Loading...
HomeMy WebLinkAboutCO 4CAG-17-108, CO #4-18 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG-17-108 Harrington Ave NE Green Connections Stormwater Retrofit C.O. #4 Project - Phase 2, SWP-27-3731 CONTRACTOR: DPK, Inc. SUMMARY OF PROPOSED CHANGE: Additional Work for the Construction of Sidewalk Ramps and Placement of Crushed Surface Top Course (CSTC) This change order is for the compensation for all labor and equipment used for additional work related to the construction of sidewalk ADA ramps and placement of crushed surface top course (CSTC) under curb, gutter, and sidewalk ramp areas. The construction plans and specifications did not require the placement of CSTC under new sidewalks, curbs, and gutters per Standard Plan No.102 dated 11/21/14, which was in place when the contract was awarded on 07/17/17. Standard Plan No.102 was then revised and approved on 10/9/17 to require the placement of CSTC under the sidewalk ramps, curbs, and gutters. The required additional work included clearing, grading, and re -grading the existing surfaces prior to placing the CSTC to comply with the new approved city standard plan and requirements. During construction, the construction plans for the sidewalk ramps were modified with additional slopes, cross sections, and more reference points to provide information necessary for the contractor to do the work to ensure the new sidewalk ramps were in compliance with ADA standards and requirements. The re -design of sidewalk ramp areas required the contractor to perfrom additional work. An additional five (5) working days were approved for the additional work. ESTIMATED TOTAL CHANGE ORDER COST = $35,042.68 Additional Working Days added to the Contract for this Change Order: 5 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $904,036.00 $984,457.96 $35,042.68 $1,019,500.64 SIGNATURES: Contractor: -►� I Project Manager:�� Approved By: Yrt J L s Horr Approved By: T14,// gg Y Approved By: Attest: Approved Utility Systems Director is Law, Mayor Jason Seth, Date: /D —/ d - / o Date: /0--/i _ / IR Date: Date: ;` y „fir,+„ ,E; 4% Date: 0114 `C. - � bate: 0ke�//�'� SEAL � Date: G' ! Shane Moloney, Ci�torney ��I'f?q`IEpIS\\\\\ti��` H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3731 Harrington Ave -Ph_ II\1600 Construction\1606 Change Orders\Change Order\CO-4\CO 4-Extra Work Sidewalk Harrington Ave NE Green Connections Stormwater Retrofit Project - Phase 2 Change Order No. 4 Additional work related to the construction of sidewalk ramp Labor Classifications Qty Hrs. Ea Total Hrs. Hrly Rate Total Forman 1 16 16 67.88 $1,086.08 Operator 2 16 32 $68.10 $2,179.20 Pipelayer 1 16 16 $55.12 $881.92 Truck Driver 1 16 16 $60.75 $972.00 Laborer 1 1 16 1 16 1 $54.13 $866.08 Flaggers 2 1 16 1 32 1 $46.03 $1.472.96 Total Labor 29% Labor Markup Total Labor & Markup Equipment $7,458.24 $2,162.89 $9,621.13 Unit No. Equipment Description Hours Worked Rates Total Regular Standby Regular Standby Regular Standby K-73 KOMATSU 120-6 EXCAVATOR - 16 - $13.11 - $209.76 K-30 Komatsu PC-120-3 Excavator 16 - $53.93 - $862.88 - K-26 1 Cat Wheel Loader 950-A 16 - $55.60 - $889.60 - K-48 Mack Dump Truck - 16 - $7.49 - $119.84 K-48 PT Pony Trailer - 16 - $3.69 $59.04 K-101 Roscoe RB 38 Sweeper 2 - $32.85 - $65.70 - K-70 Chevy Flatbed 1.5 TN 16 $31.60 $505.60 K-99 Chevy 1500 SILVERADO 16 $20.82 $333.12 Total Equipment 21% Equipment Markup Total Equipment & Markup Total Change Order Labor & Equipment $2,656.90 $388.64 $639.56 $3,685.10 $13,306.23 Harrington Ave NE Green Connections Stormwater Retrofit Project - Phase 2 Change Order No. 4 Additional work related to CSTC Placement Classifications Classifications Qty Hrs. Ea Total Hrs. Hrly Rate Total Forman 1 24 24 67.88 $1,629.12 Operator 2 24 48 $68.10 $3,268.80 Pipelayer 1 24 24 $55.12 $1,322.88 Truck Driver 1 24 24 $60.75 $1,458.00 Laborer 1 24 24 1 $54.13 $1,299.12 Flaggers 2 24 48 $46.03 $2,209.44 1 Uldl LdUUF 29% Labor Markup Total Labor & Markup Pnuinmant $11,187.36 $3,244.33 $14,431.69 Unit No. Equipment Description Hours Worked Rates Total Regular Standby Regular Standby Regular Standby K-73 KOMATSU 120-6 EXCAVATOR 24 $56.17 $1,348.08 K-75 Bomag Roller Vib. 3-5 ton 12 $23.89 $286.68 K-26 Cat Wheel Loader 950-A 24 $55.60 $1,334.40 K-48 Imack Dump Truck 24 $58.58 $1,405.92 K-48 PT Pony Trailer 24 $12.72 $305.28 K-101 Roscoe RB 38 Sweeper 3 $32.85 $98.55 K-70 Chevy Flatbed 1.5 TN 24 $31.60 $758.40 K-99 Chevy 1500 SILVERADO 24 $20.82 $499.68 1Uidi cquipmenc 21% Equipment Markup Total Equipment & Markup Total Change Order Labor & Equipment $6,036.99 $1,267.77 $7,304.76 $21,736.45