Loading...
HomeMy WebLinkAboutMFP18005801DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18005801 IVR Number: 18005801 Permit Informaon Permit Name:Zayo Bandwidth Northwest, Inc Address/Locaon :10/15/2018Application Date:6623400183Parcel Number:19201 108TH AVE SE Permit Type:01/22/2019Issue Date:Franchise Permit Work Class:01/22/2020Expiration Date:Minor Utility Job Number:Bridge: WA-BFranchise Type:Cable Description:Overlash 106', tie into existing conduit 99', riser 25': pull 144ct fiber through existing Zayo conduit. Overlash 144ct fiber to existing Zayo strand. Tie 144ct fiber into existing Zayo splice case. APPROVED WITH COMMENTS OR REDLINES. CONDITIONS OF OVERHEAD APPROVAL 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’ 6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Zayo’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Zayo shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City’s Community and Economic Development Administrator or their designee, from the first event triggering the requirement to underground the aerial lines. Contacts Name Address PhoneTypeBilling Zayo Bandwidth Northwest B: (206) 988-8600Applicant Dan Caruso Zayo Group LLC 242 Rangeline Rd Longwood, FL 32750 B: (407) 260-1011 C: (303) 381-4683 Contractor Business License Number: 36469Construction Contractor: ZAYOGGL898PJ CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ZAYO - Billing 4772 Walnut St, Suite 100 Boulder, CO 80301 B: (253) 655-1100Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18005801 (Date)(Signature) Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP18005801Scott Warlick10/18/2018Justin Johnson10-31-2018 MFP18005801Justin Johnson10-31-20188:00 am to 3:00 pmMonday through Friday BRIDGE: WA-B13 OVERBUILD (RENTON)19201 108TH AVE SERENTON, WA. 98055 1 - COVER SHEET AND PROJECT LOCATION 2 - ZAYO GENERAL NOTES 3 - LINE TYPE AND SYMBOL LEGENDS 4 - PLAN VIEW 5 - TRAFFIC CONTROL PLANPROJECT LOCATIONCONTACT PERSON:SHEET INDEX:CITY OF RENTONFibe SolutionsProject ManagerRon Desmet604 W Meeker St, Suite 103Kent, Washington 98032(Cell) 206.571.2230(Email) rdesmet@fibesolutions.comZayo GroupProject manager - Operations WestMatthew Travis20829 72nd Ave S. Suite 300Kent, Washington 98032(Office) 208.392.1925(Cell) 206.765.0915(Email) matthew.travis@zayo.comPROJECT DESCRIPTIONMFP18005801 MFP18005801 SYMBOL LEGEND:BOREPITLINE TYPE LEGEND1MFP18005801 PROPOSED 144CT FIBER 12323CITY OF KENTCITY OF RENTON1TCP22EXISTINGSPLICE (40100)MFP18005801 CROSSINGAERIALROADAHEADWORKBEPREPAREDTO STOPROADAHEADWORKROADAHEADWORKBEPREPAREDTO STOP108TH AVE SE 108TH AVE SESE 200TH STSE 200TH STCONTACT INFO:FIBE SOLUTIONSPROJECT MANAGERTERRY CROMWELL206.793.0637TCS#010558TYPE OF WORK:WORK HOURS:AERIAL WORKM-F 7AM-5PMPROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.MINIMUM WEIGHT 15,OOO LBS.*GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.TRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR AERIAL WORK PLAN SETBEPREPAREDTO STOPCENTER LANEAHEADCLOSEDWORK AREA WORK AREA KEEPRIGHTKEEPRIGHTPOLICEOFFICERROADAHEADWORKRIGHT LANEAHEADCLOSED107TH AVE SEROADAHEADWORKBEPREPAREDTO STOPMFP180058018am to 3pm January 22, 2019 Matthew Travis, Zayo Group c/o Compliance Solutions, Inc 242 Rangeline Road Longwood, FL 32750 Via Email: matthew.travis@zayo.com SUBJECT: Request for Undergrounding Exemption (Bridge WA-B13 Overbuild, MFP18005801, 19201 108th Avenue SE) Dear Mr. Travis: The City of Renton has reviewed your request to grant Zayo Group an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Zayo proposes to install a new replacement 144-count overlash fiber connection on existing Puget Sound Energy (PSE) power poles along SE 192nd Street beginning on the northeast corner of 19201 108th Ave SE. The new fiber connection will extend west approximately 106 lineal feet to the northwest corner of 19201 108th Ave SE. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(g). Ordinance 5497 grants Zayo Bandwidth Northwest, Inc., the right to construct, operate, maintain, repair, alter , remove and repair one or more fiber optics communications facilities together with all equipment, support structures, conduit, cables and appurtenances of Zayo’s systems, under, along, over, below and through certain public right of ways and other public lands within the City of Renton. The proposal would utilize existing poles and attach to the existing aerial path for a replacement line between two poles of just over one hundred lineal feet. A minimum vertical height clearance of 15’-6” would need to be provided for; therefore, staff recommends this as a condition of approval. Therefore, the staff recommends that the City grant an exemption with conditions, per RMC 4-6-090(D)(1)(g) which allows a replacement of overhead facilities for a distance of three (3) or fewer spans (four (4) poles) or five hundred feet (500’). DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant for the Project Reach is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(g). Zayo – Bridge: WA-B13 Overbuild Page 2 of 2 January 22, 2019 Conditions of Approval 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Zayo’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Zayo shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City’s Community and Economic Development Administrator or their designee, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, February 5, 2019. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Gregg Zimmerman, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Civil Engineer II Scott Warlick, Engineering Specialist II Holly Powers, Permit Technician Pat Miller, Construction Inspection Supervisor Franchise Permits