Loading...
HomeMy WebLinkAboutCO 08 CAG-17-088, CO #8-18 CITY OF RENTON Community Services Department CONTRACT CHANGE ORDER AGREEMENT 4/23/201g CONTRACT: City of Renton CAG-17-088 CONTRACTOR: Road Construction Northwest,Inc. CHANGE ORDER: No.8-R SUMMARY OF PROPOSED CHANGE: Rea son/JuStificatio n: 1. Contract extension due to cold weather for pervious concrete DESCRIPTION: item Qty. Description Unit Price Amount No, WI WSST 1 Contract Extension $ _ $ Total this Change Order: $ ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT IW/WSST) AMOUNT THIS ORDER(WI WSST) TOTAL AFTER CHANGE $ 2,351,010.48 $ 2,408,263.72 $ - $ 2,408,263.72 Additional Calendar Days: (27)Calendar Days..25 days per Exhibit A-8,plus two additional weather days.New Substantial Completion Date is May 6,2018 The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement remain in effect. SIGNATURES' Contractor,..14 ' 0*, Jeffrey M.Kanyer/President Date; 41-2 v." r if , ill Project Manager: i, ,,r:‘ va2,4 AT ' Date 4/260/20/8, Approved BY: / iF Date: 7 / F mmon y Services Adrntrustrator) Exhibit A-8-R Road Construction Northwest, Inc. PO Box 2228 Renton, Washington 98056 (425) 254-9999 (425) 254-1334 fax March 15, 2018 To: City of Renton 1055 South Grady Way Renton,WA 98057 ATTN.: Mr. Todd Black RE: City of Renton—Sunset Neighborhood Park(Phase 1) Project City Project#CAG-17-088 RCNW Project#1710 SUBJ: Delay in Pouring Pervious Concrete Dear Todd, Since the first of the year, Road Construction Northwest, Inc. (RCNW)and our concrete subcontractor Four Seasons has been diligently grading,preparing and installing the concrete curbing and flatwork in the Park. Fortunately the site has drained well to which we were not greatly impacted by the wet winter weather. However the consistent cold weather has delayed us in scheduling the pour of test panel and any pervious concrete. The concrete curb edging, drainage fabric and ballast rock for the pervious pavement on the eastside of the park has been completed since the third week of February ready for the pervious concrete. We have been told by Four Seasons that due to the sensitively of the pervious concrete mix, ambient temperatures need to be 40-degrees and rising to properly place &cure this concrete. In the winter we are not able to get these needed temperatures on a consistent basis. This morning temperatures were still in the low 30's with frost on the ground. At this point,we are not sure of when we will be able to schedule this remaining concrete work. To date we have been delayed over 3-weeks. RCNW is requesting that our contract time be extended by 25- calendar days plus any future days until we can get the required temperatures needed. Please be assured that we will continue to track the weather forecast and coordinate this pervious concrete work as soon as possible. Should you have any questions or concerns,please contact me at(425)777-7323. Very truly yours, Gordon Lee Road Construction Northwest Page 1 of 1 Alan Wyatt From: Todd Black Sent: Thursday, February 22, 2018 3:05 PM To: 'Jake Boose' Cc: 'matt@rcnw.com'; 'gordon@rcnw.com'; 'Ken@RCNW.com'; 'george@rcnw.com'; 'brian@rcnw.com'; 'chad@rcnw.com'; 'Dean W. Koonts' Subject: SNP1-Weather Conditions Hi Jake, The non-working day is accepted,which allows for the new Substantial Completion date to be April 4, 2018. Thank you. Todd Black, PLA,ASLA Capital Project Coordinator I Parks Planning& Natural Resources 1055 S Grady Way 6th Floor Renton,WA 98057 Phone:425.430.655711 ttbllaack@ rentonwa.gov on From:Jake Boose [mailto:Jake@RCNW.com] Sent:Thursday, February 22, 2018 11:08 AM To:Todd Black<TBlack@Rentonwa.gov> Cc: matt@rcnw.com; gordon@rcnw.com; Ken@RCNW.com;george@rcnw.com; brian@rcnw.com; chad@rcnw.com Subject: 1710 SNEP Ill Todd, Due to icy road conditions this morning, Four Season was unable to continue sidewalk placing today.Therefore, RCNW is requesting that the City consider today Thursday 2/22/18 a non-working day on the working day statement. Thank You, Jake Boose Estimator/Project Manager Road Construction Northwest,Inc. NM 8620 Holly Drive,Suite 210,Everett,WA 98208.PO Box 2228,Renton,WA 98056 Tel 425-777-732.5 Fax 425-228-2957 Cell 425-531-0380 Jake@RCNW.com Notice:This message,including attachments,contains confidential and privileged information for the exclusive use of the intended recipient(s)_Any unauthori,>ed use is prohibited.If this email is not for you,please notify the sender and then destroy the messages.Thank you. 1