HomeMy WebLinkAboutMISC - Report 7!r --- - -r - - - -- --
irENC- CQR. IS -0'+ IN,
1 112" NRON P!PE >>ffJ.27' VY.
S. O� ;.Ai. �� S ijfSN�
.............. `.....yy.......^ ......
I1-10, W. F c3�[ 1.0' S.
OF CAL.C'0 C ORNEq
LG F rA
PARE,PJT PARCEL
AREA:
98'f C08. SQ. FIT
(2.251 ACRES)
,,0 1
1
13C�- r
5 i
6" PVC TIGHTLINE
0 1.0% MIN, SLOPE
FOR CONNECTION TO
i ROOF AND FOOTING i,
DRAINS (TYOLQ
I I
_ oo AY)
w
STA- 2+30,07, f
RIM=508.00
IE-504.00
!r
/ 3
EAVE
ALL EXISTING TPc-IJCTURES cis
TO BE REMOVE -
LT
507.95
t4
m
-FA ONSTR1I
.G `•' ��/�: ' RAMP. �.P�F
GOINC
sj
c
TYPE III BARRICADE
PEr DETAIL THIS SHEET
N$9`51 '03 "E 330.34
� +189'50'51 "E 330.34 0
506.73 506.73 i;,o ......-
G
21 LF 12" SD 0 2.// f{
0�
o
FLO,WLINE (TYP.)
f
,f
6" ;PVC TIGHTLINE a
® 1.6% MIN. SLOP a '
FOR CONNECTION
RO: F AND FOOTING
DRAINS (TYP-)
21 LF 12" SD/goy
0 1.00
HANDICAP ACCESS f
DETAIL THIS SHEET.
OF RAMP AXI5 TO .E='
NTER, OF
E WITHCE .
r,i ioo orn iom emir
f_- ltBV'i�� GROUND
k (42' RADIUS) /'
& 1,7'± V',
/} --•- a �c....�.
/ \ 1
L
� / k
x 4\
c
ASPHALT RAMP 0 r
r�� 1:12 f F X.SLOPE
. 2 ~�
6" PVC TIGHTLINE
® 1.0% MIN. Rl P
FOR CONNECTION OF
F AND FOOTING
R00 11
DRAINS (TYP,) `t f,
-r-•'
/-:ROLLED CURB AND GUTTER
i-'OER DETAIL THIS SHEET
8
-112 LF 12" SD
0 1.95%
5' SIDEWALK
79 LF 12" SD
® 0.509
;PkOPOSED 10' -
DRAINAGE EASEMENT
TRACT A
RECREATION AREA
61 LF 12" SD
0 0.4.4%
a
3 f-NEW 150 WATT I _,,)}
It'
DP, COP
0.l'±
1 .J j 7
40
im TRA TaB
a DRAINAGE
NEW DETENTION/
WETVAULT PER
DET ,V-'SHEET C6
/- NEW 12' ACCESS ROAD
. InINT I I
NU I I U 5C ALL
ROAD ' A' -
NOT TO SCALE
APPROXIMATE Y
�nr ry TYPE I
'OT ; ~� 3 1 4 w
^ • . ! FL?WLINE (TYP.)
PAREIV T PARCEL
�,F. 7 ��, 6" PVC TIGHTLINE
A.,
., u,. t Q• i ._ �' ® 1.0% MIN. SLO2.25:r. ACPE ,, :.- _ �s� FOR CONNECTION
RO F AND FOOTING f'
ro B` [ F' ( �� DRAINS (TYP.)
r r •r. Sy�� •j��f7Ti%I � � �� 1_
ALL EXISTINC STRUCTURES -ij
_1.. I 1.
T BEE[Etvl0lrI-E.I;. M
}' .' E^¢ a fir- R 21 LF 12 5Dj�, �*
1.00
l
- V • s CONSTRU HANDICAP ACCESS f
-RAMP. PER DETAIL THIS SHEET.
CENT OF RAMP AXI5 TO t { a
�QI�I E WITH CENTER\ OF i
CURB RETURN ARC. ,, \, • .-
' n - PROP.4 t7E?.�51DEiyALt 3DEDICATION i
h
e;tit 07.50
4g
�. _
y I
R i nine T 71L"(q. 171111E
EDGE STRIPE 11' WEST OF
CONSTRUCTION CENTERLINE
SE 192ND ST.
CONSTRUCTION ALIGNMENT
START POINT
N 5001.8477
E 5330.4281
CH BASIN TABLE"
CB#5, TYPE 1
10.50, LT STA. 1 +20.16, 10.50' RT
RIM=504.59
IE=500.30 (N,E,S)
CB#6, TYPE I
.•f2G1eTC C•'Ta i , , 17 AO nI An' I T
L..0 7' 9
' f J:�fipr�ty �p. l_7P�
- 1 .ROLLED CURB AND GUTTER
6,o �PER DETAIL THIS SHEET
8
f 112 LF 12" SD
0 1.95%
5' SIDEWALK( r79 LF 12" SD
® 0.50%
,Pk0POSED 10'
DRAINAGE EASEMENT
TRACT A
RECREATION AREA
fit LF 12" SO
® 0.44%
`31-
N N
I
�
NO
°o
t_d
p *_
in o
-MA .
a DRAINAGE FAS
a NEW 150 WATT , L>
,o'alLUMINAIRE PER r� Y
PSE STANDARDS
,.Q' R/W DEDICATION 7'
ViY3IDEWALK
..4.�
FOR 5R tt-WIDTH -J �� C5 FOR W EDGE
.. r, �, ; . F PAVE14tkT PROFILE
ROAD `A": STA 0+00 �:� ?,R ` �1. =E IAIFQRWATION.
SE 192ND ST.: STA. 11 +63.99 £� .= 5� :.1 , --S, FEET
30' RIGHT OF WAY
EXIST. 15'
RIGHT OF WAY CENTERLINE
1_ 30' RIGHT OF WAY
EXIST. 15' t
22'
7'f
l!tY! ':�J i .` 5
i 1' CF'P W.= 499,55
6.5' 1 1'
—NEW DETENTION/
WETVAULT PER
DET%1 ,.,SHEET C6
/- NEW 12' ACCESS ROAD
RC
NOT
� 40 LF 12" SO
0 0.50%
PROPOSED BOLLARDS
PER DETAIL SHEET C6
EX. BOLLARDS
CB 8
4.
:'�HYDRANT,,°�� t90 L}` IX. 1
12' SD
% bk 14+01.59
7VE EX C8.
IN CASE
20' R/W DEDICATION
� � /r/7/,7777%��
- - _ - � -
6,.
Site Improvement Bond Quantity Worksheet
0 King County
Web date: 11/2112005
Department of Development & Environmental Services
900 Oakesdale Avenue Southwest
Renton, Washington 98055-1219 For alternate formats, call 206-296-6600.
206-296-6600 TY 206-296-7217
Project Name: Jessie Glen Date: 4/13/2006
Location: King (;ounty Project No.:
Activity No.:
Clearing greater than or equal to 5,000 board feet of tirnber?
yes
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Est-002.)ds
X- no
L050005
L05SR054
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
BOG
rn
d
0
can o
M
ca
o
M
M
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date: 4/12/2006
Site Improvement Bond Quantity Worksheet Web date: 11121/2005
ANN:
m_JJ ._
a
Backfill & compaction -embankment
ESC-1
$ 5.62
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 67.51
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 85.45
CY
Ditching
ESC-4
$ 8,08
CY
3700
1
29896
Excavation -bulk
ESC-5
$ 1.50
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.38
LF
4700
1
6486
Fence, Temporary (NGPE)
ESC-7
$ 1.38
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.59
SY
9500
1
5605
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 1.45
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.01
SY
Mulch, by machine, straw, 2" deeE
ESCA 1
SWDM 5,4,21
$ 0.53
SY
Piping, temporary, CPP, 6"
ESCA 2
$ 10.70
LF
Piping, temporary, CPP, 8"
ESC-13
$ 16,10
LF
Piping, temporary, CPP, 12"
ESC-14
$ 20.70
LF
Plastic covering. 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 2.30
SY
Rip Rap, machine placed; slopes
ESC-16
WS DOT 9-13.1(2)
$ 39.08
CY
Rock Construction Entrance, 50'x15'xl
ESC-17
SWDM 5.4.4,1
$ 1,464.34
Each
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 2,928,68
Each
2
1
5857
Sediment and riser assembly
ESC-19
SWDM 5,452
$ 1,949.38
Each
2
1
3899
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 17.91
LF
Sed. trap, 6 high, riprapped spllWay berm section
ESC-21
SWDM 5.4.5.1
$ 68.54
LF
Seeding, bhand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 0.51
SY
ESC-23
SWDM 5.4.2.5
$ 6.03
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 7.45
SY
TESC Supervisor
ESC-25
$ 74.75
HIR
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 97.75
HR
KNOWN
El
Each
I
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Est-002.xls
$ 51,743.12
$ 15,522.94
$ 67,266.06
A
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date- 4/12/2006
Site Improvement Bond Quantity Worksheet
VV(jb date: 11121/2005
Xx�
.1
M M:8
'M
. ..... . f`�4`
M, "M a�
00 " i . -1 1; M I `'..
M
M
INN
� . .................. .............
Backfill & Compaction- embankment
GI - 1
$ 5.62
CY
3500
19,670.00
Backfill & Compaction- trench
G1 - 2
$ 8.53
CY
Clear/Remove Brush, by hand
GI - 3
$ 0.36
SY
Clearia/Grubbin2aree Removal
GI - 4.
$ 8,876.16
Acre
3.35
29,735.14
Excavation - bulk
G1 -5
$ 1.50
CY
6500
9,750,00
Excavation - Trench
GI - 6
$ 4.06
CY
Fencing, cedar, 6' high
GI -7
$ 18.55
LF
Fencing, chain link, ,vinyl coated, 6'high
GI -8
$ 13.44
LF
670
9,004.80
Fencing, chain link, gate, vinyl coated, 2(
GI - 9.
$ 1,271.81
Each
1
1,271 -81
Fencing, split rail, 3'high
GI - 10
$ 12.12
LF
Fill & compact - common barrow
GI - 11
$ 22.57
CY
Fill & compact - gravel base
GI - 12
$ 25.48
CY
Fill & compact - screened topsoil
G1 - 13
$ 37.85
CY
Gabion, 1 Z' deep, stone filled mesh
GI - 14
$ 54.31
SY
Gablon, 18" deep, stone filled mesh
GI - 15
$ 74.85
SY
Gabion, 36" deep, stone filled mesh
(31-16
$ 132.48
SY
Grading, fine, by hand
GI - 17
$ 2.02
SY
Grading,_ fine, with grader
GI - 18
$ 0,95
SY
5100
4,845.00
Monuments, 3' long
GI - 19
$ 135.13
Each
10
1,351.30
Sensitive Areas Sign
GI - 20
$ 2.88
Each
Sodding, V deep, sloped ground
GI - 21
$ 7.46
SY
Survning, line & grade
GI - 22
$ 788.26
Day
Surveying, lot location/lines
G1 - 23
$ 1,556.64
Acre
3.35
5,214.74
Traffic control crew ( 2 flaggers)
GI - 24
$ 85.18
HR
Trail, 4" chipped wood
GI - 25
$ 7.59
SY
Trail, 4' crushed cinder
G1 - 26
$ 8.33
S
Trail, 4" to course
GI - 27
$ 8.19
SY
Wall, retaining, concrete
GI - 281
$ 44.16
SF
Wall, rockery
Cl - 291
$ 9.49
SF
Page 3 of 9
SUBTOTAL
80,842,79
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version-, 4122/02
Est-002.)1s Report Date: 411212006
Site Improvement Bond Quantity Worksheet
Web date: 11/21/2005
N R.,,
:-N 3,
. .........
MAI
MW
I N0 ,91
':j
�2
Kn-,-
1: -N
F N."_ ., . — . :' * ""' I �' - -.�X ":: : �,,:; N--
AC Grinding. 4 wide machine < 1000sy
RI-1
$ 23.00
SY
AC Grinding, 4 wide machine 1000-200C
RI -2
$ 5.75
SY
AC Grinding, 4 wide machine > 2000sy _
RI-3
$ 1.38
SY
AC RernovaMsposa[/Repair
R1 - 4
$ 41.14
SY
Barricade, type I
RI-5
$ 30.03
LF
Barricade, t
ype ill ( Permanent)
RI -6.
$ 45.05
LF
Curb & Gutter, rolled
R1 - 7
$ 1127
LF
2700
35,829,00
Curb & Gutter, vertical
RI - 8
$ 9.69
LF
340
3,294.60
Curb and Gutter, demolition and disposal
Rl - 9
$ 13.58
LF
Curb, extruded asphalt -RI-10
$ 2.44
LF
Curb, extruded concrete
RI-11
$ 2.56
LF
Sawout, as halt, 3" depth
RI - 12
$ 1.86
LF
680
1,258.00
Sawcut, concrete, per V depth
RI - 13
$ 1 - 69
LF
Sealant, as halt
RI - 14
$ 0.99
LF
680
673.20
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel, 4' thick
RI - 16,
$ 7.53
SY
Sidewalk, 4" thick
RI - 171
$ 30.52
SY
1250
38,150.00
Sidewalk, 4" thick, demolition and I!E22�
Rl - 181
$ 27.73
SY
Sidemik, 5" thick
RI - 191
$ 34,94
SY
Sidewalk, 5" thick, demolition and dispo&
R1 - 20
$ 34.65
SY
Sign, handicap
RI - 21
$ 85.28
Each
Stripinq, per stall
RI - 22
$ 5.82
Each
Striping, thermoplastic, ( for crosswalk)
RI - 23
$ 2.38
SF
Striping, 4?' reflectorized line
RI - 24
$ 0.25
LF
Page 4 of 9
SUBTOTAL
79,204.80
Unit prices updated: 02/12/02
KC 0 27A authorizes only one bond reduction. Version: 4/22/02
Est-002.)1s Report Date: 411212006
Site Improvement Bond Quantity Worksheet
Web dale: 1112112005
...... ...........
M.
-10
M
"•M
��MPM
C
M,
For KCRS'93, (additional 2.5" base) add
RS-11
$ 3.60
SY
AC Overlay, 1 .5" AC
RS - 21
$ 7.39
SY
AC Overlay, 2" AC
RS - 31
$ 8.76
SY
AC Road, Z', 4' rock, First 2500 SY
RS-4
$ 17,24
SY
1
2500
43,100.00
460
7,930.40
AC Road, Z'. 4' rock, Cfty. over 2500SY
RS-5
$ 13.36
SY
2600
34,736.00
AC Road, X, 4'rock, First 2500 SY
RS - 6
$ 19.69
SY
AC Road, 3P, 4' rock, Qty. over 2500 SY
RS-7
$ 15.81
SY
AC Road, 5", First 2500 SY
RS - 8
$ 14.57
SY
AC Road, 5", City. Over 2500 SY
RS-9
$ 13.94
SY
AC Road, 6", First 2500 SY
iS-1C
$ 16-76
SY
AC Road, 6", Qty, Over 2500 SY
RS-11
$ 16.12
SY
Asphalt Treated Base, 4'thick
is - 12.
$ 9.21
SY
Gravel Road, 4�'rock, First 2500 SY
RS - 1
$ 11.41
SY
Gravel Road, 4!' rock, Oty. over 2500 SY
RS - ll
$ 7.53
SY
PCC Road, 6', no base, over 2500 SY
RS-1d
$ 21.51
SY
PCC Road, 6", no base, over 2500 SY
RS - I �
$ 21,87
SY
Thickened Edge
RS - 11
$ 6.89
LF
226
1,550.251
1
Page 5 of 9 SUBTOTAL 77,836.00 9,480.65
Unit prices updated: 02112/02
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Est-002.)ds Report Date: 4/12f2006
November 8, 2004
Ms. Kim Claussen
King County DDES
Land Use Services Division
900 4aksdale Avenue SW
Renton WA 98055-1219
Re: Pre -application Meeting Request For
The Preliminary Plat of Jessie Glen
Dear Ms. Claussen:
N. S lJ LJ! N G E N _ j6_.
Job No.1123-002-004
With this letter and accompanying information, ESM Consulting Engineers is requesting
the scheduling of a Pre -application Meeting with the County to discuss the future
development of approximately 7.7 acres, located in unincorporated King County, on the
East Hill of Kent
The project is more specifically located between 1161h Avenue SE and 120�h Avenue SE,
just north of SE 192Ild Street, and includes King County Tax Parcel Numbers 6198400-
0080, 619840-0100, 619840-0120, 619840-0140, and 619840-0320, This property is
partially undeveloped and also contains a few existing residential homes. This property is
generally surrounded by lower density single-family residential development; however,
there are a few similar, higher density projects in various stages of development in the
immediate vicinity.
The property has a Comprehensive Plan designation of Urban Residential, Medium (Single
Family, 4-12 Units per Acre) and a zoning designation of R-6 (Single Family Residential, 6
Units per Acre). The conceptual layout depicts a total of 49 lots with appropriate areas for
roads, recreation space and a stormwater detention pond. We understand that the
proposed density exceeds the base density, and expect our client will obtain density
credits for use in this project
The configuration of this project is somewhat unique as we are proposing two separate
developed areas that are to be connected via a 30' wide parcel of land, which is proposed
to be part of the required park area. Access is proposed from 116"' Avenue SE into the
northern portion of the development The southern portion of the project will gain access
to SE 192Id Street through the approved preliminary plat of Sharmila Rathinam (KCLU
L04S0003), and will extend the road to the east to connect with 120'h Avenue SE. The
northern portion of this road is proposed to be a half -street at this time, as the property to
the north is under -developed and is likely to be further developed in the future.
720 South 3481h Street Tel (253) 838 6113 $othell 1425) 415 6144
Federal Way. WA 98003 Fax (253) 838 7104 Toll Free 1800) 345 5694
www.Lsmcivil.com
Civil Engineering Land Planning
Project Management Public Works
Land Surveying Landscape Architecture
Ms. Kim Claussen
November 8, 2004
Page 2
At this time, we are not aware of any wetlands or other sensitive areas that might have an
impact on the layout of this project We would appreciate discussing any potential issues
of which the County may be aware at the Pre Application meeting.
Enclosed with this letter are the following materiais:
• Original Application (1 copy)
• Site Plan (5 copies)
• Check for $392.44
If anything else is required, or if you have any questions regarding this project, please
contact me immediately. Otherwise, we look forward to discussing this project at your
next available pre -application meeting.
Sincerely,
ESM CONSULTING ENGINEERS, LLC,
ERIC G. LaBRIE, AICP
Director of Planning
Enclosure
Cc: Ty Pendergraft
is lesm-jobs11123100210041documentlletter-001.doc
8-12 Wetland Consulting, Inc.
1103 W. M%ker St M253�15
Kert WA -5751 (t 253.852-4732
December 14, 2004
Ty Pendergraft
The Herbrand Company
315 39th Ave SW Ste 6
Puyallup, WA 98373
RE: Wetland Determination — "Jessie Glen", King County, WA.
B-12 Job#A4-366
Dear Ty,
This letter describes my findings regarding jurisdictional wetlands, streams and buffers
on the proposed "Jessie Glen" subdivision located off 1161h Avenue SW in
unincorporated King County, Washington (the "site"). Specifically, the 7.7 acre site is an
irregular shaped combination of five (5) parcels (Parcels #619840-0080, #619840-0100,
#619840-0120, #619840-0140, and #€619840-0320) located between 1161h Avenue SE and
120th Avenue SW in the SW '14 of Section 33, Township 23 North, Range 5 East of the
Willamette Meridian. The site is generally located within a suburban area surrounded
by residential development.
A Sewall Wetland Consulting, Inc. Company
The Herbrand Co. -Jessie Glen/#A4-366
B-I2 Wetland Consulting, Inc.
December 14, 2004
Page 2
The site includes several existing single family homes with associated landscaping, lawns
gravel driveways, and scattered outbuildings. Portions of the site have immature (20-
45yrs old) deciduous forest covering them.
No wetlands, streams or associated wetland or stream buffers were found on the site.
The proposed project is the construction of a 49 lot subdivision with associated road, and
stormwater facilities.
METHODS
On December 7, 2004, I inspected the site for jurisdictional wetlands and streams using
methodology described in the Washington State Wetlands Identification Manual
(WADOE, March 1997). This is the methodology currently recognized by King County
and the State of Washington for wetland determinations and delineations.
The Washington State Wetlands Identification Manual as well as the 1987 Federal
Manual requires the use of the three -parameter approach in identifying and delineating
wetlands. A wetland should support a predominance of hydrophytic vegetation, have
hydric soils and display wetland hydrology. To be considered hydrophytic vegetation,
over 50% of the dominant species in an area must have an indicator status of facultative
(FAC), facultative wetland (FACW), or obligate wetland (OBL), according to the
National List of Plant Species That Occur in Wetlands: Northwest (Region 9) (Reed,
1988). A hydric soil is "a soil that is saturated, flooded, or ponded long enough during
the growing season to develop anaerobic conditions in the upper part." Anaerobic
conditions are indicated in the field by soils with low chromas (2 or less), as determined
by using the Munsell Soil Color Charts; iron oxide mottles; hydrogen sulfide odor and
other indicators. Generally, wetland hydrology is defined by inundation or saturation to
the surface for a consecutive period of 12.5% or greater of growing season. Areas
that contain indicators of wetland hydrology between 5%-12.5% of the growing season
may or may not be wetlands depending upon other indicators. Field indicators include
visual observation of soil inundation, saturation, oxidized rhizospheres, water marks on
trees or other fixed objects, drift lines, etc. Under normal circumstances, indicators of all
three parameters will be present in wetland areas.
OBSERVATIONS
Prior to visiting the site a review of existing inventories that included the area of the site
was completed. The inventories reviewed included the Soil Survey of King County,
Washington, the National Wetlands Inventory Map (NWI), and the King County Wetland
Inventory and iMap website. There are no wetlands, streams or hydric soils mapped for
the site.
The Herbrand Co. - Jessie Glenl#A4-366
B-12 Wetland Consulting, Inc.
December 14, 2004
Page 3
Field Observations
The portions of the site that are not already developed with single family homes and
associated lawn, landscaping and driveways consists primarily of deciduous forest on the
east, and on the north, an area of mixed forest and shrubs and small saplings on the
north. The eastern forested area is a mix of alder, big leaf maple, scattered hemlock,
salmonberry, Indian plum, sword fern and Himalayan blackberry.
Soil pits excavated within the site revealed a well drained gravelly soil with a 1"4' A -
horizon of I OYR 3/2 loam over a B-horizon of IOYR 3/4-3/6 gravelly loam. No hydric
soil indicators were noted, and excavated test pits on the site that were 6' deep were dry
to the bottom. No indication of wetland hydrology is present on the site.
The two northern parcels include a forested area on the extreme north, and a shrub area
just south of that parcel.
The forested area includes a mixed third growth forested area with a mix of Douglas fir,
big leaf maple, red alder, sword fern, Indian plum, hazelnut and salmonberry. Soils are
dry with high chroma soils colors and hydric soil indicators.
The shrub area contains large thickets of Himalayan blackberry as well as scattered
cherry, alder, and Indian plum. Several small (100sf-400sf) depressions are located
within some tire rutted areas where vehicles and debris have been driven and stored.
Some scattered patches of buttercup were found in these areas but no evidence of wetland
soils or hydrology. Soils were similar to other areas of the site previously described.
Off -site Areas
I inspected the area of off -site forest to the north of proposed Lot 32 (see "Jessie Glen
Conceptual Site Plan — ESM Consulting Engineers, Inc. 11/5/04) for wetlands with the
landowner's permission. This area has several large cottonwoods as well as some red -
osier dogwood which looked like a potential wetland area. However, soil pits excavated
within this area revealed only moist, non-hydric soils not meeting wetland criteria.
I also inspected the area to the south of the site in just south of proposed lots 33, 36, &
37-41. This area has a subdivision proposed on it (KCLU L04SO003). Some very small
depressions within old fill were noted with wetland flags on this site. Only one, just
south of Lot 39 appeared to have any evidence of wetland hydrology or soils. This area
is a small (approximately 500sf) area of scrub -shrub wetland. Since this wetland is
<2,500sf in size it would not be regulated by the County within the urban area.
Conclusion
There are no jurisdictional wetlands, streams or buffers on the Jessie Glen site.
The Herbrand Co. -Jessie Glen/#,44-366
B-12 Wetland Consulting, Inc.
December 14, 2004
Page 4
If you have any questions or need additional information, please feel free to contact me at
(253) 859-0515 or at ed bl2assoc.com
Sincerely,
B-12 Wetland Consulting, Inc.
Ed Sewall
Senior Wetland Ecologist (PWS#212)
King County Preferred Consultant
PRE -APPLICATION REVIEW FOR SC7SDIVISIONS
Project ?dame:—�eSste, Gl�v1 Activit ' No.: qo
Y 4P !a] 2 �_ Date: L'�s- l�-+Cac�
Roads
l
Evaluate neighborhood circulation and for stub streets. tae5F_-
Identify street classifications and designate urban or rural.
SE
Evaluate design standards:
horizontal curves
_
grade
intersection angle and spacing
CQ41��
Cut -de -sac length
Tracts serving 2-6 lots and [ 150 feet
1N V-e
Evaluate frontage improvements and need for ROW dedication.
1Z US�
Review Ion -Motorized Plan for equestrian and hike lanes
1I
Evaluate sight distance requirements for all intersections and
driveways.
i
Evaluate suitability of off -site serving roadways: Minimum 20
feet paving,•
Sufficient shoulders, hazardous intersections.
Determine if sufficient public ROW serves the property.C��vCr�,CFDL—
Evaluate existing or proposed half streets serving >35 to
Drainage
CR #1: Evaluate sub -basins, diversions and discharge points.
—" l +►" + .fie C4v.-P1 ,mot'
CR #2=Inform applicant of requirement need for off -site analysi.::.
_ t�
CR #3:Evaluate location of R/D, bioswales, and access roads.
All facilirj__ _ :;ted within
separate County tracts. Evaluate upstream flows and bypass
issues.
SR #l:Critical Drainage Areas
SR 43:Mastez Drainage Plan for >140 Lots and 200 acre basin
SR #4:Sasin Plans and Community Plan P-Suffix:
. V, I_.=
SR #5.Wet pond requirements "'1`��� �"^"^-�' " 3'-
SR 06:Lake Management Plan
SR 07:Closed Depressions
SR#11:Geotechnical analysis of ponds/infiltration near steep slopes or >151P.
Sensitive Areas
Wetlands, streams, steep slopes, and associated buffers located in traeLs.
Evaluate requirements for Erosion Hazards (KCC 21A.24.224).
Evaluate wildlife corridors or habitat issues.
Lk arm 4��S
4rn ee_& C c +-c- a Lam.-�:6_-nie�i j [A,
Notes: [�r]C.�� K. / L e_S''�� Lr
�'C r
Eric G. LaBrie, AICP
Director of Planning
eric.labrieaesmcivii.com
(253) 838 6113 Cell (206) 4913415
(BOW 345 5694 720 South 348th Street
Fax (253) 838 7104 Federal Way. WA 98003
aThe.�fer6rand Company
Ty Pendergraft
315 391h Ave. S. W., Suite 6 - Puyallup, WA 99373-3690
Toll free (888) 384-6237 • (253) 848-7700
Mr.hile, QnO 397-6983 FAX: (253) 84 ,NM
e Fruit: tpendergra/tUfheher6randcorrrpany.canr
King County
Department of Development
and Environmental Services 1�
900 Oakesdale Avenue SW
Renton, WA 98055-1219
April 20, 2006
Joe Singh
JPS Holdings LLC
18124 Riviera Place SW
Seattle, WA 98166
RE: Plat of Jessie Glen (DDES File No. L05P0005)
Recreation/Landscape Activity No. L.06MI030
Dear Mr. Singh;
This is in response to your request for approval of the landscape and recreation space plan
associated with the plat of Jessie Glen.
We have reviewed your submittal and with the following conditions, approve it as submitted:
1. The equipment (structures, benches, picnic table, etc.) shall meet at a minimum,
Consumer Product Safety Standards and be appropriately anchored.
2. Street trees shall be reviewed with the engineering plans and are not part of this
approval.
3. The landscaping associated with Tract D, detention tract, is not part of this
approval.
The landscaping and recreation space improvements (i.e. play structures) must be installed
and inspected or a performance bond posted, prior to plat recording. The amount of the
performance bond has been established at $60,785. This includes landscaping, equipment,
surfacing materials, etc. The bond amount also includes a thirty -percent contingency.
An inspection fee is also due prior to recording. This fee covers the cost of an installation
inspection and a maintenance inspection. The amount of the inspection deposit will be
determined by the Land Use Inspection Section (LUIS). If a performance financial guarantee
is posted, the improvements must be installed within two year's from the date of recording.
At the time of inspection by the Land Use Inspection Section, if the improvements are fully
installed per the approved plan, the performance financial guarantee may be reduced.
Enclosed is a copy of the approved plans for your records. If you have any questions, please
call me at (206) 296-6758. If you have questions regarding the financial guarantee please
contact Stacy Graves, Financial Guarantee Management Unit at (206) 296-7009, Questions
regarding the inspection process may be directed to the Land Use Inspection Section (206)
296-6642,
r *.
Sincerely,
Lalh Bull, Planner II
Current Planning Section, LUSD
Cc: ESM Consulting Engineers, LLC
33915 1s` Way South #200 Federal Way, WA 98003
Joanne Carlson, ASH, Engineering Review Section, LUSD wlencs
Steve Townsend, Supervising Engineer, Land Use Inspection Section, LUSD wlencs
FGMU wlencs
File wlencs
4'-$
71 K
OL V\
King County
Department of Development and Environmental Services
900 Oakesdale Avenue Southwest
Renton, Washington 98055-1219
208-,296-5600 TrY 206-296-7217
LANDSCAPE BOND QUANTITY
WORKSHEET FORM
For alternate formats, calf 206-296-6600.
PROJECT NAME: I I �- yf--C Q _
DDES PROJECT #: 045 F ooc)
ADDRESS: I f e " E (M 1 r' E I Z ridS f
PREPARED BY: - n PHONE: '
Bonds are based upon required landscaping only and will be posted for performance and/or maintenance. Required landscaping includes
perimeter landscaping, surface parking area landscaping, (KCC 21A 16) and any landscaping required by SEPA environment@] review The
maintenance period is for the life of the project, however, after posting for maintenance, the performance bond will be reduced to 30%
($1,000 00 minimum) and be held for a two year period Upon re -inspection of the site the bond will be released if the site has been properly
maintained (21A.16 160) A landscape maintenance inspection deposit is required prior to permit issuance to cover the costs of
the 2-year maintenance inspection. Landscape inspections are billed at the current hourly rate once the initial deposit is
exhausted. If the project has not been maintained and there are dead trees, shrubs, ground cover, or other deficiencies noted in the
required landscaping. the bond will be held until the deficiencies are corrected
UNIT PRICE
UNIT TYPE
QUANTITY
PRICE
SOD LAWN AREAS
$500.00
MSF (1000 SQ FT)
HYDROSEEDING
$50.00
MSF (1000 SQ FT)
SOIL PREPARATION
A TOPSOIL_ (6 INCHES DEEP)
$25 00
CY (CUBIC YARD)
Jff4�
B MULCH (2 INCHES ]JEEP)
$4 00
SY (SQUARE YARD)
7�
�W
C. PEAT MOSS (TWO INCHES DEEP)
$2 30
SY (SQUARE YARD)
f} COMPOST (3 INCHES DEEP & TILLING
$26.00
5Y (SQUARE YARD)
E FERTILIZER
$6.67
CY (CUBIC YARD)
Ls
..
PLANT MATERIALS
A DECIDUOUS TREES
175 - 2.00" CALIPER (minimum height 10')
PERIMETER & PARKING AREAS
$250 00 EACH
COST & LABOR
1.5 -1.75" CALIPER
WrL> *4 lANDUC*-"04R OTHER REGURiE0 LAMXXAP* 4
$225 00 EACH
COST & LABOR
c �
1
B EVERGREEN TREES
FIVE (5) FEET OR ABOVE
$150 00 EACH
COST & LABOR
C SHRUBS
$35.00 EACH
COST & LABOR
�l
D. GROUND COVER
$4 00 EACH
COST & LABOR
SUB TOTAL BOND AMOUNT
BOND AMOUNT SUB TOTAL:
$
Check out the DDES Web she at www.metrokc.uolr/ddes
P1
Lands capeWdQuantityFORM b-wks-landscapebq pdf 12-17-2003 Page 1 of 2
UNIT PRICE
UNIT TYPE
QUANTITY
PRICE
7777777
MISCELLANEOUS
TREE STAKES
$2 65 EACH
PER STAKE &
LABOR
FENCING:
LINEAR FOOT
SOLID WOOD CEDAR
$28 50
INCLUDES LABOR
BERMING
$17 50
LINEAR FOOT
INCLUDES LABOR
IRRIGATION
BOO
SQUARE FOOT
RELOCATING TREES ON SITE
36" BALL
$260 00
EACH
60" BALL
$920 00
EACH
RELOCATING SHRUBS ON SITE
12" BALL
$26 00
EACH
24" BALL
$33 00
EACH
ADDITIONAL ITEMS:
Onsite recreation facilities]
(�?
SUS TOTAL BOND AMOUNT
BOND SUB TOT��,
Add 30% of the Bond Sub -Total for Contingency in accordance
with Financial Guarantee Ordinance 120220, Section 13.
30 % CONTING1�
TOTAL BOND PRICE
TOTAL BOND PRICE;
Revised LBOW 11113r2002
u
r
Check out the DDES Web site at www.metrokc.govlddes
LandscapeBondOuantllyFORM b-wks-landscapebq pdf 12-17-2003 Page 2 of 2
King County
Department of Development ,
and Environmental Services
900 oakesdale Avenue SW
Renton, WA 98055-1219
April 20, 2006
Joe Singh
JPS Holdings LLC
18124 Riviera Place SW
Seattle, WA 98166
RE. Plat of Jessie Glen (DDES File No. _L05P0005)
Recreation/Landscape Activity No. L06MI030
Dear Mr. Singh:
This is in response to your request for approval of the landscape and recreation space plan
associated with the plat of Jessie Glen.
We have reviewed your submittal and with the following conditions, approve it as submitted:
1. The equipment (structures, benches, picnic table, etc.) shall meet at a minimum,
Consumer Product Safety Standards and be appropriately anchored.
2. Street trees shall be reviewed with the engineering plans and are not part of this
approval.
3. The landscaping associated with Tract D, detention tract, is not part of this
approval.
The landscaping and recreation space improvements (i.e, play structures) must be installed
and inspected or a performance bond posted, prior to plat recording. The amount of the
performance bond has been established at $60,785. This includes landscaping, equipment,
surfacing materials, etc. The bond amount also includes a thirty -percent contingency.
An inspection fee is also due prior to recording. This fee covers the cost of an installation
inspection and a main'tenance inspection. The amount of the inspection deposit will be
determined by the Land Use Inspection Section (LUIS). If a performance financial guarantee
is posted, the improvements must be installed within two year's from the date of recording.
At the time of inspection by the Land Use Inspection Section, if the improvements are fully
installed per the approved plan, the performance financial guarantee may be reduced,
Enclosed is a copy of the approved plans for your records. If you have any questions, please
call me at (206) 296-6758. If you have questions regarding the financial guarantee please
contact Stacy Graves, Financial Guarantee Management Unit at (206) 296-7009. Questions
regarding the inspection process may be directed to the Land Use Inspection Section (206)
296-6642.
Sincerely,
2ah Bull, Planner 11
Current Planning Section, LUSD
Cc: ESM Consulting Engineers, LLC
33915 1" Way South #200 Federal Way, WA 98003
Joanne Carlson, ASH, Engineering Review Section, LUSD w/encs
Steve Townsend, Supervising Engineer, Land Use Inspection Section, LUSD w/encs
FGMU w/encs
File wlencs
King County
Department of Development and Environmental Services
900 Oakesdale Avenue Southwest
Renton, Washington 98055-1219
206-296-6600 TTY 206-296-7217
PROJECT NAME:
DDES PROJECT * L 015r 000
LANDSCAPE BOND QUANTITY
WORKSHEET FORM
For alternate formats, call 206-296-6600.
LO(,:W!D�5D
ADDRESS: � � e � � . enq -..a,,.t.V 001 ��` Y Y, � E. i � ��rj�,
PREPARED BY: i1:1 117in= PHONE: 2L5 �5'9 (0113 .. '
Bonds are based upon required landscaping only and will be posted for performance and/or maintenance. Required landscaping includes
perimeter landscaping, surface parking area landscaping, (KCC 21A 16) and any landscaping required by SEPA environmental review The
maintenance period is for the life of the project, however, after posting for maintenance, the performance bond will be reduced to 30%
($1,000 O0 minimum) and be held for a two year period Upon re -inspection of the site the bond will be released if the site has been properly
maintained (21A 16 180) A landscape maintenance inspection deposit Is required prior to permit issuance to cover the costs of
the 2-year maintenance inspection. Landscape inspections are billed at the current hourly rate once the initial deposit is
exhausted. If the project has not been maintained and there are dead trees, shrubs, ground cover, or other deficiencies noted in the
required landscaping, the bond will be held until the deficiencies are corrected
UNIT PRICE
UNIT TYPE
QUANTITY
PRICE
SOD LAWN AREAS
$500,00
MS (1000 SO FT)
HYDROSEEDING
$50 00
MSF (1000 SO FT)
SOIL PREPARATION
A TOPSOIL (6 INCHES DEEP)
$25 00
CY (CUBIC YARD)
7
(1)4-2,5—
6 MULCH (2 INCHES DEEP)
$4 00
SY (SQUARE YARD)
7�
5I: T
C. PEAT MOSS (TWO INCHES DEEP)
$2 30
SY (SQUARE YARD)
269
(� ^"
D COMPOST (3 INCHES DEEP & TILLING
$26.00
SY (SQUARE YARD)
E. FERTILIZER
$6.67
CY (CUBIC YARD)
PLANT MATERIALS
A. DECIDUOUS TREES
175 - 2.00" CALIPER (minimum height 10')
PERIMETER & PARKING AREAS
$250 00 EACH
COST & LABOR
1.5 -1,75" CALIPER
WTERM LANOSCAPMO OR OTHER RHO VIREO "SCAPIkiG10,
$225 00 EACH
COST & LABOR
B EVERGREEN TREES
FIVE (5) FEET OR ABOVE
$150 00 EACH
COST & LABOR
C SHRUBS
$35 00 EACH
COST & LABOR
AM 9
jj
D GROUND COVER
$4 00 EACH
COST & LABOR
j
SUB TOTAL. BOND AMOUNT
BOND AMOUNT SUB TOTAL:
$
Check out the DDES Web site at wimmme rokc. otrfddes
1 lJ b b13
I-
d
LandscapeBondQua nfllyFORM b-wks-landscapebq pdf 12-17-2003 Page f of 2
UNIT PRICE
UNIT TYPE
QUANTITY
PRICE
MISCELLANEOUS
Gjd
TREE STAKES
$2 65 EACH
PER STAKE &
LABOR
FENCING:
LINEAR FOOT
�.
SOLID WOOD CEDAR
$28 50
INCLUDES LABOR
BERMING
$17 50
LINEAR FOOT
INCLUDES LABOR
IRRIGATION
800
SQUARE FOOT
RELOCATING TREES ON SITE
36" BALL
$260 00
EACH
W BALL
$920 00
EACH
RELOCATING SHRUBS ON SITE
12" BALL
$26 00
EACH
24" BALL
$33 00
EACH
ADDITIONAL ITEMS:
Onsite recreation facilities
SUB TOTAL BOND AMOUNT
BAND SUB TOW_r 75& i
�+
$
Add 30% of the Bond Sub -Total for Contingency in accordance
with Financial Guarantee Ordinance 120220, Section 13.
30 % CONTING�
s
TOTAL BOND PRICE
TOTAL BOND PRICE:
Revised LBQW 111'tMOW
00 TO
Check out the ODES Web site at www.metrokc. ovlddes
LandscapeBondQuantityFORM b-wks-landscapebq pdf 12-17-2003 Page 2 of 2
Cooper, Ted
From: Cooper, Ted
Sent: Tuesday, May 16, 2006 9:06 AM
To: Laura G Cociasu (laura@esmcivil.com); Mark Bergam
Cc: Tse, Amanda
Subject: RE: Jessie Glen L05SR054 - Status of Illumination Approval for 116th Ave SE intersection
Importance: High
Laura,
The below sequence of a -mails describes the status of the illumination approval. Mark Bergam confirmed that we must
have approved illumination plans before we can approve Jessie Glen Plat plans. I'm ready to approve these plans as soon
as I receive a copy of the approved illumination plans.
Amanda, thank you very much for this status update.
Sincerely,
Ted Cooper, P.E.
Engineer II
Phone: (206) 296-7163
FAX: (206) 296-6613
E-Mail: ted.cooper@metrokc.gov
M.S. OAK-DE-0100
From: Tse, Amanda
Sent: Tuesday, May 16, 2006 8:39 AM
To: Cooper, Ted
Cc: Mott, Linda; Bergam, Mark
Subject: RE: Jessie Glen L05SR054 - Illumination Approval needed for 116th Ave SE intersection
Ted,
After checking Linda's files, I found that her latest e-mail was sent to Greg Frisbee and Jim Kennedy of Puget Sound
Energy on 5l8 indicating a "go-ahead" with the 200-watt Iuminaire fixtures. Lighting calculations were attached to this e-
mail in her files. It appears that we are still waiting for the final illumination plan to be sent to us for approval.
Amanda Tse, P.E.
Signal Design Engineer
King County DOT Traffic Engineering
Mail Stop KSC-TR-0222
201 S Jackson St, Seattle, WA 98104
Phone:206.263.6139 Fax:206,296.0176
From: Cooper, Ted
Sent: Monday, May 15, 2006 2:47 PM
To: Tse, Amanda
Cc: Mott, Linda; Mark Bergam
Subject: FW: Jessie Glen L05SR054 - Illumination Approval needed for 116th Ave SE intersection
Importance: High
Hello Amanda,
I'm the DDES review engineer for the Jessie Glen Plat (Activity/Charge # L05SR054), I only need KCDOT Traffic approval
of the illumination design for the 116th Ave SE intersection to be able to approve this project. Linda Mott has been
reviewing these plans.
According to Linda Mott's voicemail, she is on vacation and won't return until May 23rd. Linda left your name and Norton's
name for contacts while she is an vacation.
Can you tell me the status of the illumination review and approval for this project? Also, please send me a copy of
this approved plan (either paper or mylar) so I can add it to my set of approved plans for this project.
For your better understanding of this project, I am forwarding you the e-mail correspondence that Linda sent to me (which I
forwarded to the design engineer, Laura Cociasu).
Thank you for your help in completing this project.
Sincerely,
Ted Cooper, P.E.
Engineer 11
Phone: (206) 296-7163
FAX: (206) 296-6613
E-Mail: ted.cooper@metrokc.gov
M.S. OAK-DE-0100
From: Cooper, Ted
Sent: Monday, May 01, 2006 8:58 AM
To: Laura G Cociasu (laura@esmcivil.com)
Cc: Mott, Linda
Subject: FW: Jessie Glen L05SR054 - Illumination calculations needed for 116th Ave SE intersection
Importance: }sigh
Laura,
I'm forwarding you the below e-mail from Linda Mott, who reviews illumination plans. Please read her e-mail and rop vide
the calculations she needs for the illumination of 116th Ave SE. An average of 1.5 footcandles with an average/minimum
uniformity ratio of 3:1 is required at this intersection.
The mylar channelization plan sheet was delivered to KCDOT in Seattle this morning. Kristen Langley took it to her
supervisor for review/approval.
Sincerely,
Ted Cooper, P.E.
Engineer 11
Phone: (206) 296-7163
FAX: (206) 296-6613
E-Mail: ted.cooper@metrokc.gov
M.S. OAK-DE-0100
From: Mott, Linda
Sent: Monday, May 01, 2006 8:41 AM
To: Cooper, Ted
Cc: Langley, Kristen; Ooka, Kathy
Subject: RE: Jessie Glen L05SR054
Thank you, Ted. Kris just delivered the vicinity map to me.
The internal illumination is acceptable (not too bright for residential area). To approve the desgin, I need to see some
calculations for the access intersection of 116th Avenue SE. The intersection needs to be illuminated to an average of 1.5
footcandles with an averge/minimum uniformity of 3:1. Mr. Singh should be able to get this information from Jim
Kennedy of PSE, their PSE contact. The intersection is defined on the minor street by the stop bar location and on the
major street by the tangent point of the curb return or striped radius.
Once I have this information, I can quickly approve the illumination.
Please let me know if you have any questions.
Linda Mott
King County Dept, of Transportation
Traffic Engineering Section
201 S, Jackson Street, KSC-TR-0222
Seattle, WA 98104
PH: (206) 263-6140
-----Original Message -----
From: Cooper, Ted
Sent: Monday, May 01, 2006 8:17 AM
To: Mott, Linda
Subject: RE: Jessie Glen LOSSR054
Linda,
I just handed kris Langley a vicinity map of the site to give to you. She said she would deliver it this morning.
This map shows the following:
• Western entrance to plat at intersection of 116th Ave SE (Minor Arterial) and onsite "Road D"(across from SE 89th
Place, a private road). Ilumination of this intersection is required.
• Eastern entrance to plat at intersection of 120th Ave SE (Neighborhood Collector) and onsite "Road All.
liumination of this intersection is NOT required but is being proposed.
Let me know if you need anything else.
Sincerely,
Ted Cooper, P.E.
Engineer H
Phone: (206) 296-7163
FAX: (206) 296-6613
E-Mail: ted.cooper@metrokc.gov
M.S. OAK-DE-0100
From: Mott, Linda
Sent: Monday, May 01, 2006 7:53 AM
To: Cooper, Ted
Subject: Jessie Glen L05SR054
Ted, I have plans for the subject project illumination, but the plans do not indicate the location of the development.
Looks like it ties into two existing north -south streets and one existing east -west street. Please provide me with the
location, so I can verify roadway classification relative to illumination requirements.
Thank you.
Linda Mott
KCDOT/Traffic Engineering
(2o6) 263-6140
Tracking: Recipient Delivery
Laura G Cociasu (laura@esmcivil.com)
Mark Bergam Delivered: 05116/2006 9:04 AM
Tse, Amanda Delivered: 05/16/2006 9:04 AM
Site Improvement Bond Quantity Worksheet Web date: I1121/2005
* King County
Department of Development & Environmental Services
900 Oakesdale Avenue Southwest
Renton, Washington 98055-1219 For alternate formats, call 206-296-6600.
206-296-6600 TTY 206-296-7217
Project Name: Jessie Glen Date: 4/13/2006
Location: King County Project No.:
Activity No.:
Clearing greater than or equal to 5,000 board feet of timber?
yes no
If yes,
Forest Practice Permit Number: _
(RCW 76.09)
Page 1 of 9
Est-002.xis
L050005
L05SR054
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
o
zs
fn
Cn
0
Cnn C)
ca
n
o
M
M
En
Cn
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date: 4/12/2006
Site Improvement Bond Quantity Worksheet Webdate: 11Y2112005
M.
M:1
• �Q-0' N -q--' "
i� IN OEM
00
a .};.a:::.,.}::,.:.:.:.:.
Backfill & compaction -embankment
ESC-1
$ 6.62
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4,6.3
$ 67.51
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 85-45
CY
Ditching
ESC-4
$ 8,08
CY
3700
1
29896
Excavation -bulk
ESC-5
$ 1.50
CY
Fence, silt
ESC-6
SWDM 5.4.3,1
$ 1,38
LF
4700
1
64861
Fence. Temporary (NGPE)
ESC-7
$ 1.38
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.59
SY
9500
1
5605
Jute Mesh
ESC-9
SWDM 5.4-2.2
$ 1,45
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5,4.2.1
$ 2.01
SY
Mulch, by machine. straw. 2" deep
ESCA 1
SWDM 5.4.2.1
$ 0.58
SY
Piping, temporary, CPP, 6"
ESC-12
$ 10.70
LF
Piping, temporary, CPP, 8"
ESC-13
$ 16.10
LF
Piping. temporary, CPP, 12"
ESC-14
$ 20.70
LF
Plastic covering, 6mm thick, sandbagged
ESC-1 5
SWDM 5.4.2.3
$ 2.30
S
Rip Rap, machine placed; slopes
ESC-1 6
WSDOT 9-13.1(2)
$ 39.08
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4,1
$ 1,464.34
Each
Rock Construction Entrance, 100'X15'xl'
ESC-18
SWDM 5A.4.1
$ 2.928,68
Each
2
1
5857
Sediment and riser assembly
ESC-1 9
SWDM 5.4.5.2
$ 1,949,38
Each
2
1
3899
Sediment tra B, 5' hi g In berm
ESC-20
SWDM 5.4.5.11
$ 17.91
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5,1
$ 68,54
LF
Seedinq, by hand
Sodding. 1" deep, level ground
ESC-22
SWDM 5.424
$ 0.51
SY
ESC-23
SWDM 5.4.2.5
$ 6.03
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 7.45
SY
TESC Supervisor
IESC-25
$ 74.75
HR
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 97.75
HR
N
Each
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Est-002.xls
$ 51,743.12
$ 15.522.94
$ 67,266.06
A
Unit prices updated: 02/12102
Version: 04/22/02
Report Date: 4/12/2006
Site Improvement Bond Quantity Worksheet
Web date; 1 1/2V2005
41
.......................
ml
N
M--
MI
M
Ank ... .....
...............
Backfill & Compaction- embankment
G1 - 1
$ 5.62
CY
3500
19,670.00
Backfill & Compaction- trench
GI-2
$ 8,53
Cy
Clear/Remove Brush, by hand
GI-3
$ 0.36
SY
Clearing/Grubbing/Tree Removal
GI-4
$ 8,876.16
Acre
3.35
29,735.14
Excavation - bulk
GI-5
$ 1.50
CY
6500
9,750.00
Excavation - Trench
GI-6
$ 4.06
CY
Fencing, cedar, G high
GI-7
$ 18.55
LF
Fencing, chain link, vinyl coated, 6'hl h
G1-8
$ 13.44
LF
670
9,004.80
Fencing, chain rink, gate, vinyl coated, 2(
G1 - 9.
$ 1,271.81
Each
1
1,271.81
Fencing, split rail, 3! high
G1 - 1
$ 12.12
LF
Fill & compact - common barrow
GI - 11
$ 22,57
CY
Fill & comeact - gravel base
G1 - 12
$ 25.48
CY
Fill & compact -_screened topsoil
G1 - 13
$ 37.85
CY
Gabion, I Z' deep, stone filled mesh
GI - 14
$ 54.31
SY
Gabion, 18" deep, stone filled mesh
G1 - 151
$ 74-85
SY
Gabion, 36" deep, stone Ned mesh
GI - 16
$ 132-48
SY
Grading, fine, by hand
GI - 17
$ 2.02
SY
Grading, fine, with grader
G1 - 18
$ 0,95
SY
5100
4,845.00
Monuments, 3' long
G1 - 19
$ 135.13
Each
10
1,351.30
Sensitive Areas Sign
G1 - 20,
$ 2.88
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 7.46
SY
Surveying, line & grade
GI - 22
$ 786.26
Day
Surveying, lot locatioMines
GI - 23
$ 1,556.64
Acre
3.35
5,21434
Traffic control crew ( 2 flaggers
GI - 24
$ 85.18
HR
Trail, 4'chipped wood
GI - 25
$ 7.59
SY
Trait, 4' crushed cinder
GI - 26
$ 8.33
SY
Trail, 4!'top course
Trail,
GI - 27
$ 8.19
SY
Wall, retaining, concrete
GI -T8
L$4]4.1 G
9F
rockery
C1 - 29
9
$ 9.49
SF
Page 3 of 9
SUBTOTAL
80,842.79
Unit prices updated: 02/12/02
IKCC 27A authorizes only one bond reduction. Version, 4/22/02
Est-W2.)1s Report Date: 411212006
Site Improvement Bond Quantity Worksheet
Web date: M2112005
-.0
M
A
I M,
N
AC Grinding, 4! wide machine < 1 000sy
RI - 1
$ 23,00
SY
AC Grinding, 4! wide machine 1000-200C
R1 - 2
$ 5.75
SY
AC Grinding, 4! wide machine > 2000sy
Rl - 3
$ 1.38
SY
AC Removal/DisposallRepair
Rl - 4.
$ 41.14
SY
Barricade, type I
Rl - 5
$ 30.03
LF
Barricade, type III ( Permanent)
Rl - 6
$ 45-05
LF
Curb & Gutter, rolled
RI-7
$ 13.27
LF
2700
35,829.00
Curb & Gutter, vertical
RI-8
$ 9.69
LF
340
3,294.60
Curb and Gutter, demolition and dise2sal
RI -9.
$ 13.58
LF
Curb, extruded asphalt
R1 - 101
$ 2.44
LF
Curb, extruded concrete
Rl - 111
$ 2.56
LF
Sawcut, as haft, 3" depth
Rl - 12i
$ 1.85
LF
680
1,258-00
Sawout, concrete, perl" depth
RI - 13
$ 1.69
LF
Sealant, asphalt
RI - 14
$ 0.99
LF
680
673-20
Shoulder, AC, see AC road unit price)
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 7.53
SY
Sidewalk, 41hick
RI - 17
$ 30-52
SY
1250
38,150,00
Sidewalk, 4' thick, demolition and dispo&
Rl - 18
$ 27.73
SY
Sidewalk, 5" thick
Rl - 19
$ 34.94
SY
Sidewalk, 5" thick, demolition and dispos-,
RI - 20
$ 34.65
SY
Sign, handicap
RI - 21,
$ 85.28
Each
Striping, per stall
RI - 22
$ 5.82
Each
Striping, thermoplastic, for crosswalk)
RI-23
$ 2,38
SF
-Striping, 4" reflectorized line
R1 - 24
$ 0.25
LF
— -----
L
Page 4 of 9
SUBTOTAL
79204.80
Unit prices updated: 02/12102
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Est-002,xis Report Date: 411212006
Site Improvement Bond Quantity Worksheet
Web date: 1112112005
---------------
1. 07
W
X
For KCRS '93, (additional 2.5" base) add
RS - 1
$ 3.60
SY
AC Overlay, 1.5" AC
RS - 2
$ 7,39
SY
AC Overlay, 2" AC
RS - 3
$ 8.75
SY
AC Road, 2". 4' rock, First 2500 SY
RS-4
$ 17.24
SY
2500
43,100,00
460
7,930.40
AC Road, 2", 4' rock, Qty. over 2500SY
RS-51
$ 13,36
SY
2600
34,736.00
AC Road, 3", 4!' rock, First 2500 SY
RS-6
$ 19.69
SY
AC Road, W, 4!' rock, Qty. over 2500 SY
RS-7
$ 15.81
Sy
AC Road, 5", First 2500 SY
RS - 8
$ 14.57
SY
AC Road, 5", Qty. Over 2500 SY
RS-9
$ 13.94
SY
AC Road, 6", First 2500 SY
RS - 1 C.
$ 16.76
SY
AC Road, G", Qty. Over 2500 SY
RS - Ill
$ 16.12
SY
Asphalt Treated Base, 4" thick
RS - I,,
$ 9.21
SY
Gravel Road, 4' rock, First 2500 SY
RS - I
$ 11.41
SY
Gravel Road, 4' rock, 9ty. over 2500 SY
RS - 1
$ 7.53
SY
PCC Road, 5", no base, over 2500 SY-
RS - I
$ 21.51
SY
PCC Road, 6', no base, over 2500 SY—
JES - 1 (1
$ 21.87
sy
Thickened Edge
IRS - 1A
$ 6.89
LF
1 2251
1,550.251
i
Page 5 of 9
SUBTOTAL
77,836.00 9,480.65
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4122/02
Est-002.)ds Report Date- 4/1212008
Site Improvement Bond Quantity Worksheet
Web date: 1112112005
M
N:
X.........
I ME, r 11 M M
N.,
—'R X
Access Road, RID
D - I
$ 16.74
SY
1 2001
3,348-001
Bollards - fixed
D - 2
$ 240,74
Each
I
Bollards - removable
D - 3
$ 452.34
Each
4
1,809.361
1
1
1
* (CBs Include frame and lid)
CB Type I
D - 4
$ 1,257.64
Each
19
23,895.16
CB Te IL
D - 5
$ 1,433.59
Each
CB Type H, 48!'diameter
D - 6
$ 2,033.57
Each
11
22,369.27
for additional depth over 4
D - 7
$ 436,62
FT
CB ae 11, 54' diameter
D - 8
. $ 2,192-54
Each
1
2,192.54
for additional depth over 4!
D - 9
$ 486,53
FT
CB Type 11, 60" diameter
E) - 10
$ 2,351.52
Each
1
2,351.52
for additional depth over 4'
0-11
$ 536,54
FT
CB Type 11, 72" diameter
D - 12
$ 3,212.64
Each
for additional depth over 4
D - 131
$ 692.21
FT
Through -curb Inlet Framework (Add)
D - 141
$ 366.09
Each
6
2,196.54
Cleanout, PVC, 4'
D - 151
$ 130.55
Each
Cleanout, PVC, 6"
D - 16
$ 174.90
Each
Cleanout, PVC, 8"
D-17
$ 224-19
Each
Culvert, PVC, 4!'
D - 18
$ 8.64
LF
Culvert, PVC, 6'
D - 19
$ 12-60
LF
Culvert, PVC, 8"
D - 20.
$ 13.33
LF
Culvert, PVC, 12"
0-21
$ 21.77
LF
Culvert, CMP, 8"
D - 22
$ 17.25
LF
Culvert, CMP, 12"
D - 23
$ 26.45
LF
Culvert, CMP, 15"
D - 24
$ 32.73
LF
Culvert, CMP, 18"
D - 25,
$ 37.74
LF
Culvert, CMP, 24'
D - 26
$ 53,3333
LF
Culvert, CMP, 30'
D - 27
$ 71.45
LF
Culvert, CMP, 36"
D - 28
$ 112.11
LF
Culvert, CMP, 4811
D - 29
$ 140.83
LF
Culvert, CMP, 60"
D - 30,
$ 235.45
LF
Culvert, CMP, 77'
1 D - 311
$ 302,58
LF
Page 6 of 9
SUBTOTAL
58,162,39
Unit prices updated: 02112102
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Est-002.)ds Report Date: 4112/2006
Site Improvement Bond Quantity Worksheet
Web date: 11121/2005
R'., N,
-R-5
004
T.-TI:%*�
...... ...... ......... ......
7-1,
M,
R'� -
S,
K.,
Culvert, Concrete, 8"
D - 32
$ 21 _G2
L
Culvert, Concrete, 12"
D - 331
$ 30-05
LF
Culvert, Concrete, 15"
D - 34
$ 37.34
LF
Culvert, Concrete, 18"
D - 35
$ 44-51
LF
Culvert, Concrete, 24'
D - 36
$ 61.07
LF
Culvert, Concrete, 30"
D - 37
$ 104.18
LF
Culvert, Concrete, 36"
D - 38.
$ 137.63
LF
Culvert, Concrete, 42"
D - 39
$ 158.42
LF
Culvert, Concrete, 48"
D - 40
$ 175.94
LF
Culvert, CPP, 6"
D - 41
$ 10.70
LF
Culvert, CPP, 8"
D - 42
$ 16.10
LF
Culvert, CPP, 12"
D - 43.
$ 20.70
LF
1405
29083.5
Culvert, CPP, 16'
D - 44
$ 23.00
LF
88
2024
Culvert, CPP, 181,
D - 45
$ 27.60
LF
762
21031.2
Culvert, CPP, 24�1
D - 46
$ 36.80
LF
454
16707.2
Culvert CPP, 30"
D - 47
$ 48.30
LF
Culvert, CPP, 36"
D - 48
$ 55.20
LF
Ditching -
D - 49
$ 8.08
CY
Flaw Dispersal Trench (1,436 bases )
D - 50
$ 25.99
LF
French Drain (3' depth)
D - 51
$ 22.60
LF
Geotextile, laid in trench, poly2ropylene
D - 52
$ 2.40
SY
Infiltration and testing
D -53
$ 74.75
HR
Mid -tank Access Riser, 48" dia, 6'deep
D - 541
$ 1,605.40
Each
Pond overflow Spillway
D - 55
$ 14.01
SY
30
420.3
Restrictor/Oil Separator, 12"
0-56
$ 1,045.19
Each
Restrlrtor/Oil Separator, 16'
D - 57
$ 1,095.56
Each
Restrictor/011 Separator, 16'
D - 58
$ 1,146,16
Each
1
1146.16
Riprap, placed
D - 59
$ 39.08
CY
5
195.4
Tank End Reducer (36" diameter)
D - 60
$ 1,000.50
Each
Trash Rack, 12"
D - 61
$ 211.97
Each
1
211.97
Trash Rack, 15"
D - 62
$ 237.27
Each
Trash Rack, 18"
D - 63
$ 268.89
Each
Trash Rack, 21"
D - 64
$ 306.84
Each
Page 7 of 9
70819.73
Unit prices updated: 02112102
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Est-002.x1s Report Date, 4112/2006
Site Improvement Bond Quantity Worksheet
Web date: 1112112005
3*
X. X.,"
. . ......................
am�- ME.
-.5-ar -77
No.
2" AG, Z' to course rock & 4' borrow
PL-1
$ 15.84
SY
2"AC, 1.6' to course & 2,5" base cour
P L - 2
$ 17.24
SY
4" select borrow
PL-3
$ 4.55
SY
1.5" to course rock & 2.5" base course
PL - 4,
$ 11.41
SY
......... .. ......
N ..... ........... :R,
E, L
Such as detention/water quality vaults.)
wl - I
Each
WI-2
SY
WI-3
CY
WI-4
LF
WI-5
FT
WI -6
Wl -7
WI-8
WI-9
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN-
Page 8 of 9
B
366,865.71
110,059.71
476,925.42
C
9,480.65
2,844.20
12,324.85
D
E
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Est-002.xis Report Date: 411212006
Site Improvement Bond Quantity Worksheet Web date: 11121/2005
Original bond computations prepared by:
Name: Jessie Glen Date; 4/13/2006
PE Registration Number: 40111 Tel. #: 1-800-345-5694
Firm Name: ESM Constulting Engineers, LLC
Address: 33915 1st Way South, Suite 4200, Federal Way, WA 98003 Project No: L050005
ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of --Way Improvements
Future Public Road Improvements & Drainage Facifiti
Private Improvements
Calculated quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Reduced Performance Bond* Total ***
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION
(A)
(B)
PERFORMANCE BOND*
AMOUNT
$ 67, 266.1
(C) $ 476,925.4
(D) $ 12,324.8
j (A+B) $ 67,266.1
(T) $ 556,516.3
Minimum on amount is si 000.
BOND*AMOUNT
REQUIRED AT RECORDING OR
TEMPORARY OCCUPANCY ***
(E)
T x 0.30 $ 166, 954.9 OR
(T-E) $ 556,516.3
Use larger of Tx3O%or _ )
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
(B+C) x
0.25 = $ 119,231.4
Date: r; o
j
NOTE: The word "bond" as used in this document means any financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESL as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be I $ 489,260.3 1 (C+D)-E
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES
Page 9 of 9 Unit prices updated: 02/12/02
Check out the DDFS Web site at MM .metrokc.aov/ddes Version: 4/22/02
Est-002.xls Report Date: 4/12/2006
Page 1 of 1
Cooper, Ted
From:
Cooper, Ted
Sent:
Monday, May 01, 2006 10:57 AM
To:
Laura G Cociasu (]aura@esmcivil.com)
Cc:
Bergam, Mark
Subject:
Jessie Glen Plat (L05SR054) - List #4 changes
Attachments: L05SR054 Jessie Glen - List #4.doc
Tracking: Recipient Delivery
Laura G Cociasu (laura@esmcivil.com)
Bergam, Mark Delivered: 05/01/2006 10:57 AM
Laura,
We have reviewed your most recent plan submittal and still need to have a few minor drafting changes made to one plan
sheet. Our comments are in the attached document.
Please feel free to contact me if you have any questions.
Sincerely,
Ted Cooper, P.E.
Engineer II
Phone: (206) 296-7163
FAX: (206) 296-6613
E-Mail: ted.cooper@nnetrokc.gov
M.S. OAK-DE-0100
05/01 /2006
Jessie Glen Plat 1
Project No. L05P0005 (Activity No. L05SR054)
Plan Review 44
May 1, 2006
1. The following pending reviews need to be completed for
engineering plan approval:
A. KCDOT Traffic:
1) Illumination.
2) Channelization.
2. Please make the following changes to plan sheet 13 and
resubmit 2-paper copies of only this revised plan sheet:
A. In the plan view of CB#28, correct the note specifying
the vertical bar grate design so it complies with the
following SWDM requirements:
1) Remove the following from this description of the
maximum bar spacing: 7". Notice that the maximum
bar spacing is 4" O.C, per SWDM Section a -a, on
page 5-40.
2) Decrease the Length of this 111.6 LF" vertical bar
grate so it matches the calculated length, which
is half the circumference of this 60"-diameter CB
(as required in "Overflow" Item 2, on page 5-19).
3) Correct the total number of vertical bars and
space them at 4" O.C. Currently, 11 are shown.
B. In the profile of CB#28 make the following changes:
1) Extend the shear gate rod all the way to the
bottom of the solid locking lid (per Section A -A
on page 5-40 of the SWDM). Currently, it only
extends to the top step in this CB.
Jessie Glen Plat 1
Project No. LOSP0005 (Activity No. L05SR054)
Plan Review $#4
May 1, 2006
1. The following pending reviews need to be completed for
engineering plan approval:
A. KCDOT Traffic:
1) illumination.
2) Channelization.
2. Please make the following changes to plan sheet 13 and
resubmit 2-paper copies of only this revised plan sheet:
A. In the plan view of C2#28, correct the note specifying
the vertical bar grate design so it complies with the
following SWDM requirements:
1) Remove the following from this description of the
maximum bar spacing: 7". Notice that the maximum
bar spacing is 4" O.C, per SWDM Section a -a, on
page 5-40.
2) Decrease the length of this 1116 LF" vertical bar
grate so it matches the calculated length, which
is half the circumference of this 60"-diameter CB
(as required in "Overflow" Item 2, on page 5-19).
3) Correct the total number of vertical bars and
space them at 4" O.C. Currently, 11 are shown.
B. In the profile of CB#28 make the following changes:
1) Extend the shear gate rod all the way to the
bottom of the solid locking lid (per Section A -A
on page 5-40 of the SWDM). Currently, it only
extends to the top step in this CB.
SECTION 5,3 DETENTION FACILITIES
FIGURE 5.3.4.A FLOW RESTRICTOR (TEE)
removable watertight
frame, grate &solid cover
coupling or flange
marked "DRAIN" with locking bolts
2" min. see note 3 & KCRS
r'1 _ elevation per plans dwgs 2-022, 2-023
1' min. under
pavement 16"
6" min.
Max_
6"min
plate welded to elbow __T__
with orifice as specified elbow restrictor,see detail
supports
ELBOW RESTRICTOR DETAIL pip ee Note 6
NTS
1.�xD
_F min.
I outlet pipe
D I —
i I I see notes 1 &
invert and elevation
per plans
1' section of pipe
attached by gasketed
band to allow removal
restrictor plate
with orifice diameter as
specified (not needed if
for spill control only)
vertical bar
grate for
secondary inlet
handholds, steps or
ladder see KCRS
dwg. 2-006
Inlet
Pipe
C ,— �--1—
" 12
shear gate with control
rod for cleanoutldrain
�
(rod bent as required
12"
for vertical alignment
with cover) see KCRS
dwg. 2-026
SECTION A -A
NTS
2' min. clearance
to any portion of frop-T
NOTES: including elbows
1. Use a minimum of a 54" diameter type 2
catch basin.
2_ Outlet Capacity: 100-Year developed o= ► I
peak flow.:
3. Metal Parts: Corrosion resistant. A
Non -Galvanized parts perferred.
Galvanized pipe parts to have asphalt
treatment 1.-}11� angle as
f necessary
4. Frame and ladder or steps offset s:: �` l /see note 7 f
A. Cleanout gate is visible from top. elbow restrictor 2' min.
B. Climb -down space is clear of riser and see detail `
cleanout gate.
C. Frame is clear of curb.
5. if metal outlet pipe connects to cement
concrete pipe: outlet pipe to have smooth PLAN VIEW
O.D. equal to concrete pipe I.D. less 114". NTS
6. Provide at least one 3" X .090 gage support bracket anchored to concrete wall.
(maximum 3'-0" vertical spacing)
7. Locate elbow restrictor(s) as necessary to provide minimum clearance as shown.
8. Locate additional ladder rungs in structures used as access to tanks or vaults to
allow access when catch basin is filled with water.
A
additional ladder rungs
(in sets) to allow access
to tanks or vaults when
catch is filled with water
1/24?2005 2005 Surface Water Design Manual
5-40
5.3.1 DETENTTON PONDS — DESIGN CRITERIA
FIGURE 5.3.1.13 TYPICAL DETENTION POND SECTIONS
control structure_,,
2.77 --emergency overflow WS
Z. —overflow WS v a
r pond design WS�p
f '-►
a, 67' I
debris barrier Q,'?�
see figure 4.2.1.D r
"'MMM!
L 6" sediment
storage
top width of berm
6' min.
12715' min. for
access road
2 min.
berm
embankment existing
_ - _ _ _ _ _ _ _ ` ground profile
maximum
elevation
key, if required 10-yr W.S.
SECTION A -A
NTS
circumference length of
opening sized for 100 yr flow
S. Frame/grate for secondary inlet.
Provide vertical bars in frame @
4" O.C. (other flow systems
SECTION a -a acceptabie if approved by DDES)
See also the separate overflow
NTS structure shown in Figure 5.3.1.0
SECTION B-B has 2 options
L_ 1
10 I� (as required for 6" depth) 10
F„ min
' - 2" asphalt
emergency overflow water surface (for spillway on access roads)
(see Figure 5,3.1.E)
3 3
ove low WS �11 1f-
- 1' min
Eon W.S. 1.
SECTION 13-B
V rock lining
Emergency Overflow Spillway
NTS
overflow WS
design W5
emergency overflow WS v
compacted rock lining per
embankment Table 4.4.1.A
SECTION C-C
NTS
2005 Surface Water Dte ;ign Mantaal
5-27
1 /24/2005
5.3.1 DETENTION PONDS —DESIGN CRITERIA
Overflow
In all ponds, tanks, and vaults, a primary overflow (usually a riser pipe within the control structure;
see Section 5.3.4.2, p. 5-43) must be provided to bypass the 100-year, 15-minute developed peak flow
over or around the restrictor system. This assumes the facility will be full due to plugged orifices or
high inflows; the primary overflow is intended to protect. against breaching of a pond embankment (or
overflows of the upstream conveyance system, in the case of a detention tank or vault)_ The design
must provide controlled discharge directly into the downstream conveyance system or another
acceptable discharge point.
A secondary inlet to the control structurc must be provided in ponds as additional protection against
overtopping should the inlet pipe to the control structure become plugged. A grated opening
("jailhouse window") in the control structure manhole functions as a weir (see Figure 5.3.1.B, p. 5-27)
when used as a secondary inlet. Note: The maximum circumferential length of this opening shall not
exceed one-half the control structure circumference. The "birdcage" overflow structure as shown in
Figure 5.3.1.0 (p. 5-28) may also be used as a secondary inlet,
Emergency Overflow Spillway
1. In addition to the above overflow requirements, ponds must have an emergency overflow spillway
sized to pass the 100-year, 15-minute developed peak flow in the event of total control structure
failure (e.g., blockage oCtbe control structure outlet pipe) or extreme inflows. Emergency overflow
spillways arc intended to control the location of pond overtopping and direct overflows back into the
downstream conveyance system or other acceptable discharge point,
Emergency overflow spillways must be provided for ponds with constructed berms over 2 feet in
height, or for ponds located on grades in excess of 5%. As an option for ponds with berms less
than 2 feet in height and located at grades less than 5%, emergency overflow may be provided by an
emergency overflow structure, such as a Type I1 manhole fitted with a birdcage as shown in
Figure 5.3.1.0 (p. 5-28). The emergency overflow structure must be designed to pass the 100-year
developed peak flow, with a minimum 6 inches of freeboard, directly to the downstream conveyance
system or another acceptable discharge point. Where an emergency overflow spillway would
discharge to a slope steeper than 15%, consideration should be given to providing an emergency
overflow structure in addition to the spillway.
3. The emergency overflow spillway shall be armored with riprap in conformance with Table 4.22.A.
The spillway shall be armored full width, beginning at a point midway across the berm embankment
and extending downstream to where emergency overflows re-enter the conveyance system (see
Figure 53.1.8, p_ 5-27)_
4. Design of emergency overflow spillways requires the analysis of a broad -crested trapezoidal weir as
described in Section 5.3.12 (p. 5--30). Either one of the weir sections shown in Figure 5.3,1.E
(p. 5-27) may be used.
Access Requirements
1. Maintenance access road(s) shall be provided to the control structure and other drainage structures
associated with the pond (e.g., inlet, emergency overflow or bypass structures). Manhole and catch
basin lids must be in or at the edge of the access road and at least three feet from a property line.
Rims shall be set at the access road grade.
2. An access ramp is required for removal of sediment with a trackhoe and truck. The ramp must
extend to the pond bottom if the pond bottom is greater than 1500 square feet (measured without the
ramp) and it may end at an elevation 4 feet above the pond bottom, if the pond bottom is less than
1,500 square feet (measured without the ramp), provided the pond side slopes are 3:1 or flatter.
Intent: On large, deep ponds, truck access to the pond bottom via an access ramp is necessary so
loading can be done in the pond bottom. On small deep ponds, the truck can remain on the ramp for
loading. On small shallow ponds, a ramp to the bottom may not be required if the tra.ckhoe can load a
2005 Surface Water Design Manual 1J24/2005
5-19
April 27, 2006
Mr. Ted Cooper, P.E.
King County DDES
Land Use Services Division
900 Oaksdale Avenue SW
Renton WA 98055-1219
Re: Jessie Glen Plan Review #3
Application No. L05P0005
Dear Mr. Cooper:
Job No. 1166-001-005
On behalf of JPS Holdings, LLC., ESM is submitting the following Jessie Glen revised
documents:
• 2 Sets - Final Road and Storm Construction Plans (Sheets 1 - 17)
• 2 Sets - Landscaping Plans (Sheets 18 - 20)
2 Copies - Revised Calculations for the Technical Information Report (TIR)
• 1 Mylar - Channelization Plan (Sheet 17)
The original comments are shown below in italics with our responses in bold.
The following pending reviews need to be completed for engineering plan
approval:
A. Recreation space plan (Trisha Bull).
B. DCDOT Traffic: illumination & Channelization plans.
C. Significant Tree Retention Plan: Bruce Engell.
As of April 26, 2006 the Recreation Space Plan and the Significant Tree
Retention Plan have been approved. We are currently still awaiting approval
of the Illumination and Channelization Plans.
2. Please add the following items (from the previous list) to the TIR:
A. Please use Figure "5.3.4H Riser Inflow Curves" (on page 5-48) to
determine the 100-year water surface elevation for the 21 "-diameter riser
(at 9.34 cfs). Use either the nomograph or the appropriate equation
below it
B. Using the results immediately above, design the pond's overflow and
(secondary) emergency overflow per SWDM pages 5-19, 5-27 5-28 5-30
and 5-48. Change the following TIR calculations and pond design items
on the plans:
1) Overflow water surface.
2) Use 1'-thick rock for emergency overflow spillway.
3) Emergency overflow water surfac
33915 1st Way South Tel (253) 838 6113 Bothell (425) 415 6144 � Ci�ri. Erg reer rg _and r3lcrriny
Suite 200 Fax (253) 838 7104 Www.e5MCivil.corn I' r.e,: MAn, yerne i:='LL.ic Work:
Federal Way, WA 98003 TOIL free (000) 345 5694 L u7L Survey r3 end"-r.-Fi1=t'ure
J
Mr. Ted Cooper, P.E.
April 27, 2006
Page 2
4) Top of berm elevation (minimum 0.3' freeboard).
As discussed in the meeting on April 25, 2006, the overflow
calculations have been revised as requested. Please replace the
overflow calculations in Section 4 of the TIR with the attached revised
overflow calculations.
C Please modify the offsee 100-year undetained backwater analysis and
downstream analysis so it includes the following calculations:
1) Drainage entering proposed CB#31 from the west (along SE
192"" Street).
2) For the existing CB immediately to the east of proposed CB#31,
show and determine the flows entering this CB from the north.
As discussed in the April 25, 2006 meeting, the table and exhibit
submitted previously have provided sufficient information regarding
the existing basins.
D. Modify the bond quantities sheets if any changes are made.
The bond quantities sheets did not require modifications.
3. Please make the following changes to plan sheet 3:
A. Across the southern boundary of 'Tract B', correct the existing note
which says "30' RIGHT OF WAY`: it should read as follows., "38'-ROAD "A"
R/W WIDTH"
B. Show and dimension the "Tract B" walkway as shown on the
landscape/recreation space plans. This curvy walkway must be centered
in its public access easement.
C. Label and dimension the proposed "10' UTILITY & DRAINAGE
EASEMENTS" along all plat roadways north of Road "A".
Plan sheet 3 has been revised as requested and as discussed in the
meeting on April 25, 2006.
4. Please make the following changes to plan sheets 4 and 5:
A. Provide a plan view enlargement and a cross section for the Road "A"
improvements adjacent to 'Tract B', as follows:
1) Include the following details in the enlargement.
a) Make the northern and southern boundaries of the
concrete curb ramp to Tract `B" perpendicular to Road "A"
b) Add dimensions/stationing for all proposed roadway
paving and sidewalk along the Tract "B" frontage.
c) Beginning and ending stations, with offsets, for all
proposed fogline striping.
Mr. Ted Cooper, P.E.
April 27, 2006
Page 3
2) Provide a detailed and dimensioned roadway section that extends
through the curb ramps on both sides of the roadway here. There
should be a smooth transition between the 'Tract B" curb ramp
and this widened section of the half -street.
B. Show and specify that both pairs of bollards at the ends of the Tract "B"
walkway shall be placed 10'-back of the edge of the traveled way (as
required by KCRS 5.11) with 50" C. C.-spacing.
As discussed in the meeting on April 25, 2006, the plan view enlargement
and additional roadway section are not required. The bollard locations have
been revised as requested.
5. Please revise plan sheets 10, 13, and 14 per changes required in item 2 (near
the beginning of this list).
As requested, the plan sheets have been revised to show the updated
overflow and emergency overflow elevations.
6. Please make the following changes to plan sheet 13:
A. In the profile of CB#28 make the following changes:
1) Add a note specifying "handholds, steps or ladder see KCRS dwg.
2-006" per SWDM Fig 5.3.4.A (on page 5-40).
The note is shown.
2) Show the shear gate rod extending all the way to the bottom of
the solid locking lid (so the gate must be closed to install the lid
and the shear gate rod is easily accessible).
The shear gate rod has been extended as requested.
3) Show and dimension the vertical bar grate to scale.
The vertical bar grate has been dimensioned as requested.
7. Please make the following changes to plan sheet 15:
A. Design the temporary drainage path flow and clearing limits so drainage
doesn't flow through stored materials (Expand the clearing limits?).
The location of the stored materials has been identified clearly and is
shown with sufficient distance to the drainage path.
B. Provide an outlet for the sediment trap so it will remove sediments as
designed. Drainage can't exit immediately next to its inflow stream
because sediments won't settle out in such a short flow path.
Mr. Ted Cooper, P.E.
April 27, 2006
Page 4
As discussed in the meeting on April 25, 2006, for clarity, a note has
been provided on plan sheet 15 indicating the removal of the
sediment trap upon construction of the permanent pond.
8. Please submit plan sheets 18, 19 and 20 so they can be reviewed. The following
are some of the items that could not be reviewed:
A. Please add street trees to the following locations:
1) Northwest corner of Lot 27.
2) Along the eastern side of 'Tract D"
The landscape plan sheets 18, 19, and 20 are being submitted as part of the
final plan set. The street trees have been added as requested.
Please note that time is of the essence on this project and JPS Holdings, LLC. would like
to receive approval of the Jessie Glen Project as soon as possible.
If you have any questions, please call me at (253) 838-6113.
Sincerely,
ESM CONSULTING ENGINEERS, L.L.C.
LAURA COCIASU, P.E.
Project Engineer
CC: Joe Singh, JPS Holdings, LLC.; 1 copy of submittal set
April 27, 2006
Mr. Ted Cooper, P.E.
King County DDFS
Land Use Services Division
900 Oaksdale Avenue SW
Renton WA 98055-1219
Re: Jessie Glen Plan Review #3
Application No. L05P0005
Dear Mr Cooper:
A _11 l H
Job No. 1166-001-005
On behalf of JPS Holdings, L.L.C., ESM is submitting the following Jessie Glen revised
documents:
• 2 Sets - Final Road and Storm Construction Plans (Sheets 1 - 17)
• 2 Sets - Landscaping Plans (Sheets 18 - 20)
• 2 Copies - Revised Calculations for the Technical Information Report (TIR)
• 1 Mylar - Channelization Plan (Sheet 17)
The original comments are shown below in italics with our responses in bold,
1. The following pending reviews need to be completed for engineering plan
approval.
Recreation space plan (Trisha Bull).
' .-B. DCDOT Traffic: illumination & Channelization plans.
Significant Tree Retention Plan: Bruce Fngell.
As of April 26, 2006 the Recreation Space Plan and the Significant Tree
Retention Plan have been approved. We are currently still awaiting approval
of the Illumination and Channelization Plans.
2. Please add the following items (from the previous list) to the TiP.
;A. Please use Figure "5.3.4H Riser Inflow Curves" (on page 5-48) to
determine the 100-year water surface elevation for the 21 "-diameter riser
(at 9.34 cfs)_ Use either the nomograph or the appropriate equation
below it.
B. Using the results immediately above, design the pond's overflow and
(secondary) emergency overflow per SWDM pages 5-19, 5-27 5-28 5-30
and 5-48. Change the following TIR calculations and pond design items
on the plans:
1) Overflow water surface.
.2) Use 1'-thick rock for emergency overflow spillway.
33915 1st Way South
Tel 1253) 638 6113 Bothell f425) 415 6144
Civil Engineering
Land Planning
Suite 200
Fax 12531 838 7104 www.esmcivil,cam
Project Management
Public Works
Federal Way. WA 98003
Tail Free (600) 345 5694
Land Surveying
Landscape Architecture
Mr. Ted Cooper, P.E.
April 27, 2006
Page 2
Top of berm elevation (minimum 0.3' freeboard).
As discussed in the meeting on April 25, 2006, the overflow
calculations have been revised as requested. Please replace the
overflow calculations in Section 4 of the TIR with the attached revised
overflow calculations.
C. Please modify the offsite 100-year undetained backwater analysis and
downstream analysis so it includes the following calculations.
1) Drainage entering proposed CB#31 from the west (along SE
192nd Street).
2) For the existing CB immediately to the east of proposed CB#31,
show and determine the flows entering this CB from the north.
As discussed in the April 25, 2006 meeting, the table and exhibit
submitted previously have provided sufficient information regarding
the existing basins.
' D. Modify the bond quantities sheets if any changes are made.
The bond quantities sheets did not require modifications.
3. Please make the following changes to plan sheet 3:
,,k' Across the southern boundary of `Tract B", correct the existing note
which says "30' RIGHT OF WAY" It should read as follows: "3&-ROAD "A"
R/W WIDTH':
Show and dimension the `Tract B" walkway as shown on the
landscape/recreation space plans. This curry walkway must be centered
in its public access easement.
Label and dimension the proposed 'I OLUTILITY & DRAINAGE
EASEMENTS" along all plat roadways north of Road "An
Plan sheet 3 has been revised as requested and as discussed in the
meeting on April 25, 2006.
4. Please make the following changes to plan sheets 4 and 5:
A. Provide a plan view enlargement and a cross section for the Road "AU
improvements adjacent to `Tract B' as follows:
1) Include the following details in the enlargement.,
a) Make the northern and southern boundaries of the
concrete curb ramp to Tract "B" perpendicular to Road "A'Add dimensionslstationing for all proposed roadway
paving and sidewalk along the Tract "B" frontage.
Beginning and ending stations, with offsets, for all
proposed fogline striping.
Mr. Ted Cooper, P.E.
April 27, 2006
Page 3
2) Provide a detailed and dimensioned roadway section that extends
through the curb ramps on both sides of the roadway here. There
should be a smooth transition between the `Tract B" curb ramp
and this widened section of the half -street
B. Show and specify that both pairs of bollards at the ends of the Tract "B"
walkway shall be placed 10'-back of the edge of the traveled way (as
required by KCRS 5.11) with 50" D.C.-spacing.
As discussed in the meeting on April 25, 2006, the plan view enlargement
and additional roadway section are not required. The bollard locations have
been revised as requested.
Please revise plan sheets 10, 13, and 14 per changes required in item 2 (near
the beginning of this list).
As requested, the plan sheets have been revised to show the updated
overflow and emergency overflow elevations.
6 Please make the following changes to plan sheet 13:
in the profile of CB#28 make the following changes:
1) Add a note specifying "handholds, steps or ladder see KGRS dwg.
2-006" per SWDM Fig 5.3.4.A (on page 5-40).
The note is shown.
2) Show the shear gate rod extending all the way to the bottom of
D the solid locking lid (so the gate must be closed to install the lid
and the shear gate rod is easily accessible).
The shear gate rod has been extended as requested.
3) Show and dimension the vertical bar grate to scale.
F The vertical bar grate has been dimensioned as requested.
7. Please make the following changes to plan sheet 15:
f4.-Design the temporary drainage path flow and clearing limits so drainage
doesn't flow through stored materials (Expand the clearing limits?).
The location of the stored materials has been Identified clearly and is
shown with sufficlent distance to the drainage path.
Provide an outlet for the sediment trap so it will remove sediments as
designed. Drainage can't exit immediately next to its inflow stream
because sediments won't settle out in such a short flow path.
Mr. Ted Cooper, P.E.
April 27, 2006
Page 4
As discussed in the meeting on April 25, 2006, for clarity, a note has
been provided on plan sheet 15 indicating the removal of the
sediment trap upon construction of the permanent pond.
( 8a- Please submit plan sheets 18, 19 and 20 so they can be reviewed. The following
are some of the items that could not be reviewed:
Imo-- Please add street trees to the following locations:
j Northwest corner of Lot 27.
Along the eastern side of "Tract D"
The landscape plan sheets 18, 19, and 20 are being submitted as part of the
final plan set. The street trees have been added as requested.
Please note that time is of the essence on this project and JPS Holdings, LLC. would like
to receive approval of the Jessie Glen Project as soon as possible.
If you have any questions, please call me at (253) 838-6113_
Sincerely,
ESM CONSULTING ENGINEERS, LLC.
LAURA COCIASU, P.E.
Project Engineer
CC: Joe Singh, JPS Holdings, LLC.: 1 copy of submittal set
May 2, 2006
Mr. Ted Cooper, P.E.
King County DDES
Land Use Services Division
900 Oaksdale Avenue SW
Renton WA 98055-1219
Re: Jessie Glen Plan Review #4
Application No.L05SR054
Dear Mr. Cooper:
G -E N G l H
� 0 i s � —4-7—
Job No. 1166-001-005
On behalf of JPS Holdings, LLC., ESM is submitting the following Jessie Glen revised
documents;
• 2 Sets -- Final Road and Storm Construction Plans (Sheet 13)
The original comments are shown below in italics with our responses in bold.
1. The following pending reviews need to be completed for engineering plan
approval.
A. KCDOT Traffic:
1) Illumination.
2) Channelization
2.
This comment has been noted.
Please make the following changes to plan sheet 13 and resubmit 2-paper
copies of only this revised plan sheet
A. In the plan view of CB#28, correct the note specifying the vertical bar
grate design so it complies with the following SWDM requirements:
1) Remove the following from this description of the maximum bar
spacing: 7" Notice that the maximum bar spacing is 4" O.C, per
SWDM Section a -a, on page 5-40.
2) Decrease the length of this "16 LP' vertical bar grate so it
matches the calculated length, which is half the circumference of
this 60"diameter CB (as required in "Overflow" Item 2, on page 5-
19).
3) Correct the total number of vertical bars and space them at 4"
O. C. Currently, 11 are shown,
33915 1st Way South Tel (253} 638 6113 Bolhell 14251 415 6144 C: I Li �iMCaFinc Laid Planr'iny
Sul1e 200 Fax (253) 838 7104 www,e5mcivil.[am P c)ccl Flandgu ncrl Puhlir V nr�
Federal Way. WA 98003 Toll Free (890) 345 5694 1 ,rri Suryevine Lancsca;ic F. ch i'.c clur_
Mr. Ted Cooper, P.E.
May 2, 233E
Page 2
B. In the profile of CB#28 make the following changes:
1) Extend the shear gate rod all the way to the bottom of the solid
locking lid (per Section A -A on page 5-40 of the SWDM).
Currently, it only extends to the top step in this CB.
Plan sheet 13 has been revised as requested.
Upon the approval of KCDOT Traffic Illumination and Channelization, please provide the
Jessie Glen engineering plan approval.
If you have any questions, please call me at (253) 838-5113.
Sincerely,
ESM CONSULTING ENGINEERS, L.L.C.
LAURA G. COCIASU, P.E.
Project Engineer
CC: Joe Singh, JPS Holdings, LLC.: 1 copy of submittal set
Y-
King County
Department of Development
and Environmental Services
Land Use Services Division
900 Oakesdale Avenue Southwest
Renton, Washington 98055-1219
206-296-6600 TTY 206-296-7217
Drop -Off Cover Sheet
for LUSD ONLY
For alternate formats, call 206-296-6600.
Drop -Off Cover Sheet for Land Use Services Division
****************** IMPORTANT ****,« *******
PROJECT NUMBER AND NAME IS NECESSARY
FOR ALL DROP-OFFS
Project No.: 05 Z05�1_
Project Name: iFss 11" &LF-d
FROM: ITS loco, s To>E S'"L'yl
Company Name I Contact Person
Telephone No: (2()66 719- 3'0'51
Date Received by LUSD
D =�E�V RE DQ
Alit �11 3 Z006
ADDITIONAL INFORMATION REQUESTED BY KING COUNTY STAFF (please print)
Short Plat I Plats
Please specify item(s) dropped -off:
(t P S r-rr Lit_,PT CpN�KWG�"
cor-1C-S L14"4r' �14�41�T
Lot Line Adjustment Permit
Please specify item(s) dropped -off:
Right of Way Permit
Please specify item(s) dropped -off:
Clearing I Grading Permit — Additional information requested.
Please specify item(s) dropped -off:
Other:
a AMA"
PLEASE NOTE: All drop-off item(s) will be logged into the computer under the project number, therefore, it is important
that the top portion of this form is completed properly before you drop-off anything. Assistance in finding a project number
can be provided by speaking to a Zoning/Land Use Technician. Your cooperation is important. Thank you.
Check out the DDES Web site at www.metrokc.ttov/ddes
Drop -Off Cover Sheet—LUSD Only Ig-cvs-dropoff.pdf 11-03-2004 Page 1 of 1
o
.T
I N T
355 Both Avenue NE (425) 456-; 496 ph
PC) Box go868, EST 9w (425) 462-3149 fx
Bellevue, Washington 98009-o868
STREET LIGHTING
AUTH0R1ZAt`FI0N wT'rT�K&�na r wgy
March 29, 2006
Mr. Chris Barham
JPS Holdings
18124 Riviera PI SW
Seattle, WA 98166
14 Street Lights — Jessie Glen
Dear Chris:
The cost for the installation of 14-15' Mounting Height Green, Smooth Fiberglass Poles with Madison Bases, with 14-150 Watt
high pressure sodium (HPS) Green Dayform Luminaires and secondary circuitry is $ 35,842.80. It is based on the description
in the Custom Street Lighting Order enclosed. This estimate is valid for 90 days.
After reviewing the enclosed please sign and return this Letter, Custom Street Lighting Order and the appropriate payment of
$ 35,842.80. Return one copy in the self -address envelope provided, and retain the other copy for your file. Upon receipt
of the signed agreement and your payment there is a 10-week waiting period for us to procure the necessary materials.
The following are conditions that may be required before construction of this system:
1. In the area where we are placing our cables and equipment, it is assumed the area is at grade.
2. Locate and mark all privately owned underground facilities.
3. Right-of-way and/or Easements may also be required from you or adjacent property owners.
4. Please note that the installation may not meet the Illumination Engineering Society's Minimum standard for roadway
lighting levels.
5. Restoration is not included for present construction or is the removal of excavated materials.
6. Provide trenching, conduit, back filling and pole hole to the depth necessary to accommodate the different mounting height
of the two pole types with an 18" corrugated plastic culvert pipe or equivalent. The depth is 4' for the 15' mounting height
pole.
7. Customer is responsible for proper pole locations and pole and fixture type.
8. If Permits or Flaggers are required for present construction it is your responsibility to reimburse PSE these costs.
9. Streetlights to be energized after plat is energized.
By signing this Letter, Custom Street Lighting Order and returning it, you are stating that you will comply with these
requirements and authorize us to perform the work. When the contingencies have been rnet, this order will be released to
construction for scheduling. If you have any questions, please cal.] me at 425-456-2978.
Sincerely,
RECEIVED
Jim Kennedy
Account Manager Art< 0 3 2006
The above canting i s re a cepted and authorization is given: KING COUNTY
r LAND USE SERVICES
By: � � Date �-, ��
Project Name: Jessie Glen
355 11oth Avenue NE
PO Box 90868, EST 9w
Bellevue, Washington 98009-0868
Ughting services from PugeoS rdep ig:
Location: 1161h Ave SE at SE 192nd Street, Kent
CUSTOM STREET LIGHTING ORDER
(425) 456-2496 pa
(425) 462-3149 fx
This order dated March 29, 2006 to PUGET SOUND ENERGY; Inc. (PSE) from Mr. Chris
Barham, JPS Holdings (Customer) covers the Installation of custom lighting authorized by this
order. Billing will be on a Monthly basis and in accordance with the terms and conditions
contained in PSE's Schedule 52, and any future modifications of such Schedule as may be
approved by the Washington Utilities and Transportation Commission. Ownership of all
conductors, poles, fixtures, lamps and accessory equipment installed as a result of this order shall
remain with PSE. The number, size and type of lights ordered are summarized below.
The installation charge of the listed lighting units was estimated to be $ 35,842.80. The value of
the systern used to determine the facilities charge is $ 29,257.04.
Fixture and Pole Type Number
150 watt HPS Green, Cooper Dayforrn Luminaires 14
15' Mounting Height, Green, Smooth Fiberglass Poles with Madison Bases 14
The basis of the monthly facilities charge under Rate Schedule 52, is as follows:
Full payment of installation charge up front, paid by Customer.
Monthly facilities charge is equal to 0.24% x value of the system.
0,0024 x $ 29,257.04= $ 70.22
The basis of the monthly energy charge under Rate Schedule 52 is as follows:
14- 150 watt high pressure sodium units x $4.71 = $65.94
Total monthly energy charge $65.94
The total monthly charge for this installation is
Monthly facilities charge
Monthly energy charge
$ 70.22
$ 65.94
Total monthly charge: $ 136.16
I N 1 G i h•;' 1
Page 2 t
CUSTOM STREET LIGHTING ORDER
PROJECT NAME: Jessie Glen
Non-standard facilities are not kept in PSE inventory for the purpose of maintenance; therefore
replacement of non-standard components may not be within the same time as replacement of
standard components.
Monthly Billing will be sent to Mr. Chris Barham. Please notify us of a billing party change
once the Jessie Glen Home Owners Association accepts billing of these streetlights. If there is a
builder who will be responsible in the interim, please notify PSE of that fact.
This order, executed by customer's duly authorized representative as of the date first written
above is for service, as described above, under PSE's Schedule 52.
Customer: Mr. Chris Barham., JPD Holdings
Date:
Title: v'�_7yfG
Print Name:
Company: Puget Sound Energy
By: Date: March 29, 2006
im Kenned
Title: Account Manger
LAND USE SE.f�V1GES
Cooper, Ted
From: Cooper, Ted
Sent: Wednesday, April 26, 2006 8:10 AM
To: Laura G Cociasu (laura@esmcivil.com)
Subject: FW: Plat of Jessie Glen # L05SR054 - significant tree retention plan approved
Laura,
Below is Bruce Engell's e-mailed approval of the significant tree retention plan.
Sincerely,
Ted Cooper, P.E.
Engineer H
Phone: (206) 296-7163
FAX: (206) 296-6613
E-Mail: ted.cooper@metrokc.gov
M.S. OAK-DE-0100
From: Engell, Bruce
Sent: Wednesday, April 26, 2006 7:58 AM
To: Cooper, Ted
Subject: Plat of Jessie Glen # L05SR054
Ted
I have received the 4 copies of the revised Significant Tree Retention Plan from the applicant and have stamped, dated
and approved the plans routing 3 to you and retaining 1 for my records. Please let the applicant know the Tree Plan has
been approved.
Thanks
C 0 N S _lL1_
April 13, 2006 RECEIVED Job No. 1166-001-005
Mr. Ted Cooper, P.E.
King County DDES APR 1 3 200E
Land Use Services Division
900 Oaksdale Avenue SW KiNG COUNTY
Renton WA 98055-1219 LAND USE SERVICES
Re: Jessie Glen
Application No. LOSP0005 , I`--.0 51
Dear Mr. Cooper:
On behalf of JPS Holdings, LLC., ESM is submitting the following Jessie Glen revised
documents:
• 2 Sets - Road and Storm Construction Plans (Sheets 1 - 17)
2 Copies -- Additional Exhibit and Table for the Technical Information Report (TIR)
+ 2 Copies - Revised Site Improvement Bond Quantity Worksheet for the TIR
The original comments are shown below in italics with our responses in bold.
1. Please contact Trisha Bull (DDES Planner) at 206-296-6758 because she says
she can't start reviewing the recreation space plan until the review fee and other
design details are submitted. f L
This comment has been coordinated.
2. Please provide design details now for the luminaire required (by KCRS 5.05) at
the intersection of proposed Road "Do and 116f`' Ave SE KCDOT Traffic needs to
review and approve it before engineering plan approval.
Design details have been provided as requested.
3, The following reviews are pending:
A. Channelization plan: KCDOT Traffic.
B. Significant Tree Retention Plan: Bruce Engell.
This comment has been noted.
4. Please make the following changes to the TIR:
A. Please provide the following information in the downstream analysis:
1) In a plan view map of the existing downstream system, show and
uniquely label each pipe, drainage structure, ditch and swale.
2) Specify the lengths, diameters and slopes of all pipes.
33915 1s1 Way South Tel (253) 838 6113 Bothell 1425) 415 6144 L3 ,:: I'.,i
Suite 200 Fax (2531 838 7104 Www.esmcivll_com rl
FederaIWay ,WF98003 TollFree (600)3455694
Mr. Ted Cooper, P.E.
April 13, 2006
Page 2
3) Specify the lengths, critical cross sections and slopes of every
ditch and swale
4) Revise the existing drainage map and table describing it to show
and describe
As discussed in the March 15, 2006 meeting, the information
requested above is not necessary for the design of this project. As
requested in the meeting, an exhibit has been prepared that shows
the existing drainage basins upstream of the proposed CB #31 to
determine the approximate capacity of the existing drainage system
along SE 192"d Street Please insert the attached existing basins
exhibit and a table summarizing the peak flows at the end of Section
3 of the TIR.
B. The current backwater analysis and downstream analysis lack sufficient
details to determine whether or not the tailwater elevation at proposed
CB#31 is reasonable. We need to know whether or not this tailwater will
have unacceptable adverse affects on the pond's storage or the existing
upstream/downstream drainage system along SE 192"d Street. Please
modify the offsite 100-year undetained backwater analysis and
downstream analysis so it includes the following;
1) A basin map and calculations for the following:
a) Drainage entering proposed CB#31 from the west (along
SE 192"d Street).
b) For the existing CB immediately to the east of proposed
CB#31, show and determine the flows entering this CB
from the north.
2) For the drainage system within two CB's east and west of CB#31
(along the northern side of SE 192"d Street) map and specify the
pipe sizes, pipe invert elevations, pipe lengths, pipe materials and
CB rim elevations.
As discussed in the March 15, 2006 meeting, the information
requested above is not necessary for the design of this project Plan
sheet 8 has been revised to show the pipe sizes, pipe invert
elevations, pipe lengths, and CB rim elevations for one CB east and
west of CB #31.
C. Design the pond's overflow and (secondary) emergency overflow per
SWDM pages 5-19, 5-27, 5-28, 5-30 and 5-48. Address the following in
these designs:
1) Clarify where the 100-year design flow rate came from.
The 100-year 15-minute design flow rate of 9.34 cubic feet per
second was used for the pond overflow calculations. This
Mr. Ted Cooper, P.E.
April 13, 2006
Page 3
flow rate is mentioned in the Overflow Calculations and the
KCRTS printout is attached following the calculations page.
2) Design the overflow riser pipe (in the control structure) using the
riser curves (SWDM page 5-48). Determine the overflow water
surface elevation for the 1 00-year storm flow rate.
As requested, using the riser curves and the 100-year 15-
minute storm with a flow rate of 9.34 cubic feet per second,
the overflow riser pipe has been revised on plan sheet 13 to
have a 21 inch diameter with 0.67 feet of head. The overflow
water surface elevation calculation for the 100-year storm flow
rate is shown in the Overflow Calculations in Section 4.
3) Design the size of the vertical bar grate opening for the control
structure using a weir equation. Subtract the widths of the bars to
get its effective width. The grate's maximum water surface
elevation for the 100-year storm must be less than or equal to
that of the overflow riser.
As discussed in the meeting on March 16, 2006, the impact of
the bars width to the overflow water surface elevation is
negligible. The grate's maximum water surface elevation for
the 100-year 15-minute storm is set equal to that of the
overflow riser.
4) Set the overflow elevation of the ponds (secondary) emergency
overflow (or birdcage per SWDM page 5-28) at or above the riser's
100-year design water surface elevation.
As shown in the TIR Section 4, Overflow Calculations, the
emergency overflow elevation of 502.49 is above the riser
elevation of 501.75.
D. Modify the bond quantities sheets for any changes.
The bond quantities have been modified as requested. Please
replace the Site Improvement Bond Quantity Worksheet in Section 9
of the TIR with the attached revised version.
5_ Please make the following changes to plan sheet 3 and all other affected plan
sheets:
A. Modify the part of the `Tract E" PAT roadway that serves 3-lots so it meets
minor access roadway standards (per KCRS 2.09B). Notice the 25'-radii
required at the entrance.
Mr, Ted Cooper, P.E.
April 13, 2006
Page 4
This comment was revised on March 20, 2006 to read as follows:
A. Modify the part of the "Tract E" PAT roadway that serves 3-lots so it meets
minor access roadway standards (per KCRS 2.09B). Notice the 25'-radii
required at the entrance. Use one of the following methods to provide
access to Lots 4, 5 and 6-
1) Get an approved variance (to KCRS 3.01 C.3.a.) that will allow
these three lots to be served by a JUD. If all 3-lots use a common
driveway stub to access "Road A", then an access easement
across Lot 4 (for a JUD) won't reduce the number of lots served
by this driveway stub to 2.
2) Provide two adjacent 2o'-wide pipe stem lot extensions to serve
these lots. One pipe stem would have a JUD serving 2-lots. The
other one would have a single driveway. Driveways must be
centered in the pipe stems.
3) Use a single access roadway PAT long enough to serve all 3-lots
and a JUD where this roadway only serves 2-lots. A PAT must
meet the same roadway design standards as a minor access
roadway (per KCRS 2.09B),
"Tract E" was revised using method 2).
B. Where the `Tract E" roadway serves 2-lots it can be a joint -use driveway
(see KCRS 3.01 C 3.a).
See response to the revised part A of this comment
C. Please relocate the two 16-box mailbox units on "Road A" to north of the
common property line for lots 25 and 26, as approved by the U.S
Postmaster.
The two 16-box mailbox units have been relocated as requested.
D. Correct the sheet referenced for all mailbox details. It should be DT-04.
The sheet references have been corrected.
E Show, dimension and label all necessary drainage and utility easements
for each proposed lot Outside of the R/W, a1/ lot drain pipes serving
more than one lot must be in a drainage easement
The plan sheets have been updated to show the requested
easements.
6. Modify all of the sidewalk ramps as follows:
Mr. Ted Cooper, P.E.
April 13, 2006
Page 5
A. Design them per the details on sheet DT-02.
B. Locate all proposed sidewalk easements 1'-behind the sidewalks.
The sidewalk ramps have been revised as requested and as discussed in
the March 15, 2006 meeting.
7. At all mailboxes, widen the proposed sidewalk easements so each is 1'-back of
the sidewalk widening.
The easements have been revised as requested.
8. Provide an enlarged detail for the roadway and sidewalk improvements at the
southern end of `Tract B" as follows:
A. Dimension the location of the northern rolled curb so it is centered 12'-
north of the "Road A" centerline.
This comment was revised on March 20, 2006 to read as follows:
A. Adjacent to the southern boundary of 'Tract B" use a standard concrete
pedestrian ramp that matches the one opposite it. Label this ramp as
`TEMPORARY" because it may need to be relocated for future roadway
widening. Where the pavement is wider than that of the half -street,
separate the widened area from the half -street pavement width with a
fogline stripe.
The revised comment has been incorporated on plan sheet 5.
B. Across the frontage of `Tract B" maintain the proposed half -street width
and connect the roadway to the ramp with a temporary 5'-wide ACP
walkway.
See response to the revised Part A of this comment
C. Locate the "Road A" northern R/W line 20'-north of the roadway
centerline. This is needed to place the R/W line 1'north of the ramps 6'-
wide sidewalk (per sheet DT-02).
The northern R/W line has been located as requested.
9. Please make the following changes to plan sheet 4:
A. Specify that all 12"-diameter pipes must have smooth (not corrugated)
linings between CB#19 and CB#22 and between CB#20 and CB#21. This
is necessary to meet the minimum 3-fps full -flow requirement (SWDM
page 4-11).
Mr. Ted Cooper, P.E.
April 13, 2006
Page 6
Drainage Note #12 that has been added to plan sheet 13
incorporates the requested smooth lining for all storm drainage PVC
pipe.
B. Make the following changes to the profile of CB#12.
1) Raise the invert of the 18"-pipe so its invert is clearly within 5'-0"
of this CB's rim (as required by KCRS DWG 2-003, Note 7).
Otherwise, this CB mast be changed from a TYPE 1 to a TYPE 2.
This is strictly enforced by our construction inspectors.
2) Add the missing 12"-pipe and its invert elevation.
The revisions have been made as requested.
10. On plan sheets 4 and 5, per the Postmaster's approval, show and specify the
locations of all new, proposed and relocated mailboxes. Mailbox locations
belong on these roadway sheets.
This comment was resolved in the March 15, 2006 meeting. The existing
mailboxes that are being relocated and the new locations are shown on
plan sheets 4 and 6.
11. Please make the following changes to plan sheet 5:
A. Please remove CB#1 A from the pond tract because it isn't needed.
As discussed in the March 15, 2006 meeting, this catch basin is
required.
B. At "Road A" STA 35+58 (101T) place a CB with its rim low enough to
drain the lowest point along the northern side of this roadway. Add a plan
note that says to grade the R/W along the northern side of "Road A" to
drain to this CB.
This comment was revised on March 20, 2006 to read as follows:
B. At "Road A" STA 35+58 (101T) show a CB with a rim low enough to drain
the lowest point along the northern side of this roadway. Add a plan note
stating that this CB may be omitted if approved by the LUIS inspector.
The CB and plan note have been provided as requested.
12. Please make the following changes to plan sheet 6.
Mr. Ted Cooper, P.E.
April 13, 2006
Page 7
A. in the `Tract A" detail, specify the all 12"-pipes must have smooth (not
corrugated) linings (to provide the 3-1ps full -flow velocity required on
SWDM pg 4-11).
See response to comment #9.A.
13. Please make the following changes to plan sheet 8:
A. Provide a plan view (to scale) of CB#29 showing a revised design that it
is physically large enough to accommodate both inlet pipes and the
steps. A 487-diameter CB isn't large enough to accommodate the angle
between the two inlet pipes. On KCRS DWG NO. 2-005, in Note 5, notice
the required knockout sizes and the required spacing between them.
Either a larger CB or an increased angle between these pipes is needed.
CB#29 has been revised to show a 5411-diameter CB. A plan view of
CB#29 has been provided as requested on plan sheet 13.
B. For all existing pipes that will connect to CB #31 provide the pipe data
(i.e., materials, diameters, invert elevations, slopes). Also, please verify that
the pipe show with a 2W-diameter actually has this non-standard
diameter.
The information has been provided as requested. The pipes shown
as 20"-diameter have been verified and revised to show 18%
diameter.
14. Please make the following changes to plan sheet 10:
A. Correct the labeling of both CB#28 and CB#29 and the sheets
referenced for their details.
The information has been corrected as requested.
B. Install the pond gravity drain pipe, as required by SWDM item 7 on pages
6-75 and 6-100. It is possible to drain the pond with a gravity drain by
only lowering the inverts of all pipe inverts at CB#29 and CB#30. The
pipe run between CB#29 and CB#31 would need to have roughly a 0.5%
slope (see minimum allowable pipe slope requirements on SWDM page
4-11). This gravity drain pipe could be connected directly to proposed
CB#29. Its control valve should be located within the pond trace
As discussed in the March 15, 2006 meeting, the gravity drain pipe is
not required for this project
Mr. Ted Cooper, P.E.
April 13, 2006
Page 8
C. We recommend replacing the pond's overflow emergency spillway with a
"birdcage" structure that is located immediately downstream of the
control structure. it would also have to be as close as possible to the
access road. This would have the following benefits:
1) It may eliminate the need to upsize CB#29 just to physically
accommodate its inlet pipes.
2) The control valve for the gravity drain pipe could be located inside
this structure.
3) It should eliminate the possibility of R/W ponding and erosion
from drainage flowing over the emergency overflow.
4) It would be more compatible with future R/W improvements and
more aesthetically pleasing_
As discussed in the March 15, 2006 meeting, the pond's overflow
emergency spillway meets SWDM requirements and will remain.
D. Please notice that a CB with a FROP-T (CB#1A) isn't needed (or desirable)
upstream of the pond. If you propose to keep it, provide its design details
on the plans.
See response to comment #11.A
15. Please make the following changes to plan sheet 11:
A In al/ cross sections, replace the words "GRANULAR SUB BASE" with the
words "CRUSHED SURFACING BASE COURSE' We don't have
specifications for "GRANULAR SUB BASE".
B. Eliminate "APPROX." from the dimensioning of the lanes adjacent to the
site, for 116'1' Ave SE and 120'h Ave SE
C. In the cross section for 116"' Ave SE change "CRUSHED ROACK BASF
COURSE" to "CRUSHED SURFACING BASE COURSE", a standard item.
D. in "15' POND ACCESS ROAD SECTION D-D" replace the "CRUSHED
ROCK" with "1-1 /2 INCHES CSTC OVER 5" CSBC" per SWDM page 5-20
(Construction of Access Roads).
F In "ROAD A(SUBACCESSS 112 STREET) specify a R/W width of 38' at "Tract
B" (approx. STA 32+47 to STA 32+77).
The revisions have been made as requested.
16. On plan sheet 12, please remove the "CURB RAMP ALTERNATE" because it
requires a KCRS variance.
The detail has been removed as requested.
17. Please make the following changes to plan sheet 13:
A Modify the plan view of CB#28 to show the true locations and alignments
of all pipes and other internal CB components to scale.
Mr. Ted Cooper, P.E.
April 13, 2006
Page 9
B. In note 2 of the "Structural Notes'; add the missing "O's" to "RIGHT-F-
WAY" (two occurrences).
C. In the profile of CB#28 make the fallowing changes:
1) Add a note specifying `handholds, steps or ladder see KCRS dwg.
2-006" per SWDM Fig 5.3.4.A (on page 5-40).
2) Show the shear gate rod extending all the way to the bottom of
the solid locking lid (so the gate must be closed to install the lid
and the shear gate rod is easily accessible).
3) Show and dimension the vertical bar grate to scale.
The changes to plan sheet 13 have been made as requested.
18. Please make the following changes to plan sheet 14:
A. Omit the following details that are replaced by updated details on sheet
DT-02:
1) ASPHALT TRANSITION RAMP & LANDING.
2) CURB RAMP IN ROLLED CURB DETAIL
The details have been removed from plan sheet 14 as requested.
B. Revise%mit the "OVERFLOW SPILLWAY DETAIL" per previous comments,
As discussed in the March 15, 2006 meeting and responded in the
previous comments, the overflow spillway detail will remain.
C. In the "NEIGHBORHOOD MAILBOX UNIT'detail, specify 1 S-boxes in each
unit, per Postmaster -approved plan.
The detail has been updated as requested.
D. in the "NEIGHBORHOOD MAILBOX SIDEWALK MOUNTING LOCATION"
detail, show and dimension the specify sidewalk easement 1'-behind the
sidewalk
The easement has been shown and dimensioned as requested.
19. Please make the following changes to plan sheet 15:
A. Show the final grading contours for the site. The cut and fill quantities
suggest that a large amount of cut material will be spread across much
of the site.
B. Expand the clearing limits to allow for storage of materials and final
grading.
C. Specify temporary drainage pipes at all locations where drainage crosses
a proposed roadway.
Mr. Ted Cooper, PE
April 13, 2006
Page 10
D. We strongly suggest using the permanent pond and at least some of its
permanent downstream system. See SWDM Section 03.5 (page D-44)
"Use of Permanent Drainage Facilities': Only show those parts of the
permanent drainage system that will be required for the TESL plan.
Remove the overlap of temporary and permanent ponds/traps so we can
tell what is proposed for TESC.
E. Show downstream conveyance details for the "Tract D" sediment
pond/trap.
This comment was discussed extensively in the March 15, 2006 meeting.
The final grading contours for the site are already shown. No temporary
drainage pipes are proposed, stormwater runoff shall flow along and across
the roadways using interceptor ditches that have a detail provided on plan
sheet 16. Sediment Trap #2 will be constructed within the permanent pond,
as suggested. The proposed drainage system is shown in order to identify
the location of the catch basin sediment barriers. The following changes
have been made to plan sheet 15 following the March 15, 2006 meeting:
the clearing limits have been expanded to allow for storage of the cut
material, the roof drain pipe system has been removed from this sheet, and
minor items have been revised for clarity.
20. Please add street trees to the following locations:
A. Northwest corner of Lot 27.
B. Along the eastern side of "Tract D"
The street trees have been added as requested.
The following comment was added on March 20, 2006 to read as follows:
21. Provide a design that addresses the increase and concentration of drainage flow
at the southern end of the proposed curb along 116th Avenue SE. Use one of
the following options to resolve this drainage issue:
A. Within the R/W, provide an infiltration swale extending south from the
southern end of the proposed curb. Notice that if this swale's drainage
creates a pond that extends into the neighbor's property then the second
option must be used.
B. Collect and convey this drainage to a drainage system (existing or
proposed).
Plan sheet 7 has been revised to incorporate option A
The following comments were received from Kristen Langley on March 28, 2006 to read
as follows:
Label radii of (a) fogline striping and (b) pavement edge on NE quadrant of
intersection of Road "C" at 116th Avenue SE
Mr. Ted Cooper, P.E.
April 13, 2006
Page 11
2. Label beginning STA of removal of fogline on 116th Avenue SE
3. If full -width overlay is required on 116th Avenue SE, label beginning and end
STAB for "existing" and "new" centerline channelization
4. Label radii of curb return on SE quadrant of intersection
5. Identify unlabelled signs shown south of SE quadrant of intersection of Road "C"
on 116th Avenue SE.
6. Label offsets of fogline stripe (from centerline and from edge of pavement) on
NE quadrant of Road "C"I116th Avenue SE intersection
7. Add note regarding type of, and disposition (relocate, remove and transfer to
KCDOT, ...) unlabelled signs in new paved area at intersection
8. Label radii of (a) fogline striping and (b) pavement edge on NW quadrant of
intersection of Road 'A" at 116th Avenue SE
9. Identify unlabelled object at STA 205+00 (approx) on 120th Avenue SE
10. Provide illumination plan (per requirements of KCRS 5.05) for 116th Avenue SE
The information on plan sheet 17 was revised as requested in comments
#1 - #10 above.
Please note that time is of the essence on this project and JPS Holdings, LLC, would like
to submit mylars next week. If you have any questions, please call me at (253) 838-6113,
Sincerely,
ESM CONSULTING ENGINEERS, L.L.C.
LAURA COCIASU, P.E.
Project Engineer
CC: Joe Singh, JPS Holdings, LLC.: 1 copy of submittal set
I
0
Jessie Glen Plat 1
Project No. L05P0005 (Activity No. L05SR054)
Plan Review ##3
April 21, 2006
1. The following pending reviews need to be completed for
engineering plan approval:
A.
B. DCDOT Traffic: illumination & Channelization plans.
C. Significant Tree Retention Plan: Bruce Engell.
2. Please add the following items (from the previous list) to
the TIR:
A. Please use Figure "5.3.4H Riser Inflow Curves" (on page
5-48) to determine the 100-year water surface elevation
for the 21"-diameter riser (at 9.34 cfs). Use either
the nomograph or the appropriate equation below it.
B. Using the results immediately above, design the pond's
overflow and (secondary) emergency overflow per SWDM
pages 5-19, 5-27 5-28 5-30 and 5-48. Change the
following TIR calculations and pond design items on the
plans•
1) overflow water surface.
2) Use 1'-thick rock for emergency overflow spillway.
3) Emergency overflow water surface.
4) Top of berm elevation (minimum 0.3' freeboard).
C. Please modify the offsite 100-year undetained backwater
analysis and downstream analysis so it includes the
following calculations:
1) Drainage entering proposed CB#31 from the west
(along SE 192nd Street).
2) For the existing CB immediately to the east of
proposed CB431, show and determine the flows
entering this CB from the north.
Jessie Glen Plat 2
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #3
April 21, 2006
D. Modify the bond quantities sheets if any changes are
made
3. Please make the following changes to plan sheet 3:
A. Across the southern boundary of "Tract B", correct the
existing note which says "30' RIGHT OF WAY". It should
read as follows: "38'-ROAD "A" R/W WIDTH".
B. Show and dimension the "Tract B" walkway as shown on
the landscape/recreation space plans. This curvy
walkway must be centered in its public access easement.
C. Label and dimension the proposed "10'-UTILITY &
DRAINAGE EASEMENTS" along all plat roadways north of
errR T
4. Please make the following changes to plan sheets 4 and 5:
A. Provide a plan view enlargement and a cross section for
the Road "A" improvements adjacent to "Tract B", as
follows:
1) Include the following details in the enlargement:
a) Make the northern and southern boundaries of
the concrete curb ramp to Tract "B"
perpendicular to Road "A".
b) Add dimensions/stationing for all proposed
roadway paving and sidewalk along the Tract
"B" frontage.
c) Beginning and ending stations, with offsets,
for all proposed fogline striping.
2) Provide a detailed and dimensioned roadway section
that extends through the curb ramps on both sides
of the roadway here. There should be a smooth
Jessie Glen Plat 3
Project No. L0SP0005 (Activity No. L05SR054)
Plan Review #3
April 21, 2006
transition between the "Tract B" curb ramp and
this widened section of the half -street.
B. Show and specify that both pairs of bollards at the
ends of the Tract "B" walkway shall be placed 10'-back
of the edge of the traveled way (as required by KCRS
5.11) with 50" O.C.--spacing.
5. Please revise plan sheets 10, 13, and 14 per changes
required in item 2 (near the beginning of this list).
6. Please make the following changes to plan sheet 13:
A. In the profile of CB#28 make the following changes:
1) Add a note specifying "handholds, steps or ladder
see KCRS dwg. 2-006" per SWDM Fig 5.3.4.A (on page
5-40) .
2) Show the shear gate rod extending all the way to
the bottom of the solid locking lid (so the gate
must be closed to install the lid and the shear
gate rod is easily accessible).
3) Show and dimension the vertical bar grate to
scale.
7. Please make the following changes to plan sheet 15:
A. Design the temporary drainage path flow and clearing
limits so drainage doesn't flow through stored
materials (Expand the clearing limits?).
B. Provide an outlet for the sediment trap so it will
remove sediments as designed. Drainage can't exit
immediately next to its inflow stream because sediments
won't settle out in such a short flow path.
Jessie Glen Plat 4
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #3
April 21, 2006
8. Please submit plan sheets 18, 19 and 20 so they can be
reviewed. The following are some of the items that could not
be reviewed:
A. Please add street trees to the following locations:
1) Northwest corner of Lot 27.
2) Along the eastern side of "Tract D".
Jessie Glen Plat 1
Project No. L05P0005 (Activity No. L05SR054)
Plan Review 42
March 13, 2006
1. Please contact Trisha Bull (DDES Planner) at 206-296-6758
because she says she can't start reviewing the recreation
space plan until the review fee and other design details are
submitted.
2. Please provide design details now for the luminaire required
(by KCRS 5.05) at the intersection of proposed Road "D" and
116th Ave SE. KCDOT Traffic needs to review and approve it
before engineering plan approval.
3. The following reviews are pending:
A. Channelization plan: KCDOT Traffic.
B. Significant Tree Retention Plan: Bruce Engell.
4. Please make the following changes to the TIR:
A. Please provide the following information in the
downstream analysis:
1) In a plan view map of the existing downstream
system, show and uniquely label each pipe,
drainage structure, ditch and swale.
2) Specify the lengths, diameters and slopes of all
pipes.
3) Specify the lengths, critical cross sections and
slopes of every ditch and Swale
4) Revise the existing drainage map and table
describing it to show and describe
B. The current backwater analysis and downstream analysis
lack sufficient details to determine whether or not the
tailwater elevation at proposed CB#31 is reasonable. We
need to know whether or not this tailwater will have
Jessie Glen Plat 2
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #2
March 13, 2006
unacceptable adverse affects on the pond's storage or
the existing upstream/downstream drainage system along
SE 192nd Street. Please modify the offsite 100-year
undetained backwater analysis and downstream analysis
so it includes the following;
1) A basin map and calculations for the following:
a) Drainage entering proposed CB#31 from the
west (along SE 192nd Street) .
b) For the existing CB immediately to the east
of proposed CB#31, show and determine the
flows entering this CB from the north.
2) For the drainage system within two CB's east and
west of CB#31 (along the northern side of SE 192"6
Street) map and specify the pipe sizes, pipe
invert elevations, pipe lengths, pipe materials
and CB rim elevations.
C. Design the pond's overflow and (secondary) emergency
overflow per SWDM pages 5-19, 5-27, 5-28, 5-30 and 5-
48. Address the following in these designs:
1) Clarify where the 100-year design flow rate came
from.
2) Design the overflow riser pipe (in the control
structure) using the riser curves (SWDM page 5-
48). Determine the overflow water surface
elevation for the 100-year storm flow rate.
3) Design the size of the vertical bar grate opening
for the control structure using a weir equation.
Subtract the widths of the bars to get its
effective width. The grate's maximum water surface
Jessie Glen Plat 3
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #2
March 13, 2006
elevation for the 100-year storm must be less than
or equal to that of the overflow riser.
4) Set the overflow elevation of the pond's
(secondary) emergency overflow (or birdcage per
SWDM page 5-28) at or above the riser's 100-year
design water surface elevation.
D. Modify the bond quantities sheets for any changes.
5. Please make the following changes to plan sheet 3 and all
other affected plan sheets:
A. Modify the part of the "Tract E" PAT roadway that
serves 3-lots so it meets minor access roadway
standards (per KCRS 2.09B). Notice the 25'-radii
required at the entrance.
B. Where the "Tract E" roadway serves 2-lots it can be a
joint -use driveway (see KCRS 3.01C.3.a).
C. Please relocate the two 16-box mailbox units on "Road
A" to north of the common property line for lots 25 and
26, as approved by the U.S. Postmaster.
D. Correct the sheet referenced for all mailbox details.
It should be DT-04.
E. Show, dimension and label all necessary drainage and
utility easements for each proposed lot. Outside of the
R/W, all lot drain pipes serving more than one lot must
be in a drainage easement.
6. Modify all of the sidewalk ramps as follows:
A. Design them per the details on sheet DT-02.
B. Locate all proposed sidewalk easements 11-behind the
sidewalks.
Jessie Glen Plat 4
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #2
March 13, 2006
7. At all mailboxes, widen the proposed sidewalk easements so
each is 1'-back of the sidewalk widening.
8. Provide an enlarged detail for the roadway and sidewalk
improvements at the southern end of "Tract B" as follows:
A. Dimension the location of the northern rolled curb so
it is centered 12'-north of the "Road A" centerline.
B. Across the frontage of "Tract B" maintain the proposed
half -street width and connect the roadway to the ramp
with a temporary 5'-wide ACP walkway.
C. Locate the "Road A" northern R/W line 20'-north of the
roadway centerline. This is needed to place the R/W
line 1'-north of the ramp's 6'-wide sidewalk (per sheet
DT-02) .
9. Please make the following changes to plan sheet 4:
A. Specify that all 12"-diameter pipes must have smooth
(not corrugated) linings between CB419 and CB#22 and
between C9#20 and C9#21. This is necessary to meet the
minimum 3-fps full -flow requirement (SWDM page 4-11).
B. Make the following changes to the profile of CB#12:
1) Raise the invert of the 18"-pipe so its invert is
clearly within 5'-0" of this CB's rim (as required
by KCRS DWG 2-003, Note 7). Otherwise, this CB
must be changed from a TYPE 1 to a TYPE 2. This is
strictly enforced by our construction inspectors.
2) Add the missing 12"-pipe and its invert elevation.
Jessie Glen Plat 5
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #2
March 13, 2005
10. On plan sheets 4 and 5, per the Postmaster's approval, show
and specify the locations of all new, proposed and relocated
mailboxes. Mailbox locations belong on these roadway sheets.
11. Please make the following changes to plan sheet 5:
A. Please remove CB#1A from the pond tract because it
isn't needed.
B. At "Road A" STA 35+58 (10'LT) place a CB with its rim
low enough to drain the lowest point along the northern
side of this roadway. Add a plan note that says to
grade the R/W along the northern side of "Road A" to
drain to this CB.
12. Please make the following changes to plan sheet &:
A. In the "Tract A" detail, specify the all 12"-pipes must
have smooth (not corrugated) linings (to provide the 3-
fps full -flow velocity required on SWDM pg 4-11).
13. Please make the following changes to plan sheet 8:
A. Provide a plan view (to scale) of CB#29 showing a
revised design that it is physically large enough to
accommodate both inlet pipes and the steps. A 48"-
diameter CB isn't large enough to accommodate the angle
between the two inlet pipes. On KCRS DWG NO. 2-005, in
Note 5, notice the required knockout sizes and the
required spacing between them. Either a larger CB or an
increased angle between these pipes is needed.
B. For all existing pipes that will connect to CS #31
provide the pipe data (i.e., materials, diameters,
invert elevations, slopes). Also, please verify that
Jessie Glen Plat 6
Project No. LOSP0005 (Activity No. L05SR054)
Plan Review #2
March 13, 2006
the pipe show with a 20"-diameter actually has this
non-standard diameter.
14. Please make the following changes to plan sheet 10:
A. Correct the labeling of both CB#28 and CB429 and the
sheets referenced for their details.
B. Install the pond gravity drain pipe, as required by
SWDM item 7 on pages 6-75 and 6-100. It is possible to
drain the pond with a gravity drain by only lowering
the inverts of all pipe inverts at CB#29 and CB#30. The
pipe run between C9#29 and C9#31 would need to have
roughly a 0.5% slope (see minimum allowable pipe slope
requirements on SWDM page 4-11). This gravity drain
pipe could be connected directly to proposed CB#29. Its
control valve should be located within the pond tract.
C. We recommend replacing the pond's overflow emergency
spillway with a "birdcage" structure that is located
immediately downstream of the control structure. It
would also have to be as close as possible to the
access road. This would have the following benefits:
1) It may eliminate the need to upsize CB#29 just to
physically accommodate its inlet pipes.
2) The control valve for the gravity drain pipe could
be located inside this structure.
3) It should eliminate the possibility of R/W ponding
and erosion from drainage flowing over the
emergency overflow.
4) It would be more compatible with future R/W
improvements and more aesthetically pleasing.
Jessie Glen Plat, 7
Project No. L05P0005 (Activity No. L05SR054)
Plan Review 42
March 13, 2006
D. Please notice that a CB with a FROP-T (CB#lA) isn't
needed (or desirable) upstream of the pond. If you
propose to keep it, provide its design details on the
plans.
15. Please make the following changes to plan sheet 11:
A. In all cross sections, replace the words "GRANULAR SUB
BASE" with the words "CRUSHED SURFACING BASE COURSE".
We don't have specifications for "GRANULAR SUB BASE".
B. Eliminate "APPROX." from the dimensioning of the lanes
adjacent to the site, for 116th Ave SE and 120th Ave SE.
C. In the cross section for 116th Ave SE change "CRUSHED
ROACK BASE COURSE" to "CRUSHED SURFACING BASE COURSE",
a standard item.
D. In "15' POND ACCESS ROAD SECTION D-D" replace the
"CRUSHED ROCK" with "1-1/2 INCHES CSTC OVER 5" CSBC"
per SWDM page 5-20 (Construction of Access Roads).
E. In "ROAD A(SUBACCESS 1/2 STREET) specify a R/W width of
38' at "Tract B" (approx. STA 32+47 to STA 32+77).
16. On plan sheet 12, please remove the "CURB RAMP ALTERNATE"
because it requires a KCRS variance.
17. Please make the following changes to plan sheet 13:
A. Modify the plan view of CB#28 to show the true
locations and alignments of all pipes and other
internal CB components to scale.
B. In note 2 of the "Structural Notes", add the missing
"O's" to "RIGHT-F-WAY" (two occurrences).
C. In the profile of CB##28 make the following changes:
Jessie Glen Plat 8
Project No. L05P0005 (Activity No. L05SR054)
Plan Review ##2
March 13, 2006
1) Add a note specifying "handholds, steps or ladder
see KCRS dwg. 2-006" per SWDM Fig 5.3.4.A (on page
5-40) .
2) Show the shear gate rod extending all the way to
the bottom of the solid locking lid (so the gate
must be closed to install the lid and the shear
gate rod is easily accessible) .
3) Show and dimension the vertical bar grate to
scale.
18. Please make the following changes to plan sheet 14:
A. Omit the following details that are replaced by updated
details on sheet DT-02:
1) ASPHALT TRANSITION RAMP & LANDING.
2) CURB RAMP IN ROLLED CURB DETAIL
B. Revise/omit the "OVERFLOW SPILLWAY DETAIL" per previous
comments.
C. In the "NEIGHBORHOOD MAILBOX UNIT" detail, specify 16-
boxes in each unit, per Postmaster -approved plan.
D. In the "NEIGHBORHOOD MAILBOX SIDEWALK MOUNTING
LOCATION" detail, show and dimension the specify
sidewalk easement 1`-behind the sidewalk.
19. Please make the following changes to plan sheet 15:
A. Show the final grading contours for the site. The cut
and fill quantities suggest that a large amount of cut
material will be spread across much of the site.
B. Expand the clearing limits to allow for storage of
materials and final grading.
Jessie Glen Plat 9
Project No. L05P0005 (Activity No. L05SR054)
Plan Review 42
March 13, 2006
C. Specify temporary drainage pipes at all locations where
drainage crosses a proposed roadway.
D. We strongly suggest using the permanent pond and at
least some of its permanent downstream system. See SWDM
Section D.3.5 (page D-44) "Use of Permanent Drainage
Facilities". Only show those parts of the permanent
drainage system that will be required for the TESL
plan. Remove the overlap of temporary and permanent
ponds/traps so we can tell what is proposed for TESL.
E. Show downstream conveyance details for the "Tract D"
sediment pond/trap.
20. Please add street trees to the following locations:
A. Northwest corner of Lot 27.
B. Along the eastern side of "Tract D".
Cooper, Ted
From: Langley, Kristen
Sent: Tuesday, March 28, 2006 11:05 AM
To: Cooper, Ted
Subject: Jessie Glen: Channelization Design Handout. Developer. pdf
Attachments: Channelization Design Handout.Developer.pdf
i
Channel irition
DesiSn Handout....
Please pass along to applicant.
Sheet CH01
1. Label radii of (a) fogline striping and (b) pavement edge on NE quadrant of intersection of Road "C" at 116th
Avenue SE
2. Label beginning STA of removal of fogline on 116th Avenue SE
3. If full -width overlay is required on 116th Avenue SE, label beginning and end STAs for "existing" and "new"
centerline channelization
4. Label radii of curb return on SE quadrant of intersection
5. identify unlabelled signs shown south of SE quadrant of intersection of Road "C" on 116th Avenue SE.
6, Label offsets of fogline stripe (from centerline and from edge of pavement) on NE quadrant of Road "C"/116th
Avenue SE intersection
7. Add note regarding type of, and disposition (relocate, remove and transfer to KCDOT, ...) unlabelled signs in new
paved area at intersection
B. Label radii of (a) fogline striping and (b) pavement edge on NW quadrant of intersection of Road "A" at 116th
Avenue SE
9. Identify unlabelled object at STA 205+00 (approx) on 120th Avenue SE
10. Provide illumination plan (per requirements of KCRS 5.05) for 116th Avenue SE
GUIDELINES FOR DEVELOPER PROJECTS:
CHANNELIZATION PLANS
Channelization is the separation or regulation of conflicting traffic movements into
definite paths of travel by islands or pavement markings to facilitate the orderly
movements of both vehicles and pedestrians. Proper channelization increase capacity, ,
provides maximum convenience, and instills driver confidence. — A Policy on Geometric
Design of Highway and Streets, AASHTO, 2001.
Channelization devices include painted or plastic lines, raised pavement market, and
traffic islands. In addition to standard items such as roadway centerlines and edge lines,
channelization includes crosswalks, .stop lines, and turn arrows.
In projects involving roadway construction or improvement, channelization should be
addressed early in the design process. Items such as lane widths, taper lengths, and radii
affect the required width of pavement. Determining the channelization requirements
early in the process can avoid costly redesign of roadside features such as sidewalks and
drainage improvements. For this reason, it is recommended that the channelization
review be the first step in the Road and Drainage review process.
Channelization Review Process
Unlike most development plans, channelization plans are not reviewed by DDES. As
authorized under Title 14 of the King County Code, King County DOT is the agency
responsible for reviewing and approving all channelization plans. The Traffic Systems
Unit reviews and signs channelization plans.
As with other plan sets, channelization platys should be submitted to your DDES project
manager. DDES then forwards the plans to the King County DOT Traffic Engineering
Section for review. The plans are reviewed for compliance with the King County Road
Standards (KCRS) and generally accepted engineering practice.
Plan submittals are reviewed by the Traffic Systems unit, and redlines returned to DDES
and the applicant. Multiple reviews of plans sets are frequently required and should be
anticipated. The quality of the plan submittal and complexity of the project has a major
impact on the number of reviews required. Meetings are scheduled as necessary to
resolve any issues identified during the review process.
Once the plans are approved, the final plans are submitted on mylars for signature by
King County DOT.
A Road Variance approved by the County Road Engineer is required for all roadway
designs that deviate from the KCRS. It is recommended that applicants obtain all related
variances prior to submitting channelization plans to avoid delays. See DDES Customer
Service Bulletin number 34A for more information on the variance process.
Developer Channelization Plan Guidelines Page .I
Standards and Guidelines
Standards and guidelines used when reviewing channelization plans, listed in the order of
precedence, include:
• King County Road Standards (KCRS), including Drawings 4-001 through 4-0091
• WSDOT Design Manual Chapter 910
• WSDOT Standard Plans Section H
• MUTCD Part 3
Items to Include on Plan Sheets
initial plan submittals should be printed on paper. Half size (I I"x 17") drawings are
preferred. A scale of 1 "= 40' is required for half size drawings and 1'= 20' for full size
drawings. Final plans submitted for signature shall be full size drawings printed on
Myiar.
It is recommended that copies of Hearing Examiner conditions and variances related to
channelization be provided along with the first plan submittal.
Each plan sheet shall contain a signature block with spaces for signature by the King
County DOT Review Engineer and Supervising Engineer. Each plan sheet should also
contain the following note: "Contractor shall notify Traffic Engineering (206-263-6110)
at least 3 working days prior to striping to coordinate channelization layout and sign
installation."
The appearance of channelization lines on plans should be similar to the actual lines as
they appear on the pavement, For example, a double yellow centerline should be shown
using two 4" wide (at scale) polylines. Existing channelization should be shown
throughout the project using the same line type as proposed channelization but with half-
tone line weights (aka screened).
Plans should show the entire roadway width with all elements listed below. Where new
channelization matches with existing roadway sections, plans should show no less than
100 ft of the roadway beyond the project limits.
• Survey centerline with stationing in 100' increments.
• All intersecting roadways and driveways should be shown and labeled
Beginning and ending stationing of project.
• North Arrow and Scale Bar.
• DDES Permit Number.
• All roadway names along with classifications and posted speed Iimit.
I These drawings are in the proposed KCRS revision, and are numbered 6-001 through 6-009 in the current
KCRS. There is little substantive difference between the two drawing sets. The proposed drawings are
subject to change in the adopted KCRS revision.
Developer Channelization Plan Guidelines - Page 2
• Right -of -Way Lines (labeled).
• Edge of pavement (labeled).
• Curb, gutter and sidewalk.
+ Curb ramps.
All pavement markings, including striping, arrows, bike symbols, stop lines, and
cross walks. The type of pavement marking and beginning/ending stationing
should be called out.
+ Beginning/ending stationing for all tapers.
• Callout for removal of existing striping where necessary.
• CalIout where channelization at project limits matches existing.
• The following dimensions should be shown at all matchlines, intersection
approaches, and where there are changes in width:
- Lane widths (both sides of road, include bike lanes).
- Intersection curb and/or edgeline radii.
- Radii of reverse curves and other curvilinear striping.
- Shy distance to roadway features (e.g. islands, vertical curb).
• All signs are installed by King County DOT. Signs should be called out "to be
installed by others". Sign installation details should not be included on plans.
Features that are not relevant to channelization, such as topography lines, drainage, and
utilities, should not be shown.
Helpful Hints for Channeiization PIans
Many errors can be eliminated by reviewing KCRS Drawings 4-001 through 4-009 prior
to submitting plans, particularly with respect to the required striping types, pocket
lengths, and tapers. It is recommended that applicants use the attached channelization
checklist to review plans prior to submittal. An example plan sheet is also attached for
reference.
Designers should also check to ensure that intersections can accommodate the turning
movements for the design vehicle using turning templates or software packages such as
TM
Autoturn , and should be prepared to provide documentation to support the choice of
design vehicle and turning movement design upon request.
Frequent errors include:
• Minimum pocket and/or taper lengths not met.
• Dimensions of existing channelization at project limits not shown.
• Marked crosswalks provided at unsignalized intersections (crosswalks are usually
provided only at signalized intersections).
• Lane alignments not maintained through intersections.
• Thermoplastic striping used next to bicycle lanes.
Developer Channelization Plan Guidelines Page 3
King County Traffic Engineering
Channelization Review Checklist'
Plan Sheet
❑ Scale is 1"=20' (full size) or 1"=40' (half size)
❑ Appropriate layers shown, inappropriate dropped
0 Title Block, DDES Activity Number, PE stamp, north arrow
0 Stations at 100' intervals
❑ Match lines with stations
❑ Road names, classification, and posted speed
E3 Driveways and intersecting roads labeled
0 Edge of pavement, curb lines, & ROW lines shown & labeled
0 Existing Channelization shown (half tone)
0 Call out where proposed Channelization matches existing
0 Traffic Engineering Approval Box
❑ 3 day advanced notification note
Drawing Elements
0 Edge lines (4" white continuous)
Ci Centerline (4"-4"sp-4" double yellow)
0 Lane lines K' white dashed)
0 Movement separation (8" plastic white wide line)
❑ Bicycle Lane (8" pairited white stripe)
0 Crosswalks (10' wide/stripes centered on lane lines, 8" hp/8" sp/8" hp)
0 Stop lines (16" plastic, extends to edge of traveled way)
0 Word & symbol markings, Raised Pavement Markings
❑ Islands (dimensions, curb type, striping, radius, stationing)
0 Removal of existing striping called out where required
Dimensions
0 Lane widths at match lines, intersections, and width changes
❑ Intersection curb/edge stripe radii
0 Reverse curve radii
❑ Stations & offsets at begin/end of all striping and tapers
❑ Shy distance widths to roadway features (islands, vertical curb)
Design Elements
0 T Correct taper lengths and lane widths
CI Appropriate lane assignments
0 Compliant curb ramps, crosswalk dimensions & locations
0 Minimum turn pocket lengths met
© Minimum 20' pavement width (fire lane)
❑ Lane alignments maintained through intersections
0 Traffic letters and symbols correctly located and spaced
13 Design vehicle turning radius and movement .
Coordination w/ Related. Disciplines
0 Traffic Analysis (pocket lengths/requirements)
0 Signal Design (where required)
* write "NA" where not applicable
OESI
r'
rs m
OH
YC
A
OK
8
�]Ln
�i ax ax -u
m
1.0 11SW3 • wn+£9{ Y1S
0a TiRi AL WR
'LS}LUL A
\\\` pry A31"; LLu lYf100N5 M � ,a}tqL ,p•
'1tl ,ana rw+saLV1s � g
0. fi Z
�] \ 1Laod agora irvtl aavro
'ltl A'BL 8'4L+9oL Y15 w
\ '1a ,o,el '11+1od anHY lna uaYrb %#3 ;
ltl 0'Sl 1[3dr1 k301L10V15L
'la £'L{ -M pa4rY] 1(3 LtI1YR ��lppp i
IF £L'LC+f9L YN S �
Vy� @! 711H N1360a 8 ,
ON 43TT'A 3RYT'r100rFa 'M
,ll ,LL �1L
is
T
mz �� i
R � � • A Sii y�
~ a fill
x far
L. d3VAvs II
,11 ,ll N 1f15MY$ UM3
U J a »'te+ool
S ONFKXLVR
LLSIX3 VIS
iVi SONHtlYR i 0 E6L Y15 *
ML59(3 WUVM i r.
n� ,OCa I F+ Y fa a
� I
V O
t
yV
M fs
m
C
m
� �
{
I
i
�
u y
i
T
Page 1 of 1
Cooper, Ted
From: Cooper, Ted
Sent: Monday, March 20, 2006 2:40 PM
To: Laura G Cociasu (laura@esmcivil.com)
Cc: Bergam, Mark
Subject: Jessie Glen Plat (L05SR054) - Revisions to Plan Review #2
Attachments: L05SR054 Jessie Glen - Revisions to List #2.doc
Tracking: Recipient Delivery
Laura G Cociasu (laura@esmcivil.com)
Bergarn, Mark Delivered: 03/20/2006 2:40 PM
Laura,
Please read the attached document for revisions that need to be made to List #2.
Please feel free to contact me if you have any questions.
Sincerely,
Ted Cooper, P.E.
Engineer 11
Phone: (206) 296-7163
FAX: (206) 296-6613
E-Mail: ted.cooper@metroke.gov
M.S. OAK-DE-0100
03/20/2006
Jessie Glen Plat 2
Project No. L05P0005 (Activity No. L05SR054)
REVISIONS to Plan Review #2
March 20, 2006
street, separate the widened area from the half -street
pavement width with a fogline stripe.
3. Revise Item 11.13. to read as follows:
A. At "Road A" STA 35+58 (10'LT) show a CB with a rim low
enough to drain the lowest point along the northern
side of this roadway. Add a plan note stating that this
CB may be omitted if approved by the LUIS inspector.
4. Add the following new item to the list:
A. Provide a design that addresses the increase and
concentration of drainage flow at the southern end of
the proposed curb along 116th Avenue SE. Use one of the
following options to resolve this drainage issue:
1) Within the R/W, provide an infiltration swale
extending south from the southern end of the
proposed curb. Notice that if this swale's
drainage creates a pond that extends into the
neighbor's property then the second option must be
used.
2) Collect and convey this drainage to a drainage
system (existing or proposed).
February 14, 2006
Mr, Ted Cooper, P.E.
King County DDES
Land Use Services Division
900 Oaksdale Avenue SW
Renton WA 98055-1219
Re: Jessie Glen
Application No. L05P0005
Dear Mr, Cooper,
Job No. 1166-001-005
RECEIVED
FEB 1 5 2006
KING COUNTY
LAND USE SERVICES
On behalf of JPS Holdings, LLC., ESM is submitting the following Jessie Glen revised
documents:
• 3 Sets - Road and Storm Construction Plans (Sheets 1 -- 17)
+ 3 Sets - Landscaping Plans (Sheets 18 - 20)
• 3 copies - Landscape Bond Quantity Worksheet Form
• 3 copies - Revised Pages of the Technical Information Report (TIR)
• 3 copies - Postmaster approved plan proposed or relocated mailboxes (2 sheets)
The original comments are shown below in italics with our responses in bold.
1. Please submit a recreation space plan package to Kim Claussen (DDES Planner)
u (} for review and approval. Contact Kim at 206-296-7 f 67 for the required number
of copies and fees.
The recreation space plan was submitted to the Planning Department on
January 4, 2006. The landscape plans have been revised per comment #2
below and are being resubmitted to the Planning Department at this time.
--2. Please address the following Significant Tree Retention plan comments from
Bruce Engell (206-296-6782):
f_r A The plat shows it was vested in 2005, and thus subject to the CAO
standards. The significant tree retention code (KCC 21A.38.230) was
replaced by KCC 16.82.156 on January 1, 2005. The applicant will need
to recalculate the significant trees to be retained using 10 trees per acre
or 5% of said trees, whichever is greater (refer to the files listed
immediately below).
720 South 348th Street Tel (253) 8386113 Bothell (425) 415 6144 Civil Engineering Land Planning
Federal Way. WA 48003 Fax (253) 836 7104 Tall Free (800) 345 504 Project Management Public Works
www.esrncivll.com — Land Surveying Landscape Architecture
Mr. Ted Cooper, P.E.
February 14, 2006
Page 2
The calculations have been revised as requested as shown on the
attached landscaping plans.
B. Two files (1. Significant tree plan guidelines & 2. Bonding for Significant
trees) will be sent with this review list document. Please use these
guidelines and submit the bonding forms with the revised significant tree
plan.
The requested bonding forms are attached with the revised
significant tree plan.
3. Please make the following changes to the TIR:
GA' Please include a comments stating how each of the Hearing Examiner's
Conditions has been addressed.
Responses to the Hearing Examiner's Conditions for final plat are
attached at the end of Section 2 of the TIR.
-B. Please provide a backwater analysis downstream of the proposed pond.
We are concerned that the proposed pond outlet elevation appears to be
below the flow fine of the existing downstream drainage system to at
least SE 192"f Street Make sure that enough of the existing downstream
drainage system is analyzed to make this backwater analysis accurate.
The backwater analysis downstream of the proposed pond has been
completed and is attached in the revised Section 5 of the TIR.
Not used.
Please provide two different basin maps and their corresponding
analyses. One must address the existing conditions and the other must
address the developed conditions. In your calculations, remember to
address areas that will bypass the pond (e.g., backs of yards along Road
"A"
As discussed in the meeting on January 31, 2006, verbiage has been
added to Parts A and B of Section 4 in the TIR regarding the
assumptions made for upstream existing flows and proposed flows
to the stormwater facility. Also, the exhibit in the bevel 1 Downstream
Analysis in Section 3 has been referenced to Part A of Section 4.
Please replace the attached revised Section 4 in the TIR.
E. Add a copy of the permission letter for the relocation and abandonment
of the existing driveway where proposed Road "A" will intersect 120th
Ave SE.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 3
We will provide a copy of the permission letter as requested within a
week to 10 days.
Z-f�' Add an arterial pavement design per KCRS 4.03 for 116th Ave SE
The arterial pavement design for 116"' Avenue SE has been attached
at the end of Section 6 of the TIR.
G. Provide up-to-date bond quantities sheets.
A Site improvement Bond Quantity Worksheet has been provided as
requested at the end of Section 9 of the TIR.
4. Please notice that our Internet site at http://www.metrokc.govlddesllusdlcad.htm
can be used to download current King County drawings and standards.
This comment has been noted.
Add the Hearing Approval Examiners Conditions to the plans.
The Hearing Examiner's Report and Decision Conditions for Final Plat
Approval have been added to plan sheet 1.
6. Provide a Postmaster approved plan of mailboxes that are proposed or relocated
Jar` (i.e., neighbors mailboxes).
The Postmaster approved plan of mailboxes that are proposed or relocated
(2 sheets) is attached as requested.
7. Please make the following changes to plan sheet 1:
(A: Add the Project No. L05P0005, Activity No. L05SP054 and SWM Variance
No. L05VO052 to the title block:
113� Fill in the answer to the "YES/NO" question asking whether or not this is
an erosion sensitive area site.
e" Add a plan note in bold large letters stating the following, "COORDINATE
THE ROADWAY AND SIDEWALK IMPROVEMENTS WITH THOSE OF SHORT
PLAT L04S0003':
J Add the plat's 5-year expiration date of 10-25-2010.
The information has been added to plan sheet 1 as requested.
8. On the plans, show details of the proposed construction for short plat L04S0003.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 4
These details (i.e., dimensions of all improvements and the R/W width) must
match those proposed onsite. The following problems must be addressed
acceptably to make these two projects compatible:
'A. Their RIW centerlines and R/W widths must match.
_8. The pavement widths and roadway crowns must match.
C. If these two projects are not constructed at the same time, the first one
will have to construct a temporary cul-de-sac. Later, when the second
one is constructed, it will have to remove this cul-de-sac and finish the
roadway improvements connecting the two projects. This construction
sequence needs to be described on the plans.
The plan sheets have been updated to show the revised roadway and R/W
width of the short plat L04S0003 to match the roadway and R/W width of
the proposed Jessie Glen plat. The R/W width differs only at the transition of
sidewalk from one side of the road to the other. As discussed in the
meeting on January 31, 2006, short plat L04SO003 shows the temporary
cul-de-sac and is planned to be constructed first A note has been added to
plan sheet 1 that states to coordinate the roadway and sidewalk
improvements with those of short plat L04S0003.
,9. Please modify the plan approval blocks on all plan sheets except sheet 1 so
there is more vertical space for DDES staff approval signatures and dates of
approval.
The plan approval blocks have been modified on plan sheets 2 - 20 as
requested.
10. Please make the fallowing changes to plan sheet 2:
f,AC Either fix or remove the R/W dimensioning for both major frontage
roadways.
The R/W dimensioning has been removed as requested.
U3,-Along the northern property line, at the northwest corner of the plat,
there is a new wood fence where the plans show a cyclone fence.
The fence has been revised to show as wood fence.
X� On this plan sheet and other sheets showing Road "Dn label SE 89
Place (Private Road), located west of proposed Road "D'.
The information has been added to the plan sheets.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 5
11. Please make the following changes to plan sheet 3 and al/ other affected plan
sheets:
,(A'- Connect Roads "B" and "C" with a low speed curve (per KCRS 2.10A)
because they will never have a true intersection.
The low speed curve has been provided as requested.
B. Use a private roadway stub (per the KCRS) behind the curb of the curve
to serve lots 5 and 6.
The private roadway stub has been added as requested and it will
serve lots 4 through 6. This private roadway stub will reside in a
new tract, Tract "E" that is designated as a joint use drive.
Add a plan note prohibiting direct access to 116`h Ave NE, per Condition
la
The note has been added to plan sheet 3.
/,U' Fix the ownership inconsistency for Tract "A': in plan view it is labeled as
a "PAT" (Private Access Tract). However, in the `Tract Table" it says it is
listed as a public roadway owned by King County.
Tract "A" will be a Private Access Tract and the "tract Table" has
been revised to reflect this.
E. Show a proposed construction design (on this sheet and all other
affected plan sheets) that will be compatible with short plat L04SO003
(currently waiting for approval). This design should include the following:
4) Show the design details of the temporary cul-de-sac proposed by
L04S0003.
2) Show details of the proposed work that will be required to remove
the off -site cul-de-sac and extend all of its curb, gutter and sidewalk
improvements to make a standard connection to this plat
3) Show an alternative design for the temporary on -site cul-de-sac that
would be needed if the temporary cul-de-sac for L04S0003 isn't
constructed in time.
Match the on -site R/W lines to those of L04S0003 so they are not
offset
Mr. Ted Cooper, RE
February 14, 2006
Page 6
The design details of the temporary cul-de-sac proposed by short
plat L04S0003 have been added to this sheet For further
information, see response to comment #8.
=,E Add a public access easement for the required 5'-wide public path
through Tract `B" (connecting Road "A" to Road "B"). Show this pathway
and its easement here and on the roadway plans.
The 5 feet wide public access easement and pathway are shown as
requested.
IG' Per Condition 9.a., from Lot 37 to the south, design Road "A" per urban
subaccess street standards. Please modify the other affected sheets too.
Road "A" has been revised as requested on all affected sheets.
H.` Per Condition 9.a., provide adequate R/W for the northern curb return
where Road 'A" connects to 120`h Ave SE
As discussed in the meeting on January 31, 2006 and information
received in an email from Ted Cooper dated February 1, 2006, the
pavement radius design has been revised to be 25 feet with an 11
foot offset at the ECR station on 120th Ave SE and a 25:1 pavement
taper from the 11 foot offset (at the ECR) northward to the existing
western edge of pavement along 120th Ave SE
12. Please provide the following requested by KCDOT Traffic:
,1 �4 ----A. Provide channelization plans for the roadway improvements along the
,!" t frontages of both 116t1' Ave SE and 120th Ave SE. Roadway striping
u , should be as follows:
1) South of these proposed intersections, maintain the existing lane
widths along both existing roadway frontages using fog line striping.
This striping should not extend across proposed intersections or
their radius returns.
2) Striping for the proposed northern radius return of Road `D" should
extend from the end of the proposed curb to the existing edge of
lane on 116fh Ave SE.
3) Striping for the proposed northern radius return of Road "AU should
extend along this radius return to the existing edge of lane for 120'
Ave SE
Mr. Ted Cooper, P.E.
February 14, 2006
Page 7
The channelization plan has been provided for 11 Wh Avenue SE and
120"' Avenue SE on plan sheet 17.
B. Provide an illumination design/plan.
An illumination design/plan completed by Puget Sound Energy will
be provided shortly after this submittal.
.T� c.
G Attempt to obtain additional R/W at the north side of the proposed
- Q + intersection of Road "D" with 11 Wh Ave SE to construct the ultimate curb
return design here. If R/W can't be obtained here, provide the following:
�) A letter stating that R/W can't be obtained here.
�) Locate all roadway improvements at least 1' away from the
neighboring property so they can be constructed and maintained.
Per comment #14.A, where Road "D" connects to 116t' Avenue SE,
the proposed northern curb return has been revised to stop within
the plat With this change, the pavement edge along the northern 35
foot radius is approximately 1 foot from the R/W on the north side.
Therefore, obtaining additional R/W is no longer necessary. In
addition, the roadway improvements have been revised to have 1
foot spacing to the neighboring property.
T,3. Please show the proposed final grading contours in all plan views of roadway
and drainage design plan sheets.
The proposed final grading contours have been provided as requested in all
plan views of roadway and drainage design plan sheets.
14. Please make the following changes to plan sheet 4:
✓A Where Road "D" connects to 116'h Ave NE, modify the proposed
northern concrete curb return so it ends within this plat.
The proposed northern curb return has been revised as requested.
CH: if R/W can be obtained, provide at least 1 ' of R/W width between the on -
site improvements and the adjacent property. Otherwise, move the
entrance to provide at least 1' of R/W here.
With the revision made per part A of this comment, the distance
between the onsite improvements and the R/W on the north side
has been revised and no additional R/W will be needed. For further
detail, see response to comment #12.C.2).
Mr. Ted Cooper, P.E.
February 14, 2006
Page 8
F. Show the 5'-wide public path through Tract "B"
The 5 foot wide public path is shown as requested.
,D. Add bollards (and their details per KCRS DWG NO. 5-013) across both
ends of the Tract "B" public path.
Removable bollards and bollard details have been added as
requested.
t&Please label Road "B" in big letters in plan view.
Road "B" has been labeled as requested.
15. Please add sidewalk ramps per KCRS DWG's 4-001, 4-002 and 4-003 to all plan
views at the following locations:
The intersection of Road "D" and 116rh Ave SE. Notice that only arterials
require two ramps on each curb return. For all curb ramps, specify that
transitions from rolled curbs to vertical curbs will occur within the ramps.
B: The intersection of Road "A" and 120th Ave SE
C. At both ends of the public access pathway through Tract "B"
f_. Along the south side of Road "A immediately across from the public
access pathway through Tract "B"
The sidewalk ramps have been added as requested. As discussed in the
January 31, 2006 meeting, a sidewalk ramp will be provided only on the
south end of the public access pathway through Tract "B". Also, an
additional detail sheet has been provided, plan sheet 12, which shows the
curb ramp details from KCRS DWG's 4-001, 4-002, and 4-003.
16. Please make the following changes to plan sheet 5:
Please label Road "A" in big letters in plan view.
Road "A' has been labeled as requested.
In "CURB FL TABLE 9" correct the offset distance. It can't be 9.33' It
must be at least the width of the southbound lane here.
The curb tables have been renumbered due to the addition of a low
speed curve at the intersection of Roads B and C. Curb Table #9
Mr. Ted Cooper, P.E.
February 14, 2006
Page 9
has been renumbered to #7 and the radius has been revised as
requested in comment #11.H.
in "CURB FL TABLE 10' correct the low point CB to CB#26.
As mentioned in the response above, Curb Table #10 has been
renumbered to #8 and the low point CB has been corrected.
Please remove the unnecessary Traffic approval block
The Traffic approval block has been removed as requested.
17. Please make the following changes to plan sheet 6:
lL Please label Tracts "A" and "C'; including their roadway types, in big
letters in their plan views.
'B. Add the required note from Examiner's Condition 9J to the plan view of
the JUD shown in the Tract "C' detail.
Provide a 30' minimum lane width around the cul-de-sac island as
required in KCRS DWG NO. 1-007.
Revisions for parts A and B of this comment have been incorporated in plan
sheet 6 as requested. For part C of this comment, the cul-de-sac island
has been removed as discussed in the meeting on January 31, 2006.
18. Please make the following changes to plan sheet 7:
Resolve the conflict between the proposed northern curb radius return of
116th Ave NE and the neighbor's property. There should be at least a 1'-
distance between the back of the curb and the offsite property.
The conflict has been resolved as discussed in comments #12.C.2)
#14.A and #14.13.
8. Add a luminaire at the intersection of proposed Road "D" and 116"' Ave
SE, per KCRS 5.05. Provide its design details for KCDOT Traffic to review
and approve.
We have notified Puget Sound Energy and they will include this item
in their design.
Provide drainage collection and conveyance design for drainage that
will leave the proposed gutter line of 116"' Ave. SE near STA 106+40, RT.
Drainage may pond immediately south of this location in an area where
Mr. Ted Cooper, RE~.
February 14, 2006
Page 10
where there is no established conveyance system.
As discussed in the meeting on January 31, 2006, stormwater runoff
for this area will flow overland towards the existing depression that
runs parallel to the road, in the same direction as the road currently
drains to. This information has also been mentioned in the revised
Section 4 of the TIR.
X( Add a plan note to contact Henry Perrin of King County DOT (206-263-
6138) before changing any pavement markings or sign locations.
This note has been provided as requested.
i� Please label the existing roadway, SE 89 LN (Private Road), located
across from the proposed 116"' Ave. SE entrance.
The existing roadway has been labeled as requested.
F. Specify that existing power poles and hydrants which require relocation
shall be placed behind the sidewalk
This information has been added as requested.
49. Specify all sawcuts in existing pavement to be at the existing fog line (or, if
necessary, within a traveled lane). in all areas where the pavement is to be
widened, sawcuts should not be made within the shoulders because shoulders
are not typically designed to carry the same traffic loading as traveled lanes.
This information has been specified as requested.
20. Please make the following changes to plan sheets 8 & 9:
A. For simplicity and clarity, please notice that plan sheets 8 and 9
probably could be combined because they duplicate many design
details.
Plan sheets 8 and 9 require a different scale, and as discussed in
the meeting on January 31, 2006, they will not be combined.
Add for the proposed abandonment and relocation of the existing
driveway near the proposed intersection of Road OX 120th Ave SE.
Specify that this must be coordinated with the owner of this driveway.
Please see response to comment #3.E
Mr. Ted Cooper, P.E.
February 14, 2006
Page 7 1
L�ja Please address the following problems concerning the proposed
drainage design downstream of the pond:
41}` A drainage collection/conveyance system and its details must be
provided for surface flows along the western side of 120"' Ave SE,
from the site to SE 192"d Street
As discussed in the meeting on January 31, 2006, the ditch along
the west side of 120"' Avenue SE will be restored to the original
conditions and an existing drainage ditch restoration detail has
been provided on plan sheet 16 to describe the approximate
layout of the existing ditch shape and structure.
) Grading contours and/or ditch sections must be provided where this
work is proposed.
Grading contours are shown on plan sheet 15. An approximate
existing ditch section is shown on plan sheet 16.
Remove the "Beehive"/ "birdcage" grates from all CB's in the R/W (i.e.,
CB# 27, CB 430 & CB #31. We have included a dome grate detail that
you may want to use for CB #31 because the leaves and other debris
I observed here are likely to plug a standard grate.
The plans have been revised to show and call out a dome grate
for CB #27 and CB #30 that will be located in the roadside ditch
on the west side of 120"' Avenue SE.
(4KAdd an inlet pipe stub to CB# 27 collect upstream ditch drainage.
The inlet pipe has been provided as requested.
5) Notice that the following significant benefits would result from
relocating CB#29 to the Proposed utter line at about STA 203+13
a) CB #30 would not be required the pipe run from CB #29 to CB
#31 would not exceed our maximum 300'-long limit
b) This CB relocation would also reduce the possible ponding and
erosion near the southern end of the proposed sidewalk ramp
(near STA 203+24, LT).
c) Decreased backwater effects on the pond.
---mod) It would be possible to install the pond's gravity drain pipe, as
required by SINDM item 7 on page 6-75).
r
Mr. Ted Cooper, P.E.
February 14, 2006
Page 12
21.
The suggestion above will certainly have significant benefits
to the project; therefore CB #29 has been relocated. The
pond gravity drain pipe could not be installed because of the
calculated in and out invert elevations of the control structure.
The detention pond was designed in KCRTS with a Stage 0
Elevation of 496.25 feet and locations of the three orifices are
based on this elevation. This elevation of 496.25 feet is
above the pond outlet elevation of 495.25 feet, therefore a
gravity drain is not possible. Per SWDM item 7 on page 6-75,
"a gravity drain for maintenance shall be provided if grade
allows", and as clarified above, the grade that the detention
pond was designed at does now allow a gravity drain.
6) For all existing pipes that will connect to CB #32 provide the pipe
data (i.e., materials, diameters, invert elevations, slopes).
This information has been provided as requested.
ID. Add cross sections (extending from the roadway centerline to the
western P/W line of 120t" Ave SE) to describe the proposed construction
at about STA 201 +80 and about STA 203+80.
Per discussions in the meeting on January 31, 2006, the
approximate section shown on sheet GR-02 is adequate.
Please make the following changes to plan sheet 10.
V Use the control structure design in SWDM Fig. 5.3.4.A (page 5-40)
Notice the required solid lid (i,e., no birdcage is allowed) and vertical bar
grate through its side.
The control structure has been revised as requested.
Notice that the following can be substituted for a rock -lined pond
emergency overflow spillway.
04 "Birdcage' overflow structure, per Fig 5.3.1.0 on page 5-28.
t 2) Paved asphalt overflow spillway which can also serve as an access
road to the control structure (see page 5-27).
We have evaluated the use of both additional options and have
determined that the current rock -lined pond emergency overflow
spillway is adequate.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 13
C. install a gravity drain pipe in the pond, as required by SWDM item 7 on
page 6-75). Also see page 6-100.
See answer to comment #20.C.5)d).
Add two perpendicular cross sections that completely describe the
pond's overflow spillway dimensions and materials.
The pond overflow spillway detail on plan sheet 14 has been revised
and an additional cross section has been provided as requested.
22. Please make the following changes to plan sheet 11:
11A. In all roadway sections, provide at least Vof R/W behind all curbs and
sidewalks (per KCRS roadway section drawings).
The roadway sections have been revised as requested.
r S In the "NOTES FOR TYPICAL ROADWAY SECTIONS' remove note 7
(County Engineer pavement approval requirement).
The note has been removed.
L,U' In the notes for Tract °C'; remove note 2 (County Engineer pavement
approval required).
The note has been removed.
Remove the non-standard "ROLLED CURB SECTION DRIVEWAr details
because driveway cuts are not used in rolled curb, per the KCRS.
The detail has been removed.
E. Please make the following changes to the cross section for 116'h Ave
SE.,
# I , q 1) Provide an arterial pavement design per KCRS 4.03.
The arterial pavement design has been provided as requested.
2) Show the entire roadway width, its crown and the required overlay
that will cover the full width of the roadway.
s This information has been provided as requested.
Y.
(,3r Label and dimension the location of the existing roadway centerline.
Mr. Ted Cooper, RE
February 14, 2006
Page 14
This information has been provided as requested.
Dimension the proposed pavement widening so it specifies a 22'-
wide lane adjacent to the site.
This information has been provided as requested. The proposed
pavement widening is 28'-wide lane adjacent to the site.
Please notice that there are no existing roadside ditches along either
side of this roadway here.
The roadside ditch along the west side of 116"' Avenue SE has
been removed. There is a slight existing drainage ditch or
depression along the east side of 116 h Avenue SE.
F. Please make the following changes to the cross section for 120'h Ave
SE.•
J' Show the entire roadway width, its crown and the required overlay
that will cover the full width of the roadway.
This information has been provided as requested.
Label and dimension the location of the existing roadway centerline.
This information has been provided as requested.
_--- 3) Dimension the proposed pavement widening so it specifies a 16'-
�, I � wide lane adjacent to the site.
G.
This information has been provided as requested.
�# I Not Used
Please make the following changes to the cross section for "ROAD A
(SUBA CCESS) u-
J,r Begin the stationing offsite at the point where onsite and offsite
improvements will connect, within Short Plat L03S0003. Curbs,
gutters and sidewalks for these two properties must connect.
See response for comments #8 and #11.E.
Use the 24'pavement width (with 12'-lane widths) required for urban
subaccess roadways, in KCRS 2.03H and 2.031.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 15
The pavement width has been increased to 24 feet
Z,3j Correct the R/W width, dimensions and sidewalk location in note 2
so they are consistent with the other plan sheets.
The information has been corrected as requested.
H. Please make the following changes to the cross section for "ROAD A
(SUBACCESS 112 STREET)".
L1" Correct the stationing so it is a continuation of the stationing for the
full -width street.
The stationing for Road "A" is continuous.
jam- Modify the design to comply with KCRS 2.47B.4.
The half street improvements for Road "A" will be constructed as
shown on the cross-section on sheet 11 to slope at two percent
towards the south curb line. This layout will assure proper
drainage, bank stability, and traffic safety.
,�V Add the following plan note to the cross sections of 116th Ave SE and
120th Ave SE:
Plan Note. Per KCRS Section 4.01 F, a 1 inch full width overlay shall be
required. If existing road section does not meet KCRS requirements, all
appropriate repairs to the existing subgrade, base material, surfacing and
pre -level may be required prior to placing the overlay. The overlay may
be waived only upon written request and after an evaluation of pavement
conditions and/or channelization requirements has been completed and
approved by the County Road Engineer or Development Engineer.
The plan note has been provided as requested.
�J On the plans, add our attached detail for the installation of through -curb
inlets in rolled curbs.
The attached detail has been added as requested.
23. Please make the following changes to plan sheet 12:
Plan sheet 12 has been renumbered to 13 due to adding a sheet as
mentioned in comment #15 and revised to show curb ramp details.
Mr. Ted Cooper, RE. �
February 14, 2006��Q
Page 16 r y
L& V
�o --� A. Revise the control structure to comply with the SWDM requirements in
Fig. 5.3.4A on page 5-40. Notice the solid locking lid and vertical bar
grate.
The control structure has been revised.
,: Notice that CB stations and offsets can be specified to only the nearest
foot
The Catch Basin Curb Offset Detail shows the relationship between
the flowline and the center of structure.
24. On plan sheets 12 and 15, replace all of the "King County Standard Plan Notes"
with those in SWDM Reference 7.B. These notes need to be up-to-date and
should not be reworded, renumbered or omitted You can add notes to the ends
of each of these lists.
Plan sheets 12 and 15 have been renumbered to 13 and 16 respectively and
the notes have been replaced as requested.
25. Please make the following changes to plan sheet 13:
Plan sheet 13 has been renumbered to 14.
• A. Modify all curb ramp details so they comply with the detail we have
attached with this list.
The curb ramp details have been updated as requested.
�B. Specify where you propose to use the detail labeled "CONCRETE
VERTICAL CURB" because it is probably only suitable for use around the
cul-de-sac island.
The detail has been removed from the plan set because the cul-de-
sac island has also been removed.
26. Please make the following changes to plan sheet 14:
Plan sheet 14 has been renumbered to 15.
Provide a temporary drainage collection and conveyance system that
will be used before all permanent pipes, paving and CB's are installed.
Show a design with details that clearly describe what is proposed
(instead of a vague conceptual design).
Mr. Ted Cooper, P.E.
February 14, 2006
Page 17
Interceptor ditches will provide conveyance until the CB's are
installed. The plan sheet has been revised to show the interceptor
r ditches clearly.
F1:
a� r B. Only show those parts of the permanent drainage system that will be
required for the TESC plan.
For clarity, the proposed storm drainage system has been revised in
this sheet to show light and in the background. Proposed sediment
barrier symbols are shown to be provided once catch basins are
installed.
X. Since there is no defined drainage path or ditch along the 116'" Ave SE
frontage, provide a TESC design that works here.
Drainage paths have been added along 116"' Avenue SE to guide
runoff.
Gam' Show additional silt fence along all clearing limits that are adjacent to
this site's property boundaries.
Additional silt fence has been provided as requested.
E Show inflow and downstream conveyance details for the sediment pond
and the sediment trap.
This information has been provided as requested.
f4-f Add a construction sequence with the first step being to schedule a pre -
construction conference with the DDES site inspector by calling (206)
296-6642.
The construction sequence has been provided on plan sheet 14 with
the first step as requested.
Add a plan note specifying that access must be maintained to the
existing ollsite driveways along 116rh Ave SE and 120th Ave SE.
The plan note has been added to the notes on this sheet as Note 3.
%H Don't show construction entrance rock (quarry spalls) overlapping the
existing offsite driveway along 120'h Ave SE.
The construction entrance from 1200' Avenue SE has been revised to
not show rock overlapping the existing offsite driveway.
0
Mr. Ted Cooper, P.E.
February 14, 2006
Page 18
27. On plan sheets 14 and 15, remove the note (and detail) requiring ditch
restoration to original conditions along 120«' Ave SE This note and detail don't
match either the existing conditions or the necessary proposed work here. Along
the 120th Ave SE frontage a new ditch design (with a 3:1 maximum slope
adjacent to the roadway) will be required.
Plan sheets 14 and 15 have been renumbered to plan sheets 15 and 16
respectively. As discussed in the meeting on January 31, 2006, the ditch
along the west side of 1200 Avenue SE will be restored to the original
conditions and the note and ditch detail are only approximate
representations of the shape and structure of the ditch.
28. Please put the street trees and their details on the engineering plan sheets
instead of the landscaping sheets. Street trees are part of the engineering review
and bonding.
.�,1',The street trees have been designed by a landscaped architect and the plan
sheets showing street trees needs to be stamped and signed by the same
4 landscape architect. Therefore, the street trees will remain on the
21 yE landscaping sheets and be submitted for engineering review together with
,� the engineering plan sheets.
If you have any questions during your review of this submittal, please call me at (253) 838-
6113.
Sincerely,
ESM CONSULTING ENGINEERS, LLC.
LAURA COCIASU, P.E.
Project Engineer
cc: Joe Singh, JPS Holdings, LLC.:
1 copy of submittal set
Kim Claussen, DDES Planning Department:
10 Sets - Landscaping Plans (Sheets 18 - 20) and
10 copies - Landscape Bond Quantity Worksheet Form
February 14, 2006
Mr. Ted Cooper, P.E.
King County DDES
Land Use Services Division
900 Oaksdale Avenue SW
Renton WA 98055-1219
Re: Jessie Glen
Application No. L05P0005
Dear Mr. Cooper.
(aii
Job No. 1166-001-005
RECEIVE
FEB 1 5 2006
KING COUNTY
LAND USE SERVICES
On behalf of JPS Holdings, L.L.C., ESM is submitting the following Jessie Glen revised
documents;
• 3 Sets - Road and Storm Construction Plans (Sheets 1 - 17)
• 3 Sets - Landscaping Plans (Sheets 18 - 20)
• 3 copies - Landscape Bond Quantity Worksheet Form
• 3 copies - Revised Pages of the Technical Information Report (TIR)
3 copies - Postmaster approved plan proposed or relocated mailboxes (2 sheets)
The original comments are shown below in italics with our responses in bold.
1. Please submit a recreation space plan package to Kim Claussen (DDES Planner)
for review and approval. Contact Kim at 206-296-7167 for the required number
of copies and fees.
2.
The recreation space plan was submitted to the Planning Department on
January 4, 2006. The landscape plans have been revised per comment #2
below and are being resubmitted to the Planning Department at this time.
Please address the following Significant Tree Retention plan comments from
Bruce Engell (206-296-6782):
A. The plat shows it was vested in 2005, and thus subject to the CAO
standards. The significant tree retention code (KCC 21 A.38.230) was
replaced by KCC 16.82.156 on January 1, 2005. The applicant will need
to recalculate the significant trees to be retained using 10 trees per acre
or 5% of said trees, whichever is greater (refer to the files listed
immediately below).
720 South 348th Street Tet 12531 838 6113 Bothell f4251 415 6144 my I.r.rc F:.a in, '.y
Federal Way. WA 99003 Fax 053} 836 7134 Toll Free 18M 345 5694 _ -ci 'd..r_,grn: �-�1 F.ia w,...,.
www esmcivil.com Cl L cs: c,: e ,,, - lect i. i
Mr. Ted Cooper, P.E.
February 14, 2006
Page 2
The calculations have been revised as requested as shown on the
attached landscaping plans.
B. Two files (1. Significant tree plan guidelines & 2. Bonding for Significant
trees) will be sent with this review list document Please use these
guidelines and submit the bonding forms with the revised significant tree
plan.
The requested bonding forms are attached with the revised
significant tree plan.
3. Please make the following changes to the TIR:
A. Please include a comments stating how each of the Hearing Examiner's
Conditions has been addressed.
Responses to the Hearing Examiner's Conditions for final plat are
attached at the end of Section 2 of the TIR.
B. Please provide a backwater analysis downstream of the proposed pond.
We are concerned that the proposed pond outlet elevation appears to be
below the flow line of the existing downstream drainage system to at
least SE 192" d Street Make sure that enough of the existing downstream
drainage system is analyzed to make this backwater analysis accurate.
The backwater analysis downstream of the proposed pond has been
completed and is attached in the revised Section 5 of the TIR.
C. Not used.
D. Please provide two different basin maps and their corresponding
analyses. One must address the existing conditions and the other must
address the developed conditions. in your calculations, remember to
address areas that will bypass the pond (e.g., backs of yards along Road
"A"
As discussed in the meeting on January 31, 2006, verbiage has been
added to Parts A and B of Section 4 in the TiR regarding the
assumptions made for upstream existing flows and proposed flows
to the stormwater facility. Also, the exhibit in the Level 1 Downstream
Analysis in Section 3 has been referenced to Part A of Section 4.
Please replace the attached revised Section 4 in the TIR.
E. Add a copy of the permission letter for the relocation and abandonment
of the existing driveway where proposed Road "A" will intersect 120th
Ave SE.
x p,
Mr. Ted Cooper, P.E.
February 14, 2006
Page 3
We will provide a copy of the permission letter as requested within a
week to 10 days.
F. Add an arterial pavement design per KCRS 4.03 for 116"' Ave SE
The arterial pavement design for 11 fi`" Avenue SE has been attached
at the end of Section 6 of the TIR.
G. Provide up-to-date bond quantities sheets.
A Site Improvement Bond Quantity Worksheet has been provided as
requested at the end of Section 9 of the TIR.
4. Please notice that our Internet site at http://Www.metrokc.gov/ddes/lusd/Cad.htm
can be used to download current King County drawings and standards.
This comment has been noted.
5. Add the Hearing Approval Examiner's Conditions to the plans.
The Hearing Examiner's Report and Decision Conditions for Final Plat
Approval have been added to plan sheet 1.
6. Provide a Postmaster approved plan of mailboxes that are proposed or relocated
(i.e., neighbors mailboxes).
The Postmaster approved plan of mailboxes that are proposed or relocated
(2 sheets) is attached as requested.
7. Please make the following changes to plan sheet 1:
A Add the Project No. L05P0005, Activity No. L05SR054 and SWM Variance
No. L05VO052 to the title block:
a Fill in the answer to the `YES/NO" question asking whether or not this is
an erosion sensitive area site.
C. Add a plan note in bold large letters stating the following, "COORDINATE
THE ROADWAY AND SIDEWALK IMPROVEMENTS WITH THOSE OF SHORT
PLAT L04S0003':
D. Add the plat's 5-year expiration date of 10-25-2010.
The information has been added to plan sheet 1 as requested.
8. On the plans, show details of the proposed construction for short plat L04S0003.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 4
These details (i.e., dimensions of all improvements and the R/W width) must
match those proposed onsite. The following problems must be addressed
acceptably to make these two projects compatible:
A. Their R/W centerlines and R/W widths must match.
B. The pavement widths and roadway crowns must match.
C. If these two projects are not constructed at the same time, the first one
will have to construct a temporary cul-de-sac. Later, when the second
one is constructed, it will have to remove this cul-de-sac and finish the
roadway improvements connecting the two projects. This construction
sequence needs to be described on the plans.
The plan sheets have been updated to show the revised roadway and R/W
width of the short plat L04S0003 to match the roadway and R/W width of
the proposed Jessie Glen plat. The R/W width differs only at the transition of
sidewalk from one side of the road to the other. As discussed in the
meeting on January 31, 2006, short plat L04S0003 shows the temporary
cul-de-sac and is planned to be constructed first. A note has been added to
plan sheet 1 that states to coordinate the roadway and sidewalk
improvements with those of short plat L04S0003.
9. Please modify the plan approval blocks on all plan sheets except sheet 1 so
there is more vertical space for DDES staff approval signatures and dates of
approval.
The plan approval blocks have been modified on plan sheets 2 — 20 as
requested.
10. Please make the following changes to plan sheet 2:
A Either fix or remove the R/W dimensioning for both major frontage
roadways.
The R/W dimensioning has been removed as requested.
B. Along the northern property line, at the northwest corner of the plat,
there is a new wood fence where the plans show a cyclone fence.
The fence has been revised to show as wood fence.
C. On this plan sheet and other sheets showing Road "D", label SE 89
Place (Private Road), located west of proposed Road "D`.
The information has been added to the plan sheets.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 5
11. Please make the following changes to plan sheet 3 and all other affected plan
sheets:
A Connect Roads "B" and "C" with a low speed curve (per KCRS 2.10A)
because they will never have a true intersection.
The low speed curve has been provided as requested.
B. Use a private roadway stub (per. the KCRS) behind the curb of the curve
to serve lots 5 and 6.
The private roadway stub has been added as requested and it will
serve lots 4 through 6. This private roadway stub will reside in a
new tract, Tract "E" that is designated as a joint use drive.
C. Add a plan note prohibiting direct access to 116th Ave NE, per Condition
la
The note has been added to plan sheet 3.
D. Fix the ownership inconsistency for Tract "A': In plan view it is labeled as
a "PAT" (Private Access Tract). However, in the `Tract Table" it says it is
listed as a public roadway owned by King County.
Tract "A" will be a Private Access Tract and the "tract Table" has
been revised to reflect this.
E Show a proposed construction design (on this sheet and all other
affected plan sheets) that will be compatible with short plat L04SO003
(currently waiting for approval). This design should include the following:
1) Show the design details of the temporary cul-de-sac proposed by
L04S0003.
2) Show details of the proposed work that will be required to remove
the off -site cul-de-sac and extend all of its curb, gutter and sidewalk
improvements to make a standard connection to this plat.
3) Show an alternative design for the temporary on -site cul-de-sac that
would be needed if the temporary cul-de-sac for L04SO003 isn't
constructed in time.
4) Match the on -site R/W lines to those of L04SO003 so they are not
offset
Mr. Ted Cooper, P.E.
February 14, 2006
Page 6
The design details of the temporary cul-de-sac proposed by short
plat L04S0003 have been added to this sheet. For further
information, see response to comment #8.
F. Add a public access easement for the required 5'-wide public path
through Tract "B" (connecting Road "A" to Road "B"). Show this pathway
and its easement here and on the roadway plans.
The 5 feet wide public access easement and pathway are shown as
requested.
G. Per Condition 9.a., from Lot 37 to the south, design Road "A" per urban
subaccess street standards. Please modify the other affected sheets too.
Road "A" has been revised as requested on all affected sheets.
H. Per Condition 9.a., provide adequate R1W for the northern curb return
where Road "A" connects to 120'h Ave SE.
As discussed in the meeting on January 31, 2006 and information
received in an email from Ted Cooper dated February 1, 2006, the
pavement radius design has been revised to be 25 feet with an 11
foot offset at the ECR station on 120th Ave SE and a 25:1 pavement
taper from the 11 foot offset (at the ECR) northward to the existing
western edge of pavement along 120th Ave SE.
12. Please provide the following requested by KCDOT Traffic:
A Provide channelization plans for the roadway improvements along the
frontages of both 116rt' Ave SE and 120« Ave SE. Roadway striping
should be as follows:
1) South of these proposed intersections, maintain the existing lane
widths along both existing roadway frontages using fog line striping.
This striping should not extend across proposed intersections or
their radius returns.
2) Striping for the proposed northern radius return of Road "D" should
extend from the end of the proposed curb to the existing edge of
lane on 116t'' Ave SE
3) Striping for the proposed northern radius return of Road "A" should
extend along this radius return to the existing edge of lane for 120"'
Ave SE.
Mr. Ted Cooper, P.F.
February 14, 2006
Page 7
The channelization plan has been provided for 116"' Avenue SE and
120"' Avenue SE on plan sheet 17.
B. Provide an illumination design/plan.
An illumination design/plan completed by Puget Sound Energy will
be provided shortly after this submittal.
C. Attempt to obtain additional R/W at the north side of the proposed
intersection of Road "D" with 116th Ave SE to construct the ultimate curb
return design here. !f R/W can't be obtained here, provide the following:
1) A letter stating that R1W can't be obtained here.
2) Locate all roadway improvements at least 1' away from the
neighboring property so they can be constructed and maintained.
Per comment #14.A, where Road "D" connects to 116"' Avenue SE,
the proposed northern curb return has been revised to stop within
the plat With this change, the pavement edge along the northern 35
foot radius is approximately 1 foot from the R/W on the north side.
Therefore, obtaining additional R/W is no longer necessary. In
addition, the roadway improvements have been revised to have 1
foot spacing to the neighboring property.
13. Please show the proposed final grading contours in all plan views of roadway
and drainage design plan sheets.
The proposed final grading contours have been provided as requested in all
plan views of roadway and drainage design plan sheets.
14. Please make the following changes to plan sheet 4:
A. Where Road "D" connects to 116th Ave NE, modify the proposed
northern concrete curb return so it ends within this plat
The proposed northern curb return has been revised as requested.
B. If R/W can be obtained, provide at least 1' of RIW width between the on -
site improvements and the adjacent property. Otherwise, move the
entrance to provide at least 1 ' of RIW here.
With the revision made per part A of this comment, the distance
between the onsite improvements and the R/W on the north side
has been revised and no additional R/W will be needed. For further
detail, see response to comment #12.C.2).
Mr. Ted Cooper, P.E.
February 14, 2006
Page 8
C. Show the 5'-wide public path through Tract 'B':
The 5 foot wide public path is shown as requested.
D. Add bollards (and their details per KCRS DWG NO. 5-013) across both
ends of the Tract `B" public path.
Removable bollards and bollard details have been added as
requested.
E Please label Road "B" in big letters in plan? view.
Road "B" has been labeled as requested.
15. Please add sidewalk ramps per KCRS DWG's 4-001, 4-002 and 4-003 to all plan
views at the following locations:
A The intersection of Road "D" and 116th Ave SE. Notice that only arterials
require two ramps on each curb return. For all curb ramps, specify that
transitions from rolled curbs to vertical curbs will occur within the ramps.
B. The intersection of Road "A" and 120th Ave SE
C. At both ends of the public access pathway through Tract "B':
D. Along the south side of Road "A" immediately across from the public
access pathway through Tract "B".
The sidewalk ramps have been added as requested. As discussed in the
January 31, 2006 meeting, a sidewalk ramp will be provided only on the
south end of the public access pathway through Tract "B". Also, an
additional detail sheet has been provided, plan sheet 12, which shows the
curb ramp details from KCRS DWG's 4-001, 4-002, and 4-003.
16. Please make the following changes to plan sheet 5:
A. Please label Road "A" in big letters in plan view.
Road 'W has been labeled as requested.
B. In "CURB FL TABLE 9" correct the offset distance. It can't be 9.33' It
must be at least the width of the southbound lane here.
The curb tables have been renumbered due to the addition of a low
speed curve at the intersection of Roads B and C. Curb Table #9
Mr. Ted Cooper, P.E.
February 14, 2006
Page 9
has been renumbered to #7 and the radius has been revised as
requested in comment #11.H.
C. In "CURB FL TABLE 10' correct the low point CB to CB#26.
As mentioned in the response above, Curb Table #10 has been
renumbered to #8 and the low point CB has been corrected.
D. Please remove the unnecessary Traffic approval block
The Traffic approval block has been removed as requested.
17. Please make the following changes to plan sheet 6.
A. Please label Tracts "A" and "C", including their roadway types, in big
letters in their plan views.
B. Add the required note from Examiner's Condition 9.i to the plan view of
the JUD shown in the Tract "C" detail.
C. Provide a 30'-minimum lane width around the cul-de-sac island as
required in KCRS DWG NO. 1-007.
Revisions for parts A and B of this comment have been incorporated in plan
sheet 6 as requested. For part C of this comment, the cul-de-sac island
has been removed as discussed in the meeting on January 31, 2006.
18. Please make the following changes to plan sheet 7:
A. Resolve the conflict between the proposed northern curb radius return of
116th Ave NE and the neighbors property. There should be at least a 1'-
distance between the back of the curb and the offsite property.
The conflict has been resolved as discussed in comments #12.C.2)
#14.A and #14.B.
B. Add a luminaire at the intersection of proposed Road "D" and 1106 Ave
SE, per KCRS 5.05. Provide its design details for KCDOT Traffic to review
and approve.
We have notified Puget Sound Energy and they will include this item
in their design.
C. Provide drainage collection and conveyance design for drainage that
will leave the proposed gutter line of 116"' Ave. SE near STA 106+40, RT.
Drainage may pond immediately south of this location in an area where
Mr. Ted Cooper, P.E.
February 14, 2006
Page i o
where there is no established conveyance system.
As discussed in the meeting on January 31, 2006, stormwater runoff
for this area will flow overland towards the existing depression that
runs parallel to the road, in the same direction as the road currently
drains to. This information has also been mentioned in the revised
Section 4 of the TIR.
D. Add a plan note to contact Henry Perrin of King County DOT (206-263-
6138) before changing any pavement markings or sign locations.
This note has been provided as requested.
E. Please label the existing roadway, SE 89 LN (Private Road), located
across from the proposed 116`h Ave. SE entrance.
The existing roadway has been labeled as requested.
F. Specify that existing power poles and hydrants which require relocation
shall be placed behind the sidewalk
This information has been added as requested.
19. Specify all sawcuts in existing pavement to be at the existing fog line (or, if
necessary, within a traveled lane). In all areas where the pavement is to be
widened, sawcuts should not be made within the shoulders because shoulders
are not typically designed to carry the same traffic loading as traveled lanes.
This information has been specified as requested.
20. Please make the following changes to plan sheets 8 & 9.
A For simplicity and clarity, please notice that plan sheets 8 and 9
probably could be combined because they duplicate many design
details.
Plan sheets 8 and 9 require a different scale, and as discussed in
the meeting on January 31, 2006, they will not be combined.
B. Add for the proposed abandonment and relocation of the existing
driveway near the proposed intersection of Road "AU 120th Ave SE
Specify that this must be coordinated with the owner of this driveway.
Please see response to comment #3.E.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 11
C. Please address the following problems concerning the proposed
drainage design downstream of the pond:
1) A drainage collection/conveyance system and its details must be
provided for surface flows along the western side of 120'h Ave SE,
from the site to SE 192"d Street
As discussed in the meeting on January 31, 2006, the ditch along
the west side of 1200 Avenue SE will be restored to the original
conditions and an existing drainage ditch restoration detail has
been provided on plan sheet 16 to describe the approximate
layout of the existing ditch shape and structure.
2) Grading contours and/or ditch sections must be provided where this
work is proposed.
Grading contours are shown on plan sheet 15. An approximate
existing ditch section is shown on plan sheet 16.
3) Remove the "Beehive"/ "birdcage" grates from all CB's in the R/W (i.e.,
CB# 27, CB #30 & CB #31. We have included a dome grate detail that
you may want to use for CB #31 because the leaves and other debris
I observed here are likely to plug a standard grate.
The plans have been revised to show and call out a dome grate
for CB #27 and CB #30 that will be located in the roadside ditch
on the west side of 120t' Avenue SE.
4) Add an inlet pipe stub to CB# 27 collect upstream ditch drainage.
The inlet pipe has been provided as requested.
5) Notice that the following significant benefits would result from
relocating CB#29 to the proposed gutter line at about STA 203+13
LT :
a) CB #30 would not be required the pipe run from CB #29 to CB
#31 would not exceed our maximum 300' iong limit
b) This CB relocation would also reduce the possible ponding and
erosion near the southern end of the proposed sidewalk ramp
(near STA 203+24, LT).
c) Decreased backwater effects on the pond.
d) It would be possible to install the pond's gravity drain pipe, as
required by SWDM item 7 on page 6-75).
Mr. Ted Cooper, P.E.
February 14, 2006
Page 12
21
The suggestion above will certainly have significant benefits
to the project; therefore CB #29 has been relocated. The
pond gravity drain pipe could not be installed because of the
calculated in and out invert elevations of the control structure.
The detention pond was designed in KCRTS with a Stage 0
Elevation of 496.25 feet and locations of the three orifices are
based on this elevation. This elevation of 496.25 feet is
above the pond outlet elevation of 495.25 feet, therefore a
gravity drain is not possible. Per SWDM item 7 on page 6-75,
"a gravity drain for maintenance shall be provided if grade
allows", and as clarified above, the grade that the detention
pond was designed at does now allow a gravity drain.
6) For all existing pipes that will connect to CB #32 provide the pipe
data 0 e., materials, diameters, invert elevations, slopes).
This information has been provided as requested.
D. Add cross sections (extending from the roadway centerline to the
western R/W line of 120'h Ave SE) to describe the proposed construction
at about STA 201 +80 and about STA 203+80.
Per discussions in the meeting on January 31, 2006, the
approximate section shown on sheet GR-02 is adequate.
Please make the following changes to plan sheet 10:
A Use the control structure design in SWDM Fig. 5.3.4.A (page 5-40)
Notice the required solid lid (i.e., no birdcage is allowed) and vertical bar
grate through its side.
The control structure has been revised as requested.
B. Notice that the following can be substituted for a rock -lined pond
emergency overflow spillway.-
1) "Birdcage" overflow structure, per Fig 5.3.1.0 on page 5-28.
2) Paved asphalt overflow spillway which can also serve as an access
road to the control structure (see page 5-27).
We have evaluated the use of both additional options and have
determined that the current rock -lined pond emergency overflow
spillway is adequate.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 13
C. install a gravity drain pipe in the pond, as required by SWDM item 7 on
page 6-75). Also see page 6-100.
See answer to comment #20.C.5)d).
D. Add two perpendicular cross sections that completely describe the
pond's overflow spillway dimensions and materials.
The pond overflow spillway detail on plan sheet 14 has been revised
and an additional cross section has been provided as requested.
22. Please make the following changes to plan sheet 11:
A. in all roadway sections, provide at least 1'of R/W behind all curbs and
sidewalks (per KCRS roadway section drawings).
The roadway sections have been revised as requested.
B. In the "!VOTES FOR TYPICAL ROADWAY SECTIONS'; remove note 7
(County Engineer pavement approval requirement).
The note has been removed.
C. in the notes for Tract "C'; remove note 2 (County Engineer pavement
approval required).
The note has been removed.
D. Remove the non-standard "ROLLED CURB SECTION DRIVEWAY" details
because driveway cuts are not used in rolled curb, per the KCRS.
The detail has been removed.
E Please make the following changes to the cross section for 116'n Ave
SE
1) Provide an arterial pavement design per KCRS 4.03.
The arterial pavement design has been provided as requested.
2) Show the entire roadway width, its crown and the required overlay
that will cover the full width of the roadway.
This information has been provided as requested.
3) Label and dimension the location of the existing roadway centerline.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 14
This information has been provided as requested.
4) Dimension the proposed pavement widening so it specifies a 22'-
wide lane adjacent to the site.
This information has been provided as requested. The proposed
pavement widening is 28'-wide lane adjacent to the site.
5) Please notice that there are no existing roadside ditches along either
side of this roadway here.
The roadside ditch along the west side of 116t' Avenue SE has
been removed. There is a slight existing drainage ditch or
depression along the east side of 116t' Avenue SE.
F. Please make the following changes to the cross section for 120`h Ave
SE:
1) Show the entire roadway width, its crown and the required overlay
that will cover the full width of the roadway.
This information has been provided as requested.
2) Label and dimension the location of the existing roadway centerline.
This information has been provided as requested.
3) Dimension the proposed pavement widening so it specifies a 16'-
wide lane adjacent to the site.
This information has been provided as requested.
4) Not Used
G. Please make the following changes to the cross section for "ROAD A
(SUBACCESS)".
1) Begin the stationing offsite at the point where onsite and offsite
improvements will connect, within Short Plat L03S0003. Curbs,
gutters and sidewalks for these two properties must connect.
See response for comments #8 and #11.E.
2) Use the 24'pavement width (with 12'-lane widths) required for urban
subaccess roadways, in KCRS 2.03H and 2.031.
Mr. Ted Cooper, RE.
February 14, 2006
Page 15
The pavement width has been increased to 24 feet.
3) Correct the R/W width, dimensions and sidewalk location in note 2
so they are consistent with the other plan sheets.
The information has been corrected as requested.
H. Please make the following changes to the cross section for "ROAD A
(SLlBACCESS 112 STREET)":
1) Correct the stationing so it is a continuation of the stationing for the
full -width street.
The stationing for Road "A" is continuous.
2) Modify the design to comply with KCRS 2.07B.4.
The half street improvements for Road "A" will be constructed as
shown on the cross-section on sheet 11 to slope at two percent
towards the south curb line. This layout will assure proper
drainage, bank stability, and traffic safety.
L Add the following plan note to the cross sections of 116th Ave SE and
120"' Ave SE.'
Plan Note. Per KCRS Section 4.01 F, a 1 inch full width overlay shall be
required. If existing road section does not meet KCRS requirements, all
appropriate repairs to the existing subgrade, base material, surfacing and
pre -level may be required prior to placing the overlay. The overlay may
be waived only upon written request and after an evaluation of pavement
conditions and/or channelization requirements has been completed and
approved by the County Road Engineer or Development Engineer.
The plan note has been provided as requested.
J. On the plans, add our attached detail for the installation of through -curb
inlets in rolled curbs.
The attached detail has been added as requested.
23. Please make the following changes to plan sheet 12:
Plan sheet 12 has been renumbered to 13 due to adding a sheet as
mentioned in comment #15 and revised to show curb ramp details.
Mr. Ted Cooper, P.E.
February 14, 2006
Page 16
A. Revise the control structure to comply with the SWDM requirements in
Fig. 5.3.4A on page 5-40. Notice the solid locking lid and vertical bar
grate.
The control structure has been revised.
B. Notice that CB stations and offsets can be specified to only the nearest
foot
The Catch Basin Curb Offset Detail shows the relationship between
the flowline and the center of structure.
24. On plan sheets 12 and 15, replace all of the "King County Standard Plan Notes"
with those in SWDM Reference 7.a These notes need to be up-to-date and
should not be reworded, renumbered or omitted. You can add notes to the ends
of each of these lists.
Plan sheets 12 and 15 have been renumbered to 13 and 16 respectively and
the notes have been replaced as requested.
25. Please make the following changes to plan sheet 13:
Plan sheet 13 has been renumbered to 14.
A. Modify all curb ramp details so they comply with the detail we have
attached with this list.
The curb ramp details have been updated as requested.
B. Specify where you propose to use the detail labeled nCONCRETE
VERTICAL CURB" because it is probably only suitable for use around the
cul-de-sac island.
The detail has been removed from the plan set because the cul-de-
sac island has also been removed.
26. Please make the following changes to plan sheet 14:
Plan sheet 14 has been renumbered to 15.
A. Provide a temporary drainage collection and conveyance system that
will be used before all permanent pipes, paving and CB's are installed.
Show a design with details that clearly describe what is proposed
(instead of a vague conceptual design).
s
Mr. Ted Cooper, P.E.
February 14, 2006
Page 17
Interceptor ditches will provide conveyance until the CB's are
installed. The plan sheet has been revised to show the interceptor
ditches clearly.
B. Only show those parts of the permanent drainage system that will be
required for the TESC plan.
For clarity, the proposed storm drainage system has been revised in
this sheet to show light and in the background. Proposed sediment
barrier symbols are shown to be provided once catch basins are
installed.
C. Since there is no defined drainage path or ditch along the 1161'' Ave SE
frontage, provide a TESC design that works here.
Drainage paths have been added along 116"' Avenue SE to guide
runoff.
D. Show additional silt fence along all clearing limits that are adjacent to
this site's property boundaries.
Additional silt fence has been provided as requested.
E. Show inflow and downstream conveyance details for the sediment pond
and the sediment trap.
This information has been provided as requested.
F. Add a construction sequence with the first step being to schedule a pre -
construction conference with the DDES site inspector by calling (206)
296-6642.
The construction sequence has been provided on plan sheet 14 with
the first step as requested.
G. Add a plan note specifying that access must be maintained to the
existing offsite driveways along 11 Wh Ave SE and 120"' Ave SE.
The plan note has been added to the notes on this sheet as Note 3.
H. Don't show construction entrance rock (quarry spalls) overlapping the
existing offsite driveway along 120rh Ave SE.
The construction entrance from 120' Avenue SE has been revised to
not show rock overlapping the existing offsite driveway.
Mr. Ted Cooper, P.E.
February 14, 2006
Page I a
27. On plan sheets 14 and 15, remove the note (and detail) requiring ditch
restoration to original conditions along 120'h Ave SE. This note and detail don't
match either the existing conditions or the necessary proposed work here. Along
the 120th Ave SE frontage a new ditch design (with a 3:1 maximum slope
adjacent to the roadway) will be required.
Plan sheets 14 and 15 have been renumbered to plan sheets 15 and 16
respectively. As discussed in the meeting on January 31, 2006, the ditch
along the west side of 120t' Avenue SE will be restored to the original
conditions and the note and ditch detail are only approximate
representations of the shape and structure of the ditch.
28. Please put the street trees and their details on the engineering plan sheets
instead of the landscaping sheets. Street trees are part of the engineering review
and bonding.
The street trees have been designed by a landscaped architect and the plan
sheets showing street trees needs to be stamped and signed by the same
landscape architect Therefore, the street trees will remain on the
landscaping sheets and be submitted for engineering review together with
the engineering plan sheets.
If you have any questions during your review of this submittal, please call me at (253) 838-
6113.
Sincerely,
ESM CONSULTING ENGINEERS, L.L.C.
LAURA COCIASU, P.E.
Project Engineer
CC: Joe Singh, JPS Holdings, LLC.:
1 copy of submittal set
Kim Claussen, DDES Planning Department:
10 Sets - Landscaping Plans (Sheets 18 - 20) and
10 copies - Landscape Bond Quantity Worksheet Form
Cooper, Ted
From:
Cooper, Ted
Sent:
Thursday, January 26, 2006 3:09 PM
To:
Laura G Cociasu (laura@esmcivil.com)
Cc:
Bergam, Mark
Subject:
Jessie Glen (L05SR054) - Engineering Review List #1
Attachments: L05SR054 Jessie Glen - List #1.doc; SigTreePlatDirectionsCAO.doe;
SigTreeExPlantBond.doc; Dome grate detail.pdf; ADA_Ramps.pdf; Thru-Curb Inlet in Rolled
Curb.pdf
Hi Laura,
Please notice that I couldn't finish and send these comments because I was out of the office unexpectedly yesterday.
I have finished reviewing the plans and TIR for the Jessie Glen Plat. My comments and Bruce Engel's Tree Retention
comments are in the attached documents below. I've also included some details in pdf files.
L05SR054 ]essie
Glen - List #1...
SigTreePlatDirection
sCAO.doc (...
Thru-Curb Inlet in
Rolled Curb...
SigTreeExPlantBond
.doc (20 KB)...
Dome grate
detail.pdf (22 KB)
ADA_Ramps. pdf
(241 KB)
We usually find that it save both of us a significant amount of time by meeting to discuss items on this list. Please contact
me if you want to meet to discuss this list.
Please feel free to contact me if you have any questions.
Sincerely,
Ted Cooper, P.E.
Engineer 11
Phone: (206) 296-7163
FAX: (206) 296-6613
E-Mail: ted.cooper@metrokc.gov
M.S. OAK-DE-0100
Jessie Glen Plat 1
Project No. L0SP0005 (Activity No. L05SR054)
Plan Review #1
January 26, 2006
1. Please submit a recreation space plan package to Kim
Claussen (DDES Planner) for review and approval. Contact Kim
at 206-296-7167 for the required number of copies and fees.
2. Please address the following Significant Tree Retention plan
comments from Bruce Engell (206-296-6782):
A. The plat shows it was vested in 2005, and thus subject
to the CAO standards. The significant tree retention
code (KCC 21A.38.230) was replaced by KCC 16.82.156 on
January 1, 2005. The applicant will need to
recalculate the significant trees to be retained using
10 trees per acre or 5% of said trees, whichever is
greater (refer to the files listed immediately below).
B. Two files (1. Significant tree plan guidelines & 2.
Bonding for Significant trees) will be sent with this
review list document. Please use these guidelines and
submit the bonding forms with the revised significant
tree plan.
3. Please make the following changes to the TIR:
A. Please include a comments stating how each of the
Hearing Examiner's Conditions has been addressed.
B. Please provide a backwater analysis downstream of the
proposed pond. we are concerned that the proposed pond
outlet elevation appears to be below the flow line of
the existing downstream drainage system to at least SE
192"d Street. Make sure that enough of the existing
downstream drainage system is analyzed to make this
backwater analysis accurate.
C.
Jessie Glen Plat 2
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #1
January 26, 2006
D. Please provide two different basin maps and their
corresponding analyses. One must address the existing
conditions and the other must address the developed
conditions. In your calculations, remember to address
areas that will bypass the pond (e.g., backs of yards
along Road "A".
E. Add a copy of the permission letter for the relocation
and abandonment of the existing driveway where proposed
Road "A" will intersect 120th Ave SE.
F. Add an arterial pavement design per KCRS 4.03 for 116th
Ave SE.
G. Provide up-to-date bond quantities sheets.
4. Please notice that our Internet site at
http://www.metarokc.gov/ddes/luad/cad.htm can be used to
download current King County drawings and standards.
S. Add the Hearing Approval Examiner's Conditions to the plans.
6. Provide a Postmaster approved plan of mailboxes that are
proposed or relocated (i.e., neighbors mailboxes).
7. Please make the following changes to plan sheet 1:
A. Add the Project No. L05P0005, Activity No. L0SSR054 and
SWM Variance No. L0SV0052 to the title block:
B. Fill in the answer to the "YES/NO" question asking
whether or not this is an erosion sensitive area site.
C. Add a plan note in bold large letters stating the
following, "COORDINATE THE ROADWAY AND SIDEWALK
IMPROVEMENTS WITH THOSE OF SHORT PLAT L04S0003"
Jessie Glen Plat 3
Project. No. L05P0005 (Activity No. L05SR054)
Plan Review 41
January 26, 2006
D. Add the plat's 5-year expiration date of 10-25-2010.
8. On the plans, show details of the proposed construction for
short plat L04S0003. These details (i.e., dimensions of all
improvements and the R/W width) must match those proposed
onsite. The following problems must be addressed acceptably
to make these two projects compatible:
A. Their R/W centerlines and R/W widths must match.
B. The pavement widths and roadway crowns must match.
C. If these two projects are not constructed at the same
time, the first one will have to construct a temporary
cul-de-sac. Later, when the second one is constructed,
it will have to remove this cul-de-sac and finish the
roadway improvements connecting the two projects. This
construction sequence needs to be described on the
plans.
9. Please modify the plan approval blocks on all plan sheets
except sheet 1 so there is more vertical space for DDES
staff approval signatures and dates of approval.
10. Please make the following changes to plan sheet 2:
A. Either fix or remove the R/W dimensioning for both
major frontage roadways.
B. Along the northern property line, at the northwest
corner of the plat, there is a new wood fence where the
plans show a cyclone fence.
C. On this plan sheet and other sheets showing Road "D",
label SE 89 Place (Private Road), located west of
proposed Road "D".
Jessie Glen Plat 4
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #1
January 26, 2006
11. Please make the following changes to plan sheet 3 and all
other affected plan sheets:
A. Connect Roads "B" and "C" with a low speed curve (per
KCRS 2.10A) because they will never have a true
intersection.
B. Use a private roadway stub (per the KCRS) behind the
curb of the curve to serve lots 5 and 6.
C. Add a plan note prohibiting direct access to 116th Ave
NE, per Condition 13.
D. Fix the ownership inconsistency for Tract "A". In plan
view it is labeled as a "PAT" (Private Access Tract).
However, in the "Tract Table" it says it is listed as a
public roadway owned by King County.
E. Show a proposed construction design (on this sheet and
all other affected plan sheets) that will be compatible
with short plat L04S0003 (currently waiting for
approval). This design should include the following:
1) Show the design details of the temporary cul-de-
sac proposed by L04S0003.
2) Show details of the proposed work that will be
required to remove the off -site cul-de-sac and
extend all of its curb, gutter and sidewalk
improvements to make a standard connection to this
plat.
Show an alternative design for the temporary on -
site cul-de-sac that would be needed if the
temporary cul-de-sac for L04SO003 isn't
constructed in time.
Jessie Glen Plat 5
Project No. L05P0005 (Activity No. L05SR054)
Plan Review 41
January 26, 2006
4) Match the on -site R/W lines to those of L04S0003
so they are not offset.
F. Add a public access easement for the required 5'-wide
public path through Tract "B" (connecting Road "A" to
Road "B"). Show this pathway and its easement here and
on the roadway plans.
G. Per Condition 9.a., from Lot 37 to the south, design
(�� . {��� Road "A" per urban subaccess street standards. Please
Z.-,�'��� modify the other affected sheets too.
\ H. Per Condition 9.a., provide adequate R/W for the
northern curb return where Road "A" connects to 120tn
Ave SE.
12. Please provide the following requested by KCDOT Traffic:
A. Provide channelization plans for the roadway
improvements along the frontages of both 116t" Ave SE
and 120th Ave SE. Roadway striping should be as
follows:
1) South of these proposed intersections, maintain
the existing Lane widths along both existing
roadway frontages using fog line striping. This
striping should not extend across proposed
intersections or their radius returns.
2) Striping for the proposed northern radius return
of Road "D" should extend from the end of the
proposed curb to the existing edge of lane on
116th Ave SE.
3) Striping for the proposed northern radius return
of Road "A" should extend along this radius return
to the existing edge of lane for 120th Ave SE.
Jessie Glen Plat 6
Project No. L05P0005 (Activity No. L05SR054)
Plan Review 41
January 26, 2006
B. Provide an illumination design/plan.
C. Attempt to obtain additional R/W at the north side of
the proposed intersection of Road "D" with 116th Ave SE
to construct the ultimate curb return design here. If
R/W can't be obtained here, provide the following:
1) A letter stating that R/W can't be obtained here.
2) Locate all roadway improvements at least 1' away
from the neighboring property so they can be
constructed and maintained.
13. Please show the proposed final grading contours in all plan
views of roadway and drainage design plan sheets.
14. Please make the following changes to plan sheet 4:
A. Where Road "D" connects to 116th Ave NE, modify the
proposed northern concrete curb return so it ends
within this plat.
B. If R/W can be obtained, provide at least 1' of R/W
width between the on -site improvements and the adjacent
property. Otherwise, move the entrance to provide at
least 1' of R/W here.
C. Show the 5'-wide public path through Tract "B".
D. Add bollards (and their details per KCRS DWG NO. 5-013)
across both ends of the Tract "B" public path.
E. Please label Road "B" in big letters in plan view.
15. Please add sidewalk ramps per KCRS DWG's 4-001, 4-002 and 4--
003 to all plan views at the following locations:
A. The intersection of Road "D" and 116th Ave SE. Notice
that only arterials require two ramps on each curb
Jessie Glen Plat 7
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #1
January 26, 2006
return. For all curb ramps, specify that transitions
from rolled curbs to vertical curbs will occur within
the ramps.
B. The intersection of Road "A" and 120th Ave SE
C. At both ends of the public access pathway through Tract
„13,l
D. Along the south side of Road "A", immediately across
from the public access pathway through Tract "B".
16. Please make the following changes to plan sheet 5:
A.
Please label Road
"A" in big
letters in plan view.
B.
In "CURB FL TABLE
9" correct
the offset distance. It
can't be 9.33'. It
must be at
least the width of the
southbound lane here.
C.
In "CURB FL TABLE
10" correct
the low point CB to
CB#26.
D.
Please remove the
unnecessary
Traffic approval block.
17. Please make the following changes to plan sheet 6:
A. Please label Tracts "A" and "C", including their
roadway types, in big letters in their plan views.
B. Add the required note from Examiner's Condition 9.i to
the plan view of the JUD shown in the Tract "C" detail.
C. Provide a 301-minimum lane width around the cul-de-sac
island as required in KCRS DWG NO, 1-007.
18. Please make the following changes to plan sheet 7:
A. Resolve the conflict between the proposed northern curb
radius return of 116th Ave NE and the neighbor's
19
Jessie Glen Plat 8
Project No. L05P0005 (Activity No. L05SR054)
Plan Review 41
January 26, 2006
property. There should be at least a 11-distance
between the back of the curb and the offsite property.
B. Add a luminaire at the intersection of proposed Road
"D" and 116th Ave SE, per KCRS 5.05. Provide its design
details for KCDOT Traffic to review and approve.
Provide drainage collection and conveyance design for
drainage that will leave the proposed gutter line of
116th Ave. SE near STA 106+40, RT. Drainage may pond
immediately south of this location in an area where
there is no established conveyance system.
D. Add a plan note to contact Henry Perrin of King County
DOT (206-263-6138) before changing any pavement
markings or sign locations.
E. Please label the existing roadway, SE 89 LN (Private
Road), located across from the proposed 116th Ave. SE
entrance.
F. Specify that existing power poles and hydrants which
require relocation shall be placed behind the sidewalk.
Specify all sawcuts in existing pavement to be at the
existing fog line (or, if necessary, within a traveled
lane). In all areas where the pavement is to be widened,
sawcuts should not be made within the shoulders because
shoulders are not typically designed to carry the same
traffic loading as traveled lanes.
20. Please make the following changes to plan sheets 8 & 9:
A. For simplicity and clarity, please notice that plan
sheets 8 and 9 probably could be combined because they
duplicate many design details.
Jessie Glen Plat 9
Project No. L05P0005 (Activity No. L05SR054)
Plan Review 41
January 26, 2006
B. Add for the proposed abandonment and relocation of the
existing driveway near the proposed intersection of
Road "A" 120th Ave SE. Specify that this must be
coordinated with the owner of this driveway.
C. Please address the following problems concerning the
proposed drainage design downstream of the pond:
1) A drainage collection/conveyance system and its
details must be provided for surface flows along
the western side of 120th Ave SE, from the site to
SE 192nd Street.
2) Grading contours and/or ditch sections must be
provided where this work is proposed.
3) Remove the "Beehive"/ "birdcage" grates from all
CB's in the R/W (i.e., CB# 27, CB 430 & CB #31. We
have included a dome grate detail that you may
want to use for CB 431 because the leaves and
other debris I observed here are likely to plug a
standard grate.
4) Add an inlet pipe stub to CB# 27 collect upstream
ditch drainage.
5) Notice that the following significant benefits
would result from relocating CB#29 to the proposed
gutter line at about STA 203+13 (LT):
a) CB #30 would not be required the pipe run
from CB 429 to CB #31 would not exceed our
maximum 300'-long limit.
b) This CB relocation would also reduce the
possible ponding and erosion near the
southern end of the proposed sidewalk ramp
(near STA 203+24, LT).
Jessie Glen Plat 10
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #1
January 26, 2006
c) Decreased backwater effects on the pond.
d) it would be possible to install the pond's
gravity drain pipe, as required by SWDM item
7 on page 6-75).
6) For all existing pipes that will connect to CB 432
provide the pipe data (i.e., materials, diameters,
invert elevations, slopes).
D. Add cross sections (extending from the roadway
centerline to the western R/W line of 120th Ave SE) to
describe the proposed construction at about STA 201+80
and about STA 203+80.
21. Please make the following changes to plan sheet 10:
A. Use the control structure design in SWDM Fig. 5.3.4.A
(page 5-40). Notice the required solid lid (i.e., no
birdcage is allowed) and vertical bar grate through its
side.
B. Notice that the following can be substituted for a
rock -lined pond emergency overflow spillway:
1) A "Birdcage" overflow structure, per Fig 5.3.1.0
on page 5-28.
2) A paved asphalt overflow spillway which can also
serve as an access road to the control structure
(see page 5-27).
C. Install a gravity drain pipe in the pond, as required
by SWDM item 7 on page 6-75). Also see page 6-100.
D. Add two perpendicular cross sections that completely
describe the pond's overflow spillway dimensions and
materials.
Jessie Glen Plat 11
Project No. L0SP0005 (Activity No. L05SR054)
Plan Review #1
January 26, 2006
22. Please make the following changes to plan sheet 11:
A. In all roadway sections, provide at least 1'of R/W
behind all curbs and sidewalks (per KCRS roadway
section drawings).
S. In the "NOTES FOR TYPICAL ROADWAY SECTIONS", remove
note 7 (County Engineer pavement approval requirement).
C. In the notes for Tract "C", remove note 2 (County
Engineer pavement approval required).
D. Remove the non-standard "ROLLED CURB SECTION DRIVEWAY"
details because driveway cuts are not used in rolled
curb, per the KCRS.
E. Please make the following changes to the cross section
for 116th Ave SE:
1) Provide an arterial pavement design per KCRS 4.03.
2) Show the entire roadway width, its crown and the
required overlay that will cover the full width of
the roadway.
3) Label and dimension the location of the existing
roadway centerline.
4) Dimension the proposed pavement widening so it
specifies a 22'-wide lane adjacent to the site.
5) Please notice that there are no existing roadside
ditches along either side of this roadway here.
F. Please make the following changes to the cross section
for 120th Ave SE:
1) Show the entire roadway width, its crown and the
required overlay that will cover the full width of
the roadway.
2) Label and dimension the location of the existing
roadway centerline.
Jessie Glen Plat 12
Project No. L05P0005 (Activity No. I,05SR054)
Plan Review ##1
January 26, 2006
3) Dimension the proposed pavement widening so it
specifies a 16'-wide lane adjacent to the site.
m
G. Please make the following changes to the cross section
for "ROAD A(SUBACCESS)":
1) Begin the stationing offsite at the point where
onsite and offsite improvements will connect,
within Short Plat L03S0003. Curbs, gutters and
sidewalks for these two properties must connect.
2) Use the 24'pavement width (with 12'-lane widths)
required for urban subaccess roadways, in KCRS
2.03H and 2.03I.
3) Correct the R/W width, dimensions and sidewalk
location in note 2 so they are consistent with the
other plan sheets.
H. Please make the following changes to the cross section
for "ROAD A(SUBACCESS 1/2 STREET)":
1) Correct the stationing so it is a continuation of
the stationing for the full -width street.
2) Modify the design to comply with KCRS 2.079.4.
I. Add the following plan note to the cross sections of
116th Ave SE and 12 0th Ave SE -
Plan Note: Per KCRS Section 4.01F, a 1 inch full width
overlay shall be required. If existing road section does
not meet KCRS requirements, all appropriate repairs to the
existing subgrade, base material, surfacing and pre -level
may be required prior to placing the overlay. The overlay
may be waived only upon written request and after an
evaluation of pavement conditions and/or channelization
requirements has been completed and approved by the County
Road Engineer or Development Engineer.
Jessie Glen Plat 13
Project No. L05P0005 (Activity No. L05SR054)
Plan Review #1
January 26, 2006
J. On the plans, add our attached detail for the
installation of through -curb inlets in rolled curbs.
23. Please make the following changes to plan sheet 12:
A. Revise the control structure to comply with the SWDM
requirements in Fig. 5.3.4A on page 5-40. Notice the
solid locking lid and vertical bar grate.
B. Notice that CB stations and offsets can be specified to
only the nearest foot.
24. On plan sheets 12 and 15, replace all of the "King County
Standard Plan Notes" with those in SWDM Reference 7.B. These
notes need to be up-to-date and should not be reworded,
renumbered or omitted. You can add notes to the ends of each
of these lists.
25. Please make the following changes to plan sheet 13:
A. Modify all curb ramp details so they comply with the
detail we have attached with this list.
B. Specify where you propose to use the detail labeled
"CONCRETE VERTICAL CURB" because it is probably only
suitable for use around the cul-de-sac island.
26. Please make the following changes to plan sheet 14:
A. Provide a temporary drainage collection and conveyance
system that will be used before all permanent pipes,
paving and CB's are installed. Show a design with
details that clearly describe what is proposed (instead
of a vague conceptual design).
Jessie Glen Plat 14
Project No. LOSP0005 (Activity No. L05SR054)
Plan Review #1
January 26, 2006
B. Only show those parts of the permanent drainage system
that will be required for the TESL plan.
C. Since there is no defined drainage path or ditch along
the 116th Ave SE frontage, provide a TESL design that
works here.
D. Show additional silt fence along all clearing limits
that are adjacent to this site's property boundaries.
E. Show inflow and downstream conveyance details for the
sediment pond and the sediment trap.
F. Add a construction sequence with the first step being
to schedule a pre -construction conference with the DDES
site inspector by calling (206) 296-6642.
G. Add a plan note specifying that access must be
maintained to the existing offsite driveways along
116th Ave SE and 120th Ave SE.
H. Don't show construction entrance rock (quarry spalls)
overlapping the existing offsite driveway along 120th
Ave SE.
27. On plan sheets 14 and 15, remove the note (and detail)
requiring ditch restoration to original conditions along
120th Ave SE. This note and detail don't match either the
existing conditions or the necessary proposed work here.
Along the 120th Ave SE frontage a new ditch design (with a
3:1 maximum slope adjacent to the roadway) will be required.
28. Please put the street trees and their details on the
engineering plan sheets instead of the landscaping sheets.
Street trees are part of the engineering review and bonding.
_0 N...S_ll_L U_N._f E N 0 l N. E. E R
September 21, 2005 'D5
Jim Sanders % Vt,'AY
King County Department of Development ar
Land Use Services Division - Engineering R
900 Oakesdale Ave. SW
Renton, WA 98055-1219
RE. Jessie Glen Request for Concurrer 0�
Dear Mr. Sanders:
On behalf of JPS Holdings, LLC., ESM Consulting Engineers, L.L.C. is requesting King
County DDES to perform engineering review for the proposed Jessie Glen development
prior to Preliminary Plat approval. We acknowledge that the County's Public Hearing on
the Jessie Glen Preliminary Plat may result in revisions to the Preliminary Plat.
We are requesting to submit construction design plans based on the Preliminary Plat with
the understanding that the final plat conditions may require changes to these construction
plans.
Please give me a call if you have any comments or questions.
Sincerely,
ESM CONSULTING ENGINEERS, LLC.
LAURA COCIASU, P.E.
Project Engineer
cc: Pete Dye - King County DDES Land Use Services Division - Engineering Review
Joe Singh, JPS Holdings, L.L.C.
1+esm8lengrlesm-johs111 W00110051documenticoncurrentreview.doc
33915 1st Way soulh Tel 1253i 83e 6113 Bothell 1425) 415 6144 .. ,i: Fngincurinu, Laid P1 inning
Suite 200 Fax 12531 836 7104 www.esmcivii.corn rojecl t-larIri1'.1 Puhl ,-. V"❑rk�.
I
Federal Way. WA 98003 Toll Free i800} 345 5694 _.� :eyii�-_: La•i dseapc Arc h i �c:l.ii
Cooper, Ted
From: Cooper, Ted
Sent: Wednesday, January 04, 2006 10:53 AM
To: Laura G Cociasu (Iaura@esmcivil.com)
Subject: Jessie Glen Plat (Activity # L055R054) - Road "A" vertical alignment request
Hello Laura,
This e-mail documents my request by phone (today) for the vertical alignment information for Road "A" on plan sheet 5.
Please send 2-copies of sheet 5 with this missing information on it.
Please feel free to contact me if you have any questions.
Sincerely,
Ted Cooper, P.E.
Engineer 11
Phone: (206) 296-7163
FAX: (206) 296-6613
E-Mail: ted.cooper@metrokc.gov
M.S. OAK-DE-0100
January 24, 2005
Mr. Ted Cooper, P.EE
King County DDES
Land Use Services Division
900 Oaksdale Avenue SW
Renton WA 98055-1219
Re: Jessie Glen
Application No. L05P0005
Dear Mr. Cooper;
Job No. 1166-001-005
RECEIVED
JAN 2 6 2006
KING COUNTY
1__ANP W— IFIRVICES
On November 3, 2005 Pete Dye sent Mr. Joe Singh at JPS Holdings, L.L.C. a letter
regarding the Permit Fee Estimate for the proposed Jessie Glen development. As you
know, Mr. Singh has already provided a check for $17,000 to the County. Included in this
letter was a request for additional information. The requested additional information is
listed below in items A) through G) with our responses in bold.
A) Illumination Plans required per KCRS 5.05
Illumination Plans are currently being designed by Puget Sound Energy and
will be submitted as soon as the design is completed.
B) Pavement design for arterials per KCRS 4.03
The pavement design for 116"' Avenue SE arterial will be included in the
second submittal of the construction plan set that will incorporate the King
County DDES comments.
C) TIR Section 1 - Summary and/or analysis of BMA's (Drainage Manual Chapter 5=2)
The requested summary and/or analysis will be included in the second
submittal of the Technical Information Report that will incorporate the King
County DDES comments.
D) TIR Section 2 - Plat conditions with applicant responses
On behalf of JPS Holdings, LLC., ESM Consulting Engineers, LLC. is
submitting with this letter our responses to the conditions for final plat
approval in the Hearing Examiner's Report and Decision dated October 20,
2005 for the preliminary plat of Jessie Glen, application number 11-051130005.
The original conditions are shown in italics with our responses in bold.
E) TIR Section 4 - Evaluation of enhanced water quality (Drainage Manual Page 1-60)
The enhanced water quality standard is required for development that
exceeds 8 units per acre when considering lot area only. The proposed
Jessie Glen development has 49 hots in 6.57 acres lot area. Therefore, the
proposed development with 7.46 units per acre will not require an enhanced
water quality standard.
720 South 3481h Street
Tel (253) 838 6113
Bothell 1425) 415 6144
F"J ",,,r i,:
and r;
Federal Way. WA 98003
Fax (253) 838 7104
Toll Free (800) 345 5694
' h-+; -rr --� )-
'L L I( Vk-I f=_
www.esmcivil.cam
a-. r. ,'12 ":j
_a)i ds(.,; l;e
Mr. Ted Cooper, P.E.
January 24, 2006
Page 2
F) TIR Section 7 - Pollution plan (Drainage Manual pg. 2-28)
Attached is the Stormwater Pollution Prevention Plan (SWPPP) for the
proposed Jessie Glen project that is referenced in Section 7 of the Technical
Information Report
G) TIR Section 9 - Bond quantity sheets
The requested bond quantity sheets will be included in the second submittal
of the Technical Information Report that will incorporate the King County
DDES comments.
RESPONSES TO CONDITIONS FOR FINAL PLAT APPROVAL IN THE HEARING
EXAMINER'S REPORT AND DECISION DATED OCTOBER 20, 2.005 FOR THE
PRELIMINARY PLAT OF JESSIE GLEN APPLICATION NUMBER L05P0005
1. Compliance with all platting provisions of Title 19 of the King County Code.
This condition will be met
2. All persons having an ownership interest in the subject property shall sign on the
face of the final plat a dedication which includes the language set forth in King
County Council Motion No. 5952.
This condition will be met
3. The plat shall comply with the base density (and minimum density) requirements
of the R-6-SO zone classification. All lots shall meet the minimum dimensional
requirements of the R-6-SO zone classification or shall be as shown on the face
of the approved preliminary plat, whichever is larger, except that minor revisions
to the plat which do not result in substantial changes may be approved at the
discretion of the Department of Development and Environmental Services.
This condition will be met
4. All construction and upgrading of public and private roads shall be done in
accordance with the King County Road Standards established and adopted by
Ordinance No. 11187, as amended (1993 KCRS).
This condition will be met
5. The applicant shall obtain documentation by the King County Fire Protection
Engineer certifying compliance with the fire flow standards of Chapter 1 Z08 of
the King County Code.
The documentation shall be obtained.
6. Final plat approval shall require full compliance with the drainage provisions set
forth in King County Code 9.04. Compliance may result in reducing the number
andlor location of lots as shown on the preliminary approved plat Preliminary
review has identified the following conditions of approval which represent
Mr. Ted Cooper, P.E.
January 24, 2006
Page 3
portions of the drainage requirements. All other applicable requirements in KCC
9.04 and the Surface Water Design Manual (SWDM) must also be satisfied during
engineering and final review.
This comment has been noted.
a. Drainage plans and analysis shall comply with the 2005 King County
Surface Water Design Manual and applicable updates adopted by King
County. DDES approval of the drainage and roadway plans is required
prior to any construction.
This comment has been noted.
b. Current standard plan notes and ESC notes, as established by DDES
Engineering Review, shall be shown on the engineering plans.
This condition will be met
C. The following note shall be shown on the final recorded plat:
All building downspouts, footing drains, and drains from all impervious
surfaces such as patios and driveways shall be connected to the
permanent storm drain outlet as shown on the approved construction
drawings # on file with DDES and/or the King County
Department of Transportation. This plan shall be submitted with the
application of any building permit All connections of the drains must be
constructed and approved prior to the final building inspection approval.
For those lots that are designated for individual lot infiltration systems, the
systems shall be constructed at the time of the building permit and shall
comply with plans on file. "
This completed note shall be shown on the final recorded plat.
7. The drainage detention facility shall be designed to meet at a minimum the
Conservation Flow Control and Basic Water Quality provisions in the 2005 King
County Surface Water Design Manual (KCSWDM).
This condition has been met
8. A drainage adjustment (L05VO052) is approved to combine the onsite subbasins
into one post -developed detention facility. All conditions of approval for this
adjustment shall be incorporated into the engineering plans.
The conditions of approval for this adjustment have been incorporated into
the engineering plans as requested.
9. The proposed subdivision shall comply with the 1993 King County Road
Standards (KCRS) including the following requirements:
Mr. Ted Cooper, P.E.
January 24, 2006
Page 4
This condition will be met.
a. Road A from 120t'' Avenue SE to Lot 37 shall be improved to the urban
one-half street standard. The remaining portion of Road A from Lot 37 to
the south plat boundary shall be improved to the urban subaccess street
standard.
This condition will be met.
Road A shall include an adequate pavement radius to 120'h Avenue SE
on the north side; unless otherwise approved by DDES Property owner
permission and an appropriate easement are required for this
improvement to be submitted with the engineering plans. The existing
private driveway at this location is to be abandoned, with new access to
Parcel 6198400300 on the new Road A Property owner permission is
required to relocate the driveway. (Vote that DDES has received a letter of
intent to provide permission.
This condition will be met.
This subdivision shall comply with Section 1.03(D) of the KCRS. This
Section requires a continuous public access prior to recording. if the
proposed subdivision to the south (L04S0003) is not completed and
approved by King County prior to this subdivision recording, a temporary
turnaround shall be provided at or near the south end of Road A, subject
to DDES approval as to location.
This condition will be met.
b. Roads B, C, and D shall be improved to the urban subaccess street
standard
This condition will be met.
C. The west R/W line for Road A shall be extended north across Lot 36 and
Tract C to the north line of Tract C
This condition will be met
d The east R/W line for Road C shall be extended north across Lot 7 and 8
to the north line of Lot 7.
This condition will be met
e. FRONTAGE.' The frontage of the site along 116'h Avenue SE shall be
improved to the urban minor arterial standard (33 fi half -width pavement
section). The design shall require compliance with Section 4.01(f) of the
KCRS; asphalt overlay when widening.
Mr. Ted Cooper, P.E.
January 24, 2006
Page 5
This condition will be met
Twelve feet of additional R/W is required to be dedicated along the 116`h
Ave SE frontage as required for a 42 ft total half width R/W(east side).
This condition will be met
g. FRONTAGE. The frontage along 120'h Ave SE (west side) shall be
improved at a minimum to the urban neighborhood collector standard.
The design shall require compliance with Section 4.01(f) of the KCRS;
asphalt overlay when widening.
This condition will be met
h. Tract A shall be a minimum 26 feet wide and improved as a private
access tract per Section 2.09 of the KCRS. This tract shall be owned and
maintained by the lot owners served. Notes to this effect shall be shown
on the engineering plans and on the final plat map. As an alternative to
private access tract status, Tract A may be improved and dedicated as a
public road subject to the KCRS.
This condition will be met
Tract C shall be a minimum 20 feet wide and improved as joint use
driveways per Section 3.01 of the KCRS. This tract shall be owned and
maintained by the lot owners served Notes to this effect shall be shown
on the engineering plans and on the final plat map.
This condition will be met
A minimum 5 foot wide paved, public pedestrian walkway shall be
provided between Road A and Road B, through Tract B.
This condition will be met
k Modifications to the above road conditions may be considered according
to the variance provisions in Section 1.08 of the KCRS.
This condition will be met
10. All utilities within proposed rights -of -way must be included within a franchise
approved by the King County Council prior to final plat recording.
This comment has been noted.
11. The applicant or subsequent owner shall comply with King County Code 14.75,
Mitigation Payment System (MPS), by paying the required MPS fee and
administration fee as determined by the applicable fee ordinance. The applicant
Mr. Ted Cooper, P.E.
January 24, 2006
Page 6
has the option to either. • (1) pay the MPS fee at final plat recording, or (2) pay the
MPS fee at the time of building permit issuance. If the first option is chosen, the
fee paid shall be the fee in effect at the time of plat application and a note shall
be placed on the face of the plat that reads, "All fees required by King County
Code 14.75, Mitigation Payment System (MPS), have been paid " if the second
option is chosen, the fee paid shall be the amount in effect as of the date of
building permit application.
This comment has been noted.
12. Lots within this subdivision are subject to King County Code 21A43, which
imposes impact fees to fund school system improvements needed to serve new
development As a condition of final approval, fifty percent (50%) of the impact
fees due for the plat shall be assessed and collected immediately prior to
recording, using the fee schedules in effect when the plat receives final approval.
The balance of the assessed fee shall be allocated evenly to the dwelling units in
the plat and shall be collected prior to building permit issuance.
This condition will be met
13. There shall be no direct vehicular access to or from 116t" Avenue SE from those
lots which abut it A note to this effect shall appear on the engineering plans and
final plat
This condition will be met
14. The planter islands (if any) within the cul-de-sacs shall be maintained by the
abutting lot owners or homeowners association. This shall be stated on the face
of the final plat.
This condition will be met
15. Prior to final plat approval and recording, the applicant shall provide a valid
Transfer of Development Rights (TDR) Certificate approved by the King County
Department of Natural Resources to create the three additional lots within the
proposed development The certificate must show the applicant (or successor or
assign) as the lawful owner of the development rights.
This condition will be met
16. Suitable recreation space shall be provided consistent with the requirements of
KCC 21 A 14.180 and KCC 21 A 14.190 (i.e., sport court(sj, children's play
equipment, picnic tablefsj, benches, etc.).
This condition will be met
a A detailed recreation space plan (i.e., area calculations, dimensions,
landscape specifications, equipment specifications, etc.) shall be
Mr. Ted Cooper, P.E.
January 24, 2006
Page 7
submitted for review and approval by DDES and King County Parks prior
to or concurrent with the submittal of the engineering plan. This plan
must not conflict with the Significant Tree Inventory & Mitigation Plan.
This condition has been met
b. A performance bond for recreation space improvements shall be posted
prior to recording of the plat
This condition will be met
17. A homeowners' association or other workable organization shall be established
to the satisfaction of DDES which provides for the ownership and continued
maintenance of the recreation, open space and/or sensitive area tract(s).
This condition will be met
18. Street trees shall be provided as follows (per KCRS 5.03 and KCC 21 A 1 G.050):
a. Trees shall be planted at a rate of one tree for every 40 feet of frontage
along al! roads. Spacing may be modified to accommodate sight
distance requirements for driveways and intersections.
This condition will be met
b. Trees shall be located within the street right-of-way and planted in
accordance with Drawing No. 5-009 of the 1993 King County Road
Standards, unless King County Department of Transportation determines
that trees should not be located in the street right-of-way.
This condition will be met
C. if King County determines that the required street trees should not be
located within the right-of-way, they shall be located no more than 20 feet
from the street right-of-way line.
This condition will be met
d The trees shall be owned and maintained by the abutting lot owners or
the homeowners association or other workable organization unless the
County has adopted a maintenance program. Ownership and
maintenance shall be noted on the face of the final recorded plat.
This condition will be met
e. The species of trees shall be approved by DDES if located within the
right-of-way, and shall not include poplar, cottonwood, soft maples, gum,
any fruit -bearing trees, or any other tree or shrub whose roots are likely to
Mr. Ted Cooper, P.E.
January 24, 2006
Page 8
obstruct sanitary or storm sewers, or that is not compatible with overhead
utility lines.
This condition will be met
The applicant shall submit a street tree plan and bond quantity sheet for
review and approval by DDES prior to engineering plan approval.
This condition will be met
g. The applicant shall contact Metro Service Planning at 684-1622 to
determine if 116`h Avenue SE and/or 120th Avenue SE are on a bus route.
if 116rh Avenue SE and/or 120rh Avenue SE are a bus route, the street tree
plan shall also be reviewed by Metro.
Metro Service Planning has been contacted and 116th Avenue SE and
120'h Avenue SE are not on a bus route.
h. The street trees must be installed and inspected, or a performance bond
posted prior to recording of the plat if a performance bond is posted, the
street trees must be installed and inspected within one year of recording
of the plat. At the time of inspection, if the trees are found to be installed
per the approved plan, a maintenance bond must be submitted or the
performance bond replaced with a maintenance bond, and held for one
year. After one year, the maintenance bond may be released after DDES
has completed a second inspection and determined that the trees have
been kept healthy and thriving.
This condition will be met
A landscape inspection fee shall also be submitted prior to plat recording.
The inspection fee is subject to change based on the current County fees.
This condition will be met
19. To implement KCC 21.A38.230, Special District Overlay - significant trees, which
applies to the site, a detailed tree retention plan shall be submitted with the
engineering plans for the subject plat The tree retention and engineering plans
shall be consistent with the requirements of KCC. No clearing of the site is
permitted until the tree retention plan is approved by DDES. Flagging and
temporary fencing of trees to be retained shall be provided, consistent with KCC.
The placement of impervious surfaces, fill material, excavation worm or the
storage of construction materials is prohibited with the fenced areas around
preserved trees, except as may be permitted under the provisions of KCC
A note shall be placed on the final plat indicating that the trees shown to be
retained on the tree retention plan shall be maintained by the future owners of
Mr. Ted Cooper, P.E.
January 24, 2006
Page 9
the proposed lots, consistent with KCC 21A38.23086. The tree retention plan
shall be included as part of the final engineering plans for the subject plat
This condition will be met
If you have any questions during your review of this submittal, please call me at (253) 838-
6113.
Sincerely,
ESM CONSULTING ENGINEERS, LLC.
;a 7
LAURA G. COCIASU, P.E.
Project Engineer
Attachments: Stormwater Pollution Prevention Plan 0 copy)
CC: Joe Singh, JPS Holdings LLC: (letter only)
1)esmMengrlesm jobsO 166=1 MS0 documentVetter-005.doc
Engell, Bruce
To: Cooper, Ted
Subject: Plat of Jessie Glen L05SR054
Ted
The applicant made final revisions to the Significant Tree Retention Plan and I approved 3 sets ... routed 3 to you this
date.
0
Tes'st6 Leff
CZEUIsED
SSG `ram "44(
»�% k$ \
� :
�� r� � � � } ■
.� � �f
� } .� � � f \\� !
� � . #
_ \����'� � {�
®� . 4�±j\�� >
! -;
� % f / .
% �
^k./�� � .
. a� �
.
�, �. «� -
� ��� z
�>� \w_��r
� �
� � ¥t%z� a� ,
— . •� :a> #� .
v��f�\:�
!.�
\ }
� t ! � �
� » / \
Lwos SRO so
SIGNIFICANT TREE BOND QUANTITY WO_RKSHEET (Planting &
ExistinL Trees)
(Complete and return electronically)
Date: 2,k3� 0 (
Project Namea2
DDES Project Number: L 0 S ! CC0 5
1. Soil Preparation
Topsoil
Mulch (2 inch depth X 36" round)
1 Oo
P
Fertilizer
j
OCR
Removal of invasive species
D LTJ
Irrigation
2. Plant Materials
Deciduous Trees (Nursery Stock)
Caliper:
Evergreen Trees (Nursery Stock)
Caliper:
+V
�i%
(i�✓D.
Other:
3. Labor & Equipment Costs
Labor: (planting)
—112VA-
P
*Equipment:
4. Tree Protection Measures
High Visibility Fencing
(} /-0/'
it r0l I
Tree Stakes
DO
5. Monitoring Costs
3 years monitoring with reports
J��
*Existing Significant Tree Values
Other:
Other;
�}
SUBTOTAL
30% CONTINGENCY & MOBILIZATION
TOTAL PERFORMANCE BOND AMOUNT
First S2500M shall be cash � ^^����/ �+c
Quantity Calculations completed by:Jli> m� ioi RECEIVED
Approved by Site Development Specialist: (/
* Use Tree Value for lumber mill prices at minimum FEB 15 2006
KING COUNTY
LAND USE SERVICES
t-os SRO S a
SIGNIFICANT TREE BOND QUANTITY WORKSHEET LPlanting &_
Existin Trees
(Complete and return electronically)
Date: 2i0 ob
Project Name j�� J U
DDES Project Number: L D 5` 6W5
1. Soil preparation
Topsoil
Mulch (2 inch depth X 36" round)
O V0
Fertilizer
j
b5
//.00
Removal of invasive species
tti
Irrigation
2. Plant Materials
Deciduous Trees (Nursery Stock)
J7vv
r ,��
`�'t
Caliper:
lGU
I
Evergreen Trees (Nursery Stock)
Caliper:
W
I�
Other:
3. Labor & Equipment Costs
Labor: (planting)
*Equipment:
4. Tree Protection Measures
High Visibility Fencing
Tree Stakes
D!J
s' aff,6
5. Monitoring Costs
3 years monitoring with reports
( -
*Existing Significant Tree Values
Other:
Other:�41-1
�}
i,
SUBTOTALrJ
30% CONTINGENCY & MOBILIZATION
TOTAL PERFORMANCE BOND AMOUNT
First $2500.00 shall be cash p�
Quantity Calculations completed by: RECEIVED
1 i/ �(% RECEIVED
Approved by Site Development Specialist: (/
* Use Tree Value for lumber mill prices at minimum FEB 16 2006
KING COUNTY
LAND USE SERVICES
Site Improvement Bond Quantity Worksheet
Web date: 11121/2005
.. .. .. ....... .................
x :5:M
. "d
........... . ...........
N. X-
. ....... ..
0 0
M
Oil
0"
4
.. XX
Access Road, RID
D - 1
$ 16.74
SY
200 3,348.001
1
1
1
Bollards - fixed
D - 2
$ 240.74
Each
I
I
I
I
Bollards - removable
D - 3
$ 452.34
Each
4 1,809.361
1
1
1
(CBs include frame and lid)
CB Type I
D - 4
$ 1,257.64
Each
19
23,695.16
CP_Type IL
D - 5
$ 1,433.59
Each
CB Type 11, 48" diameter
D - 6
$ 2,033,57
Each
11
22,369.27
— for additional depth over 4
D - 7
$ 436,52
FT
CB Type 11, 54'diameter
D - 8
$ 2,192.54
Each
1
2,192.54
for additional depth over 4
D - 9
$ 486.53
FT
CB Type 11, 6W diameter
0-10
$ 2,351.52
Each
1
2,351.52
for additional depth over 4
D - 11
$ 536.54
FT
CB Type 11, 72' diameter
D - 12
$ 3,212.64
Each
for additional depth over 4!
D - 13
$ 692.21
FT
Through -curb inlet Framework (Add)
D - 14
$ 366-09
Each
6
2,196.54
Cleanout, PVC, 4�'
D - 15
$ 130.55
Each
Cleanout, PVC, 6"
D - 16
$ 174.90
Each
Cleanout, PVC, 8"
D - 17
$ 224.19
Each
Culvert, PVC, 4'
D - 18,
$ 8.64
LF
Culvert, PVC, 6"
D-19
$ 12.60
LF
Culvert, PVC, 8*'
D-20
$ 13-33
LF
Culvert, PVC, I Z'
D - 21
$ 21.77
LF
Culvert, CMP, 8"
D - 22
$ 17.25
LF
Culvert, CMP, I Z'
D - 23,
$ 26,45
LF
Culvert, CMP, 15"
D - 24
$ 32.73
LF
Culvert, CMP, IF'
D - 25
$ 37.74
LF
Culvert, CMP, 24'
D -26
$ 53.33
LF
Culvert, CMP, 30"
D -27
$ 71.45
LF
Culvert, CMP, 36"
D - 28
$ 112.11
LF
Cutvert, CMP, 48"
D - 29
$ 140.83
LF
Culvert, CMP, 60"
ID-30
$ 235.45
LF
Culvert, CMP, 72"
D - 311
$ 302.58
LF
Page 6 of 9
SUBTOTAL
58,162.39
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Est-002.xis Report Date: 4112/2006
Site Improvement Bond Quantity Worksheet
Web date: 11 72112005
. �-N
-104 ...................
M"M
Culvert, Concrete, 8!'
D-32
$ 21-02
LF
Culvert, Concrete, 12"
D - 33
$ 30.05
LF
Culvert, Concrete, 15"
D - 34
$ 37,34
LF
Culvert, Concrete, 18"
D - 35
$ 44.51
LF
Culvert, Concrete, 24"
D - 36
$ 61.07
LF
Culvert, Concrete, 30"
D - 37
$ 104.18
LF
Culvert, Concrete, 36"
D - 38
$ 137.63
LF
Culvert, Concrete, 42"
D - 39
$ 158-42
LF
Culvert, Concrete, 48"
D - 40
$ 175.94
LF
Culvert, CPP, 6"
D -41
$ 10.70
LF
Culvert, CPP, 8"
D - 42
$ 16.10
LF
Culvert, CPP, IZ'
D - 43
$ 20-70
LF
1405
29083,5
Culvert, CPP, 16'
D - 44
$ 23.00
LF
88
2024
Culvert, CPP, 18"
D - 45
$ 27.60
LF
762
21031.2
Culvert, CPP, 24'*
D - 46.
$ 36.80
LF
454
16707.2
Culvert, CPP, 30"
D - 47.
$ 43.30
LF
Culvert, CPP, 36"
0-48
$ 55.20
LF
Ditching
D - 49
$ 8.08
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 25.99
LF
French Drain @' depth)
D - 61,
$ 22.60
LF
GeotsAle, laid in trench, polypropylene
D - 521
$ 2.40
SY
Infiltration and testing
D - 53
$ 74.75
HR
Mid -tank Access Riser, 48" dia, 5'deep-
- 54
$ 1,605.40
Each
Pond Overflow Spillway
-D
D - 55
$ 14.01
SY
30
420,3
Restrictor/011 Separator, IT
D - 56
$ 1,045.19
Each
Restrictor/011 Separator, 15'
D - 57
$ 1,095.56
Each
Restrictor/Oil Separator. 18"
0-58
$ 1,146.16
Each
1
1146.16
Riprap, placed
D - 69
$ 39.08
CY
5
195.4
Tank End Reducer (36'. diameter
0-60
$ 1,000.50
Each
Trash Rack, 12"
.0-61
$ 211.97
Each
-1
211.97
Trash Rack, 15"
D - 62
$ 237.27
Each
Trash Rack, IT
D - 63
$ 268.89
Each
ITrash Rack, 21-
D - 64
$ 306.841
Each+
I
I
Page 7 of 9
SUBTOTAL
70819.73
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Est-002.)ds Report Date, 411212006
Site Improvement Bond Quantity Worksheet
Web date: 11121/2005
...... ......
WR
M..
.......... .......
x -4
MA
.............. .
No.
2" AC, 2" to course rock & 4!' borrow
P L - 1
$ 15.84
SY
2" AG, 1.5" to course & 2.5" base cour
P L - 2
$ 17.24
SY
4" select borrow
PL-3
$ 4.55
SY
1.5" to course rock & 2.5" base course
P L - 4
$ 11.41
SY
rg.
Such as detentionAvater quality vaults.)
W1 - 1
Each
WI-2
SY
WI-3
CY
WI-4
LF
WI-5
FT
Wl - 6
Wl - 7
WI-8
WI-91
wi- io
I
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION;
GRANDTOTAL:
COLUMN:
Page 8 of 9
B
366,865.71
110,059.71
476,925.42
C
9,480.65
2,W.20
12,324.85
D
E
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4122/02
Est-002.xls Report Date: 4112/2006
Site Improvement Bond Quantity Worksheet Webdate: 11/21/2005
Original bond computations prepared by:
Name: Jessie Glen Date: 4/13/2006
PE Registration Number: 40111 Tel. #: 1-800-345-5694
Firm Name; ESM Constulting Engineers, LLC
Address: 33915 1st Way South, Suite #200, Federal Way, WA 98003 Project No: L050005
ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND` PUBLIC ROAD & DRAINAGE
AMOUNT BOND* AMOUNT MAINTENANCE/DEFECT BOND*
REQUIRED AT RECORDING OR
Stabilization/Erosion Sediment Control (ESC) (A) $ 67,266.1 TEMPORARY OCCUPANCY*'*
Existing Right -of -Way Improvements (B) $ -
Future Public Road Improvements & Drainage Facilitie (C) $ 476,925.4
Private Improvements (0) $ 12,324.8
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond' shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Reduced Performance Bond* Total ***
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION
(A+B) $ 67,266.1
(T) $ 556.516.3
Minimum on amount is $1000.
(E) $
x 0.30 $ 166,954.9 OR
(T-E) $ 556,516.3
Use larger of Tx3O%or7r-77—
(B+C) x
0.25 = $ 119, 231.4
Date: Y/f� %!� ,o
i
' NOTE: The word "bond" as used in this document means any financial guarantee acceptable to King County.
NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total oost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity,
NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be $ 489,250.3 (C+D)-E
REQUIRED BOND' AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY ODES
Page 9 of 9 Unit prices updated: 02/12/02
Check out the DDES Web site at t+-vtnrw.metrokc.gov/ddes Version: 4/22102
Est-002.xiis Report Date: 4/12/2006