HomeMy WebLinkAboutAdden 1 CAG-17-093,Adden #1-18
�
�
AMENDMENT N0. 1 TO AGREEMENT FOR ON-CALL
SUPPORTING ENGINEERING SERVICES, CAG-17-093
��..-�:���
THIS AMENDMENT, dated Sept�e� �' , 2018, is by and between the City of Renton (the
"City"), a Washington municipal corporation, and Shea, Carr, Jewell Inc., dba SCJ Alliance
("Consultant"),a Washington corporation.The City and the Consultant are referred to collectively
in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is
effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-17-093, dated
May 30, 2017,to provide necessary services for on-call supporting engineering services (referred
to herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to change the time of performance in order
to allow a second survey of the existing seaplane ramp, originally anticipated in February 2018,
with such work as described as"Task 2"and as called for in attached Exhibit 1 to this amendment.
NOW THEREFORE, It is mutually agreed upon that CAG-17-093 is amended as follows:
1. Time of Performance: Section 3, Time of Performance, is amended such that all work
shall be performed by no later than May 2019.
2. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNE55 WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CO I�LTANT
- __.��
,..---
� \�
By: B
Gregg A. i man, P.E.
Public Work Administr tor � � � � � � (�
a v
Date Date
ORlG{I�q�
Approved as to Legal Form
.�d��t.e
Shane Moloney
Renton City Attorney
Contract Tempiate Updated 12/29/2017
�ro
PAGE 2 OF 2
„��� _
�'
SC�J L':LLIANCE
CONSULTING SERVICES
EXHIBIT 1
SCOPE OF WORK
CAG-17-093 ON-CALL TASK ADDENDUM NO. 2
Task Order No. 2—Resurvey Seaplane Ramp
Prepared for: City of Renton
Prepared By: Lisa Reid, P.E., PMP, Project Manager
Date prepared: February 4, 2018
Overview
The objective of this task order is to perform a second survey of the existing seaplane ramp at
the City of Renton Municipal Airport to determine whether the ramp has settled since the last
survey performed in June 2017. This work will result in a recommendation for next steps to
determine a temporary and permanent repair if necessary.
The work will consist of the following Phases:
• Phase 1—Task Management and Coordination
• Phase 2—Survey(by MTN2Coastj
• Phase 3—Geotechnical Review of Existing Information (by PanGEO)
• Phase 4—Review of Existing Information and Recommendations
Assumptions
1. The CITY is funding this study.
2. Access to the ramp for surveying will be unrestricted during typical working hours,
except for gaining access to the secured airport areas.
Information Provided by the CITY
1. Access to seaplane ramp.
Phase 1. Task Management and Coordination
Task 1 Task Management and Coordination
1) Task Set-up:Set-up task order,subconsultant agreements,and billing.
2) Invoicing and Progress Reporting: Prepare weekly status reports and monthly invoicing
and progress reports for this task order.
CAG-17-093 On-Call Task Addendum No.2,Task Order No.2 February 4,2018
City of Renton Page 1
,
�� ,
�"���.
SC..1 �LLIANCE
CONSULTING SERVICES
3) Subconsultant Coordination.Coordinate work with subconsultants.
Phase 2. Survey (MTN2Coast)
Task i Survey
Perform a survey of the seaplane ramp, including:
• Setting survey control to match the June 2017 survey.
• Survey shots on the four corners and up to twenty mid points of the concrete portion of
the seaplane ramp.
• Survey shots on the four corners and up to ten mid points of the timber section of the
seaplane ramp.
• Up to two survey shots to determine the water elevation.
• Comparison of this survey to the June 2018 survey and summarize information.
Phase 3. Geotechnical Review of Survey Inf�rmation (PanGEO)
Task 1 Geotechnical Review of Survey Information
Review the survey information and available existing documentation and assess the vulnerability
of the seaplane ramp to settlement based on its construction.
Phase 4. Review of Survey Information and Recommendations
Task 1 Review of Survey Information and Recommendation
Compare the new survey to prior surveys(including ones from 2001 and 2017)to determine if
and how the seaplane ramp has settled. Prepare a technical memorandum based on the survey
and as-built review that recommends next steps appropriate to design temporary and final
repair options for the ramp.
Deliverables
• Emailed PDF of technical memo summarizing assessment and recommendations for
next steps.
CAG-17-093 On-Call Task Addendum No.2,Task Order No.1 February 4,2018
City of Renton Page 2
.,..,,rr ..,,,.� . ,...,�
� _.., . .. ...: .
��
SC�.1 l:LLIANCE
CONSULTING SERVICES
EXHIBIT 2
TECHNICAL APPROACH
CAG-17-093 ON-CALL TASK ADDfNDUM NO. 2
Task Order No. 2—Grant Writing
Prepared for: City of Renton
Prepared By: Lisa Reid, P.E., PMP, Project Manager
Date prepared: February 4, 2018
No additional specifications or requirements are required for this addendum.
CAG-17-093 On-Call Task Addendum No.1,Task Order No.2 February 4,2018
Gity of Renton Page 3
,
� �,��� �
,, '��
SC..J �LLIANCE
CONSULTING SERVICES
EXHIBIT 3
DELIVERABLES
CAG-17-093 ON-CALL TASK ADDENDUM NO. 2
Task Order No. 2—Grant Writing
Prepared for: City of Renton
Prepared By: Lisa Reid, P.E., PMP, Project Manager
Date prepared: February 4, 2018
1. AutoCAD file of survey points and contours.
2. Emailed PDF of technical memo summarizing assessment and recommendations for next
steps.
CAG-17-093 On-Call Task Addendum No.2,Task Order No.2 February 4,1018
City of Renton Poge 4
.� ��,�ri . �. .
...,.-��� ����� �
SC..J �LLIANCE
CONSULTING SERVICES
EXHIBIT 4
SCHEDULE
CAG-17-093 ON-CALL TASK ADDENDUM NO. 2
Task Order No. 2—Grant Writing
Prepared for: City of Renton
Prepared By: Lisa Reid,P.E., PMP, Project Manager
Date prepared: February 4,2018
This work will commence immediately upon notice to proceed and will be completed within 4
weeks of the notice to proceed.
CAG-17-093 On-Call Task Addendum No.2,Task Order No.2 February 4,2018
City of Renton Page 5
Consultant Fee Determination
EXHIBIT 5 �`"
SCJ F.Lt_IANCE
SG Alliance �<��,..��.,,.�..�..,,�_�_,
Client: City of Renton
Project: On-Call Supporting Engineering Services-Task Order#02
1ob#: 773
File tl: Renton On-Call TO#2 Cost.xlsm
Consuitant Fee Determination
SALARY COST
Discfoline Hours Rate Amount
Principal-Lisa Reid 10.0 $235.00 $2,350
Project Coord.II-Alissa North 3.0 $95.00 $285
Subtotal: 13.0 Total Salary Cost $2,635
SUBCONSUCTANTS(Yes or NoJ Yes
MTN2COAST(Phase 2) 52,070
PanGEO(Phase 5) $530
Total Subconsultants $2,600
REIMBURSABLES
Copies,Reproductions,etc: 0.0% of Total Salary Cost $0
Mileage: 0 miles at 50.535 $0
TotalEzpenses: $0
SUBTOTAL(SALARV,SUBCONSULTANTS AND EXPENSES)
Subtota1�Salary,5ubconsultantsand Expenses) $5,235
Total Estimated Budget: $5,235
2/4/2018 Page 1
Consultant Labor Hour Estimate
SG Alliance EXHIBIT 5 +"a.
�
Client: CityofRenton SCJ C.�unn�ce
Projed: Dn-Cali Supporting Engineering Services-Task Order k02 �'-"�"�"`"""""
� lob q: 773.01
� File p: Renton On-Call TOM2 Costxlsm
Frincipal- Project
Task No. Task Description Coord.ll- Total
Lisa Reid
Alissa North
Phase 1 Task Management and[oordination
� Task 1 Task Management and Coordination
� 1 Scoping and Coord of 2017 and 2016 surveys 2.0 2.0
2 Task Set-up � 1.0� 2.0 3.0
3 Invoicing and Progress Reporting 1.0 1.0 2.0
4 Subconsultant Coordination 2,0 2.0
Subtotal Hours: 6.0 3.0 9.0
Total Phase Hours: 6.0 3.0 9.0
Total Phase Cost: $1,410.00 $285.00 $1,695.00
Phase 2 Survey(MTN2Coast)
Task 1 Survey
1 Survey
Subtotal Hours:
Total Phase Hours:
Total Phase Cost:
Phase 3 Geotechincal Review of Survey Information
(PanGEO)
Task 1 Geotechnical Revtew of Ezisting Information
1 Geotechnical Review of Existing Information
Subtotal Hours:
Total Phase Hours:
Total Phase Cost:
Phase 4 Review of Survey Information and
Recommeadation
Task 1 Revlew of Survey Information and Rewmmendation
1 Review of Survey Information and Rxommendation 4.0 4.0 �
Subtotal Hours: 4.0 4.0
TotalPhase Hours: 4.0 4.0
Total Phase Cost: $940.00 $940.00
Total Hours All Phases 30.0 3.0 13.0
Total Cost All Phases 52,350.00 $285.00 $2,635.00
z or z �yzoia
EXHIBIT 5
COST
CAG-17-093 ON-CALL TASK ADDENDUM NO. 1
Task Order No. 2—Resurvey Seaplane Ramp
Prepared for: City of Renton
Prepared By: MTN2Coast Survey
Date prepared: February 4, 2018
Phase 2. Survey
Classification No. of Hours Rate/Hour Total Cost
2 Person Survey Crew 10 $150/hour $1,500
Professional Land Surveyor 3 $110/hour $330
Survey CAD/Technician 3 $80/hour $240
Total Cost $2,070
CAG-17-093 On-Call Task Addendum No.1,Task Order No.1 February 4,2018
Ciry of Renton Page 1
EXHIBIT 5
COST
CAG-17-093 ON-CALL TASK ADDENDUM NO. 2
Task Order No. 2—Resurvey Seaplane Ramp
Prepared for: City of Renton
Prepared By: PanGEO, Inc
Date prepared: February 4, 2018
Phase 5. Geotechnicai Review of Existing Information
Classification No. Hours Rate/Hour Total Cost
Principal Geotechnical 2 $150/hour $300
Engineer
LG Project Geologist 2 $115/hour $230
Total Cost $ 530
CAG-17-093 On-Call Task Addendum No.1,Task Order No.2 February 4,2018
City of Renton Page 1