HomeMy WebLinkAbout38. Rainier Ave N Corridor Improvements (Phase 5)TRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 38 Project Title:Rainier Ave N Corridor Improvements (Phase 5) Community Planning Area:City Center Fund: Functional Classification:N/A Project: Project Length:0.76 mi Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning 100,000 - - 100,000 - - - - 100,000 - Preliminary Engineering 2,000,000 - - 2,000,000 - - - - - 2,000,000 R-O-W (includes Admin)- - - - - - - - - - Construction - - - - - - - - - - Construction Services - - - - - - - - - - Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 2,100,000 - - 2,100,000 - - - - 100,000 2,000,000 Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share - - - - - - - - - - Fund Balance - - - - - - - - - - Grants In-Hand (1)- - - - - - - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand - - - - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (1)- - - - - - - - - - Other In-Hand (2)- - - - - - - - - - - - - - - - - - - - Undetermined 2,100,000 - - 2,100,000 - - - - 100,000 2,000,000 Total Sources 2,100,000 - - 2,100,000 - - - - 100,000 2,000,000 - 2,100,000 Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program Rainier Ave N Corridor Improvements (Phase 5) 317 Vangie Garcia 425-430-7319 This is Phase 5 of the Rainier Ave Corridor Improvements, and will extend the improvements from NW 3rd Pl to north City limits. Project elements include widening of sidewalks with streetscaping, adding pedestrian-scale illumination and planted buffer strips. The street may be narrowed from 5 to 3 lanes where feasible. On the east side of Rainier Ave the new multi-use trail will be installed (Lake Washington Loop Trail), (as shown on TIP #18). Rainier Ave is a critical corridor in Renton with existing operational problems and in need of infrastructure enhancements to provide greater ease for non-motorized and transit- based travel. Funds shown in 2023 are for planning to determine the roadway cross section. Project cost estimated at $31.5M and is unfunded. Costs beyond 2024 not shown.