HomeMy WebLinkAboutCO 02 CITY OF RENTON CAG-17-174, Co #2-18 Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Renton Hill Utility Replacement CAG-17-174 C.O.# 2 CONTRACTOR: Laser Underground&Earthworks, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor,equipment,subcontracting, bonding,insurance for the complete work required for the extra Work as outlined below: ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price Total Price B32. NEW ITEM: LS 1 $51,964.75 $51,964.75 Additional unforeseen work items associated with"Bid Schedule B—Wastewater"as described below: Contractor Daily Date Description&Cost Report# 15395 1/5/18 Additional Work to connect new SSMH#4 and new SSMH#5.($1,640.27) 15552 1/16/18 Relocate new SSMH#1 due to conflict with existing water main.($1,103.31) 15554 1/17/18 Pothole revised location for new SSMH#2 due to conflict with existing water main.($1,239.95) 15574 2/9/18 Revise new sewer main location due to conflict with existing water main.($2,512.81) 15580&15581 2/15/18 Pothole new SSMH#22 location due to utility conflicts.($1,708.51) 15585 2/21/18 Trench for City crew to cut&cap existing water main to allow placement of new SSMH#22. ($3,715.79) 15588 2/23/18 Continuation of cut and cap work from 2/21/18. ($3,517.27) 15591 2/27/18 Completion of cut and cap work to set SSMH#22. ($2,270.89) 15593 2/28/18 Additional pipe fittings and time to connect new SSMH#2 to existing sewers.($3,286.52) 15598 3/5/18 Remove existing culvert,fill and regrade ditch adjacent to 922 Renton Ave S.($525.89) 15503 3/8/18 Additional materials and time to Relocate new SSMH#10.($1,468.33) 15515 3/20/18 Delays and additional shoring due to several unknown and unlocated utilities in 700&800 block of High Ave S.($4,197.36) 15520 3/22/18 Reset new SSMH#11 due to existing inverts differing from project plans.($1,436.90) 14033 5/24/18 Field Modification of new SSMH#6 due to existing alley sewer differing in size from project plans.($4,969.23) 14037 5/29/18 Modification to SSMH#6 drop connection to match up with incoming existing sewer pipe from the east.($4,900.19) 14041 5/31/18 Removal of large rock at location of new SSMH#8.($8,834.16) 14049 6/11/18 Removal of another large rock 15 downstream of new SSHM#8.($4,637.37) H:\File Sys\WTR-Drinking Water Utility\WTR-27-Water Project Files\WTR-27-03824-2015 Water Main Replacement\Pay Estimates\Change Orders\Schedule B Sewer\Change Order#2-Renton Hill Utility Replacement.doc\)Hmc 833. NEW ITEM: EACH 16 3,343.75 $53,500 Cost for prepatory work to CIPP-line side sewers under sidewalks and retaining walls on Cedar Ave S between S 5`h St and S 7m St. All side sewers were deemed unlinable following the pre-lining CCTV inspections. This item covers the preparatory work as outlined in bid item 818 B18. DELETED ITEM: EACH 16 ($7,500.00) ($120,000) This item is replaced with new item B33. Sub Total ($14,535.25) Sales Tax (10.0%) ($1,453.53) Total ($15,988.78) ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $5,048,703.20 $5,351,109.99 ($15,988.78) $5,335,121.21 SIGNATURES: Contractor: r.__ Date: 7/117/6"'17/I; Project E sneer: .,•p% Date: 7-"9-!' Approved By: f77 Date: -7/ /fig Lys Horn by, rty• 'ire •r Approved By: T�4( / Date: diGreggZimmern)n, W,•ministr.tor i— Approved By: Date: Denis Law,Mayor Approved By: Date: Shane Moloney,Renton City Attorney Attest: Date: Jason Seth,City Clerk H:\File Sys\WTR•Drinking Water Utility\WTR-27-Water Project Files\WTR-27-03824-2015 Water Main Replacement\Pay Estimates\Change Orders\Schedule B Sewer\Change Order#2-Renton Hill Utility Replacement.doc\JHmc