Minor Franchise Permit: MFP24003935
IVR Number: 24003935
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:07/31/2024Application Date:7231501970Parcel Number: 124 WILLIAMS AVE S
Permit Type:08/20/2024Issue Date:Franchise
Permit Work Class:08/20/2025Expiration Date:Minor Utility
Job Number: 101173239Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO LOWER 3 4" CONDUITS TO AVOIDE CITIES NEW 8" STORM DRAIN.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
124 WILLIAMS AVE S
101173239
Dustin Weller 206-379-4347
MFP24003935
Scott Warlick CED
Monday Friday 8:00am 3:00pm
8/20/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
W20-1ROADWORKAHEADSHOULDERWORKW21-5X'≥X'≥JFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
THE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREA
V01
J01
W20-1ROADWORKAHEADX'≥W20-1ROAD
WORK
AHEADX'≥W20-1ROADWORKAHEAD X'≥RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
2020
2020 13111411WILLIAMS AVE SS 2ND ST
0'60'30'
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
jose.rodriguez@pse.com
425-424-6658
JOSE RODRIGUEZ
1 OF 2124 WILLIAMS AVE S, RENTON, WA 98057
0
11793435
07/08/2024
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
UG/BOX/VAULTVAULT
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425
MFP24003935
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
THE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREA
VV02
IP1
IP2W20-1ROADWORKAHEADSHOULDERWORKW21-5X'≥X'≥FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
W20-1ROADWORKAHEADX'≥W20-1ROAD
WORK
AHEADX'≥W20-1ROADWORKAHEAD X'≥2020 13111411S 2ND ST
2020
WILLIAMS AVE SProject Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
jose.rodriguez@pse.com
425-424-6658
JOSE RODRIGUEZ
2 OF 2124 WILLIAMS AVE S, RENTON, WA 98057
0
11793435
07/08/2024
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
UG/BOX/VAULTVAULT
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425
0'60'30'
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
MFP24003935
N
Vicinity Map
101173239UNDERGROUND CIRCUIT MAP
SCALE: NONE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
SCALE: NONE
UNIVERSAL CIRCUIT MAP
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
BURNETT AVE S & WILLIAMS AVE S STORM
SYSTEM IMPROVEMENTS
RELOCATING UG CABLE
PSE CAPITAL PROJECT
GENERAL SPECIFICATIONS
Scope of Work
PSE will be relocating UG power conduit to a lower depth in order to provide sufficient
clearance between PSE power and the proposed new storm drain pipe.
General
-All work is to be completed per PSE Standards & Practices. Copies of all PSE
Standards are available upon request.
-Work sites shall be kept clear of debris and all construction materials; equipment
and packing shall be removed daily.
-Return all unused and removed poles, transformers and hardware to PSE,
storeroom. All copper shall be coiled and returned the day it is removed from the
poles. Remove all unused pins and insulators.
-Return all streetlights, area lights and floodlights to Sumner yard.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a
minimum of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in
red on Foreman's copy of worksketch.
- Return one Foreman's copy of worksketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading
requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of
each work day, or as otherwise instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with
local traffic regulations.
- Maintain traffic flow as required by permitting agency.
Erosion & Sediment Control
- Refer to PSE standards 0150.3200 for minimum requirements.
- Comply with all requirements of permitting agency.
- Installed erosion & sediment devices shall be maintained until vegetation has been
re-established or disturbed soil has been otherwise permanently stabilized.
Joint Facilities
- Coordinate with Communication Companies for transfers.
OVERHEAD CONSTRUCTION
Poles & Structures
- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole
location measurements are from the center of the pole.
- All new poles set shall be the class indicated on the sketch, or better. Do not set a
lower class pole than specified.
- Install ground plate assembly on all new poles. Install Switch Ground Assembly per
standard specification 6014.1000 at new gang operated switch locations.
- Install grid numbers on all new and existing poles as shown on sketch.
- Straighten existing poles as indicated or as necessary.
- Treat all field-drilled poles with copper napthenate wood preservative.
- Remove old poles after communication companies have transferred off and return to
PSE storeroom. Fill and crown pole holes and restore area similar to adjacent
landscaping.
Conductors & Equipment
- Transfer all overhead and underground primary, secondary and service conductors
and guys to new poles set, unless otherwise indicated on this sketch.
- Transfer existing transformers to new poles unless otherwise indicated on this sketch.
- Use stirrups to connect all overhead and underground primary taps, and all
transformers. Install at all sites being worked within the scope of the project where
they are currently missing.
- Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600
amp switch jumpers. Install tree wire conductor for jumpers on all poles that are
double deadended with tree wire.
- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.
- Connect primary taps and transformers to same phase as existing unless otherwise
shown on the drawing.
- All neutral connections to be made with solid compression connectors. Connect all
pole grounds to common neutral.
- Use Load-interrupter cutouts (with arc shields) on all primary overhead and
underground taps with fused protection above 40T.
- Install Wildlife Protectors on all transformers.
UNDERGROUND CONSTRUCTION
Excavation
-Trenching outside of the Right-of-way shall be of sufficient depth to provide a
minimum of 36” of cover for primary conductors and 24” of cover for secondary
conductors.
-Road crossings and all trenches within the Right-of-way shall be of sufficient depth
to provide a minimum of 36” of cover for all conductors or as required by the
permitting Agency.
-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand
cover.
-No rocks larger than 6” shall be included in backfill.
-Backfill in road crossings and within the Right-of-way shall be compacted to 95%
density or as required by the permitting Agency.
-Restore all excavated areas to original condition.
- If four or more six inch conduits are installed in a trench, fluidized thermal backfill
(FTB) shall be installed around the conduits to a depth of six inches above and to
the sides of the conduit, and two inches underneath, per PSE Standard 6790.0140.
Vaults & Handholes
- Refer to PSE standard 6775.0040 “Vault and Handhole Installation”
- Vaults shall be placed level and 2” above final grade in landscaped areas and flush
with final grade when placed in hard surface areas.
- A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 “PVC Conduit Installation”.
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be
plumbed directly to road crossing conduits.
- Install insulating caps on all unused primary bushings.
- All “spare” conduits shall be capped at each end.
Owner / Developer Contact Info
officeATTN:
CITY OF RENTON
1055 S GRADY WAY
RENTON, WA 98057
AMANDA PIERCE 425-757-4012PHONE
CABLE TV
11793435 101173239
N/A N/A
N/A N/A
N/A
N/A
N/A 108155381
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG Expense
Removal
OH Expense 593257731
594159759
UG Expense
OH Expense
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DUSTIN WELLER
206-379-4347
DUSTIN.WELLER@PSE.COM
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
DUSTIN WELLER 206-379-4347 7/8/24
DAVID SANTIAGO 425-738-8705 7/8/24
N/A N/A N/A
DAVID SANTIAGO 425-738-8705 7/8/24
N/A RENTON
BURNETT AVE S & WILLIAMS AVE S IMPROV.
RELOCATING UG CABLE
124 WILLIAMS AVE S, RENTON, WA 98057
N/A N/A
N/A 101173239
AS NOTED 1 / 2
KING N/A N/A CSPFEPI
NW-17-23-5 N/A N/A
A2305E066,067,069,072 D2305E076,088 R2305E066SW,067,069SE,072NE GRA-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
LEGEND
CONDUIT RISER
OVERHEAD TRANSFORMER
JUNCTION VAULT/JUNCTION BOX
NEW CONDUCTOR AND OR TRENCH LINE
DISCONNECT - FUSED
PULL VAULT OR SPLICE VAULT
EXISTING POLE
DOWN GUY
DISCONNECT - UNFUSED
NEW POLE
PADMOUNT TRANSFORMER
SECONDARY HANDHOLE
EXISTING CONDUCTOR TO BE REMOVED
OR ABANDONED
STREET LIGHT
TOTAL UNDERGROUND TRANSFORMER
ENERGY CUSTOMER DEMAND POINT
OR
OR
OR
OVERHEAD JUMPER CONNECTION
POTELCO
JOB SITE
JOB SITE
JOB SITE
ALICIA PAULSEN 253-259-1740 7/8/24
James Lengel Digitally signed by James LengelDN: C=US, E=james.lengel@pse.com, O=Puget Sound Energy, OU=Public Improvement, CN=James LengelDate: 2024.07.09 06:46:31-07'00'
MFP24003935
2ND AVE SWILLIAMS AVE S710858124116L6
L7
20+0021+0022+00109+00
109+66
EXISTING 3-4" CONDUIT
NEW 3-4" CONDUIT
EXISTING 4" CONDUIT
EXISTING 4" CONDUIT
EXISTING 4" CONDUIT WILLIAMS AVE SNEW
EHS541-AØ
EHS542-BØ
EHS543-CØ
EXIST
ACI696-AØ
ACI697-BØ
ACI698-CØ
EXIST
ACI693-AØ
ACI694-BØ
ACI695-CØ
EXIST
ACI687-AØ
ACI688-BØ
ACI689-CØ WILLIAMS AVE SREMOVE
ACI690-AØ
ACI691-BØ
ACI692-CØ
SITE PLAN 101173239SCALE: 1" = 20'
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
DUSTIN WELLER 206-379-4347 7/8/24
DAVID SANTIAGO 425-738-8705 7/8/24
N/A N/A N/A
DAVID SANTIAGO 425-738-8705 7/8/24
N/A RENTON
BURNETT AVE S & WILLIAMS AVE S IMPROV.
RELOCATING UG CABLE
124 WILLIAMS AVE S, RENTON, WA 98057
N/A N/A
N/A 101173239
AS NOTED 2 / 2
KING N/A N/A CSPFEPI
NW-17-23-5 N/A N/A
A2305E066,067,069,072 D2305E076,088 R2305E066SW,067,069SE,072NE GRA-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
SITE SPECIFIC NOTES
IP1-IP2
-EXPOSE AND INTERCEPT EXISTING 3-4" ON BOTH ENDS AND LOWER.
NOTE: TOP OF UG POWER
CONDUIT WILL NEED TO BE
72" FROM TOP OF GRADE IN
ORDER TO AVOID BOTTOM
OF CITY'S NEW 8" STORM
DRAIN AT 53" FROM TOP OF
GRADE.
Vault & Equipment Table
Site Working
Space
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
MATERIAL INFORMATION ASBUILT INFORMATION
Foreman-Complete (Include Transformer Phase
Tapped and Test Secondary Voltage)
LB DC
V01 EXIST 317868
166058
PADMOUNT
XFMR
225KVA
120/208V ---
J01 EXIST 317877
166059
575 J-BOX
VAULT J-BOX 3 -INSTALL 3-ELB10J
(STD 6041.1000)
V02 EXIST 317881
166065
5106 J-BOX/TUT
COMBO VAULT
3X50 KVA TUT XFRM
120/208V WYE/WYE 3 -INSTALL 3-ELB10J
(STD 6041.1000)
CABLE REMOVAL TABLE
Cable #
Location
Wire Size & Type Quantity
Length
(per
conductor)RemarksFromTo
ACI690-AØ
ACI691-BØ
ACI692-CØ
J01 V02 1/0 AL JKT 3 86
Total 258 Feet (1/0 AL JKT) Removed
Actual ________ Feet (1/0 AL JKT) Removed
CONDUIT ONE LINE DIAGRAM
SCALE: NOT TO SCALE
CABLE ONE LINE DIAGRAM
SCALE: NOT TO SCALE
Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE (gal.)AS BUILT INFORMATION
From To Size
(in)
Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev
(lbs)
Cable
Size
Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY
Check applicable box
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed
(Conduit & Cable)
IP1 IP2 4 3 15 XX 4 CONDUIT ONLY
J01 V02 CABLE ONLY 1/0 AL
JKT 100 EHS541 EHS542 EHS543
1-6, 1-4" Power Conduits
Communications
(When Present)
Excavated Dirt Pile
Final Grade
24" Min
6" Min Sand Cover Over Power Conduits
12" MinSeparation36"
Min
Cover
48"
Max
Backfill
(No rocks over 6" diameter)
NOTE: Install 12" shading
if the backfill contains rocks
greater than 10" dia.
Separation
12" Min
Gas
3" Sand Bedding
VEHICLE
ACCESS
SIDE
6"4"
(Power, Gas, and
Communications)
(When Present)
NOT TO SCALE
TRENCH EXCAVATION DETAIL
STORM PROFILE
SCALE: NOT TO SCALE
EXISTING
POWER
PROPOSED
POWER
NOTE: TOP OF UG
POWER CONDUIT
WILL NEED TO BE
72" FROM TOP OF
GRADE IN ORDER
TO AVOID BOTTOM
OF CITY'S NEW 8"
STORM DRAIN AT
53" FROM TOP OF
GRADE.
2-36x45
2-49x15
2-49Ax15
2-55x100
2-57x6
2-55x86
ALICIA PAULSEN 253-259-1740 7/8/24
MFP24003935
RESTORATION PER CITY OF RENTON STANDARDS