Loading...
HomeMy WebLinkAboutAdden 2 CAG-18-032 , Adden #2-19 lk IVWashington State Department of Transportation Supplemental Agreement Organization and Address Number 2 DGK Inc. Original Agreement Number 1902 120th PI SE,Suite 202 Everett,WA 98208 CAG-18-032 Phone: 425-418-7162 Project Number Execution Date Completion Date February 20,2018 December 31,2019 Project Title New Maximum Amount Payable Renton Avenue South Resurfacing $25,872.40 Description of Work This project will resurface,with a grind and 3-inch overlay,a 0.59 mile segment of Renton Ave S from South 130th St to Hardie Avenue SW/Taylor Avenue NW,extending the life of the pavement by 12 to 15 years.it will include curb ramp retrofits and pedestrian access improvements.This supplement will amend the original scope of work to add support services for the ongoing environmental compliance reviews of the project during construction and provide weekly oversight to assure contractor compliance with Washington State water quality standards and the King County permit. The Local Agency of City of Renton desires to supplement the agreement entered in to with DGK Inc. and executed on February 20,2018 and identified as Agreement No. CAG-18-032 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: The scope of work is amended to add support services for the ongoing environmental compliance reviews of the project during construction and provide weekly oversight to assure contractor compliance with Washington State water quality standards and the King County permit in accordance with Exhibit A. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 31.2019-No Change. III Section V, PAYMENT, shall be amended as follows: The original agreement's maximum amount payable of$4,933.60 is increased by this Supplement by$20,938.80 for a new maximum amount payable of$25,872.40 in accordance with Exhibit B. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By:DGK Inc. By:Gregg Zimmerman,Public Works Administrator 4 Consultant Signature 1fAnjatur ' e / l/ 20/q DOT Form 140-063 Revised 09/2005 Scope of Work Supplemental Agreement No. 2 Exhibit A Agency: City of Renton Consultant DGK,Inc. Contract: CAG-18-032 Project: Renton Avenue South Resurfacing PROJECT UNDERSTANDING The City is currently undertaking the asphalt resurfacing of Renton Avenue South from Harding Avenue SW to S 130th Street. This project will include grinding down the existing pavement and replacing it with new asphalt. This work will also include updated pedestrian push buttons and intersection ramps as required to meet ADA standards. This scope of work provides for the ongoing environmental compliance reviews of the project during construction. The work will be performed in accordance with the WSDOT LAG manual. The following tasks identify the work needed: TASKS: 1. Provide Weekly assistance in NPDES oversight with the CM team to assure contractor compliance with the NPDES permit. 2. Provide CESCL inspection services as needed for all utility work on the project that is not covered by the contractor. 3. Respond to contractor RFI's concerning environmental issues and commitments. 4. Update environmental documentation as needed to address construction issues. 5. Complete onsite inspections. 6. Make recommendations for environmental compliance. DELIVERABLES 1. Notes and email recommendations. x btB Project Name Renton Avenue S Client City of Renton - Michelle Faltaous Location City of Renton Date 1/13/2019 Project Project Manager Biologist Task 1-NEPA&NPDES Compliance 10 10 Task 2-CESCL Inspections for utiltiy work 8 8 Task 3-RFI Reponses 24 20 Task 4-Update environmental docs to address issues 5 4 Task 5-Onsite inspections 20 20 Task 6-Recommendations for enviro compliance 5 4 Total Hours 72 66 Hourly Rate Total Labor Overhead * Profit ** Project Manager $71.00 $5,112.00 $5,623.20 $1,533.60 Project Biologist $50.00 $3,300.00 $3,630.00 $990.00 Project Manager $12,268.80 Project Biologist $7,920.00 Mileage $750 TOTAL ESTIMATED COST $20,938.80 *Overhead 110% **Profit of Labor 30%