HomeMy WebLinkAboutCO 1 CAG-18-064, CO #1-18 Community Services Facilities Division CO NO. CONTRACT CHANGE ORDER (CO) PROJECT TITLE FS 14 Water Intrusion TO: Stellar Ent. (CONTRACTOR) The following mutually agreed to and Owner approved Change Order Proposal(s)and/or Field Authorization(s)are hereby incorporated by reference into the contract. COP#1 $632.50 CONTRACT SUM: ❑ NO CHANGE INCREASE OF Six Hundred Thirty Two Dollars and Fifty Cents $632.50 ❑ DECREASE — --(WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: ❑✓ NO CHANGE ❑INCREASE OF CALENDAR DAYS 0 ❑ DECREASE The foregoing amount covers everything required in connection with the change.Allother provisions of the contract remain in full force and effect. CONTRACT SUMMARY(Internal Use Only) ORIGINAL CONTRACT SUM $ 59,400.00 PREVIOUS TOTAL $ 59,400.00 PREVIOUS ADDITIONS $ 0 CHANGE AMOUNT $ 632.5 PREVIOUS DEDUCTIONS $ 0 NEW TOTAL $ 60,032.50 NEW CONTRACT COMPLETION DATE No Change TOTAL CONTRACT CALENDAR DAYS No Change The City of Renton hereby accepts the foregoing Field Authorization(s)and/or Change Order Proposal(s).This formal acceptance constitutesa Change Order to the contract only when authorizing signature is affixed.Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this Change Order. r' F / • 7/321/4? AUTHORIZING SIGNAT ' DATE 0 Community Services Facilities Division COP# 1 CONTRACT CHANGE ORDER PROPOSAL (COP) TO: Stellar Ent. (CONTRACTOR) Proposal Request Date: 7/3/2018 You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: Reroute Electrical $275.00 Patch Holes $100.00 Additional Painting $200.00 Sub-Total $575.00 WSST 10% 557.50 Total $632.50 REASON FOR CHANGE Design Errors Design Oty Latent Code Value Ommissions Conditions Requirement Engineering EXPLANATION: Additional work added DATE PROPOSAL REQUIR 7/3/2018 CHANGE ORIGINATED BY: Robert Ebert (14 days from Request Date.unless other date agreed to) PROPOSAL REQUESTED BY: Robert Ebert TO: (A/E) TO: Robert Ebert COR WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: [A NO CHANGE [)INCREASE OF Six Hundred Thirty Two Dollars and Fifty Cents $632.50 (-f DECREASE - -_.._.. ._.... .—.._...— .....__ ...... _.__.._---- — __.. (WASHINGTON STATE SALES TAX INCLUDED) in accordance with the general condidtion,Cost Estimate Detail Sheet(s)are attached hereto. CONTRACT TIME: [71 NO CHANGE n INCREASE OF CALENDAR DAYS 0 [ DECREASE The foregoing amount covers everything required in connection with the change.Allother provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the • of Renton. 5+41( E .cf(t)'S BY .717-/H CONTRACTOR RE DATE We have carefully examined this pro.• and find the cost to be reasonable.Therefore,we recommend acceptance. /1.4i A/E DATE CITY OF RENTON DATE