HomeMy WebLinkAboutCO 1 CAG-17-108 , CO #1-18 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG-17-108 Harrington Ave NE Green Connections Stormwater Retrofit C.O.N 1 Project—Phase 2 SWP-27-3731 CONTRACTOR: DPK, Inc. SUMMARY OF PROPOSED CHANGE: Re-design Sidewalk and Ramps FA. No.13 $394.75 The original approved construction plans did not show sufficient slopes for the construction of a new sidewalk and ramps in compliance with ADA standards and requirements.The working area was located at the northwest corner of Harrington Ave NE and NE 7th St.On February 7,2018,the contractor requested payment for labor time lost while they awaited direction from the city and sidewalk re-design performed by CH2MHill. Re-grade and Remove Rock from Grade FA.No.14 $3,532.18 On February 8,2018,additional work was performed at the northwest corner of Harrington Ave NE and NE 7th St resulting from the change in sidewalk and ramp re- design to comply with ADA standards and requirements.The additional work included re-grading,removing rock from grade,providing professional surveying services,and re- building concrete forms for a revision. Private Light System Connection FA.No.15 $1,181,19 The private light system connection work was not identified in the original approved construction plans.This was additional work where the sub-contractor and Transportation Systems provided labor,equipment,and materials necessary for pulling new wire into the existing conduit and connecting private lights.The work was performed on February 8,2018. Extend Rockery Wall Drain Pipe FA.No.16 $1,110.13 On February 28,2018,the contractor extended the rockery wall drain pipe across a new pervious pavement area for a potential future connection to planter areas.This Is additional work not identified in the original approved construction plans. Relocate and Repair Existing Irrigation System FA.No.17 $5,737.38 On March 1,2018,the Contractor relocated and repaired the existing irrigation system. This was additional work not indicated or shown in the approved construction plans for the construction of a new sidewalk.The working area was located on west side of Harrington Ave NE and in front of Highland Elementary School,—Sta.146+00 R.The work was performed by a sub-contractor,Yorozu landscape. Relocate Existing Irrigation System FA.No.18 $2,674.94 On March 2,2018,the contractor continued relocation of the existing irrigation system. This was additional work not indicated or shown in the original approved construction plans related to the construction of a new sidewalk.The working area was located on the west side of Harrington Ave NE and in front of Highland Elementary School.The work was performed by a sub-contractor,Yorozu landscape. H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3731 Harrington Ave-Ph_II\1600 Construction\1606 Change Orders\Change Order\CO-1.docx\KSmc Excavate New Location for Pedestrian Curb FA.No.19 $6,429.46 On April 11,2018,the contractor excavated a new location for the installation of a pedestrian curb In front of the Breezy Apartments.This was additional work where the excavation was beyond the original approved construction plans.The cost also included the labor,equipment,material from a sub-contractor,Tyee Concrete. A Concrete Wheel Stop for new Pedestrian Curb CP.No.004 $792.79 Nine concrete wheel stops with rebar pins were determined necessary for a private parking lot at the Breezy Apartments at 802 Harrington Ave NE to prevent parked vehicles from rolling onto the new pedestrian curb and side walk.This is additional construction material not specified in the bid item and contract provision.This was only for the material and delivery cost.The concrete wheel stops with rebar pins were delivered to the site on May 16,2018.The installation would be performed by Mr.Todd Karam at the property manager's request TOTAL CHANGE ORDER COST: $21,852.82 Additional Working Days added to the Contract for this Change Order: 10 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $904,036.00 $904,036.00 $21,852.82 $925,888.82 SIGNATURES: Contractor: � � Date: �+, �j `,/, ��,� Project Manager: JD '` Date: �/ _ Approved By: Date: 7/Ai(l 8 Lys Hor ,Utilit Systems Director Approved By: ;� Date: Gregg Zimmer an, ubifc rks A imistra o H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3731 Harrington Ave-Ph_11\1600 Construction\1606 Change Orders\Change Order\CO-1.docx\KSmc