Plumbing up to 3,000 sq ft $317 $317
(i i) Plumbing over 3,000 sq it $348 $348
(iii) Mechanical up to 3,000 sq it $254 $254
(iv) Mechanical over 3,DOO sq ft $285 $285
(v) Electrical up to 3,DOO sq it $285 $285
(vil Electrical over 3,000 sq ft $348 $348
'This fee shall be$0 for Accessory Dwelling Units(ADU).
'Combination Building Permit fees are required for each new single family residential structure.
C. Building Plan Check Fee'
(i) Initial Building Plan Check Fee' 65%of permit fee 65%of permit fee
(if) Additional Building Plan Check Fee 50%of initial plan Check Fee 50%of initial plan Check Fee
'This fee shall be$0 for Accessory Dwelling Units(ADU).
'Building Plan Check Fee Is In addition to the building permit fees,demolition permit fees,and combination building permit fees.The plan check fee Is equal to 65%at the building permit
fee,or the demolition permit fee,or the combination building permit fee.Includes three(3)review cycles.
d. State Building Code Fee
(I) Non-residential projects $25 $25
(i i) Residential projects
(1) Base Residential Fee $6.50 $6.50
(2) Each additional unit after first unit $2 $2
e. Electrical Permit Fees':
(i) Residential Fees-Single-Familyand Duplex
(1) New Service-Single Family and Duplex'
lal upt0200AMP $269 $269
(b) Over 200 AMP $285 $285
(2) Service Changes/NewCircuits-Single Family and Duplex
(a) Change up to 200 AMP $209 $209
(b) Change over 200 AMP $221 $221
(c) Any new circuits added to above price is per each up to a maximum of$80.00 $26 $26
(d) Minimum fee for remodel/addition of new circuits without a service charge $209 $209
(e) Cooling system circuit for new or replaced appliance $93 $93
(if) Multi-Family,Commercial and Industrial Fees:Fees based an value of work.
(1) $1.00to$500.00 $82 $82
(2) $500.01to$1,000.00 $82+4.99%of value $82+4.99%of value
(3) $1,000.01 to 5,000.00 $106.45+4.93%of value $1D6.45+4.93%of value
Mult$5,000.01 to$50,000.00 $303.78+2.58%of value $303.78+2.58%of value
(5) $50,O00.01to$250,000.00 $1,463.10+1.7D%of value $1,463.10+1.70%of value
(6) $250,000.D1to$1,000,000.00 $4.870.92+1.45%of value $4,970.92+1.45%of value
(7) $1,D00,000.01 and up $15,775.97+0.53%of value $15,775.97+MS3%of value
(lit) Temporary Electrical Services $209 $209
(IV) Miscellaneous Electrical Fees
(1) lob Trailers $209 $209
(2) Signs per each $209 $209
(3) Mobile Homes $209 $209
(4) Low Voltage Work(e.g.,alarm systems;thermostats;computer,data,or phone lines;fiber optics,cable 50%of commercial fees SO%of commercial fees
television,etc.) Minimum$209 Minimum$209
(S) Residential Photovoltaic(PV)Solar Panel
(a) Review Fee 5135 $135
(h) Permitfee $2D9 $2139
'This fee shall be$0 for Accessory Dwelling Units(ADUI.
'Exemption:Residential telephone communication systems,thermostats,securlty systems,and cable television Installations are exempt from fees
f- House Moving'-minimum per hour Inspection Fee $190 $190
'This covers only the Building Section Inspection of the structure prior to move.There Is a separate additional fee charged by the Public Works Department to cover the actual house move
permit.A building permit Is also required in order to site the structure on the new site.
g. Inspection Fee For Condominium Conversions $190 on 1st unit/$24 each $190 on Ist unit/$24 each
add')unit add'I unit
6
City of Renton Fee Schedule
2023-2024
SECTIONDEVELOPMENT (CONTINUED 2023 2024
1. Building Fees:(Continued)
h. Manufactured/Mobile Home Installation Fees`
(i) Within a manufactured home park $190 $190
(ii) Outside of a manufactured home park Building Permit Fees Building Permit Fees
`Includes plan review and Inspection fees for the foundation(electrical,plumbing,mechanical,sewer and water connection fees are in addition to the below amountsl.
I. Mechanical Permit Fees:`
(i) Residential-Mechanical Permit base fee plus itemized fees below: $65 $65
(1) Heating system(furnace,heat pump,suspended heater,fireplace,wood stove,etc.).A/C system(air $26 $26
conditioner,chiller or Air Handling Unit(VAV)including ducts and vents)
12) Boiler or Compressor $26 $26
(3) Appliance or piece of equipment regulated by this code but not classed in other appliance categories,or for $26 526
which no other fee is listed in this code
(4) Ventilation/exhaust fan $26 $26
(5) Fuel Gas Piping(each gas piping system up to 6 outlets) $26 $26
(i i) Commercial or Multi-Family-Mechanical Permit base fee plus itemized fees below: $96 $96
(1) Heating system(furnace,heat pump,suspended heater,fireplace,wood stove,etc.).A/C system(air $45 545
conditioner,chiller or Air Handling Unit(VAV)including ducts and vents)
(2) Boiler or Compressor $96 $96
(3) Refrigeration System $96
$96
(4) Commercial Hood:Installation of each served by a mechanical exhaust,including the ducts for such hood each $96 $96
(5) Incinerator:Installation orrelocation ofeach 5127 $127
(6) Appliance or piece of equipment regulated by this code but not classed in other appliance categories,or for $45 $45
which no other fee is listed in this code
(7) Fuel Gas Piping(each gas piping system up to 6 outlets) $45 $45
`This fee shall be$0 for Accessory Dwelling Units(AOUI.
( Plumbing Permit Fees:`
(i) Residential-Plumbing Permit base fee plus itemized fees below: $65 $65
(11 Per plumbing fixture(e.g.,sink,shower,toilet,dishwasher,tub,etc.1 or set of fixtures on one trap $12 $12
(2) Water Service:For meter to house $12 $12
(3) Per fixture for repair or alteration of drainage orvent piping $12 $12
(4) Per drain for rainwater systems $12
$12
(5) Per lawn sprinkler system,Includes backfiow prevention $12 $12
(6) Per vacuum breaker or backfiow protection device on tanks,vats,etc. $12 $12
(7) Per interceptor for industrial waste pretreatment $12 $12
(8) Fuel Gas Piping:(each gas piping system up to 6 outlets) 526
$26
(f) Commercial or Multifamily:Plumbing Permit base fee plus itemized fees below: $96 $96
(1) Per plumbing fixture(e.g.,sink,shower,toilet,dishwasher,tub,etc.)or set of fixtures on one trap $19 $19
(2) Water Service:For meter to building $19 $19
(3) Per fixture for repair or alteration of drainage or vent piping $19 $19
14) Per drain for rainwater systems $19
$19
(5) Per lawn sprinkler system,Includes backfiow prevention
$19 $19
(6) Per vacuum breaker or backflow protection device on tanks,vats,etc. $19 $19
(7) Per interceptor for industrial waste pretreatment $19 $19
(8) Fuel Gas Piping:(each gas piping system up to 6 outlets) $33 $33
(9) Medical Gas Piping:(each gas piping system up to 6 outlets) $96
$96
`This fee shall be$o for Accessory Dwelling Unfits(AOU).
k. Sign Permit Fees:
(I) Permanent Signs:
(1) Roof,projecting,awning,canopy,marquee,and wall signs $317 $317
(2) Freestanding ground and pole signs $317
$317
(iii Temporary and Portable Signs:
(1) Real Estate Directional Signs,pursuant to RMC 44-100)2,permit valid for a 12-months period $96 $96
(2) Grand Opening Event Signs,pursuant to RMC 44-10(b6d1i) $96 $96
(3) Event Signs,pursuant to RMC 4-4-100J6d(ii)and(iii)per sign,per promotion $63 $63
(41 A-Frame Signs,pursuant to RMC 4-4-1 0 015 Charge is for the first sign,all subsequent signs are 550 DO $158 $158
(5) Commercial Property Real Estate Banner each sign permit is valid for 12 months. $96 $95
(6) Decorative Flags fee is per entrance and valid until Rag(s)are removed $96 $96
I. Miscellaneous Fees:
(I) Inspection Fees:
(1) Minimum Housing Inspection $158
$158
(2) WABO-Adult Family Home;Misc building inspection $158 $158
(3) Reinspection Fee;Misc building inspection $158 $158
(4) After hours inspection' $175/hr $175/hr
(iii Plan Review Fees:
(I) Electrical,Plumbing,or Mechanical Permits(percentage of permit fee) 40% 40%
(2) Additional Plan Review Fees Over three review cycles(percentage of plan review fee) SO% 50%
(3) Miscellaneous Plan Review hourly fee. $158/hr $158/hr
(4) Site Plan/Zoning Review 5%of Permit Fee 5%of Permit Fee
(5) Engineering Review 5%of Permit Fee 5%of Permit Fee
(III) Work commencing before permit Issuance:Where work for which the permit is required is started prior to 2 X Permit Fee 2 X Permit Fee
obtaining the permit,a special investigation fee in an amount equal to twice the permit fee shall be charged.The
special investigation fee shall he paid in addition to the required permit fees.
'This fee shall be$o for Accessory Dwelling Units(AOU).
'Applies to inspection performed on Saturdays,Sundays,observed City of Renton holidays,and non-holiday Monday-Fridays
outside the hours of 7:00AM to 3:30PM
7
City of Renton Fee Schedule
2023-2024
SECTIONDEVELOPMENT FEES(CONTINUED) e
2. Land Use Review Fees:
a. General Land Use Review':
ji) Additional Animals Permit $56 $56
(i 1) Address Change $120
$120
(iiij Annexation:
(1) Less than 10 acres $5,900 $5,900
(2) 10 acres or mare $5,900 $5,900
(iv) Appeal of:
(1) Hearing Examiner's Decision $560
$560
(2) Administrative Decision $560 $550
(3) Environmental Decision $560 $560
(v) Binding Site Plan
(1) Preliminary $2,965 $2,965
(2) Final $5,930 $5,930
(VI) Code Text Amendment
(vill Comprehensive Plan Map or Text Amendment(each) $5,900 $5,900
(viii) Conditional Use Permit:
(1) HEX $3.710 $3,710
(2) Administrative $1,800 $1,800
(31 Revision(minor,administrative) 50%of Application Fee SO%of Application Fee
(4) Revision(major) Application Fee Application Fee
IN) Critical Areas Exemption N/C N/C
(x) Critical Areas Permit
$1A10 $1,410
NO Critical Areas Review Fee:forthose projects that propose impacts to critical areas and will be billed at the cost of 100%of contract cost 100%of contract cost
contract biologist's review!
(xii) Development Agreement
$11,240 $11,240
(xiii) Environmental Impact Statement Cost include the coordination,review and appeal.Draft and Final' 100%of cost 100%of cost
(xiv) Environmental Checklist Review $1,800 $1,800
(xv) Environmental(SEPA)Addendum $1.800 $1,8D0
(xvi) Fence Permit(special) $180 $180
(xvii) Grading and Filling Permit(Hearing Examiner) $6,080 $6,080
(xviii) Home Occupation Permit(Special)
$230
(xix) Landscape Review Fee $1g0
$180
(xx) Legal Lot Segregation N/C N/C
(xxi) Lot Consolidation $570 $570
(xxii) Lot Line Adjustment $1,230 $1,230
(xxiiij Manufactured/Mobile Home Park:
(1) Tentative $1,230 $1,230
(2) Preliminary $3,650 $3,650
(3) Final $1,800 $1,800
(xxiv) Open Space Classification Request $170 $170
(xxv) Plats:
(1) Preliminary Short Plat $6,080 $6,080
(2) Final Short Plat $3,040 $3,040
(3) Preliminary Plat $12,170 $12,170
(4) Final Plat $6,080 $6,090
(5) Minor Plat Amendment 50%of Application Fee 50%of Application Fee
(6) Major Plat Amendment
Planned Urban Development(xxvi) . Application Fee Application Fee
(1) Preliminary Plan $6,080 56,080
(2) Final Plan $3,030 $3,030
(xxvii) Reasonable Use Exception:
(1) In conjunction with land use permit $570
$570
12) Stand alone $1,730
$1,730
(xxviii) Public Arts Exemption
N/C N/C
(xxix) Rezone $5,900 $5,900
jxxx) Routine Vegetation Management Permit without Critical Areas $120 $120
jxxxi) Shoreline-Related Permits:
(1) Shoreline Permit Exemption N/C N/C
(2) Substantial Development Permit
$3,030 $3,030
MultConditional Use Permit $3,650 $3,650
(4) Variance $3,650 $3,650
(xxxil) Site Development Plan(She Plan or Master Plan which includes design review fee for projects subject to RMC 4-3-300):
(1) Hearing Examiner Review $4,270 $4,270
(2) Administrative Review $3,030 $3,030
(3) Modification Iminor,administrative) 50%of Application Fee 50%of Application Fee
(4) Modification(major)required new application and repayment of fee required Application Fees Application Fees
(xxxiii) Small Cell Permit,per site $570 SS70
(xxxiv) Special Permit(Hearing Examiner) $3,030 53,030
(xxxv) Street Naming(Honorary)
(1) Application $280 $280
(21 Installation $290 $ZB0
(xxxvi) Temporary Use Permits
(1)Tier 1 $120 $120
(2)Tier $230 $230
(xxxvii) Variance(per each variance requested)Administrative or Hearing Examiner $1,490 $1,490
(xxxviii) Waiver or Modification of Code Requirements cost is per request 5290 $290
(xxxix) Zoning Compliance Letter $540 $540
8
City of Renton Fee Schedule
2023-ZO24
SECTION X11.DEVELOPMENT FEES(CONTINUED) t
2. Land Use Review Fees:(Continued)
a. General Land Use Review' (Continued)
s Exception for Projects Vested in the County:For those projects that have vested to a land use permit under the development regulations of King County,the King County Land Use Review
Fee Schedule shall apply,and is herebv adopted by reference.A copy of that fee schedule has been filed with the City Clerk and Is available at the City Clerk's office for Public review.
r Per RMC 4-3-1 the City may charge and collect fees from any applicant to cover costs Incurred by the City in review of plans,studies,monitoring reports and other documents related to
evaluation of impacts to or hazards from critical areas and subsequent code-requlred monitoring.
s When the City Is the lead agency for a proposal requiring an Environmental Impact Statement(EIS)and the Environmental Review Committee(ERCI determines that the EIS shall be
prepared,the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City In preparing the EIS.The ERC shall advise the applicants)of the projected
costs for the EIS prior to actual preparation;the applicant shall post bond or otherwise ensure payment of such costs.The ERC may determine that the City will contract directly with a
consultant for preparation of an EIS,or a portion of the EIS,and may bill such costs and expenses directly to the applicant.Such consultants shall be selected by mutual agreement of the City
and applicant after a call for proposals.If a proposal Is modified so that an EIS is no longer required,the ERC shall refund any fees collected under this subsection which remain after incurred
costs are paid.The City may collect a reasonable fee from an applicant to cover the cost of meeting the public notice requirements of this Title relating to the applicant's proposal.The City
shall not collect a fee for performing its duties as a consulted agency.The City may charge any person for copies of any document prepared under this Title,and for mailing the document,in a
manner orovided by chapter 42.17 RCW.
r Prior to Issuance of a small cell permit,the applicant shall pay the actual administrative expenses incurred by the City that are directly related to the City's review of the application,
Including plan Inspection,and approval,as authorized by RCW 35.21.860(1)(b),as may be amended.
b. Miscellaneous Fees':
(i) Permit review staff overtime(applies only if permit review is requested by the applicant to be performed on $175/hr $175/hr
Saturdays,Sundays,observed City of Renton holidays,and non-holiday Monday-Fridays outside ofthe hours of r,ty
staff regular work schedule)
s Exception for Projects Vested In the County:For those projects that have vested to a land use permit under the development regulations of King County,the King County Land Use Review
Fee Schedule shall apply,and is hereby adopted by reference.A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk's office for cubllc review.
(CONTINUEDSECTION XII.DEVELOPMENT FEES ON THE NEXT PAGE)
9
City of Renton Fee Schedule
2023-2024
SECTIONDEVELOPMENT aNTINUED) 2023 2024
3. Site Work,Utilities,and Right of Way Fees:
a. Site Work and Civil Construction Fees
(0 Clearin,Grading,Excavation,and Mini n Permits and License Fees Fees shall be based on the highest tier triggered
Tier Grade and Fill Quantity Cleared or Disturbed Area New or Replaced Hard Surface
0 <50 c <7,000 sf c 2,000 sf
1 50 cy-499ry 7,000 sf-<3/4 acre 2,DOO sf-4,999 sf
2 500c -4,999 cy 3/4 ac-<1ac 5,000 sf-clac
3 5,000c -49,999 1
ac-<25ac lac-<2.5 ac
4 50,000c -99,999 25ac-<5 ac 2.5 ac-<5 ac
5 100,000 cy and larger 5ac and larger 5ac and larger
(1) Review/Intake Fee:
(a) Tier 0(no permit required) N/A N/A
(b) Tier 1 $520 $520
(c) Tier $700 $700
(d) Tier $1,05D $1,050
(q Tier $1,400 $1,400
(e) Tier $1,750 $1,750
(2) Inspection/Issuance Fee:
(a) Tier 0(no permit required) N/A N/A
(b) Tier 1 $500 $500
(e) Tier $1,000 $1,000
(d) Tier $1,330 $1,330
(1) Tier $2,660 $2,660
(a) Tier $3,990 $3,990
(3) Solid Waste Fills Review Fee': 1.5 x Review/Intake Fee 1.5 x Review/Intake Fee
(4) Annual Licenses of Solid Waste Fills Review Fee'z 1.5 x Review/Intake Fee 1.5 x Review/Intake Fee
Civil construction plan review and inspection fees"
(1) $150,000,00 or less 6%of cost 6%of cost
(2) Over$150,000.00 but less than$350,000 00 $9,000+5%over$150,000 $9,000+5%over$150,000
(3) $3S0,000.00 and over $17,500.4%over 350,0004%over
(lit) Site Plan/Zoning Review and Inspection Fee°' 0.5%of cost $17,5000 5%of cost
350,000
(IV) Plan Revision following Permit Issuance
Ill Minor(Results in a change 10%or less than the cost of improvements'Excludes minor adjustments that are $280 $290
approved by the City to be shown on record drawings)
(2) Major(Results in a change of greater than 10%of the cost of,mprovements ) $1,7130 51,700
(v) Wet weather lannual fee)
$3,000 $3,000
'The fee for a grading license authorizing additional work to that under a valid license shall be the difference between the fee paid for the original license and the fee shown for the entire project.
t Any unused fee may be carried forward to the next year.If any work Is done before the license is issued,the grading license fee shall be doubled.
'All developers,municipal or quasi-municipal entities,or utility corporations or companies,except those specifically exempted,shall pay fees under this Section.Exempted entitles Include City-
franchised cable TV,cable modem,natural gas,telecommunications,and electrical power.
'Includes three(3)review cycles.Additional reviews will be charged$1,700 each.
s If deemed necessary by the City in its sole discretion,the City will contract with one or more consultants to provide plan reviews and/or Inspections with the related costs and expenses payable by
the applicant.
`The fee shall be based up percentage of the estimated cost of improvements.
'Cost of Improvements shall be based on the City's bond quantity worksheet and shall include all project related improvements outside of the building envelopes,Including,but not limited to,all costs
required to construct the following:paved parking lots,private sidewalks or walkways;private and public storm water management facilities;temporary erosion and sedimentation control facilities;
water quality facilities;public and private streets;public and private sanitary sewers;public water main improvements;required off-site street,bike and pedestrian improvements;street lighting
improvements;required landscaping and street tree improvements;and site grading and mobilization costs.The applicant may elect to submit a separate,Itemized cost estimates for each item of
improvement subject to the approval by the City.
`Fifty Percent(SO%)of the fee is due at Civil Construction Permit Application and the remaining shall be due prior to permit issuance.
b. Latecomers'Agreement Application Fees'
Processing fee'(Nonrefundable)
(1) $50,000 or less $1,120 $1,220
(2) Over$50,000 but less than$200,000 $2,250 $2,250
13) $200,000 and aver $4,S00
$4,500
Pi) Muiti-family:2 units,Duplexes,&Accessory Dwelling Unit(ADU)'
(1) $50,000orless 15%of total 15%of total
(2) Over$50,000 but less than$200,000 10%of total 10%of total
(3) $200,000 and over 5%of total 5%of total
(iii) Segregation processing fee,if applicable 5840 $940
`Fees are based on the amount covered by the latecomers'.
'The administration and collection fee is deducted from each Individual latecomer fee payment and the balance forwarded to the holder of the latecomer's agreement pursuant to RMC 9-5,Tender of
Fee.
C. Utility System Development Charges(SOC)
(i) Water and Wastewater System Development Charges(SOC)
(1) 518 x 3/4 inch and 1 inch
(a) Waterservicefee" $4,850 $4,850
(b) Fire sprinkler service fee" $648 $648
(c) Wastewater fee'' $3,650 $3,650
12) 1-1/2 inch:
(a) Waterservicefee' $24,250 $24,250 -
(b) Fire sprinkler service fee's $3,239 $3,238
(c) Wastewaterfee' $16,250 $18,250
(3) 2inch:
(a) Waterservice fee $38,800 $38,800
(b) Fire sprinkler service fee'' $5.181 $5,181
(c) Wastewaterfee' $29,200 $29,200
10
City of Renton Fee Schedule
2023-2024
SECTION DEVELOPMENT (CONTINUED t
3. Site Work,Utilities,and Right of Way Fees: (Continued)
c. Utility System Development Charges(SDCI:(Continued)
(4) 31nch:
III) Waterservicefee° $77,600 $77,600
I Fire sprinkler service fee $10,362 $20,362
(c) Wastewater fee' $58,400 $58,400
(5) 4 inch:
(a) Waterservicefee' $121,250 $121,2So
(b) Fire sprinkler service fee $16,191 $16,191
(c) Wastewaterfee° $92,250 $91,250
(6) 6 inch:
(a) Water service fee $242,500 $242,500
(b) Fire sprinkler service fee z' $32,383 $32,393
(c) Wastewater fee $182,500 $182,500
(7) 8 inch:
(a) Water service fee $388,0DO $388,000
(b) Fire sprinkler service fee',s $51.812 $51,812
(c) Wastewaterfee° $292,000 $292,000
(ii) Storm Water System Development Charges(SDCI:
(1) New single family residence(including mobile/manufactured homes)&Accessory Dwelling Unit(ADU)s $2,300 $2,300
(2) Addition to existing single family residence greater than 500 square feet(including mobile/manufactured homes)Fee $0.920 per so foot 50 920 per sq foot
not to exceed$2,300
(3) All other uses charge per square foot of new impervious surface,but not less than$2,300 $0.920 per so foot $0.920 per so foot
(i if) Utility SDC Segregation Requests $940+administrative costs $840+administrative costs
(iv) Temporary Utility Connection':
(1) Storm Water Fee;Fee equal to thirty percent(30%)of the current SDC applicable to that portion of the property. 30%of SDC 30%of SDC
(2) Wastewater Fee;Annual fee equal to thirty percent 130%)of the current SDC applicable to the size of the temporary 30%of SDC 30%of SDC
domestic water meter(s)
(3) Water Fee;Annual fee equal to thirty percent(30%)of the current SDC applicable to the size of the temporary water 30%of SDC 30%of SDC
meter(s).
r This fee shall be reduced by fifty percent(50%)for Accessory Dwelling Units(ADU).
'Based upon the size of the fire sprinkler service(NOT detector bypass meter)
'Unless a separate fire sprinkler service is provided,the system development charge(s)shall be based upon the size of the meter Installed and a separate Fire sprinkler service fee will not be charged.
'Any parcel that currently has water and or sewer service is eligible for a prorated system development charge is eligible for credit of the existing connection.Feels)based upon meter(s)proposed for
final project will be reduced by the feels)based upon meter existing on site.
s The applicant shall pay the City's administrative costs for the preparation,processing and recording of the partial payment of the feels).If the same segregation Is used for more than one utility's
special assessment district,and/or latecomers charge,then only one administrative fee Is collected.
Temporary connection may be granted for a one-time,temporary,short-term use of a portion of the property for a period not to exceed three(3)consecutive years.Fee shall be paid annually(non-
prorated),and shall be nonrefundable,nontransferable(from one portion of the property to another)and shall not constitute a credit to the system development charge due at the time of permanent
use of the utility system.The application for temporary connection shall consist of a detailed plan and a boundary line of the proposed development service area for use in the fee determination.
III. Utility Construction Permit Fees
(i) Water Construction Permit Fees
(1) Water Testing,Construction,and Administration Fees
(a) Water meter tests for 3/4"to 2"meter $50 $50
(b) Water metertestson meters 2"or larger
$60 deposit+ $60 deposit*
time and materials time and materials
(c) Open and close fire hydrants for fire flow tests conducted by others. Time and materials Time and materials
(d) Water service disconnection(cut at main) $275 $275
(e) Meter resets $95
$95
(f) Repair of damage to service $250 $250
(g) Water main connections $560 $560
(h) Water main cut and cap $1,025 $1.025
(i) Water quality/inspection/purity tests $80 $8r1
(j) Specialty water tests(lead,copper,etc) Cost of test+ Cost of test+
$70 processing fee $70 processing fee
(k) Water turn ons/offs after hours $185 $185
(1) Installation of isolation valve.
$2,000 deposit+ $2,000 deposit+
time and materials time and materials
(m)New water line chlorination fee.Fee plus$0.15 per lineal foot for any footage after the first two hundred fifty $250+$0.15 per lineal foot $250+$0.15 per lineal foot
(250)lineal feet
(n) Miscellaneous water installation fees. Time and materials Time and materials
(o) Service size reductions $50 $50
(p) Installation fees for ring and cover castings 5200 $200
(2) Water meter installation fees-City installed:
(a) 3/4"meter installed by City within City limits.'
(I) Installation ofstub service and meter setteronly. $2,975 $2,875
(ii) Drop in meter only $400 $400
(b) 3/4"meter installed by City outside City limits'
(i) Installation of stub service and meter setter only. $2,935 $2,935
(h) Orop in meter only $400 $400
(c) 1'meter installed by the City.'
(i) Installation of stub service and meter setter only $2,875 $2,875
(li) Drop in meter only $460
$460
(d) 1-1/2"meter installed by the City.
(i) Installation of stub service and meter setter only $4,605 $4,605
(if) Drop in meter only $750 $750
City of Renton Fee Schedule
2023-2024
'SECTIONDEVELOPMENT (CONTINUED F2024
3. Site Work,Utilities,and Right of Way Fees (Continued]
d. Utility Construction Permit Fees: (Continued)
(e) 2"meter installed by the City.
(i) Installation of stub service and meter setter only. $4,735 $4,735
(ii) Drop in meter only $950 $950
(3) Water meter processing fees—Applicantinstalled:For meters largerthan 2",the applicant must provide materials $220 $220
and install the meter.
(4) Hydrant Meter fees:
(a) Hydrant meter permit fee $So $SD
(b) Deposits:
(1) 3/4"meter and back0aw prevention assembly $500 $500
(if) 3"meter and backflow prevention assembly. $2,000 $2,000
(iii) Depositprocessing charge,nonrefundable. $25 $25
(c) Meterrental(begins on day of pickup):
(i) 3/4"meter and back0ow prevention assembly.Per month $50 $50
(111 3'meter and backfiow prevention assembly.Per month. $250 $250
Wastewater and Surface Water Construction Permit Fees':
(1) Residential:
(a) Wastewater permit fee $375 $375
(b) Surface water permit fee $375 $375
(21 Commercial:
(a) Wastewater permit fee $375 $375
(b) Surface water permit fee $375 $375
(3) industrial:
(a( Wastewater permit fee $375 $375
(b( Surface water permit fee $375 $375
(4) Repair or modification of any of the above
(a) Wastewater permit fee $375 $375
(b) Surface water permit fee $375 $375
(5) Cut and Cap/Demolition Permit:
(a) Wastewater permit fee $375 $375
(b) Surface water permit fee $375 $375
(6) Reinspection for Wastewater or Surface Water Permits $375 $375
(7) Ground water discharge ltemporary connection to wastewater system for dlschargeof contaminated ground water $375 $375
over 50,D00 gallons)Rate plus billed far current Renton and King County sewer rate on discharged amount(meter plus King County sewer rate on plus King County sewer rate on
provided by property owner) discharged amount discharged amount
(iv) Street light system fee,per new connection to power system $525 $525
(v) Utility Locate Refresh Fee(Fee is due each time excavator calls in for locate refresh during 45-day locate ticket)
(1) Standard locate $500 $500
(2) Large project locate $1,000 $1,000
s This fee shall be$0 for Accessory Dwelling Units(ADU).
z This fee shall be reduced by fifty percent 150%)for Accessory Dwelling Units(ADU).
e. Right of Way(ROW)Use Permits Fees'
(i) Franchise Permit Fees:
(1) Master Service Agreement Application Fees $5,620 $5,620
12) Franchise Permit Fees:Is
(a) Small work,including trenching less than 60 linear feet or installation of 6 or less utility poles $670 $670
(b) All other work,permit fee plus staff time per hour' $670 rime and Materials $670+Time and Materials
(c) Other public agencies constructing utilities within City right-of-way $670 $670
(3) Small Cell Master Lease Agreement including Site License Addendum and Small Cell Permits
(a) Master Lease Agreement Administrative Costs,Staff time per hour and/or cost of materials.° Time and Materials Time and Materials
(b) Pole Reservation,per pole $135 $135
(c) Administrative Fee,Base plus time and/or cost of materials.° $850 deposit+Time and $850 deposit+Time and
(d) Public Reimbursement(any costs incurred by the City on behalf of the permit applicant forinstallation or
operation of site equipment)
(1) Electrical service(annual fee)
(1) Tier 1,Daily peak kWh<20 $725 38 $715.38
(2) Tier 2,Daily peak kWh 21.40 $1,43076 $1,430.76
(3) Tier 3,Daily peak kWh 41-60 $2,146 14 $2,146.14
(4) Tier 4,Daily peak kWh 61-80 $2,861.51 $2,861.51
(5) Tier S,Daily peak kWh>81 $3,57669 $3,576.89
(4) All other reimbursement Actual cost Actual cost
(e) Site License Addendum Rent $270 $270
(f) Allotherfeess Actual cost Actu al cost
14) Conduit Lease Rates per Lineal Foot(annual fee):
(a) Tier 1,conduit in existing planter strips $10 00 $10.00
(b) Tier 2,conduit outside of planter strips excluding signalized intersection crossings,bridges and train tracks $2000 $20.00
(c( Tier 3,conduit within signalized intersection crossings,bridges and train tracks $30 00 $30.00
Short-Term ROW Permit Fees(duration 30 days or less)";
(1) Single family residence,one unit only $370 $370
(2) All other uses,excluding those listed $700 $700
(3) Wastewater or storm water service $375 $375
12
City of Renton Fee Schedule
2023-2024
�• s s
3. Site Work,Utilities,and Right of Way Fees: (Continued)
e. Right Of Way Use Permits Fees'(Continued)
(fill Long Term ROW Permit Fees(duration over 30 days)z
(1) Duration greater than thirty(30)days but no more than one(1)year
(a) Within City Limits';Short-Term ROW Permit Fee associa led with use plus leasehold excise tax(LET)' Short-Term ROW Short-Term ROW
Permit Fee+LET' Permit Fee+LET'
lb) King County ROW Perm its/Inspections:
(I) Service Installation Only $1,025 $1,025
(if) Utility Extension per 100'of Length(M'n 200'Length) $1,025 $1,025
(2) Duration greater than one(1)year":
(I) Single family and two family uses";fee assessed annually plus leasehold excise tax(LET)', if applicable $50+LET' $50+LET'
(ii) All uses without public benefit fee is a per month charge assessed annually based on property value"of 0.5%x Value'+LET' 0.5%x Value"+LET'
land to be utilized,plus leasehold excise tax',if applicable.
(fill All other uses, fee is a per year charge of assessed value of land adjoining the property",plus leasehold D.5%x Value"+LET' 0.5%x Value"+LET
S
excise tax',if applicable.In no case less than$50 OD.
(iv) Oversize Load Permits
$30 $10
'Bond required pursuant to RMC 9-10-5
z Work and/or use of the right of way,including those associated with a Civil Construction Permit and excludes utilities from other public agencies and service providers which shall be considered
under a franchise permit.
'The fixed application fee established herein Is Intended to cover the Cityfs Internal administrative costs In processing and administenng the franchise.In addition to the fixed application fee,the City
may require applicants to either directly pay or reimburse the City for external costs reasonably incurred to process the application and/or administer the franchise agreement.The City may require
applicants to deposit funds In advance to cover legal and/or other professional services fees as they are Incurred.
The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant.
'If a franchise agreement does not specify the fee amount,the generic fee,as identified in this fee schedule,shall be collected.
'Regular hours and standard after hour and overtime fees apply.
'A no fee permit may be Issued for the following:Individual homeowners performing work In street ROW for street tree or parking strip Irrigation systems;residential moving pads or moving trucks
provided that they are In the ROW for no more than three(3)days;use in CD zone provided ground disturbing activity is not proposed;and work associated with City of Renton capital improvement
Prolects or Citv funded projects.
r A no fee permit may be Issued for the following:A public agency and when the proposed use of the right-of-way provides a direct service to the public(e.g.,Metro applications for right-of-way for
bus shelters);and work associated with City of Renton capital Improvement projects or City funded projects.
'Leasehold excise tax(LET)imposed pursuant to Chapter 82.29A RCW on leasehold Interests for the use of real or personal public property shall be collected from the permittee at a rate established
by the State of Washington.
10 Insurance Required:Public Liability and property damage Insurance is also required pursuant to RMC 9.2-51 Minimum Permit Requirements for Excess Right-of-Way Use.
"Except those single family and two family uses that utilize right of way along a waterfront.
"Right-of-way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor.
f. Release of easement fees:The Impost on,collection,payment and other specifics concerning this charge are detailed in chapter 9-1
RMC,Easements.
(i) Filing fee $280 $280
(ill Processing fee
$280 $280
I. Street and Alley vacation Fees:The imposition,collection,payment and other specifics concerning this charge are detailed in chapter
9.14 RMC,Vacations.
W Filing fee $560 $560
(i i) Processing and completion fee,payable upon Council approval of the vacation and upon administrative determination of
appraised value of vacated right-of-way.Appraised Value of Vacated right-of-way
(1) Less than$25,000 $840
(2) $25.000 to$75.000 $
$1,430 $1,40
430
(3) Over$75,000 $2,250 $2,250
h. Miscellaneous Fees:
(I) Street Frontage Improvements Fee-In-Lieu:
(1) All eligible uses except Single Family Additions less than 1,1Fi0 sq ft:
(a) Street with existing storm drainage main line $130/LF $130/1-F
(b) Street with existing conveyance ditch 5150/LF $150/1
(2) Single Family Additions less than 1.160 Sq Ft:Proportional share of the fee in lieu of all eligible uses fee based on (Sq Ft of addition/1,160 sq ft) (Sq Ft of addition 11,160 sq it)
square footage of addition.
(li) Re-inspection Fee o1 Feetin-heu of Fee-in-lieu
$158 $158
(iil) Inspection for Unscheduled Work' $158 $158
(w) Regular Staff Review and Inspection Hours' $158/hr $158/hr
(v) After hours inspection $175/hr $175/hr
(v1) Permit review staff overtime' $175/hr 5175/hr
(vn) Public Works Reimbursement' Actual cost Actual cast
(viii) Standard or minor drainage adjustment review $670 $670
'This fee shall be$0 for Accessory Dwelling Units(ADU).
'Unscheduled work Includes,but is not limited to,site work that is found to be occurring,or did occur,for which an inspection was not scheduled.Fee is subject to be applied for each occurrence but
does not replace a stop work order or other code violation as determined applicable by the City.The fee is in addition to any other applicable inspection fees.The fee may provide day of inspection at
the discretion and availability of the City inspector.
'Applies only to those fees that are noted as time and materials and performed during city staff regular work schedule.
x Applies to inspections performed on Saturdays,Sundays,observed City of Renton holidays,and non-holiday Monday-Fridays outside the hours of 7:00am to 3:30pm.
'Applies only if permit review Is requested by the applicant to be performed on Saturdays,Sundays,observed City of Renton holidays,and non-holiday Monday-Fridays outside at the hours of city
staff regular work schedule
s Any work performed by City forces or under City contract on behalf of a permit applicant to repair damage to the City infrastructure or caused by the permit applicant or contractor under Its control,
or any and all roadway or right-of-way cleanup efforts performed by City forces or under City contract that resulted from the work performed by the permit applicant or contractors under its control.
13
City of Renton Fee Schedule
2023-2024
SECTIONDEVELOPMENT e a t r
4. Technology Surcharge Fee
24
An additional technology surcharge shall be required for all fees included in the following Subsections of Section XII,Development Fees, 5.0% 5.0%
of the City of Renton Fee Schedule Brochure:Subsection 1,Building Fees;Subsection a,except for appeals,critical areas review fee,and
direct EIS casts,of subsection 2,Land Use Review Fees;Subsections a,In,c(iii),d,and e,except Master Franchise/Small Celt Permit
Application Fee and Long Term ROW Permit Fees Iduration over one year),of subsection 3,Site Work,Utilities,and Right of Way Fees;
and Section XIII,Fire Department Fire Marshall Fees
S. Impact Fen:
a. Schaal Impact Fees.
Ill Issaquah School District
(1) Single Family Fee $11,377 $15,510
(2) Multi Family,Duplex,&Accessory Dwelling Fee(ADUI Sill $3,514
(ill Kent School District
(11 Single Family Fee SO.00 $moo
(21 Multi Family,Duplex,&Accessory Dwelling Fee(ADU) $0.00 SCIDO
(ill) Renton School District
(1) Single Family Fee $2,911 $2,161
12) Multi Family,Duplex,&Accessary Owe Ping Fee(ADU)' $3,697 $4.257
(iv) School Impact Fee Administration 5%It School Impact Fee 5%It School Impact Fee
'This fee shall be$0 for Accessory Dwelling Units(ADUI.
Is. Transportation Impact Fees"4: ITE Land Use
11) Accessory,Dwelling Unit ADU,per dwelling Codes
[ ( 1 P 8 ITE LUC 2z0
(if) Church,per sq foot ITE .02 $4.79
LUC
560 $6$6.0 $,79
(ill) Coffee/Donut Shop,no drive up,per sq foot ITE LUC 996 SZ48.51 $175 21
(IV) Coffee/Donut Shop,with drive up,per sal foot ITE LUC 931 $261,04 $211.59
(v) Convenience market-24 hour,per sq foot ITE LUC 851
7.87
NO Daycare,per sq foot $24994 $20.81
(WI) Drinking Place,per sq foot 7E LUC 975 $69.16 $19.81
(vlli) Drive-in bank,per sq foot $69..1 514..9
ITE LUC 912 $157.10 $120.84
04 Fast Casual Dining with 30 seat max,incl,only walk-up w ndow,per sq foot ITE LUC 930 568.10
(x) Fast food,no drivii per sq foot ITE LUC 933
$
(xi) Fast food,with clma p,per sq foot ITE LUC 930 $203..13 $18$182 23
032.87
(x8) Gas station with convenience store,per pump ITE LUC 945 $73,411.90 S89,966 30
(xlll) Gas station,per pump ITE LUC 944
(xiv) General Light Industrial,per sq fact ITE LUC 210 5 SIO.6,27 $8$636
36.72
(xv) General office,per sq loot ITE LUC 710 S16.39 $40
(xvl) Health/fitness club,per sq foot $40.49 $14.07
ITE LUC 492 $g0.49 $35,23
(will High-Cube Warehouse:Cold Storage,per sq foots ITE LUC 357 $2 57
Will High-Cube Warehouse:Fulfillment Center INS),per sq foots ITE LUC 1SS $2 33
(tdxl High-Cube Warehouse:Parcel Hub,persq fsat2 ITE LUC 156 $10.12
1al High-Cube Warehouse:Transload/Shan-Term,per sq foot' ITE LUC 154 $161
(nl) Hospital,per sq foot mE LUC 610
$8
(nil) Hotel,per room
ITE LUC 310 $q,819.19.16 $4,Z16,216.05
(06i) Industrial Park,per sq fact' ITE LUC 230 $5 62
1XIM Manufacturing,per sq foot' ITE LUC 140
(xev) Marina,per boat berth $ 04
ITE LUC 420 52,S70.22 $2,2116,28fi.67
(mil) Medical office,per sq foot
4
(xxvli) Mobile home,per dwelling ITE LUC 0 $37.0E $36 23
ITE LUC 20 $7,228.75 $7,068 Il
(Mill) Motel,per roam ITE LUC 32D $4,417.57 $3,001 2S
(xxfx) Movie theater,per seat ITE LUC 445
(m) Multifamily Housing,per dwelling ITE LUC 220 $72E 88 $718.04
459
(Mill Nursing home,per bed 52,007.98 $1,28511
ITE LUC 932 5$68.51 $SS6023
(xxvii) Restau rant:sit-down,per sq foot ITE LUC 932
(xniii) Self-service Storage,per sq footITELUC 568.51 5560E
(xxxiv) Senor housing-detached,per dwelling ITE LUC 251 $3,293 ,694
xxv)(x Shopping center,per sq foot
ITE LUC 820 $29.8g 5$24$24 37 37
(nxvi) Single family house,per dweGng ITE LUC 210 $12, $11,49567
(xxxv4l) Supermarket,per sq foot
ITE Luc gso $73.97 3.97 $6317
(xaxi0) Townhouses,per twisting ITE LUC 2IS 56,345.23 $6,987.79
(xnix) Warehouse,per sq foot' ITE LUC ISO
$3 29
(xxzx) Net New PM Peak Hour Person Vehicle Trip(Proposed•Existing,Per PM Peak Hoer Person Vehicle Trip 58,031.94 $8,031.94
'ITE LUC:Institutue of Transportation Engineers Land Use Codes defined in the 11th Edition ITE Trip Generation Handbook
'Impact lees include a Passenger Car-Equivalent(PCE)factor.
s Applied fee reductions based on uses by percentage of Net New PM Peak Hour Person Vehkle Trip:Early teaming Facilities
(i.e.Davcarel is 20%and Commercial/Retall/Industrial Is 88.97%except uses with PCE factors which will remain at 100%.
All uses within the Center Downtown ICD)Zone shall be reduced to 20%of the assessed transportation Impact fee.
C. Park Impact Fees:
(I) Single family 53.276.44 $3,27644
110 Multi-family:2 units,Duplexes,&Accessory Dwelling Unit(ADL I S2.659.70 $2,659.70
(8i) Multi-family:3 or4 units
(IV) Multi-family:S or more units $2,531.21 $2,531.21
254
I'd Mobile home $2,2.6 $2.2
$2,325.6
3 $2,3256363
s This fee shall be$0 far Accessory Dwelling Units IADII{.
d. Fire Impact Fees:
(1) Residential-single farm y(detached dwellings&duplexes),per dwelling unit $029.77 $42198
(n) Residential-multifamily&Accessory Dwelling Unit(ADO)',per dwelling un It $964.S3 $57941
(bi) Hotel/motel/resort,per room
$3.
I.) Mad cal care facility,per bed 2
00
(vl Office,per sq foot $3.92 $1,05,052
$O Z6 $0.14
14
City of Renton Fee Schedule
2023.2024
,SECTIONDEVELOPMENT • r
S. Impact Fees:(Continued)
(vi) Medical/dental office,per sq foot
61
(vt) Retail,per sq foot $125 $066
(viii) Leisure facilities,per sq foot $236 $042
(ixl Restaurant/lounge,per sq foot S592 $142
(x1 Indusvial/manufacturing,persq foot 559s $144
OS
(ai) Church,per sq foot $O 15 $024
(ail) Education,per student $O72SIS $0.24
$2802
(xiii) Special public facilities,per sq S448 foot 49 $
01313
r This fee shall be SO for Accessory Dwelling Units(ADU).
e. Independent Fee Calculation Review(or unless otherwise established by School District or Renton Regional Fire Authority) $560 SS60
I. Impact Fee Deferral Administration
(i) Each Lot,Single Family Owe Ong,or Condominium $100 $lOD
(ii) Each Multi-fatuity Building $100 Sim
6. Miscellaneous Fees
a. Multifamily Tax Exemption Application 51,000 00 $1,000.00
b. Tree Fee In lieu,credit replacement,and/or credit supplement
Ill Per diameter inch measured at 45 feet above grade S22S00 $225.00
(ill Labor cost for each 2"caliper(or 6ft tall)tree to be planted $50000 $50000
c• Affordable Housing Cash Payment in L eit"s:
(i) Zip Code 98055
(1) Stud.
$2$2
(2) 1-Bedroom 27.51020
(3) 2-Bedroom
(4) 3-Bedroom $253,46939
6939
$406,775 51
(5) 4-Bedroom
$495,673 47
1111 Tap Code 98056
(11 Stud
12) 1-Bedroom $156,48990
,265 31
(3) 2-Bedroom $170.20408
(4) 3-Bedroom $296,57243
(5) 44Bedroom $368,32653
(1111 Zip Code 9BOS7 $3fi8,32fi 53
(1) Studo
$1
12) 1-Bedroom $124,,65306
$
(3) 2-Bedroom 33,46939
(4) 3•Badrtwm 247, 4
591
(5) 4-Bedroom $
(iv) 21p Code 99058 $
31414,4488a8 98
(1) Studio
$203,551O2
(2) 1-Bedroom
$
(3) 2-Bedroom $211,11,936 3673 73
(4) 3 Bedroom
(5) 4 Bedroom $
IWI Zip Code 98059 $
432,000.00
2,89796
(1) Studio
12245
(2) 1-Bedroom $262,79592
(3) 2-Bedroom $292,65306
(4) 3.3edroom $458,204 08
(5) 4-Bedroom $555,89708
$556,897 9fi
'The cash payment In lieu iscakulaled by multiplying the fee shown In the table by the number of affordable housing units
requested for cash payment In Ileu of ort-site development.
z The cash payment In lieu shall be based on the zipcode of the project site.If the project site Is located Ina zipcode not listed
In the table above,the closest abutting zipcode shall be utilized to determine payment calculation.
s The bedroom count utilized to calculate the cash payment in lieu shall be based on the bedroom count majority developed on•
site.if the bedroom counts developed on-site are equally divided(11 50%1 bedrooms and 50%2 bedrooms),the higher
bedroom count shall be utilized for calculation.The bedroom number selection for payment calculation shall also comply with
RMC4.4-155 D,Number of Bedrooms.
SECTION XIII.FIRE DEPARIMENT FIRE MARSHAL FEES(RFA)
1
a. Fire pan review and ns pection fees
(1) SO to$249.99
(ii) $250.00 to$999.99 $50 $50
(Ili) $1,000 00 to$4.999.99 $50+2%of the cost $50+2%of the mat
(W) 55,000 OD to$49,999.99 $75+2%of the cost $75+2%ofthe cost
(IV $SO,OOO.o0 $49,999999 5200+15%of the cost $200+15%ofthe cost
(till $100,000D0 and above $450+12%o(the cost $450+12%of the cast
$950+75%of the cost 5950+7.1%of the cost
(vial Construction Re-Inspection In Is per hour with a 2 hour minimum.The minimum may be assessed if the requested $175 $175
:nspect:on does not meet the approval of the inspector.
(vill) Violation/Second Re4nspecuon after 30-day period(whenever 30 days or more have passed since Fire Department S150 5150
notification of a violation,which required a first re4ropecdon,and such violation has not been remedied or granted an
extension)
(Ix) Third and subsequent re-Inspection/Pre-Citation Follow-Up Inspection when re-Inspections are required beyond the first $250 $250
and second re-Inspections
Ix) Preventable Fire alarm fee
(1) First,second,and third preventable alarms N/C
(2) Fourth and fifth preventable alarms in a calendar year,fee is per each alarm. N/C
575 $75
(3) Sixth preventable alarm and successive preventable alarms in a calendar year,in Is per each alarm. $15D 5150
(xi) Late Payment Penalty $35 $35
b. Fire Permit type:
(i) Operational fire mtle permit(Issued in accordance with Section 105.6 of the IFC)fee is yearly lincludes items such as fire $150 $150
special events,covered stages,mobile food facilities,hot works,etc.(
(11) Permits for Mobile food facilities that have passed a Ore and life safety inspection in another jurisdiction that has $75 S75
reciprocity with Renton RFA
(Ili) Hazardous materials and HPM facilities yearly $250 $250
(iv) Construction permit:
20%of plan review fee- 20%of plan review fee-
Min.575 Min$75
(v) Hazardous production materials permit(for businesses storing,handling,or using hazardous production materiasas 5250 5250
regulated in the fire code)permit is yearly
NO Underground tank removal permit(commercial) See Fire plan review and See Fire plan reviewand
construction permit fees construction permit fees
15
City of Penton Fee Schedule
1023-2024
[ON X III.FIRE IDEPARMENTIF •NTINU ED)
2023 2024
(v.i) Underground tank removal or a bandonirr in-place permit(residentia l) 5200 5200
tvii( Other requested inspection when not required by the fire code,or when requested for after hours inspections Fee is per $175 $175
hour with a minimum 2 hours when approved by the Fire Marshal,such as home driwares.
(ix) (Vill)Non-emergency Billable Semites(ie:boat assists,etc)Rates published at: WFC Current Wage and WFCCurrent Wage and
www.washin tonfirechiefs.com
(x) NSF check fees Equipment Rate Equipment Pate
$25 $25
(xi) RFA technology surcharge fee app�ie l to Fire Department Fire Marshal Fees,subsection a,(i,ii,ill,Iv,v,vi)and subsection 5% 5%
Is(ill)
16
City of Renton Fee Schedule
2023-2024
SECTION aNETARY PENALTY SCHEDULE FOR INFRACTIONS ISSUED UNDER THE AUTHORITYOF 1 1
24
CHAPTER :1 RCVJ
1. Effect of Schedule.This schedule establishes default base penalties for violations of the Renton Municipal Code that are issued as infractions under the authority of RCW 7 80 RCW,but these
penalties do not include any state-imposed statutory assessments.Except as otherwise prohibited by law or court rule,a court with jurisdiction over the infraction may impose on a defendant a
lesser penalty in an individual case.Provided that,whenever the base penalty plus mandatory statutory assessments results in a total payment that is not an even dollar amount,the base penalty is
deemed to be amended to a higher amount which produces the next greatest even dollar total
2. Penalties Established by Court Rule or Specific Penalty Established by Law.This schedule does notapply to penalties established by state or local court rule or to a penalty that is established In law
with a specific amount(i.e ordinance or statute setting a penalty equal to a specified amount rather than a penalty up to a maximum amount).To the extent a penalty scheduled herein conflicts
_ with a state or local court ru'e or a penalty that is established in law,this schedule shall be deemed preempted bythe court rule or penalty established In law
3. Penalties.
The following violations shall carry the following listed default base penalty,not including statutory assessments
a. Violation of Park Rules(Civil Infract on) RMC 2-9.8.0 $73 $73
i Activities Prohibited in a Park RMC 2-9-8.C.1 $73 $73
ii. D sregard Park Trail Sign RMC 2-9-e.C.2 $73 $73
iii. Unauthorized Vehicle in a Park RMC 2-9-B.C.3 $73 $73
iv. Operating Motorized Vehicle on Park Troll RMC 2-9-8.C.4 $73 $73
v. Dismount Zone Violation RMC 2-9-8.C.5 $73 $73
vi. Speeding on Trails RMC 2-9.8.C.6 $73 $73
vd. Vehicle/Boat Repair in Park RMC 2-9-8.C.7 $73 $73
vlii. Racing in Park RMC 2-94C.8
$73 $73
Ix. SCUBA Diving in Park RMC 2-9-B.C.9 $73 $73
x. Camping/Overnight Stay In Parks RMC 2-9-8.C.10 $73 $73
11. Fire/Barbeque in Park RMC 2-9-8.C.11 $73 $73
Al. Metal Detecting RMC 2-9-B.C.12 $73 $73
xlli. Glass Container in Park with Swimming Area RMC 2-9-e.C.13 $73 $73
xiv. Group Rally/Specoal Use Permit RMC 2-9-8.C.14 $73 $73
xv. Parking&Mooring Violation RMC 2-9-S.C.15 $73 $73
xvii. City Events Violation RMC 2.94C,16 $73
xvii. Alcohol in Park RMC 2.9.8,C.17 $73
xviii. Smokingin Park $73 $73
� RMC 2A-8 C.17 $73 $73
b. Possession/Sale/Discharge of Fireworks RMC 4-5-070.C.102 549 $49
c. Animal Control-No Ucense RMC 5.4.1 $49 $49
d. Littering RMC 6.14.22 $50
$50
i. Litter in Public Spaces RMC 6-14.3 $50 $50
ii. Placement of Utter in Receptacles RMC 6.14.4 $50 $50
ill. Sweeping Litter in Gutters RMC 6-14-5 550 $50
iv. Merchants'Duty RMC 6.14-6 $50
$50
v. Litter Thrown By Persons in Vehicles RMC 6.14.7 $50 $50
vi. Truck Loads Causing Utter RMC 6-14.8 $50 $SO
vii. Litter in Lakes and Fountains RMC 6-14-10 $50 $50
viil. Throwing/Distributing Commercial Handbills in RMC 6-14.11
Public Places $50 $50
ix. Placing Handbills on Vehicles RMC 6-14-12 $50 $50
X. Depositing Handbills on Uninhabited/Vacant RMC 6.24-13
Premises $50
$50
III. Prohibiting Distribution of Handbills Where RMC 614-14
Properly Posted $50
$SD
xii. Distributing Handbills at Inhabited Private Premises RMC 6.14-15 $50 $50
.iii. Dropping Litter from Aircraft RMC 6.14-16 $50 $50
xiv Posting Notices Prohibited RMC 6.14.17 $50 $50
xv. Litter on Occupied Private Property RMC 6.14.18 $50 $50
xvi Owner to Maintain Premises Free of Utter RMC 6.14.19 $50 $50
xvii Litter of Vacant Lots RMC 6.14-20 $50 $50
e. Animal Control-Animal at Large RMC 6.6.1 A S49 $49
F. Animal Control-Animal/Fowl Habitual Noise RMC 6.6-SA $49 $49
g. Encroachment on Public Property RMC 9.17-10 $100 $100
h. Negligent Operation of Watercraft RMC9-3.5 S42 542
I. Speed Regulations of Watercraft RMC 9-3-7 $42 $42
J. Obstructions of Waterways RMC9-3-10 $122 $122
It. Equipment Numbering Violation RMC9-3-26 $42 $42
I. Violation of Rules of the Road RMC 9-3-31 $42 $42
m. Inattentive Driving RMC 10.12-25 $67 $67
n. Truck Route Violation RMC 10-12-26 542 $42
a. Avoiding Intersection RMC 10.12-27 $42 $42
p. Unsafe Use of Scooter RMC 10-22-28.0 $42 $42
q. Use of Scooter Where Prohibited RMC 10.12-28 D 542 $42
r. Use of Scooter Without a Helmet RMC 1D-12.28 E.1 $42 $42
s. No Reflectors on Scooter RMC M22.29 E.2 $42 $42
t. No Muffler on Scooter RMC 10.12-28 F $42 $42
u. Scooter Operator Under Age 13 RMC 10.12-28.G $42 $42
V. Operating Scooter When Prohibited RMC 10.12-28.H $42 $42
w. Violation of ATV Ordinance RMC 10.2-5 $47 $47
All other violations identified by Renton Municipal Code as an infraction not listed or otherwise specified by court rule or law. $49 $48
17