Loading...
HomeMy WebLinkAboutJT 254295 ROW Permit AppDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ---~ItentOil ® Planning Division I 1055 South Grady Way, 61h Floor I Renton, WA 98057 I 425-430-7200 Email : franchisepermits@rentonwa .gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Publ~hed :3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franch ise Agency: Comcast of WA IV Inc Franch is e Job Number : 254295 Phone : 253-864-4663 ~-------~-----~ Contact Name: Brian Hoback Email : brian_hoback@comcast.com ~-------------~ Job Site Address: 164 Whitman CT NE Project Name: Description of work: Requesting to open trench/bore 59' in r/w and place 2" PVC. Begin trenching 2' from CATV ped SW corner of 170's property to bore 5' under sidewalk, trench 10' to bore 17' under 170's driveway , trench 10' to bore 5' under sidewalk, and continue trenching 10' to place a 9" flush mount Carson box . See attached. Please check all that apply: !!!!! New Construction D Repair/Relocate !!!I Underground !!!I Open Trench !!!!! Bore # of feet : _2_7_' ______ _ Contractor Name: Prince Telecom LLC State Contractors License#: EC PRINCTL834BF D Overhead 0 Sidewalk Phone: 253-891-2899 City of Renton Bus iness License#: 29850 D Street ~-------- "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and condit ions set forth under this permit nd shall com ith the City of Renton 's Trench Restoration and Street Overlay Requ i rements." Date 08/09/2017 INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT. COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Site Construction Inspector Development Engineering Manager Date Date Date D Approved as submitted D Pre-Construction Meeting required D Approved with comments or redlines D Camera inspection of utilities required Page 1 I Published : 3/30/2017 MFP17003880 Holly Powers Restoration per City of Renton Standards Justin Johnson 9-18-2017 9-18-2017 Print Form I \ Reset Form -oc~fill1c@illl ® CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME : 164 Whitman CT NE Comcast Job 254295 PERMIT# CONSTRUCTION COMPANY: Prince Telecom LLC PHONE#: 253-891-2899 CONTACT NAME: Ryan Wilkerson PHONE#: 253-261-1882 ADDRESS: 2205 West Valley Hwy E Sumner, WA 98390 CELL#: E-MAIL ADDRESS : ryan.wilkerson@princetelecom.com FAX#: PROJECT LOCATION:164 Whitman CT NE N/E/S/W OF : WORK TIME : 8:30AM -4:30PM APPROVED BY: WORK DATE: 09/11/2017 APPROVAL DATE: Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington . • Prepare a traffic control plan and obtain City approval of that plan . That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-fou r (24) hours before any street or lane closures . . Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W . 47 .36 .200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes . . Indemnify and hold harmless the City of Renton from any and all claims , actions, and judgments, including all costs of defense and attorney's fees incurred in defending against same, arising from and related t o implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder's agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, i ncluding the City's reasonable attorney's fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same . . Flagger and sign placement are subject to revision by the City Inspector on site , if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements . ~ ~ DATE: vejoq /t =r PRINT NAME: OFF IC E COPY T- ~ CO NTRACTOR DE V. SERVICE , INS PECTION P. M ILLER SIGNATURE : DEV. SERVICE, PLAN REVIEW B. BANNWARTH PO LI CE CHA RLES KAR LEWICZ FI RE FIRE M ARSHALL FS #13 MFP17003880 Monday through Friday Justin Johnson 9-18-2017 NOTES: Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. The plan must be submitted to the City's PW/Transportation Divis ion for review and/or approval at least three working days prior to work. Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425 -204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded . Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade , or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address , and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time . The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site . • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned , City crews will remove and store them at the City's maintenance shop (3555 NE 2"d Street). SKETCH --NORTH -- 8/8/2017 164 Whitman Ct NE -Google Maps 164 Whitman Ct NE Imagery ©2017 Google, Map data ©2017 Google United States 20 ft https ://www.google .com/mapslplace/164+Whitman+Ct+NE , +Renton , +WA+98059/@47.4844812,-122.1611018 , 103m/data=!3m1!1e3!4m5!3m4!1 s0x54... 1 /1 SIGN SPACING • X (1) MINIMUM SHOULDER TAPER LENGTH • UJ (feet) CHANNELIZATION DEVICE BUFFER DATA RURAL ROADS & URBAN ARTERIALS 35 /40 MPH 350'.t SPACING (feet) RURAL ROADS, URBAN ARTERlALS, SHOULDER Posted Speed (mph) MPH I TAPER I TANGENT LONGITUDINAL BUFFER SPACE • B RESIDENTIAL & BUSINESS DISTRICTS 25 / 30 MPH 200'.t (2) Vv'IDTH 35140 I 30 I 60 URBAN STREETS 25 MPH OR LESS 100'.t (2) (feel) 25 1 30 I 35 I 40 45 I 50 I 55160165110 25130 I 20 I 40 SPEED (MPH) I 25 I 30 I 35 I 40 I 45 I so I 55 I 60 I 65 I 10 (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE 8' 40 1 40 I 60 I 90 I I I I I LENGTH (feel) I 155 I 200 I 250 I 305 I I I I I I INTERSECTIONS AND DRIVEWAYS. 10' 40 I 60 I 90 I 90 -I -I -I I I (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT BUFFER VEHICLE ROLL AHEAD DISTANCE • R ROADWAV CONDITIONS. USE A J DEVICES TAPER FOR SHOULDERS LESS THEN 8' TRANSPORTABLE ATTENUATOR 30 FEET MIN. MINIMUM HOST VEHICLE V\IEIGHT 15,000 LBS. THE MAXIMUM TO v-JEIGHT SHALL BE IN ACCORDANCE WTH THE MANUFACTURERS 100 FEET MAX. RECOMMENDATION. PROTECTIVE VEHICLE NO SPECIFIED MAY BE A 'NORK VEHICLE STRATEGICALLY LOCATED TO SHIELD DISTANCE THE Y\IORK AREA. REQUIRED --- - - - - ------ ---!l - - - --- - -~-& ~-7 A D D D D D D D D '7 I) T ~ WORK AREA~ Q Kl Kl I) c::m Q I I I) Q " ,., I x I x I U3 B I ~ I 50' I I I I I 48" 48" ROAD WORK SHOULDER AHEAD WORK 48" 48" W20-1 W21-5 LEGEND Kl TEMPORARY SIGN LOCATION SHOULDER CLOSURE -LOW SPEED D CHANNELIZING DEVICES NOTES: (40 MPH OR LESS) 1. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE 20'(FT). c:J33 PROTECTIVE VEHICLE NOT TO SCALE 2. All SIGNS ARE BLACK ON ORANGE. FILE NAME S:\Dulan R P& S\.4.Standards\2-Ptan ShHt Llbral"\'\01-Publshed PSL\CTC Woftl: Zone Tratne Control\W TC-5 Shoulder Clo.ure • low SDMMI 40 M H or leH)ITC-S.dgn ~ TIME 1:20:14 PM "'-~llT.t.TC FED.AID PROJ.NO. ..... ~·""° DATE 9118'2014 iWASf ~ TCS PLOITED BY FletcCo ,____ DESIGNED BY ---ENTERED BY Washington State CHECKED BY ~-LOCll._..O. Department of Transportation M PROJ.ENGR ~ -----....--TRAFFIC CONTROL PLAN llfl!lll REGIONAL ADii. REV1Sk)N DATE BY ~.t:.ITA•-~.L ...... _