Loading...
HomeMy WebLinkAboutAdden 1 CAG-17-093,Adden #1-18 � � AMENDMENT N0. 1 TO AGREEMENT FOR ON-CALL SUPPORTING ENGINEERING SERVICES, CAG-17-093 ��..-�:��� THIS AMENDMENT, dated Sept�e� �' , 2018, is by and between the City of Renton (the "City"), a Washington municipal corporation, and Shea, Carr, Jewell Inc., dba SCJ Alliance ("Consultant"),a Washington corporation.The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-17-093, dated May 30, 2017,to provide necessary services for on-call supporting engineering services (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to change the time of performance in order to allow a second survey of the existing seaplane ramp, originally anticipated in February 2018, with such work as described as"Task 2"and as called for in attached Exhibit 1 to this amendment. NOW THEREFORE, It is mutually agreed upon that CAG-17-093 is amended as follows: 1. Time of Performance: Section 3, Time of Performance, is amended such that all work shall be performed by no later than May 2019. 2. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNE55 WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CO I�LTANT - __.�� ,..--- � \� By: B Gregg A. i man, P.E. Public Work Administr tor � � � � � � (� a v Date Date ORlG{I�q� Approved as to Legal Form .�d��t.e Shane Moloney Renton City Attorney Contract Tempiate Updated 12/29/2017 �ro PAGE 2 OF 2 „��� _ �' SC�J L':LLIANCE CONSULTING SERVICES EXHIBIT 1 SCOPE OF WORK CAG-17-093 ON-CALL TASK ADDENDUM NO. 2 Task Order No. 2—Resurvey Seaplane Ramp Prepared for: City of Renton Prepared By: Lisa Reid, P.E., PMP, Project Manager Date prepared: February 4, 2018 Overview The objective of this task order is to perform a second survey of the existing seaplane ramp at the City of Renton Municipal Airport to determine whether the ramp has settled since the last survey performed in June 2017. This work will result in a recommendation for next steps to determine a temporary and permanent repair if necessary. The work will consist of the following Phases: • Phase 1—Task Management and Coordination • Phase 2—Survey(by MTN2Coastj • Phase 3—Geotechnical Review of Existing Information (by PanGEO) • Phase 4—Review of Existing Information and Recommendations Assumptions 1. The CITY is funding this study. 2. Access to the ramp for surveying will be unrestricted during typical working hours, except for gaining access to the secured airport areas. Information Provided by the CITY 1. Access to seaplane ramp. Phase 1. Task Management and Coordination Task 1 Task Management and Coordination 1) Task Set-up:Set-up task order,subconsultant agreements,and billing. 2) Invoicing and Progress Reporting: Prepare weekly status reports and monthly invoicing and progress reports for this task order. CAG-17-093 On-Call Task Addendum No.2,Task Order No.2 February 4,2018 City of Renton Page 1 , �� , �"���. SC..1 �LLIANCE CONSULTING SERVICES 3) Subconsultant Coordination.Coordinate work with subconsultants. Phase 2. Survey (MTN2Coast) Task i Survey Perform a survey of the seaplane ramp, including: • Setting survey control to match the June 2017 survey. • Survey shots on the four corners and up to twenty mid points of the concrete portion of the seaplane ramp. • Survey shots on the four corners and up to ten mid points of the timber section of the seaplane ramp. • Up to two survey shots to determine the water elevation. • Comparison of this survey to the June 2018 survey and summarize information. Phase 3. Geotechnical Review of Survey Inf�rmation (PanGEO) Task 1 Geotechnical Review of Survey Information Review the survey information and available existing documentation and assess the vulnerability of the seaplane ramp to settlement based on its construction. Phase 4. Review of Survey Information and Recommendations Task 1 Review of Survey Information and Recommendation Compare the new survey to prior surveys(including ones from 2001 and 2017)to determine if and how the seaplane ramp has settled. Prepare a technical memorandum based on the survey and as-built review that recommends next steps appropriate to design temporary and final repair options for the ramp. Deliverables • Emailed PDF of technical memo summarizing assessment and recommendations for next steps. CAG-17-093 On-Call Task Addendum No.2,Task Order No.1 February 4,2018 City of Renton Page 2 .,..,,rr ..,,,.� . ,...,� � _.., . .. ...: . �� SC�.1 l:LLIANCE CONSULTING SERVICES EXHIBIT 2 TECHNICAL APPROACH CAG-17-093 ON-CALL TASK ADDfNDUM NO. 2 Task Order No. 2—Grant Writing Prepared for: City of Renton Prepared By: Lisa Reid, P.E., PMP, Project Manager Date prepared: February 4, 2018 No additional specifications or requirements are required for this addendum. CAG-17-093 On-Call Task Addendum No.1,Task Order No.2 February 4,2018 Gity of Renton Page 3 , � �,��� � ,, '�� SC..J �LLIANCE CONSULTING SERVICES EXHIBIT 3 DELIVERABLES CAG-17-093 ON-CALL TASK ADDENDUM NO. 2 Task Order No. 2—Grant Writing Prepared for: City of Renton Prepared By: Lisa Reid, P.E., PMP, Project Manager Date prepared: February 4, 2018 1. AutoCAD file of survey points and contours. 2. Emailed PDF of technical memo summarizing assessment and recommendations for next steps. CAG-17-093 On-Call Task Addendum No.2,Task Order No.2 February 4,1018 City of Renton Poge 4 .� ��,�ri . �. . ...,.-��� ����� � SC..J �LLIANCE CONSULTING SERVICES EXHIBIT 4 SCHEDULE CAG-17-093 ON-CALL TASK ADDENDUM NO. 2 Task Order No. 2—Grant Writing Prepared for: City of Renton Prepared By: Lisa Reid,P.E., PMP, Project Manager Date prepared: February 4,2018 This work will commence immediately upon notice to proceed and will be completed within 4 weeks of the notice to proceed. CAG-17-093 On-Call Task Addendum No.2,Task Order No.2 February 4,2018 City of Renton Page 5 Consultant Fee Determination EXHIBIT 5 �`" SCJ F.Lt_IANCE SG Alliance �<��,..��.,,.�..�..,,�_�_, Client: City of Renton Project: On-Call Supporting Engineering Services-Task Order#02 1ob#: 773 File tl: Renton On-Call TO#2 Cost.xlsm Consuitant Fee Determination SALARY COST Discfoline Hours Rate Amount Principal-Lisa Reid 10.0 $235.00 $2,350 Project Coord.II-Alissa North 3.0 $95.00 $285 Subtotal: 13.0 Total Salary Cost $2,635 SUBCONSUCTANTS(Yes or NoJ Yes MTN2COAST(Phase 2) 52,070 PanGEO(Phase 5) $530 Total Subconsultants $2,600 REIMBURSABLES Copies,Reproductions,etc: 0.0% of Total Salary Cost $0 Mileage: 0 miles at 50.535 $0 TotalEzpenses: $0 SUBTOTAL(SALARV,SUBCONSULTANTS AND EXPENSES) Subtota1�Salary,5ubconsultantsand Expenses) $5,235 Total Estimated Budget: $5,235 2/4/2018 Page 1 Consultant Labor Hour Estimate SG Alliance EXHIBIT 5 +"a. � Client: CityofRenton SCJ C.�unn�ce Projed: Dn-Cali Supporting Engineering Services-Task Order k02 �'-"�"�"`""""" � lob q: 773.01 � File p: Renton On-Call TOM2 Costxlsm Frincipal- Project Task No. Task Description Coord.ll- Total Lisa Reid Alissa North Phase 1 Task Management and[oordination � Task 1 Task Management and Coordination � 1 Scoping and Coord of 2017 and 2016 surveys 2.0 2.0 2 Task Set-up � 1.0� 2.0 3.0 3 Invoicing and Progress Reporting 1.0 1.0 2.0 4 Subconsultant Coordination 2,0 2.0 Subtotal Hours: 6.0 3.0 9.0 Total Phase Hours: 6.0 3.0 9.0 Total Phase Cost: $1,410.00 $285.00 $1,695.00 Phase 2 Survey(MTN2Coast) Task 1 Survey 1 Survey Subtotal Hours: Total Phase Hours: Total Phase Cost: Phase 3 Geotechincal Review of Survey Information (PanGEO) Task 1 Geotechnical Revtew of Ezisting Information 1 Geotechnical Review of Existing Information Subtotal Hours: Total Phase Hours: Total Phase Cost: Phase 4 Review of Survey Information and Recommeadation Task 1 Revlew of Survey Information and Rewmmendation 1 Review of Survey Information and Rxommendation 4.0 4.0 � Subtotal Hours: 4.0 4.0 TotalPhase Hours: 4.0 4.0 Total Phase Cost: $940.00 $940.00 Total Hours All Phases 30.0 3.0 13.0 Total Cost All Phases 52,350.00 $285.00 $2,635.00 z or z �yzoia EXHIBIT 5 COST CAG-17-093 ON-CALL TASK ADDENDUM NO. 1 Task Order No. 2—Resurvey Seaplane Ramp Prepared for: City of Renton Prepared By: MTN2Coast Survey Date prepared: February 4, 2018 Phase 2. Survey Classification No. of Hours Rate/Hour Total Cost 2 Person Survey Crew 10 $150/hour $1,500 Professional Land Surveyor 3 $110/hour $330 Survey CAD/Technician 3 $80/hour $240 Total Cost $2,070 CAG-17-093 On-Call Task Addendum No.1,Task Order No.1 February 4,2018 Ciry of Renton Page 1 EXHIBIT 5 COST CAG-17-093 ON-CALL TASK ADDENDUM NO. 2 Task Order No. 2—Resurvey Seaplane Ramp Prepared for: City of Renton Prepared By: PanGEO, Inc Date prepared: February 4, 2018 Phase 5. Geotechnicai Review of Existing Information Classification No. Hours Rate/Hour Total Cost Principal Geotechnical 2 $150/hour $300 Engineer LG Project Geologist 2 $115/hour $230 Total Cost $ 530 CAG-17-093 On-Call Task Addendum No.1,Task Order No.2 February 4,2018 City of Renton Page 1