Loading...
HomeMy WebLinkAboutCO 1 CAG-18-037 , CO #1-18 en on CHANGE ORDER NO. 1 NAME OF CONTRACTOR: ALL STRIPES LLC. CONTRACT NAME & NUMBER: Helicopter Pavement Marking at City of Renton Municipal Airport CAG-18-037 ORIGINAL CONTRACT DATE: 12/1/2017 This Change Order amends the above-referenced contract (the "Agreement"). All provisions of the Agreement that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the Agreement is modified as follows: 1. Original Section I of the Agreement,entitled "Scope of Services," is hereby deleted and replaced in its entirety with the following: Scope of Services: Contractor will provide all material and labor necessary to perform all work described in the revised proposal dated March 6, 2018 which is attached and fully incorporated into this Agreement by reference as "Attachment A-Revised!' The scope does not include the two"optional line items" listed in Attachment A-Revised. All work will be performed on the areas identified as"Helicopter pavement marking plan" in Attachment S. All work will conform to the standards and procedures set forth in Attachment A-Revised. 2. "Attachment A"to the original Agreement is deleted. 3. The contract amount and time for performance provisions of Agreement Section 3"Time of Performance,"Agreement Section 4 "Term of Agreement,"and Agreement Section 5 "Agreement Sum,"are hereby modified as shown in the following table: ORIGINAL City of Renton Change Order-Small Public Works Contract Page 1 Original Contract Sum $ 1200.00 Net Change by Previous Change Orders(if N/A applicable) Current Contract Amount $ 1200.00 (incl. Previous Change Orders) Current Change Order $ 3770.00 Applicable WSST Tax on this Change Order $ 497.07 Revised Contract Sum $ 5467.77 Original Time for Performance (insert date) Up to 12/30/2017 Revised Time for Performance under prior N/A Change Orders(if applicable)(insert date) Days Required (±)for this Change Order Revised Time for Performance(insert date) Up to 9/30/2018 4. Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration,onsite or home office overhead,or lost profits. This Change Order,unless otherwise provided,does not relieve the Contractor from strict compliance with any and all guarantee and warranty provisions of the Agreement. 5. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders(if any),and this Change Order shall be deemed to have applied. 6. If this Change Order revises the contract sum under the Agreement, the Contractor will adjust the amount of its surety bonds(if any)for this project to be consistent with the revised contract sum. 7. Contractor accepts all terms and requirements of this Change Order by signing below. City of Renton Change Order—Small Public Works Contract Page 2 IN WITNESS WHEREOF,the Parties have voluntarily exeuted this Change Order which will become effective on the last date written below. CITY OF RENTON CONTRACTOR ~ - � A4(1, 9&k,„12,L..-3 Greg8Ziihnhean, Public Works Mike5e|s,Ovvner /\dnninistnato, ALL Stripes, LLC 1055 South Grady Way Renton, Washington 98057 5/ 6/ 7 / 4 — /[ / L Date Date Approved as to Legal Form Shane Moloney Renton City Attorney �� // / / »/ 'l��[J| (� ) | Date City of Renton Change Order—Small Public Works Contract Page 3