HomeMy WebLinkAboutCO 03 CITY OF RENTON CAG-17-174, Co #3-18 Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Renton Hill Utility Replacement CAG-17-174 C.O.# 3 CONTRACTOR: Laser Underground& Earthworks,Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor,equipment,subcontracting, bonding,insurance for the complete work required for the extra work as outlined below and shown in the contractor's proposal: ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price Total Price A35. NEW ITEM: EACH 28 $1,070.00 $29,960.00 Surface Water Utility portion of costs for contractor stormwater monitoring as required for the D.O.E.Stormwater General Construction Permit(WAR306165). B34. NEW ITEM: EACH 28 $1,070.00 $29,960.00 Wastewater Utility portion of costs for contractor stormwater monitoring as required for the D.O.E.Stormwater General Construction Permit(WAR306165). C30. NEW ITEM: EACH 28 $1,070.00 $29,960.00 Water Utility portion of costs for contractor stormwater monitoring as required for the D.O.E.Stormwater General Construction Permit(WAR306165). Sub Total $89,880.00 Sales Tax (10.0%) 58,988.00 Total $98,868.00 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $5,048,703.20 $5,335,121.21 $98,868.00 $5,449,977.99 SIGNATURES:, Contractor __- —- Date: 7--fir "�I tial - Proj ngineer: /t/. Date: 7-/9'—/S Approved By: I Date: 7 f/cf/`!l Lys Hornsby,Ut S ste s Director Approved By: ``�aa�lnllurn,r Date: Gre i erman,IPWAdmi0-tor ``\\\0(,,*`R1E'Ny.,:t*,/' Approved By: -l\��`•�• n�,,�y �s Date: /2-ll Denis ,Mayor _ V t �% - Approved By: _ - ' y` _ * - Date: c Shane Mol• ,Renton City Atto All = i Attest: (A 1 '1�� ,-4,'-i'iit, ��`��` �o Date: Jason Seth i Clerk / i,.0 C,, u,,,,,,,,.�` .., N ii,`�/RpORATEO S�\\\�� H:\File Sys\WTR-Drink' g Water Utility\WTR-27-Water Project Files\WTR4 -b3t1 15 Water Main Replacement\Pay Estimates\Change Orders\Combined Schedules\Change Order#3-Renton Hill Utility Replacement.doc\IHmc LA SER UNDERGROUND&EARTHWORKS, INC. • July 5, 2018 Construction Stormwater Permit Transfer and Monitoring John, After reviewing the permit transfer and monitoring requirements please see the below cost for monitoring along with the scope of work. • Weekly reporting to the DOE through their web portal • Inspections for the year duration of the permit. o 1 inspection required per week. o Required to inspect within 24 hrs of any precipitation. o During the winter months this could result in a site visit every day • Maintaining an onsite log book and plan set per the DOE permit The cost per visit for the inspections and required monitoring/reporting is proposed at $1,070/ea. Laser anticipates there will be a total of 84 visits needed when looking at the summer and winter months. This number could go up or down depending on the weather season we have. The total anticipated cost for the permit and monitoring is $89,880.00 plus applicable WSST. Please call or email with any questions. Thanks, Jason Lane Laser Underground&Earthworks, Inc. 206-235-3052 (Cell) 20417 87th Avenue SE,Snohomish,WA 98296 Phone:(425)251-1636 Fax:(425)251-1656