CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: Renton Hill Utility Replacement CAG-17-174 C.O.# 3
CONTRACTOR: Laser Underground& Earthworks,Inc.
SUMMARY OF PROPOSED CHANGE:
Provide all labor,equipment,subcontracting, bonding,insurance for the complete work required for the extra
work as outlined below and shown in the contractor's proposal:
ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price Total Price
A35. NEW ITEM: EACH 28 $1,070.00 $29,960.00
Surface Water Utility portion of costs for contractor stormwater monitoring as
required for the D.O.E.Stormwater General Construction Permit(WAR306165).
B34. NEW ITEM: EACH 28 $1,070.00 $29,960.00
Wastewater Utility portion of costs for contractor stormwater monitoring as required
for the D.O.E.Stormwater General Construction Permit(WAR306165).
C30. NEW ITEM: EACH 28 $1,070.00 $29,960.00
Water Utility portion of costs for contractor stormwater monitoring as required for
the D.O.E.Stormwater General Construction Permit(WAR306165).
Sub Total $89,880.00
Sales Tax (10.0%) 58,988.00
Total $98,868.00
ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT
THIS ORDER TOTAL AFTER CHANGE
$5,048,703.20 $5,335,121.21 $98,868.00 $5,449,977.99
SIGNATURES:,
Contractor __- —- Date: 7--fir
"�I tial -
Proj ngineer: /t/. Date: 7-/9'—/S
Approved By: I Date: 7 f/cf/`!l
Lys Hornsby,Ut S ste s Director
Approved By: ``�aa�lnllurn,r Date:
Gre i erman,IPWAdmi0-tor ``\\\0(,,*`R1E'Ny.,:t*,/'
Approved By: -l\��`•�• n�,,�y �s Date: /2-ll
Denis ,Mayor _ V t �% -
Approved By: _ - ' y` _ * - Date: c
Shane Mol• ,Renton City Atto All = i
Attest: (A 1 '1�� ,-4,'-i'iit, ��`��` �o Date:
Jason Seth i Clerk / i,.0 C,, u,,,,,,,,.�` ..,
N ii,`�/RpORATEO S�\\\��
H:\File Sys\WTR-Drink' g Water Utility\WTR-27-Water Project Files\WTR4 -b3t1 15 Water Main Replacement\Pay
Estimates\Change Orders\Combined Schedules\Change Order#3-Renton Hill Utility Replacement.doc\IHmc
LA SER
UNDERGROUND&EARTHWORKS, INC. •
July 5, 2018
Construction Stormwater Permit Transfer and Monitoring
John,
After reviewing the permit transfer and monitoring requirements please see the below cost
for monitoring along with the scope of work.
• Weekly reporting to the DOE through their web portal
• Inspections for the year duration of the permit.
o 1 inspection required per week.
o Required to inspect within 24 hrs of any precipitation.
o During the winter months this could result in a site visit every day
• Maintaining an onsite log book and plan set per the DOE permit
The cost per visit for the inspections and required monitoring/reporting is proposed at
$1,070/ea. Laser anticipates there will be a total of 84 visits needed when looking at the
summer and winter months. This number could go up or down depending on the weather
season we have.
The total anticipated cost for the permit and monitoring is $89,880.00 plus applicable
WSST.
Please call or email with any questions.
Thanks,
Jason Lane
Laser Underground&Earthworks, Inc.
206-235-3052 (Cell)
20417 87th Avenue SE,Snohomish,WA 98296 Phone:(425)251-1636 Fax:(425)251-1656