Loading...
HomeMy WebLinkAboutCO 07CAG-17-235, CO #7-19 URICommunity Services Facilities Division CONTRACT CHANGE ORDER (CO) TO: Par -Tech Construction Inc. CAG-17-235 CO NO. PROJECTTITLE FireStation15 (CONTRACTOR) The following mutually agreed to and Owner approved Change Order Proposal(s) and/or Field Authorization(s) are hereby incorporated by reference into the contract. Description Amount RRFA COP #4 - Flooring at Sinks $ 2,040.99 COP #11- Comm Room Revisions $ 5,106.01 COP #23 - Plumbing Revisions $ 2,954.26 COP #25 - PSE Connection Fees $ 8,325.11 COP #27 - Flashing Revisions $ 3,566.23 COP #29 - Credit for Veneer Revision $ (864.00) CONTRACT SUM: NO CHANGE INCREASE OF: $ 21,128.60 ❑ DECREASE (WASHINGTON STATE SALES TAX INCLUDED) iFA CONTRACT TIME: Q✓ NO CHANGE ❑ INCREASE OF: O ❑ DECREASE CALENDAR DAYS The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. CONTRACT SUMMARY (Internal Use Only) ORIGINAL CONTRACT SUM $ 4,273,500.00 PREVIOUS ADDITIONS/DELETIONS $ 135,712.47 PREVIOUS TOTAL $ 4,409,212.47 CHANGE AMOUNT THIS CHANGE ORDER $ 21,128.60 REVISED CONTRACT TOTAL $ 4,430,341.07 PERCENT TOTAL CHANGE FROM ORIGINAL 3.67% PREVIOUS CONTRACT CALENDAR DAYS 324 PREVIOUS SUBSTANTIAL COMPLETION DATE January 4, 2019 REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 0 CURRENT SUBSTANTIAL COMPLETIOrpAT January4, 2019 z. s Ar6hitect Ac no led geme t Date Con ractor Acknowledgement Date The City of Renton hereby accepts the foregoing Field Authorization(s) and/or Change Order Proposal(s). This formal acceptance constitutes a Change to the contract only when authorizing signature Is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection witjt,this Ch"e Order. AUTHORIZING GNATU DATE Community Services Facilities Division CONTRACT CHANGE ORDER PROPOSAL (COP) TO: Par -Tech Construction (CONTRACTOR) Proposal Request Date: RRFA COP#4 10/25/18 You are directed to prepare a cost proW4 for the work described below and/or detailed on the attachment referred to: At the floor sinks in Custodial 120 & Decon 121, install an elastomeric waterproof coating to protect the concrete and CMU attached ASK-63. ASK-63 replaces 4/A7.03 and shows the elastomeric coating and sealant at the bottom of the GW3. The elastomeric coating should completely cover the floor and run up the walls on each side of the floor sink to the finish floor level. Tint the coating to match the concrete color. Complete surface preparation and follow installation specifications (including coverage, number of coats and the use of a primer) as (ewmmended by manufacturer. Product basis of design is Sherwin Williams SherLast,., A5-6W series. Contractor may submit alternative equal products for review. REASON FOR CHANGE Design Errors t--%n�RRtA Late t Code omOissibn�s Conditions Requiternent Value Engineering EXPLANATION: Protect joints in concrete I CMU DATE PROPOSAL REQUIRED: 11/8/18 CHANGE ORIGINATED BY: SSW Architects (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Will Aho (RRFA) TO: SSW Architects (Mary Jo Lux) (A/E) TO: Robert Ebert COR WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: [—I NO CHANGE INCREASE OF-TJA.�C:> oq�o DECREASE _T (WASHINGTON STATE SALES TAX INCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto CONTRACT TIME: NO CHANGE INCREASE OF 0 CALENDAR DAYS DECREASE The foregoing amount covers everything required In connection with the change. All other provisions of the contract remain In full force and effect. We understand that this proposal do--- not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the City of Renton. CONTRACTOR We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance. DATE RRFA DATE Aoftk U-R Community Services Facilities Division CONTRACT CHANGE ORDER PROPOSAL (COP) TO: Par -Tech Construction COP #11 (CONTRACTOR) Proposal Request Date: 10/2/18 You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: Revise the layout in the Comm Room per attached sketches ESK-09 & ESK-10. ESK-09 replaces a portion 1/E4.00. ESK-09 increases the amount of fire rated plywood to run continuously on the north, east & south walls and adds D-rings at 24" AFF between the MDF & conduit penetrations in the floor slab. Provide a credit to omit the equipment rack and all associated equipment specified in 27 1001 2.07. In its place, provide and install a Tripplite SmartRack 26U (cut sheet attached). Also provide all associated equipment specified in 27 10012.07 that corresponds with the Tripplite rack. Per the contract documents, provide backing as needed to support both the MDF & the Alerting cabinets. ESK-10 replaces a portion of 1/E3.00. ESK-10 changes four of the electrical receptacles to be isolated ground. Design City I Latent Code Value REASON FOR CHANGE Design Errors Omissions CI Conditions Requirement Engineering EXPLANATION: Layout changes directed by COR IT department DATE PROPOSAL REQUIRED: 10/16/18 CHANGE ORIGINATED BY: SSW Architects (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Jonas Hallstrom TO: SSW Architects (Mary Jo Lux) (A/E) TO: Robert Ebert COR WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: ❑ NO CHANGE INCREASE ❑ DECREASE OF �J'4id� f �JAit�}r+9� S)j�u�} J D to • o) (WASHINGTON STATE SALES TAX INCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: �' NO CHANGE ❑ INCREASE OF CALENDAR DAYS ❑ DECREASE The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the City of Renton. CONTRACTOR SfISNATURE DATE We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance. DATE 1-�A-llg> Sketch No. ESK-09 Aki Sheet/Detail No. VE4.0 A R C H I T E C T 5 SCHREIBER STARLING Date: September 25, 2018 WHITEHEAD Project: Fire Station 15 Client: City of Renton /Renton Regional Fire Authority 901 FIFTH AVE N93100 Client Project No. CAG-17-046 SEATTLE, WA 98164 SSW Project No. 17001 206.687-8300 SSWARCH TECTS.COM PLAN FLAG NOTES: O MAIN DISTRIBUTION FRAME - OFCI. O SEE SHEET E1.00 FOR DATA CONDUIT LOCATIONS. O PROVIDE 5" x5" D-RINGS MOUNTED 16" O.C. AT 24" AFF BETWEEN MDF AND CONDUIT PENETRATIONS IN THE FLOOR SLAB AT NORTHEAST CORNER OF ROOM. 4 1 OI 10 1 N E4.00 I FIRE -RATE PLYWOOD 2 2" CONDUITS TO ROOF ANTENNA OMM ROOM LOW VOLTAGE PLAN Scale: 112" = 1'-0" 2' 1' 0' 2' 4' Sketch No. ESK-10 Sheet/Detail No 1/E3.00 Date: September 13, 2018 Project: Fire Station 15 Client: City of Renton / Renton Regional Fire Authority Client Project No. CAG-17-046 SSW Project No. 17001 E 1 N E3.00 n �JAt ARCHITECTS SCHREIBER STARLING WHITEHEAD 901 FIFTH AVE '.03100 5EATTLE, WA 98164 206-682-8300 SSWARCH TECTS.COM � HA Comm Room Power Plan Scale: 1/2" = 1'-0" 21 1' o, 2' 4' 'TECH CONSTRUCTION, INC. CCB #109451 WA#PARTECI97211 Par -Tech Self Perform Total (See Breakdown on next page) Project: Renton Fire Station 15 COP: Project Manager: Ben Parsons Cell Number: (971) 275-6238 Subcontractor work $4,167.14 Overhead Markup 4% to the first ($50,000) $166.69 Overhead Markup 2% to the remaining costs Profit Markup 4% $166.69 Total Subcontractor Markup $333.37 Subcontractor Total Sub total of Par -Tech & Subcontractor Pricing BondingInsurance & Liability Insurance (1.54%) $69.31 Public Works Bond (1.60%) $72.01 Tota I Tax (10%) Grand Total $464. (::NW: Utility Services, LLC. Attention: Ben Parsons Job: Fire Station # 15 Backup Proposal #: COP-11 Description: Comm Room Date: 10/17/2018 DIRECT JOB EXPENSES DOLLARS Delivery $72.00 Freight Permit & Inspection Insurance $24.00 Job Office & Whs. Equipment Small Tools Man Lift Non -Productive Labor Engineering & Drafting Job Truck Job Telephone Travel Expense Room & Board Shift Adder Material Sales Tax General Supervision Safety TOTAL DIRECT JOB EXPENSE $96.00 'Note: The above price does not include any Impact or Delay Costs We reserve our rights for any Impact or Delay costs incurred. This Propsal may be withdrawn by NW Utility Services, LLC. if not accepted within 30 days. Invoice Terms / Net 30 Days. A Finance Charge of 1.5% will be made on past Due Balances. Corresponding Annual Rate of 18% Minimun Finance Charge SUMMARY DOLLARS Material Cost $386.81 Labor Hours: 20 Aver. Rate Per Man/Hr.: $94.37 Direct Labor Cost $1,887.40 Direct Job Expense $96.00 SUB TOTAL $2,370.21 Profit: $0.00 SUB TOTAL (w/Overhead) $2,370.21 Profit: 12% $284.43 Home Office Overhead 1 0% $0.00 SUB TOTAL (w/Profit & Overhead) $2,654.64 TOTAL PRIME COST $2,654.64 SUB CONTRACTORS D & R $1,375.00 SUB TOTAL $1,375.00 Overhead/Profit: 10% $137.50 TOTAL SUB. COST $1,512.50 SUB TOTAL $4,167.14 Bond: 0.0% $0.00 Sales Tax: 0.0% $0.00 TOTAL SELLING PRICE $4,167.14 Authorized Signature Dean Pitsch III Dean Pitsch III ' Tel 253.891-7802 • Fax 253.891-7873 ' Email dean3@puie.com ' PO Box 1008 Sumner, WA 98390 Ln N L.D lD e-1 N OO M LD ,. LD ri LD 00 ct M Ln 00 Ln Q1 N ri O O ri 0 0 0 O O O ri S f0 a+ O H LJ1 zi- 1` V o0 00 ko (V Ln N w to --:i- oo o0 Ln O Ct u) O O O m o0 N tD O -) --t 6 P� C1 O lD O 00 M N m N L e-1 M Il r4 a' O Ql W O c-1 rl 00 O Ln M r-1 rti lD ri N N ri m N O F- 2 2 2 0 0 0 U a cJ c) i1 cL L1 „. f� w m O m V w O O 00 Ln u1 O w r-I W Ln 0) Ln Ln N ri i N N (-1 m rr) n 1* M O O O O ll? -! JO N O O O m J Lu w w U Q) U U U U U U U w w w w w w w w w w m ct ct -1 t1 LD a) +-i cv m to Ln l0 o0 Ln Ul O f- Ln O O O O tD e-i zi O fV [t m M in O t- 1- w m O W tD N O w w N Ln 0 (- O M (V w w O V n N 0 w t-I rH w N 00 ri ri M V Ln O Ln O 00 w m r-1 (V M N N * .-1 V' Ln ra N Ln t D r 4 1-1 Ct Q0 Ln ri m Q) Z v W Z J 'S O LL W = \ - 1 OC O U r4 O Ln U <t Z w Z O \ U 'S O O w J Z Q w Ln a Q cc Q Ln Z p a g o L/1 to LL m O d JLL J O aY Q N n. x Y Z z = U U a\ N O U m m o �-+ \ ~ O O 00 -+ ti 2 2 O Y m m L� co O O OU w Ln a m~ O Y O p U U p p Q a� m m U m U w w Z Z z a p wj xNzO z a OJJNZLnQZ Lno= a <` 00 mNzZpFd x w m O m U7 p Zz w dom° C2 Z R dUv F-4�u-Uw 7 Q>>>-: w Lu _ x x L Q O O w U U zc co r� M ct [t ct t- 2 N cn m U U a Ln �- 0 Ln Dean Pitsch III To: Ben Parsons Subject: FW: COP-11 From: Frank DiBisceglie Sent: Thursday, October 25, 2018 9:02 AM To: Dean Pitsch III <Dean3@puie.com>; Dean Pitsch <dean@puie.com> Subject: RE: COP-11 Remove the Chatsworth 55053-X03 open frame rack $157.35 Supply new Tripplite SRW26USDP add cost $889.38 (difference of Chatsworth above and new Tripplite) Original Chatsworth would take %: an hour to install New Tripplite will take 4 hours to install. Additional cost of 3 — Y2 hours @ 107.89 an hour ($377.62) Office PM time of an hour @ 108 an hour ($108.00) Total of $1,375.00 Frank DiBisceglie NICET III D & R Monitoring Networks, LLC P.O. Box 1008 Sumner, WA 98390 Office # (253) 887-5606 Cell # (253) 228 — 7915 frank@puie.com eCoffirvAinity Services Facilities DMMon COP # 23 CONTRACT CHANGEORPER.PROPOSAL (COP) TO: Pam Tech -Construction (CONTRACTOR) Proposal Request Date; 10/2/18 You are directed top7re0ima.boStOmposalfbriMworkde='bed'belowandlor.detailed,on the atfachmanfiiferred.Iici; Add a P-10D Wait h lift lldl*'ter connections at . the extractor per attached MSK-08. Add a PVC drain I . 14 �a from the extractor to_th#sui0o,4tiln04'ft t( !*r!*-rOlLilfftents and MSk-08. MSk-06 replaces-atporticin of I/M3.01and also relocates the P-iOCwall.hyrifan,ta46iie.theisqriio-4raIrtV the west wall. Attached ASK 60 replaces a portion of I/A3.02 (and ASk-28) and mvisesihe.plan�tayoui-i*n,becon. ASK-61 replaces details 5- 8/M4.05 (and ASK-29) and revises the Interior elevations in Decon and;locatesthe MEP: elements on the east-will.ASK-6i also relocates the TA713 shelves to the south wall. . ' I Desire 1 Latent Code 11 Value. Ci ,REASON FORCHAME Des1g n ,Errors missions MY Conditions Requlrement Engineering DATE PROPOSAL REQUIRED:; IWO) (14 days from Request 60e, uritess other date agreed io). TO: SSW Ai WE -AGREE CH4WqE1OR1GIA P RO P PSA4- R g!40 8ADW. Jonas Hallstrorn COR IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: n NO CHANGE [21INCREASE OF,Ab .� EIDECREASE -(WASi4Wd:roN.stArit sAfts TAX INCLUDED) rbof— In accordance with the general condition, Cost Estimate De Sheet(s) are attached hereto. CO E; 0 CHANGE UINCREASE OF CALENDAR DAYS [] DECREASE -- The foregoing amount covers everything required In connection with the change. All othdrprevisions af the contract remain in full 'force and effect. We understand that fhlls�proposal does not constitute authorization to proceed with the specified changes In the work until Incorporation of f this COP Into a Change Order by the ZCienton. By �i %l Z We have,carefully-examinedthis proposal and find the cost to be reasonable. Therefore, we recommend acceptance. DATE 41111-1jYL DATE MEN& T ECH CONSTRUCTION, INC. CCB #109451 WA#PARTECI972JI IPar-Tech Work Par -Tech Self Perform Total (See Breakdown on next page) Project: Renton Fire Station 15 COP: Project Manager: Ben Parsons Cell Number: (971) 275-6238 .. VIC Pipemasters $2,411.0. Subcontractor work $2,411.04 Overhead Markup 4% to the first ($50,000) $96.44 Overhead Markup 2% to the remaining costs Profit Markup 4% $96.44 Total Subcontractor Markup $192.88 Subcontractor Total $0.00 $2,603.92 Sub total of Par -Tech & Subcontractor Pricing $2,603.92 Insurance & Bonding Liability Insurance (1.54%) $40.10 Public Works Bond (1.60%) $41.66 Total Tax (10%) Grand Total MC Pipemasters Extractor change order 11/7/2018 Project: Renton Fire Station 15 COP# Type of Worker Rate Quantity Total Plumber $83.69 12 $1,004.28 $0.00 $0.00 $0.00 Total of Labor, $1,004.28 Type of Materials Rate Quantity Total Copper pipe and fittings $862.60 Silcocks $93.60 2 $187.20 Total of Materialsi $1,049.80 Type of Equipment Rate Quantity Total $0.00 $0.00 $0.00 $0.00 Total of Equipment $0.00 Total of Change w/ out markup 12% Markup Small tools @ 5% of Direct Labor 6% for work performed by own forces $2,054.08 $246.49 $50.21 $60.26 Sub total for Par -Tech $2,411.04 Community Services Facilities Division CONTRACT CHANGE ORDER PROPOSAL (COP) TO: Par -Tech Construction (CONTRACTOR) Proposal Request Date: You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: Direct reimbursement for electrical service connections costs from PSE COP # 25 10/5/18 REASON FOR CHANGE Design Errors Design I I Conditions Lode Value Omissions Requirement Engineering EXPLANATION: Direction provided by RE per email on 5/25 DATE PROPOSAL REQUIRED: 10/19/18 CHANGE ORIGINATED BY: SSW Architects (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Jonas Halistrom TO: SSW Architects (Mary 10 Lux) (A/E) TO: Robert Ebert COR WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: ❑ NO CHANGE [A INCREASE OF $ 2,3zl 11 ❑ DECREASE (WASHINGTON STATE SALES TAX INCLUDED) Tt-.S EwY % d-- ,%Ilo. In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TI ME: p NO CHANGE [:]INCREASE ❑ DECREASE OF CALENDAR DAYS The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the City of Renton. _ BY DATE We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance. A/E DATE' CITY OF REWTON / DATE ''TECH CONSTRUCTION, INC. CCB #109451 WA#PARTEC1972J1 Par -Tech Self Perform Total (See Breakdown on next page) Project: Renton Fire Station 15 COP: Project Manager: Ben Parsons Cell Number: (971) 275-6238 Subcontractor work $7,568.28 Overhead Markup 4% to the first ($50,000) $0.00 Overhead Markup 2%to the remaining costs Profit Markup 4% $0.00 Total Subcontractor Markup $0.00 Subcontractor Total Sub total of Par -Tech & Subcontractor Pricing Liability Insurance (1.54%) $0.00 Public Works Bond (1.60%) $ 00 Total Tax (10%) Grand Total PUGET SOUND ENERGY pse,com f * 00 ® ® W PAR -TECH CONSTRUCTION ATTN: BEN PARSONS Account Name: 1404 N 30TH ST / RENTON WA 98056 How to reach us Bill Specific Inquiry Department: Customer Construction Services Email: customer construction@pse.com Contact Number: 1-888-321-7779 PSE Contact: Marcus Bayley For All Other Inquiries Q Email: customercare@pse.com Customer Service: 1-888-225-5773 f TTY: 1-800-962-9498 Hours: 7:30 a.m. -- 6:30 p.m. M -- F I TRS: 1-866-831-5161 Puget Sound Energy: P.O. Box 91269, Bellevue, WA 98009 24 Hour Emergency and Outage line: 1.888.225-5773 Page 1 of 3 dssued October 8, 2b18 ,,. AccountNtimber4OOOp287`.476 _f 1 V4 IDA.tSctor ?q,20%'] .�75GlE28 Your Account Summary Previous Charges: Amount of Your Last Bill Total Previous Charges Current Charges- () Products & Services Total Current Charges Total laMidea current end past due ohatyee $ 0.00 $ 0.00 $ 7,568.28 $ 7,668.28 Total $ 7,568.28 -------------------------------------------------------------------------------------------------- ---------------------------------------- PUGET SOUND ENERGY zv�T;p Kill T k Y I want to donate $ to the Warm Home Fund �Q pse.com to pay online or to find pay station locations - 0 Mall this coupon and make check payable to Puget Sound Energy 000864 000980 854 1 MB 0,421 0005 Irlll'6r�1����ll��l��lil'IIIl�'il"'1111111"'IIJill I1I111lll"1 NiV.Puget Sound Energy PAR -TECH CONSTRUCTION P.O. BOX 91269 BEN PARSONS Bellevue, WA 98009-9269 13783 FORSYTHE RD OREGON CITY OR 97045-1131 2 25500000194439 0001 01 00400002187476 000000000000 000000756828 Page 2 of Ca) Products and Services Project Name: KENNEYDALE FIRE STATION Service Address: 1404 N 30TH ST # RENTON Attn, BEN PARSONS PSE Contact: Marcus Bayley Invoice: 90598620 Description of Charges Amount Electric Line Extension Job Order # 105087942 Construction Costs (eligible for refund subject to review), $ Construction Costs -6,978,16 Charge for Itfetime equipment malntenance. --842.41 Jurisdict'onal Permit Fee -173.12 Administrative Permit Processing Fee -419.06 Total Charges Invoice 90598620 $ -187.41 -7,600.16 Project Name: KENNEYDALE FIRE STATION Service Address: 1404 N 30TH ST # RENTON Attn; BEN PARSONS PSE Contact: Marcus Bayley Invoice: 90598784 Description of Charges Amount Electric Line Extension Job Order # 105087942 Construction Costs (aIgible for refund subject to review) $ Construction Costs --5,978.16 Charge for I fet�me equipment ma ntenance. -842.41 Jurisdictional Permit Fee -15&37 Administrative Permit Processing Fee -419,06 -187,41 Total Charges Invoice 90598784 $ -7,583,41 Project Name: KENNEYDALE FIRE STATION Service Address: 1404 N 30TH ST # RENTON Attn: - BEN PARSONS Pf='Contact: Marcus Bayley Invoice: 90599086 Description of Charges Amount Electric Line Extension Job Order # 105087942 Construction Costs (eligible for refund subject to review) $ 5,978.16 Emergency or Power Outage Dial 1-888-225.5773 To report a natural gas or electric emergency or a power outage, 24 hours a day, call 1-888-225.5773 Para Informar sobre emergencias el&ctrlcas, de gas o apagones 24 houas al dla, Ilame at 1-888-226.5773 4VX 24 9\1*934R 41-888-226.5773 4T06b1 c006L4HTb o6 ampH% CBFIU4HOt C npHpogHblM raaoM Nno 3neKrpo3HeprHeA, Hna o nepep6lBe B nogave aneKTpo3HepN", 386HHTe s na6oe speMa cywic no HOMepy 1.888-225.5773 We can translate for other languages. Call 1.888-225.5773. Keeping our word. You will receive a $50 credit on your PSE bill If we do not keep a set appointment to Install new or reconnect existing service or Inspect natural gas equipment. Exceptions apply during major storms or significant events beyond our control. You deserve excellent service. Every day we aim to give you clear, understandable answers to your questions about bills, credits, deposits and your energy service. If you have a complaint or dispute with your bill or service, please call us at 1488-225-5773. If you are not satisfied wtth the response, ask to speak with a supervisor, if you are still not satisfied, you may contact the Consumer Affairs section of the Utilities and Transportation Commission at ■ 1..888-333-WUTC (9882) or complete an online complaint form at www.utc,ws.gov. i] 0 Th`s bi is recyclable, Page 3 of 3 Description of Charges (Continued) Amount Construction Costs $ 842.41 Job Order # 105087942 Charge for lifetime equipment maintenance. 141.24 Jurisdictional Permit Fee 419.06 Administrative Permit Processing Fee 187.41 Total Charges Invoice 90599086 S 7,568.28 0 =� Community Services Facilities Division CONTRACT CHANGE ORDER PROPOSAL (COP) TO: Par -Tech Construction (CONTRACTOR) Proposal Request Date: You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: COP # 27 11/13/18 Revise the base flashings at the fiber cement panel walls adjacent to exterior paving per attached previously issued FA-08 REASON FOR CHANGE Design Errors Design City latent Code Value Omissions Conditions Requirement Engineering EXPLANATION: Flashing drip edge conflicts with paving DATE PROPOSAL REQUIRED: 11/27/18 CHANGE ORIGINATED BY: SSW Architects (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Jonas Halistrom TO: SSW Architects (Mary Jo Lux) (A/E) TO: Russ Woodruff COR WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: ❑ NO CHANGE Q INCREASE OF VS*,--3 0 �C- QJ, c � `3 S-(o ,1j3 ❑ DECREASE WASHINGTON STATE SALES TAX INCLUDED) olA s,--M-Y STK � Z-71 �=o In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: P,9O CHANGE ❑ INCREASE OF CALENDAR DAYS ❑ DECREASE The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain In full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until Incorporation of this COP into a Change Order by the City of Union. -1-1 BY I L q) J 00--- CONTRACTOR X6NATJAE D r E We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance. 1 • •l� DATE DATE Community Services Facilities Division CONSTRUCTION FIELD AUTHORIZATION (FA) TO: Par -Tech Construction FA NO.8 Fire Station 15 PROJECT TITLE (CONTRACTOR) REQUEST DATE: 10/30/2018 When authorized by the City of Renton, you are directed to proceed with work as described below and/or detailed on the attachments referred hereto: Where exterior paving abuts the building, amend the base flashings as follows so that they do not conflict with the paving: -At the patio outside of Kitchen & Dining, remove the base flashing and install a new flashing piece with a shape similar to the adjacent metal wall panels (detail 1/A6.02) -At all other locations, cut the installed flashing at the finish floor level and install a new piece of flashing with a hemmed edge and set in a full bed of sealant per attached sketch ASK-66. The bottom row of fiber cement panels may be removed and reinstalled in order to provide access to the flashings at the Fitness patio. REASON FOR CHANGE *DESIGN ERRORS 0 DESIGN OMISSIONS Q CITY Q OTHER CONTRACT SUM: ❑ NO CHANGE Q INCREASE OF Four Thousand and 00/100 $4 000.00 ❑ DECREASE --L_ (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: Q✓ NO CHANGE ❑ INCREASE OF 0 CALENDAR DAYS ❑ DECREASE The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. CONTRACT SUMMARY (Internal Use Only) ORIGINAL CONTRACT SUM $ PREVIOUS TOTAL $ PREVIOUS ADDITIONS $ CHANGE AMOUNT $ PREVIOUS DEDUCTIONS $ NEW TOTAL $ PERCENT CHANGE FROM ORIGINAL CONTRACT AMOUNT NEW CONTRACT COMPLETION DATE TOTAL CONTRACT CALENDAR DAYS The City of Renton hereby accepts the foregoing Field Authorization(s) and/or Change Order Proposal(s). This formal acceptance constitutes a Change Order to the contract only when authorizing signature is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this Change Order. t J0V8,A,1X§TEA"CH CONSTRUCTION, INC. CCB #109451 WA#PARTEC1972JI Par -Tech Self Perform Total (See Breakdown on next page) Project: Renton Fire Station 15 COP: Project Manager: Ben Parsons Cell Number: (971) 275-6238 Subcontractor work $1,181.00 Overhead Markup 4% to the first ($50,000) $47.24 Overhead Markup 2% to the remaining costs Profit Markup 4% $47.24 Total Subcontractor Markup $94.48 Subcontractor Total Sub total of Par -Tech & Subcontractor Pricing Liability Insurance (1.54%) $48.41 Public Works Bond (1.60%) $50.29 Tax (10%) Grand Total Total .85 'TECH CONSTRUCTION, INC. Project: Renton Fire Station 15 COP # 1 Type of Worker Rate Quantity Total Carpenter (removal of replace Panels) $73.25 12 $879.00 Waterproofing $73.25 8 $586.00 $0.00 $0.00 Total of Laborl $1,465.00 Type of Materials Rate Quantity Total Liquiflash $85.00 1 $85.00 $0.00 $0.00 $0.00 Total of Materials $85.00 Type of Equipment Rate Quantity Total $0.00 $0.00 $0.00 $0.00 Total of Equipmentl $0.00 Total of Change w/ out markup 12% Markup Small tools @ 3% of Direct Labor 6% for work performed by own forces $1,550.00 $186.00 $43.95 $87.90 Sub total for Par -Tech $1,867.85 METAL EXTERIORS, FLASHING, & FABRICATION 11220 164TH ST. E. PUYALLUP, WA 98374 (253) 445-9500 - FAX (253) 446-0664 / FAX TRANSMISSiON DATE TIME 10-29-2018 TO Bob Parsons FAX COMPANY Par -Tech Construction Inc. SUBJECT Fire Station # 15 ref = Base Trim revision at FCB Darren Pederson FROM I U i�4L ivUIwocrr Ur rHUt0 Ilvc,LUUuvU t t115 eA(Jt . /1- YUU UU NOT RECEIVE ALL PAGES, PLEASE CONTACT US. REMARKS Architectural Sheet Metal is pleased to offer a quote for the above -mentioned subject Total = $1,181.00 Price Includes -) Cutting off the front edge on about 48 feet of base trim (detail #I) -) Fabricating and installing top piece set in sealant (detail # I ) -) Removal and reinstalling new base metal with different profile (detail #2) Price breakdown as follows Material cost -) 62 sq ft 24ga Cool Parchment @ $1.40 per sq ft------------------- $ 87.00 -) Misc screws, sealant and rivets ---------------------------------------- 52.00 Labor cost Shop 1 Field 7 Total = 8 @ $95.12 per hour ---------------------------------------------- 761.00 Sub total = 900.00 12% Overhead /Profit = 108.00 15% Direct Labor Supervision = 135.00 3% Small tools = 23.00 2% Safety = 15.00 Total = $1,181.00 Price Excludes -) wa state sales tax Any questions please feel free to call Thank You Darren Pederson .`. Community Services Facilities Division COP # 29 CONTRACT CHANGE ORDER PROPOSAL (COP) TO: Par -Tech Construction (CONTRACTOR) Proposal Request Date: 11/13/18 You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: Provide a credit to change the wood veneer grade from AA to A at all wood cabinets. Wood cabinets to be white maple, plain sliced & book matched per contract documents REASON FOR CHANGE Design Errors Design I City I Latent Code Value Omissions Conditions Requirement Engineering EXPLANATION: Change requested by contractor to maintain schedule DATE PROPOSAL REQUIRED: 11/27/18 CHANGE ORIGINATED BY: SSW Architects (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Jonas Hallstrom TO: SSW Architects (Mary Jo Lux) (A/E) TO: Russ Woodruff COR WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: ❑ NO CHANGE ❑ INCREASE OF 0 DECREASE (WASHINGTON STATE SALES TAX INCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: Q NO CHANGE ❑ INCREASE OF 0 CALENDAR DAYS ❑ DECREASE The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance. fA. DATE 1*14 DATE =TECH CONSTRUCTION, INC. CCB #109451 WA#PARTEC1972J1 Par -Tech Work Par -Tech Self Perform Total (See Breakdown on next page) Project: Renton Fire Station 15 COP: Project Manager: Ben Parsons Cell Number: (971) 275-6238 Subcontractor work-$864.00 Overhead Markup 4% to the first ($50,000) $0.00 Overhead Markup 2%to the remaining costs Profit Markup 4% $0.00 Total Subcontractor Markup $0.00 Subcontractor Total Sub total of Par -Tech & Subcontractor Pricing Liability Insurance (1.54%) $0.00 Public Works Bond (1.60%) $0.00 Total Tax (10%) Grand Total ` •c GENOTHEN A division of Genothen Holdings L.L C. Change Order Proposal # 2 LW Job: 12357 Fire Station 15 - City of Renton COP Generated Per Change in wood grade To Par -Tech Construction Attn Ben Parsons Phone: (503) 557-8300 Fax: DESCRIPTION Per direction of Ben Parsons of Par -Tech Const, From: Kyanne Brown, Project Administrator, ext. 110 Date Issued: Wednesday, November 14, 2018 Expiration Date: Saturday, November 24, 2018 1. Change the wood veneer panel product that is being used on the project from AA grade NAUF core to an A grade non NAUF core. COSTS Total Cost Total The approximate lead time on this product after receipt of approval is 0 week(s). Genothen is not proceeding with this work until written notification is received, per contract documents. AMOUNT ($864.00) ($864.00) Genothen agrees to be bound by this proposal up until the Expiration Date noted above, AFTER WHICH IT BECOMES VOID. In accordance with contract documents, Genothen will not be held responsible for impacts to construction schedule due to change orders left unsigned after the Expiration Date. Signature Name (Please Print) Date Page 1 of 1 2948 29th Ave SW - Tumwater, WA 98512 - voice (360) 352-3636 - fax (360) 352-0753 - www.genothen.com Washington Contractor's License # GENOTHL944BD / Oregon CCB Registration # 159658 Idaho Public Works # PWC-C-15877-A-4 / Alaska General Contractor's License # 30968