Loading...
HomeMy WebLinkAboutMiscAmends ORD: 4056, 4269 4835, 4851 4963, 5100 CITY OF RENTON, WASHINGTON ORDINANCE NO. 5132 AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING CHAPTER 4-2, ZONING DISTRICTS — USES AND STANDARDS, CHAPTER 4-39 ENVIRONMENTAL REGULATIONS AND OVERLAY DISTRICTS, CHAPTER 44, CITY-WIDE PROPERTY DEVELOPMENT STANDARDS, CHAPTER 4-6, STREET AND UTILITY STANDARDS, AND CHAPTER 4.11, DEFINITIONS, OF TITLE IV (DEVELOPMENT REGULATIONS) OF ORDINANCE NO. 4260 ENTITLED "CODE OF GENERAL ORDINANCES OF THE CITY OF RENTON, WASHINGTON" TO AMEND THE R-1 RESIDENTIAL LOW DENSITY ZONE IN ORDER TO REGULATE CLUSTERED DEVELOPMENT AND CREATE AN URBAN SEPARATOR OVERLAY DESIGNATION. WHEREAS, the King County Countywide Planning Policies designate certain, properties in the County as "Urban Separators"; and WHEREAS, Countywide Planning Policy LU-27 calls for the preservation of urban separators as permanent low density lands which protect adjacent resource lands, Rural Areas, and environmentally sensitive areas; and WHEREAS, Urban Separators are intended to create open space corridors within and between Urban Areas which provide environmental, visual, recreational and wildlife benefits; and WHEREAS, Countywide Planning Policy LU-27 establishes that maintenance of urban separators is a regional as well as local concern and further provides that modifications to development regulations should have King County review and concurrence; and WHEREAS, the City of Renton has coordinated review of the proposed Urban Separator regulations with King County staff and elected officials; and l ORDINANCE NO. 51 3 2 WHEREAS, applicable Metropolitan. King County Code, Title 21 A.12.030.17, establishes standards within R-1 zoning, including a fifty percent contiguous open space requirement and mandatory clustered development outside these corridors; and WHEREAS, the City Council adopted Community Design Element policies that designate certain low -density residential and resource areas as Urban Separators, to provide physical and visual distinctions between Renton and adjacent communities, and to define Renton's boundaries; and WHEREAS, the City Council created a Residential Love Density Designation to map Urban Separators; and WHEREAS, the Renton City Council determined that Renton development standards should address the same or better level of protection for Urban Separators as is provided by King County regulations; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Section 4-2-110.A, Development Standards for Single Family Residential Zoning Designations, of Chapter 2, Zoning Districts — Uses and Standards, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended to read as shown on Exhibit A. SECTION H. Subsection 4-2-110.D.3 of Section 4-2-110.1), Conditions Associated with Development Standards Table for Single Family Residential Zoning Designations, of Chapter 2, Zoning Districts — Uses and Standards, of Title IV (Development Regulations) of Ordinance No, 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended, to read as follows: 2 ORDINANCE NO. 5132 3. Clustering is allowed to meet objectives such as preserving significant natural features, providing neighborhood open space, or facilitating the provision of sewer service. Within designated urban separators, clustering is required, consistent with the provision of Section 4-3-110, Urban Separator Overlay Regulations. a. The maximum net density requirement shall not be exceeded except that within Urban Separators a density bonus may be granted allowing the total density to achieve one dwelling unit per gross contiguous acre for projects that meet the following criteria. (1) Provision of native vegetation cover on 65% of the gross area of all parcels in the land use action, including both the area within and outside the open space corridor, with either existing or new vegetative cover, and at least one of the following additional criteria. (i) Enhancement of wetlands is provided at a ratio of one-half acre enhanced for one acre delineated within the Urban Separator pursuant to Section 4-3-050M 12b. Evaluation Criteria, and Section 4-3-050M 12.c. Wetlands Chosen for Enhancement. Enhancement proposed for a density bonus may not also be used for a mitigation for other wetland alterations. (ii) Legal non -conforming uses are removed from the site and/or brought into conformance with Renton standards. (iii) Natural surface pedestrian trails, with public access, are provided as part of an adopted trail system or, where there is no planned trail system, in a configuration approved by the Reviewing Officiai. (iv) In the absence of either wetlands or legal non -conforming uses on the site, public access and trails shall be required to the satisfaction of the Reviewing Official. 3 ORDINANCE No 513 2 (2) Parcels within the Urban Separator may be combined into larger contiguous holdings to allow platting to achieve bonus density, however existing legal lots shall not be reduced in land area for the purpose of transferring density unless such lots are included in a proposed plat b. The area of individual lots shall not be less than 10,000 sq. ft. SECTION III. A new Section, 4-3-110, of Chapter 4-3, Environmental Regulations and Overlay Districts, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby added, to read as follows: 4-3-110 URBAN SEPARATOR OVERLAY REGULATIONS: A. PURPOSE: The purpose of this section is to implement the Urban Separators policies in the Community Design Element of the Comprehensive Plan and the King County Countywide Planning Policies. The intent is to provide physical and visual distinctions between Renton and adjacent communities, define Renton's boundaries and create contiguous open space corridors within and between urban communities, which provide environmental, visual, recreational and wildlife benefits. Urban Separators shall be permanent low -density lands that protect resources and environmentally sensitive areas. B. APPLICABILITY: This section shall apply to subdivisions and building permits on lands within designated Urban Separators as shown in the Urban Separators Maps. C. URBAN SEPARATORS MAPS: 4 ORDINANCE NO. 5132 V�Y Rd 5 ORDINANCE NO. 5132 2. Talbot Urban Separator 4tst E S 65th St P CK Talbot Urban Separator Gcwroamc 11 elapnsari Neishborhaad=$ Slr�r ie F� gfmu (iamr) Ciy Ldlii9 n 6r P:rah. nsmvmas�r � Urban Soparstor Poundary 27 r--m-m-Y' lI R It ORDINANCE NO. 5132 D. ADMINISTRATION: 1. Review Process: Applications subject to Urban Separator Regulations shall be processed as a component of the governing land use process. 2. Authority: The Reviewing Official shall have the authority to approve with conditions, or deny proposals based on the provisions of the Urban Separator Overlay Regulations. E. URBAN SEPARATOR OVERLAY REGULATIONS: i. Contiguous Open Space Corridor Established. A designated contiguous open space corridor is established as shown on the Urban Separators Overlay Map in Section 4-3-110J. 2. Dedication of Open Space Required. a. Approval of a plat, and/or building permit on an undeveloped legal lot in the Urban Separator Overlay shall require dedication of 50°fo of the gross land area of the parcel or parcels as a non -revocable open space tract retained by property owner, or dedicated to a homeowners association or other suitable organization as determined by the Reviewing Official. Acreage in tracts may include critical areas and/or critical area buffers. At a minimum, open space shall be connected to another contiguous open space parcel by a fifty foot (50') corridor. b. Existing residences, existing accessory uses and structures, existing above ground utilities located in the tract at the time of designation and new small and medium utilities shall not count toward the 50% gross land area calculation for open space except for storm water ponds designed with less than 3: l engineered slopes and enhanced per techniques and landscape requirements set forth in the publication the "integrated Pond" King County Land and Water Resources Division. h ORDINANCE NO. 5132 C. Approval of a building permit for an addition of 300 square feet for a primary use structure or 500 square feet for an accessory structure shall require recordation of a conservation easement, protective easement or tract and deed restriction on critical areas and critical area buffers located within the Contiguous Open Space Corridor pursuant to Section 4-3- 050.G, Native Growth Protection Areas. d. Land dedicated as open space shall be located within the mapped Contiguous Open Space Corridor unless a modification is approved pursuant to Section 4-3- 110.B.6. 3. Uses Allowed 1n Contiguous Open Space. a. Passive Recreation with no development of active recreation facilities except within a municipal park. b. Natural surface pedestrian trails. C. Animal husbandry (small, medium and large) provided that fencing is subject to the conditions in 4-3-110.E.3.g, below. d. Existing residences and accessory uses and structures. e. Small and medium utilities and large underground utilities. £ Access Easements. (1) Utilities easements and emergency service access roads may be located within Contiguous Open Space Corridors for the limited purpose of providing service to parcels platted after March 2005, for which there is no practical alternative way to provide service. Utilities and emergency service easements shall be developed with permeable surface treatment. 8 ORDINANCE NO. 5132 (2) Private access easements for ingress and egress may be located within Contiguous Open Space in the limited instance where there is no alternative access to a pre- existing legal lot, but shall not serve lots platted after March 2005. g. Fencing or similar structures and/or hedges or similar landscape features on the property or easement boundary of properties abutting and within the Contiguous Open Space Corridor shall not create a solid barrier. Where required to protect wetlands pursuant to Section 4-3-050.M.7.c, fencing shall be the minimum necessary. 4. Uses in Portions of the Urban Separator Outside the Established Contiguous Open Space Corridor. a. Lases shall be consistent with Section 4-2-060 and 4-2-070.B. Residential-1 Zone, one dwelling unit per net acre. b. Development shall be clustered outside the Contiguous Open Space Corridor mapped in 2-3-110.J. 5. Standards Within Entire Urban Separator. a. Forest/vegetation clearing shall be limited to a maximum of 35% of the gross acreage of the site except: (1) The percentage of forestivegetation coverage may be increased to qualify for the density bonus allowed in Section 4-2-110.D. (2) The Reviewing Official may modify the percentage of forest/vegetation retention if determined necessary to meet the surface water retention/detention standards of Section 4-3-110.E-7. (3) The Reviewing Official may approve forest/vegetation clearing greater than 35% of individual building sites to allow grading for a home site provided that: 0 ORDINANCE NO. 5 t 3 2 (i) A landscape plan is provided for each building site showing compensating re -planting of species with the same or better water retention and erosion control fuunctions. (ii) 5% additional replacement landscaping per site is provided (iii) Plant caliper is determined by the Reviewing Official to be sufficient to achieve needed water retention and erosion control functions, and (iv) Individual trees or stands of trees are retained when feasible. Feasibility is defined as locations and tree health sufficient to ensure continued viability of the tree and safety of structures within the developed portion of the lot and (v) The landscape plan provides massing of plant material to create either a connection to required open space or is of sufficient size to create functional wildlife habitat. b. If the existing cleared area of a site, as of March 21, 2005 is greater than 35%, approval of a plat shall require re -planting of forest/vegetative cover. C. Forest/vegetation cover may include a combination of Northwest native vegetation including conifer, deciduous trees and shrubs sufficient to provide water retention and erosion control, as determined appropriate by the Reviewing Official. The Reviewing Official shall determine whether existing vegetation provides functions to meet forest/vegetation coverage standards, and shall require additional plantings if existing vegetation is found to be insufficient. d. Stormwater management shall comply with the 2005 King County Surface Water Design Manual Conservation Flow Control Area Level 2 flow control standards. 10 ORDINANCE NO. 5132 e. Private access easements and improvements shall be established at the minimum standard needed to meet public safety requirements. £ Landscape plans required in Section 4-4-070 shall include retention/re-planting plans as applicable, consistent with standards and plant lists in King County Department of Natural Resources and Parks Water and Land Resources Division Publication "Going Native." 6. Modification of Mapped Contiguous Open Space. The Reviewing Official may modify the open space configuration where: a Site specific data confirms that the adopted Contiguous Open Space Corridor map includes more than the required gross area for any parcel, or b. The applicant can demonstrate a configuration of contiguous open space that provides better or equal provision of the open space requirement. Modifications to the Contiguous Open Space Corridor shall be re -mapped during the City's annual Title IV review process. SECMDN IV, Section 4-4-0403 of Chapter 4, City -Wide Property Development Standards, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended to read as follows: B. APPLICABILITY. The provisions and conditions of this Section regulating height are not applicable to fences or barriers required by state law or by the zoning provisions of the Code to surround and enclose public safety installations, school grounds, public playgrounds, private or public swimming pools and similar installations and improvements. Fences, and hedges within the Urban Separator Overlay are also subject to requirements of the Urban Separator Overlay Regulations (see Section 4-3-110). I ORDINANCE NO. 5132 SECTION V. Section 4-4-130.0 of Chapter 4, City -Wide Property Development Standards, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended to read as follows. C. ALLOWABLE TREE CUTTING ACTIVITIES. Tree cutting and associated use of mechanical equipment is permitted as follows, except as provided in subsection D.2 of this Section, restrictions for Critical Areas, and in Section 4-3- I IO.E.5.b, Urban Separator Overlay Regulations. Emergency Situations: Removal of trees and/or ground cover by the City and/or public or private utility in emergency situations involving immediate danger to life or property, substantial fire hazards, or interruption of services provided by a utility. 2. Dead, Dangerous, or Diseased Trees: Removal of dead, terminally diseased, damaged, or dangerous ground cover or trees which have been certified prior to removal as such by a forester, registered landscape architect, or certified arborist, selection of whom to be approved by the City based on the type of information required, or the removal of which is approved by the City. 3. Maintenance Activities/Essential Tree Removal — Public or Private Utilities, Roads and Public Parks: Maintenance activities including routine vegetation management and essential tree removal for public and private utilities, road rights -of -way and easements, and parks. 4. Installation of SEPA Exempt Public or Private Utilities: Installation of distribution lines by public and private utilities provided that such activities are categorically exempt from the provisions of the State Environmental Policy Act and RMC 4-9-070, Environmental Review Procedures. 12 ORDINANCE NO. 5132 5. Existing and Ongoing Agricultural Activities: Clearing associated with existing and ongoing agricultural activities as defined in chapter 4-11 RMC, Definitions. b. Commercial Nurseries or Tree Farms: Clearing or cutting of only those trees which are planted and growing on the premises of a licensed retailer or wholesaler. 7. Public Road Expansion: Expansion of public roads. 8. Site Investigative Work: Site investigative work necessary for land use application submittals such as surveys, soil logs, percolation tests, and other related activities including the use of mechanical equipment to perform site investigative work provided the work is conducted in accordance with the following requirements. a. Investigative work should not disturb any more than five percent (5%) of any protected sensitive area described in subsection D.2 of this Section, Restrictions for Critical Areas, on the subject property. In every case impacts shall be minimized and disturbed areas restored. b. In every location where site investigative work is conducted, disturbed areas shall be minimized, and immediately restored. C. A notice shall be posted on the site by the property owner or owner's agent indicating that site investigative work is being conducted, and that the work must minimize disturbance to the critical areas identified in subsection D.2 of this Section, Restrictions for Critical Areas. d. No site investigative work shall commence without first notifying the Director or his or her designee in advance. 13 ORDINANCE NO. 5132 9. Allowable Minor Tree Cutting Activities: Tree cutting and associated use of mechanical equipment is permitted as follows, except as provided in subsection D2 of this Section, Restrictions for Critical Areas: a. On a developed lot or on a partially developed lot less than one-half (1/2) of an acre any number of trees may be removed; b. On a partially developed lot greater than one-half (1/2) of an acre or on an undeveloped lot provided that: i. No more than three (3) trees are removed in any twelve (12) month period from a property under thirty five thousand (35,000) square feet in size; and ii. No more than six (b) trees are removed in any twelve (12) month period from a property over thirty five thousand (35,000) square feet in size. r •wi �+wE�t:LnrEo LOI TYPES ri-A�4t74L $ DEVELOPED iii. Rights -of -Way Unobstructed: In conducting minor tree cutting activities, rights -of -way shall not be obstructed. 10. Landscaping or Gardening Permitted: Land clearing in conformance with the provisions of subsection C.9 of this Section, Allowable Tree Cutting Activities, and subsection D.2, Restrictions for Critical Areas, is permitted on a developed lot for purposes of landscaping or gardening. Land clearing in conformance with the provisions of subsection C.9, Allowable Minor Tree Cutting Activities, and subsection D.2, Restrictions for Critical Areas, is permitted 14 ORDINANCE NO. 5132 on a partially developed or undeveloped lot for purposes of landscaping or gardening provided that no mechanical equipment is used. 11. Operational Mining/Quarrying: Land clearing and tree cutting associated with previously approved, operational mining and quarrying activities. 12. Modification of Existing Utilities and Streets (not otherwise exempted by RMC 4- 3-050.C.7) by Ten Percent (10%) or Less: Overbuilding (enlargement beyond existing project needs) or replacement and/or rehabilitation of existing streets, provided the work does not increase the footprint of the structure, line or street by more than ten percent (10%) within the critical area and/or buffer areas. SECTION VL Section 4-6-030.F of Chapter 6, Street and Utility Standards, of Title fV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended to read as follows: F. DRAINAGE PLAN DESIGN CRITERIA, DRAFTING STANDARDS AND CONTENTS: The drainage plan shall be prepared in conformance with the Department's construction plan drafting standards and contents, the City's Standard Specifications for Municipal Construction and Standard Detail documents, and the design criteria, construction materials, practices and standard details contained in chapters 3, 4, and 5 of the current King County Surface water design manual; provided that the Department's standards and design criteria will take precedence and prevail in any interpretation of conflicting or contradictory standards and design criteria, and provided, further, that within designated Urban Separators regulated in Section 4-4-110, the 2005 King County Surface Water Design Manual Conservation Flow Control Area Level 2 flow control standards are required. 15 ORDINANCE NO. 5132 SECTION VI. Section 4-11-150.0 of Chapter 11, Definitions, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended by adding the following definition of Open Space, Contiguous, Urban Separator, to read as follows: Open Space, Contiguous, Urban Separator: band permanently set aside as open space located in recorded tracts. Contiguous open space lands may include critical areas, such as wetlands and steep slopes, and wetland buffers, as well as stormwater ponds enhanced per the techniques and landscape requirements set forth in The Integrated Pond, Ding County Water and Land Resources Division. SECTION VII. This ordinance shall be effective upon its passage, approval, and five days after its publication. PASSED BY THE CITY COUNCIL this 4 th _ day of April � , 2005. APPROVED BY THE MAYOR this 4 th AppFoyeo as to form: Lawrence J. Warren, Attorney Date of Publication: 4/ 8/ 2 0 0 5 (summary) ORD.I 1753/24/05:ma Bonnie 1. Walton, City Cleric day of April 2005. �4 g -� "-ka- Kathy K olker-Wheeler, Mayor 16 ORDINANCE NO. 5132 Exhibit A 4-2-110A DEVELOPMENT STANDARDS FOR SINGLE FAMILY RESIDENTIAL ZONING DESIGNATIONS (Primary and Attached Accessory Structures) RC R-1 R-4 R-8 DENSITY Net D.ehgity in Dwell! g Units per Net Acre) Minimum None None None 4 dwelling units Housing Density per net acre''2 for proposed short plats or subdivisions Maximum 1 dwelling unit 1 dwelling unit per 4 dwelling units 8 dwelling units z Housing Density per 10 net 1 net acre except 73 per 1 net acre per 1 net acre acres that in designated Urban Separators, density of up to 1 unit per gross acre may be permitted subject to conditions in RMG 4-3-110 Urban Separator Overlay. NUMBER OF DWELLING UNITS PER .LOT Maximum 1 dwelling with 1 dwelling unit 1 dwelling unit 1 dwelling unit Number per legal 1 accessory Joe unit LOT DIMENSIONS Minimum Lot 10 acres 1 acre 8,000 sq. ft. 4,500 sq. ft. for Size for lots 10,000 sq. ft. for except where parcels greater created after cluster small lot than 1 acre. !November 10, development3 clusters1' are 2004 allowed, R-8 5,000 sq. ft. for standards shall parcels 1 acre or apply. less. Minimum Lot 150 ft. for 75 ft. for interior 70 ft. for interior 50 ft. for interior Width for lots interior lots. lots. lots. 80 ft, for lots. created after corner lots."' i3 November 10, 175 ft. for 85 ft, for corner except where 60 ft. for corner 2004 corner lots. lots. small lot lots Except for clusters40 are clustered allowed, R-8 development standards shall within designated apply. Urban Separators R-4 standards shall apply for both interior and corner lots. Minimum Lot 200 ft. 85 ft. 80 ft. except 65 ft. Depth for lots where small lot created after clustersi0 are November 10, allowed, R-8 2004 standards shall apply. Page 1 of 5 ORDINANCE NO. 5132 Exhibit A R C R-1 R-4 R-8 SETBACKS Minimum Front 30 ft.5 30 ft_ b30 ft. except 15 ft. for primary Yard where small lot structure. clusters'0 are allowed, R-8 20 ft. for attached standards shall garages accessed apply. from front or side Unit with Alley yard street. Access Unit with Alley Garage: The Access Garage: front yard set- The front yard back of the set -back of the primary primary structure structure may may be reduced be reduced to to 10 ft. if all 20 ft. if all parking is parking is provided in the provided in the rear yard of the lot rear yard of the with access from lot with access a public right -of - from a public way or alley. s right-of-way or alley. 6 Minimum Side 30 ft. 20 ft. 20 ft. except 15 ft. for the Yard Along a where small lot primary structure Street clusters'0 are and 20 ft. for the allowed, 15 ft. is attached garages allowed. which access from the front and side yard along a street. Minimum Side 25 ft. 15 ft, 15 combined 5 ft. Yard ft. 12, 13 are allowed with a minimum of 5 ft. for any side yard, except where small lot clusters 10 are allowed, 5 ft. Page 2 of 5 ORDINANCE NO. 5132 Exhibit A RC R-1 R-4 R-8 SETBACKS Continued Minimum Rear 35 ft. 25 ft. 25 ft. 20 ft. Yard Where small lot clusters1° are allowed, 20 ft. Clear Vision Area In no case shall In no case shall In no case shall In no case shall a a structure over a structure over a structure over structure over 42 42 in. in height 42 in. in height 42 in. in height in. in height intrude into the intrude into the intrude into the intrude into the 20 ft. clear 20 ft. clear 20 ft. clear 20 ft. clear vision vision area vision area vision area area defined in defined in RMC defined in RMC defined in RMC RMC 4-11-030. 4-11-030. 4-11-030. 4-11-030. Minimum 10 ft. 10 ft. 10 ft. 10 ft. landscaped Freeway landscaped landscaped landscaped setback from the Frontage Setback setback from the setback from the setback from the street property street property street property street property line. line. line. line. BUILDING STANDARDS Maximum 2 stories and 30 2 stories and 30 2 stories and 30 2 stories and 30 Building Height ft. ft. ft. for standard ft. and Number of roof. Stories, except for uses having a 2 stories and 35 "Public Suffix" (P) ft. for roofs designations having a pitch greater than 3/12. Maximum Height See RMC 4-4- See RMC 4-4- See RMC 4-4- See RMC 4-4- for Wireless 140G. 140G. 140G. 140G. Communication Facilities Page 3 of 5 ORDINANCE NO. 5132 Exhibit A RC R-1 R-4 R-8 BUILDING STANDARDS (Continued) Maximum Lots 5 acres or 35%. Lots greater Lots 5,000 sq. ft. Building more: 2%. An than 5,000 sq. or greater: 35% Coverage additional 5% of ft.: 35% or or 2,500 sq. ft., (including primary the total area 2,500 sq. ft., whichever is and accessory may be used for whichever is greater. buildings) agricultural greater. buildings. Lots less than Lots 10,000 sq. Lots 5,000 sq. 5,000 sq. ft.: ft. to 5 acres: ft. or less: 50% 50%, 15%. On lots greater than 1 acre, an additional 5% of the total area may be used for agricultural buildings. Lots 10,000 sq. ft. or less: 35%. Vertical Faigade All dwelling units Modulation shall provide vertical fagade modulation at least every twenty horizontal feet (20'), including front, side and rearfagades when visible from a street. Page 4 of 5 ORDINANCE NO. 5132 Exhibit A RC I R-1 R-4 R-8 LANDSCAPING AND OPEN SPACE Minimum Off- 5 ft. wide irrigated 5 ft. wide irrigated Site or drought or drought Landscaping resistant resistant Abutting Non- landscape strip landscape strip Arterial Public provided that if provided that if Streets for Plats there is additional there is additional and Short Plants undeveloped right undeveloped right Submitted on or of way in excess of way in excess after November of 5 ft, this shall of 5 ft, this shall 10, 2004 also be also be landscaped. landscaped. Minimum Off- 10 ft. wide 10 ft. wide Site irrigated or irrigated or Landscaping drought resistant drought resistant Abutting landscape strip landscape strip Principal, provided that if provided that if Minor and there is additional there is additional Collector undeveloped right undeveloped right Arterial Streets of way in excess of way in excess for Plats and of 10 ft., this shall of 10 ft., this small Short Plants also be also be Submitted on or landscaped, landscaped, after November unless otherwise unless otherwise 10, 2004 determined by the determined by reviewing official the reviewing during the official during the subdivision subdivision process. process. Minimum On or At least two (2) At least two (2) Off -Site Street trees of a City- trees of a City - Tree approved species approved species Requirements with a minimum with a minimum for Plats and caliper of 1 112" per caliper of 1 1/2" Short Plants tree shall be per tree shall be Submitted on or planted in the planted in the after November front yard or front yard or 10, 2004 planting strip of planting strip of every lot prior to every lot prior to occupancy. occupancy. Page 5 of 5 D oil •miq's OL Contents Why Go Native, Make a Plan ....................................... 1 Prepare the Site, Pick the Hight Plants ...................... 2 Proper Planting is Paramount ..................................... 3 Maintenance................................................................ 4 Appendices: Sample Planting Plans ............................................... 4 Planting for Sunny, Dry Conditions ............................ S Planting for Sunny, !foist Conditions ......................... S Planting for Shady, Dry Conditions ............................ 6 Planting far Shady, Moist Conditions ......................... 6 Plant .List —Rees r Plant List -Shrubs and Ferns .................................... 8 Plant List—Groundcouers and Perennials ................... 9 Footnote Resources for More Information ................... 9 my go native? .t's up to all of us to keep our water- ways clean and healthy. Native plants bring benefits to Northwest land and water resources, wildlife and people --and you can have them in your own yard! Well —established native plants control erosion by hold- ing the soil with their roots. They reduce flooding by slowing runoff. Trees, shrubs and groundcovers clean water by filtering out sediment and pollutants before they reach lakes and streams. Northwest fish and wildlife depend on native plants for food, shelter, and cover. Once established, native plants in the right place require little maintenance. A naturally —cared for native landscape is healthy for kids, pets and our environment. Your yard makes a difference! This brochure, plus a little time, money and sweat, is all you need to build a great looking native plant landscape. Footnotes refer to Web sites and other resources found on the last page. 1. Make a plan Scan the land. Assess your site conditions to deter- mine what plants will thrive in your spot. Remember that planning is easier (and cheaper) than replanting. Consider light, moisture and soil conditions. Is the site sunny, shady or some of both? How often is the area wet? Test your soils by sticking a shovel in the ground. Is it rocky? Sandy? Mostly clay? Need dynamite? 0 Think about the other features of your site, too. Note power lines, existing trees, view corridors, and height restrictions. Leave space for decks, additions or water features you may want to add in years to come. If you want to plant beside a stream or wetland, check with your local jurisdiction about possible permit re- quirements. If you are using only native plants and hand tools, permits may not be required. Where to plant? Put your native plant landscape in the less —traveled areas of your property to attract more wildlife. Keep your vegetable garden, perennial beds, and lawn close to the house (and hose) so they get the attention they need with fewer hassles. 2. Prepare the site Take some lawn out. Consider replacing your lawn with natives where grass grows poorly or is losing the battle with moss. You'll save time and aggravation and your yard will look great. Unwanted lawn can be cut into easily lifted squares with a flat bladed spade or removed with a rented sod remover. Or compost your lawn in place by covering grass with heavy cardboard and a few inches of wood chips or bark.' Add other features. Now is also the time to create mounds, install wildlife snags, rock piles or ponds2 and remove any pesky invasive weeds. Weed removal is a challenge; Be sure to look at other resources to battle your problem weeds'. 3. Pick the right plants for your spot This brochure includes a plant list of popular and common natives, many of which can adapt to a range of sites. Narrow your choices to plants that match the sunlight, moisture and space conditions of your site. Then pick your favorites. Each native plant performs a role in its , habitat, so use each plant to its best advan- wo tage. To control erosion on the edge of a stream, plant red osier dogwood, willows, Oregon ash and vine maple. To attract hummingbirds, plant red flowering currant and orange honeysuckle.4 And kids as well as animals enjoy huckleberries and native blackber- ries. To attract more wildlife, "layer" plants that grow to different heights; check out the examples of layering on page 6.2 Is bigger better? Most important, choose plants that fit your spot when full-grown. Pruning large plants to fit a small area is loads of work and could harm your plant's health. Larger plants may suffer more transplant shock and higher mortality than small plants, but can survive deer browsing better and are less likely to be trampled or weed —whacked. Start shopping. While native plants are increasingly available in nurseries, some may be a little harder to finds Ask the King Conservation District (206-764-3410 or wwwkingcdorand the Washington Native Plant Society (206-527-3210 or www.wnpsorg) about their annual native plant sales. When buying, use the Latin name to get the plant you want. For example, asking for mock orange could land you the European Philadelphus coronarius rather than our Northwest native mock orange, Philadelphus lewisii. Bring the attached plant list to help. 4. Proper planting is paramount! Help your plants put their best root forward.6 Take the time to plant carefully. Fall or winter is the best time of year to plant. In most years, a newly installed plant's survival decreases after March as the weather gets drier and warmer. Set out your plants, still in their pots, where you want them and rearrange for the look you like. Cluster three or more shrubs of the same species for a natural look. General guidelines for plant spacing are 10- 15 feet apart for trees, 5-10 feet for shrubs and 1-3 feet apart for groundcovers. 4D Take the plant out of its pot or burlap to view its root size. Keep the roots wet. Dig a saucer -shaped hole 2-3 times the width of the root mass, and about as deep. Fill hole with water and let drain. Build a mound of soil at the bottom of the hole. Q Loosen bound roots and gently shake off excess potting soil (not into the planting hole). Gently spread the roots evenly over the soil mound. The roots should not circle in the hole. A 10 Place the plant so the root flare (where the roots join the stem) is at the soil surface. 10 Replace soil into the hole so it fills the space between the roots. 10 Water generously and add more soil to fill the hole up to the root flare. Create a soil berm around the planting hole to retain moisture. Q Mulch! :2- Mulch, mulch, mulch! Tree grindings, leaves, wood chips, shredded bark, grass clippings, compost, and manure are all common mulches.? Spread mulch at least a couple of inches deep around your new plants (but keep the mulch a couple of inches from the plant's stem) . Use mulch over weed barriers (cardboard or newspaper) if you're eager to reduce weeding. Weed barriers are temporary, though; annual additions of mulch and shading by plants helps control weeds and creates a healthy landscape in the long run. Do fence me in. A fence can keep livestock, rodents, pets or children away from new plants. There are a variety of plant protectors available to keep your tender new shrubs from becoming a wildlife snack. Once established, most plants survive moderate munching. 1. aY�su+auasvvv 5. A little maintenance goes a long way Mulch helps reduce weeding and watering, but you will still need to help your new plantings get established.' Water when dry during the first two growing seasons. Deep, infrequent watering is best. Let the soil nearly dry out between soakings. Many native plants will need little or no additional water after one or two growing seasons, when they develop healthy root systems. Handpull invasive plants to give your new natives a chance to grow.3 Once a well -planned native landscape matures, it will almost care for itself. Learn more! Visit http://dnr.metroke.gov/topics/yard-and- garden for links to native plant nurseries, resources and more. Or call 206-296-6519 and ask for information about native plant landscaping. If you are planning to restore habitat along streams or rivers, ask for the Small Habitat Restoration Program. Sample planting plans The following four illustrations are intended to give you a jumping offpoint to get started naturescaping. Different conditions make it very difficult to present a planting plan suitable for every site. Soil alkalinity, elevation, slope and soil texture can all affect the survival of plants in your yard. Learn more, experiment and celebrate the successes. * Suggested native plants list This list contains some of the more common and readily available native plants. We left out some notable plants, but there are plenty here to get you started. Check out our resource list at the end to learn more. -2 Sample Planting for Sunny, Dry Conditions (OG) currant (RC) (SB) 0 dogwood (RD) (LF) rose (NR) groundcover (C) Sample Planting for Sunny, Moist Conditions Sample Planting for Shady, Dry Conditions M # PLAN VIEW Vine inaple Sword L Salal (VM) fern (SF) (S) SECTION VIEW ?!7 ff. high 1.0 ft. hir'll Wood sorrel (oxalis) (WS) dogwood (RD) huckleberry (EH) (DF) flower (IF) Sample Planting for Shady, Heist Conditions Native Plant List —Trees Common name Botanical name Ideal growing conditions Height Notes Big leaf maple (Ater macrophyllum) Deciduous .... ......... dry —moist, sun —part shade 100 ft Bitter cherry (Prunus emarginata) Deciduous dry —moist, sun —part shade 30 ft Black. cottonwood . . (Populus balsamifera) ..... _ Deciduous moist —wet, sun —part shade 160 ft Black hawthorn (Crataegus suksdorfrt) . ....................................... Deciduous moist —wet, sun —part shade ............... 30 ft Cascara (Rhamnuspurshiana) ... ........ Deciduous *dry —wet, sun —shade 30 ft Douglas —fir (Pseudotsuga menziesii) .. Evergreen _ __.............. . .......... dry —moist, sun —part shade ........... _. 250 ft Grand fir (Abies grandis) Evergreen dry Oregon ash (Fraxinus latifolia) Deciduous ......... . moist —wet, sun —part shade .............. . 70 ft Pacific crabapple (Malus fusca) Deciduous moist —wet, sun —part shade 40 ft Pacific willow (Sala lasiandra) Deciduous moist —wet, sun —part shade 40 ft Red alderdry—wet,W� (Alnus rubra) Deciduous ..... _ dry wet, sun part shade 120 ft Scouler's willow (Salix scouleriana) Deciduous .................... dry —moist, sun —part shade 30 ft Shore pine (Pines contorta var. contorta) Evergreen dry —wet, sun —part shade 50 ft Sitka spruce (Picea sitchensis) Evergreen .... moist —wet, sun —part shade 200 ft Sitka willow (Salix sitchensis) Deciduous moist —wet, sun —part shade 30 ft Vine maple (Ater circinatum) Deciduous .. ......... ................. *dry —moist, sun —shade ..................................... 25 ft Western hemlock (Tsuga heterophylla) ........ Evergreen moist —wet, part shade —shade 225 ft Western red cedar . (Thuja plicata) ................. Evergreen . moist —wet, part shade —shade 200 ft Western white pine (Pinus monticola) Evergreen dry —moist, sun —part shade 130 ft Definitions: Dry: quick drying well draining soils Sun: more than 6 hours sun Deciduous: drops leaves seasonally Moist: damp much of year (not standing water) Part shade: 2-6 hours sun *Ifplan ted in full sun, prefers moist Wet: rarely or never dries out Shade: fewer than 2 hours sun conditions. Dry shade is f ne. Native Plant List —Shrubs and Ferns Common BotanicalIdeal!conditionsHeightNotes Beaked hazelnut (Corylus cornuta) ...... ......... ......... ......... Deciduous dry —moist, sun —shade 20 ft Deer fern (Blechnum spicant) - ...__...... Evergreen _ ......... moist —wet, part shade —shade ............................ 2 ft Evergreen huckleberry . . .. .. ........ ............ (Vaccinium ovatum) Evergreen ..... *dry —moist, part shade —shade ........ .. .......... loft Indian plum ... .. _ ....... (Oemleria cerasiformis) - _ __.. . Deciduous *dry —moist, part shade —shade ........................ 15 ft Lady fern (Athyrium frlix femina) Deciduous moist —wet, sun —shade 4 ft Mock orange ...._. __. _..._... ........ (Philadelphus lewisii) __........... Deciduous _.. .... dry —moist, sun —part shade ... .... ... 9 ft Oceanspray (Holodiscus discolor) _ Deciduous dry —moist, sun —part shade 15 ft Oregon grape (tall) (Mahonia aquifolium) Evergreen *dry —moist, sun —shade 5 ft spreads easily Pacific ninebark (Physocarpus capitatus) Deciduous moist —wet, sun —shade 13 ft .......................... . Pacific wax myrtle (Myrica californica) Evergreen .. .............. Red elderberry (Sambucus racemosa) Deciduous . . .. . ......... ......... Red —flowering currant (Ribes sanguineum) Red huckleberry (Vaccinium parvifolium) Red osier dogwood (Cornus sericea) Rosa species Salal Salm anberry Servicebezry Snowberry Sword fern . ............................ Tbimbleberry ........ (R. nutkana, R. pisocarpa) (Gaultheria shallon) (Rubus spectabilis) ... ........... (Amelanchier alntfolia) ................ ................. ................. (Symphoricarpos albus) ......... ........ ......... (Polystichum munitum) .................... (Rebus parviflorus) Deciduous ............ Deciduous Deciduous Deciduous Evergreen Deciduous Deciduous Deciduous . ...... Evergreen . .......... Deciduous ............. *dry —moist, sun —shade ......__............... 15 ft *dry —moist, sun —shade ................... . ....... . 15 ft dry —moist, sun —part shade 6 ft dry —moist, part shade —shade ..... ...... 10 ft moist —wet, sun —shade 15 ft ........................ dry wet, sun —part shade *dry —moist, part shade --shade moist —wet, sun shade ................. dry —moist, sun shade dry —wet, sun or part shade dry -moist, part shade —shade *dry —moist, sun —shade ......... ......... 6 it spreads easily 5 ft .. ........._ spreads easily 10 ft spreads easily 20 ft 5 ft spreads easily 3ft 8 ft spreads easily Definitions: Dry: quick drying well draining soils Sun: more than 6 hours sun Deciduous: drops leaves seasonally Moist: damp much of year (not standing water) Part shade: 2-6 hours sun * If planted in full sun, prefers moist Wet: rarely or never dries out Shade. fewer than 2 hours sun conditions. Dry shade is fine. Native Plant List—Groundcovers and Perennials Common name Botanical name Ideal growing conditions Height Notes Beach strawberry (Fragaria chiloensis) Evergreen dry -moist, sun part shade 6 in spreads easily Bleedingheart (Dicentra formosa) Deciduous dry -moist, part shade -shade 1.5 ft spreads easily Camas (Camassia quamash) Deciduous ..... .... *dry -moist, sun part shade 1 ft Inside -out -flower (Vancouveria hexandra) ..... Deciduous ...... dry moist part shade --shade 6 in spreads easily Kiunikinuick (Arctostaphylos uva-ursz) Evergreen dry, sun 6 in spreads easily Western trillium (Pillium ovatum) Deciduous moist, shade 1 ft Wood sorrel (Oxalis oregana) Deciduous dry -moist, part shade -shade 6 in spreads easily Definitions: Dry: quick drying well draining soils Sun: more than 6 hours sun Deciduous: drops leaves seasonally Moist: damp much of year (not standing water) Part shade: 2-6 hours sun * If planted in full sun, prefers moist Wet. rarely or never dries out Shade: fewer than 2 hours sun conditions. Dry shade is fine. Footnote Resources for More Information • WSU Native Plant Guide http://gaidening.wsu.edu/text/nwnative.htm All these and more are at: 5. Native Plant Sources: http://dnr.metrokc,Eov/wlr/gil/,npresrcs.htm •Where to purchase native plants 1. Shrink your Lawn! 1M1Hdnrmetrokc.gov/wlr1p>Znpnursryhtm httpmHdnr.metrokr,,O-vLw-l-rY-pi/shrunklawn.htni "` • Restoration Growers Association —Let the King Conserva- 2. Landscaping for Wildlife in the Pacific Northwest. Russell tion District find local native plants for you! Contact KCD at Link. UW Press, Seattle. 1499. 206-296-3410 ext. 129. 3. King County Noxious Weeds: 6. Plant it Right Brochure: gip;//dnr.metrokc.goy/wlr ds/weeds/index htr� h�tp: /cru.cahe u.edu/CEPublications/niiscO337/miscO337,T)df 4. Native Plant Information: 7. Soils, Compost & Mulch Information: • Grow Your Own Native Landscape. Item MISCO273 WSU • Soils, compost and mulch use Cooperative Extension. Revised 1999. Order at h trk /s it 1-800-723-1763. • Mulch and horticulture myths • Gardening with Native Plants of the Pacific Northwest htWlZA?vwwcfrwashingion.edu/research.-m-uI 2"d edition. Arthur R. Kruckeburg. UW Press, Seattle 1996. 8. Natural Yard Care Booklet (includes watering): • Plants of the Pacific Northwest Coast. Jim Pojar and Andy I nr.me ok w sRecylso o in Mackinnon. Lone Pine Publishing, Vancouver, BC. 1994, r&tl mj=dbooklet.shtmUj R-1 Cluster Code Amendment Draft November 3, 2004 4-2-11QA DEVELOPMENT STANDARDS FOR SINGLE FAMILY RESIDENTIAL ZONING DESIGNATIONS (Primary and Attached Accessory Structures RC R-1 R-4 R-8 DENSITY (Net Densi in Dwelling Units per Net Acre Minimum None None None 4 dwelling units Housing Density per net acre''2 for proposed short plats or subdivisions Maximum 1 dwelling unit 1 dwelling unit per 4 dwelling units g dwelling units 2 Housing Density per 50 net 1 net acre except per 1 net acre per 1 net acre acre that in designated Urban Separators, density of up to-1_ unit per gross 404 acre may be permitted subject to conditions in RMC 4-3-110 Urban Separator Overlay. NUMBER OF DWELLING UNITS PER LOT Maximum 11 dwelling with 1 dwelling unit 1 dwelling unit 1 dwelling unit Number perlegal 1 accessory loe unit LOT DIMENSIONS . Minimum Lot 10 acres 1 acre 8,000 sq. ft. ' 4,500 sq. ft. for Size for lots 48$10,000 sq. except where parcels greater created after ft. for cluster3 small lot than 1 acre. November 10, development clusters10 are 2004 allowed, R-8 5,000 sq. ft. for standards shall parcels 1 acre or apply. less. Minimum Lot 150 ft. for 75 ft. for interior 70 ft. for interior 50 ft. for interior Width forlots interior lots. lots. lots. 80 ft. for lots, created after corner lots."''3 November 10, 175 ft. for 85 ft. for corner except where 60 ft. for corner 2004 corner lots. lots. small lot lots clustersi° are allowed, R-8 standards shall apply. Minimum Lot 200 ft. 85 ft. 80 ft. except 65 ft. Depth for lots where small lot created after clustersf0 are November 10, allowed, R-8 2004 standards shall apply. p s H:IEDNSP1Title 1VIR-1 Clusterin 1E. 4-2-110 A.revised2-27doe.doc A.re�sed2 27des.deePI!1ED�'`T�ride POR 1 Gjuster�ga& n 2 y , n n de Last printed 2/8/2005 9:40 AM44;QQQS4-.-Q44441 1,ari i 1� i29- I ,.154"Vage 1 of 5 R-1 Cluster Code Amendment Draft November 3, 2004 RC R-1 R-4 R-8 SETBACKS Minimum Front 30 ft. 30 ft. 30 ft. except 15 ft. for primary Yard where small lot structure. clusters10 are allowed, R-8 20 ft. for attached standards shall garages accessed apply. from front or side Unit with Alley yard street. Access Unit with Alley Garage: The Access Garage: front yard set- The front yard back of the set -back of the primary primary structure structure may may be reduced be reduced to to 10 ft. if all 20 ft. if all parking is parking is provided in the provided in the rear yard of the lot rear yard of the with access from lot with access a public right -of - from a public way or alley. right-of-way or alley. 6 Minimum Side 30 ft. 20 ft. 20 ft. except 15 ft. for the Yard Along a where small lot primary structure Street clusters10 are and 20 ft. for the allowed, 15 ft. is attached garages allowed. which access from the front and side yard along a street. Minimum Side 25 ft. 15 ft. 15 combined 5 ft. Yard ft. 12, 13 are allowed with a minimum of 5 ft. for any side yard, except where small lot clusters i0 are allowed, 5 ft. H:\EDNSP\TitlelV\R-1 Clustering\E. 4-2-110 A.revised2-27doc.doct4:T-D `TSP4T itI. Ar' , Gusle in" ^ 2 11 n A Q 27R4D e�iae nnn y ri,,.,tefing�L .r 2 110 n .de Last printed 2/8/2005 9.40 AM age 2 of 5 R-1 Cluster Code Amendment Draft November 3, 2004 RC I R-1 I R4 I R-8 SETBACKS" Contin Minimum Rear 35 ft. Yard Clear Vision Area In no case shall a structure over 42 in. in height Intrude into the 20 ft. clear vision area defined in RMC 4-11-030. Minimum 10 ft. Freeway landscaped Frontage Setback setback from the street property line. BUILDING STANDARDS Maximum Building Height and Number of Stories, except for uses having a "Public Suffix" (P) designation9 25 ft. In no case shall a structure over 42 in. in height intrude into the 20 ft. clear vision area defined in RMC 4-11-030. 10 ft, landscaped setback from the street property line. 2 stories and 30 2 stories and 30 I ft. ft. Maximum Height See RMC 4-4- for Wireless 140G. Communication Facilities See RMC 4-4- 140G. 25 ft. Where small lot clusters1D are allowed, 20 ft. In no case shall a structure over 42 in. in height intrude into the 20 ft. clear vision area defined in RMC 4-11-030. 10 ft. landscaped setback from the street property line. 2 stories and 30 ft, for standard roof. 2 stories and 35 ft. for roofs having a pitch greater than 3/12. See RMC 4-4- 140G. 20 ft. In no case shall a structure over 42 in. in height intrude into the 20 ft. clear vision area defined in RMC 4-11-030. 10 ft. landscaped setback from the street property line. 2 stories and 30 ft. See RMC 4-4- 140G. H:IEDNSP1Titie MR-1 ClusterinaT. 4-2-110 A.revised2-27doc.docf4.l.- SP-\Tide AnD�aeteFinO& ^ ' "n 2.7dE) dE)eHAE-D `rcn4;+ie nnn 1 Quster-in 1& n 2 1 1 n n Ae Last printed 2/8/2005 9:40 AM ;;9005 c.nn PM W »nnn 3:25 nage 3 of 5 R-1 Cluster Code Amendment Draft November 3, 2004 RC R-1 R-4 R-8 BUILDING STANDARDS (Continued) Maximum Lots 5 acres or 35%. Lots greater Lots 5,000 sq. ft. Building more: 2%. An than 5,000 sq. or greater: 35% Coverage additional 5% of ft.: 35% or or 2,500 sq. ft., (Including primary the total area 2,500 sq, ft., whichever is and accessory may be used for whichever is greater. buildings) agricultural greater. buildings. Lots less than Lots 5,000 sq 5,000 sq. ft.: Lots 10,000 sq. ft. or less: 50 /0 50 /o. ft. to 5 acres: 15%. On lots greater than 1 acre, an additional 5% of the total area may be used for agricultural buildings. Lots 10,000 sq. ft. or less: 35%. Vertical Fagade All dwelling units Modulation shall provide vertical facade modulation at least every twenty horizontal feet (20'), including front, side and rear fagades when visible from a street. H:IEDNSPITitle IV1R-1 Clusterin 1E. 4-2-110 A.revised2-27doc.doc . Last printed 2/8/2005 9:40 AM' »70GS c.n t ��► ry t 3/2Q04 4 PWage 4 of 5 R-1 Cluster Cade Amendment Draft November 3, 2004 RC R-1 R4 R-8 LANDSCAPING AND OPEN SPACE Minimum Off- 5 ft. wide irrigated 5 ft. wide irrigated Site or drought or drought Landscaping resistant resistant Abutting Non- landscape strip landscape strip Arterial Public provided that if provided that if Streets for Plats there is additional there is additional and Short Plants undeveloped right undeveloped right Submitted on or of way in excess of way in excess after November of 5 ft, this shall of 5 ft, this shall 10, 2004 also be also be landscaped. landscaped. Minimum Off- 10 ft. wide 10 ft. wide Site irrigated or irrigated or Landscaping drought resistant drought resistant Abutting landscape strip landscape strip Principal, provided that if provided that if Minor and there is additional there is additional Collector undeveloped right undeveloped right Arterial Streets of way in excess of way in excess for Plats and of 10 ft., this shall of 10 ft., this shall Short Plants also be also be Submitted on or landscaped, landscaped, after November unless otherwise unless otherwise 10, 2004 determined by the determined by reviewing official the reviewing during the official during the subdivision subdivision process. process. Minimum On or At least two (2) At least two (2) Off -Site Street trees of a City- trees of a City - Tree approved species approved species Requirements with a minimum with a minimum for Plats and caliper of 1 %Z' per caliper of 1 '/z" Short Plants tree shall be per tree shall be Submitted on or planted in the planted in the after November front yard or front yard or 10, 2004 planting strip of planting strip of every lot prior to every lot prior to occupancy. occupancy. H:IEDNSPITitle IV1R-1 Clusterin 1E. 4-2-110 A.revised2-27doc.doc A..r-e -27c es leeH � SP4 49 PPR-1 GWsteri,..g\ 4 2 ' t-'_"ndeeLast printed 2/8/2005 9:40 AWAPA200 5.nn nrx11/34004 94 PWage 5 of 5 Laureen iVicalay - 4-2-110 DRevised2-3.doc Pa e 4-2-11 OD To be amended by the following changes Amended February 1, 2005 in Response to Planning and Development Committee public comments and In house Staff Review 4-2- I IOD CONDITIONS ASSOCIATED WITH DEVELOPMENT STANDARDS TABLE FOR SINGLE FAMILY RESIDENTIAL ZONING DESIGNATIONS 1. a. Phasing, shadow platting, or land reserves may be used to satisfy the minimum density requirements if the applicant can demonstrate that the current development would not preclude the provision of adequate access and infrastructure to future development and would allow for the eventual satisfaction of minimum density requirements through future development. b. In the event the applicant can show that the minimum density cannot be achieved due to lot configuration, lack of access, environmental or physical constraints, minimum density requirements may be waived by the Reviewing Official. 2. Use -related provisions are not variable. Use -related provisions that are not eligible for a variance include: building size, units per structure/lot, or densities. Unless bonus size or density provisions are specifically authorized, the modification of building size, units per structure, or densities requires a legislative change in the code provisions and/or a Comprehensive Plan amendment/rezone. 3. Clustering is allowed to meet objectives such as preserving significant natural features, providing neighborhood open space, or facilitating the provision of sewer service. Within designated urban separators clustering is required, consistent with the provision of Section 4-3-110, Urban Separator Overlay Re lations. a. . d. a. The maximum net density requirement shall not be exceeded except within Urban Separators a density bonsus may be gg ted allowing the total denser to achieve 1 dwelling unitper oss acre for Rrojects that meet the followingcriteria. i. Provision of native vegetation cover on 65% of the gross land area including both the area within and outside the open space corridor with either existing or new vegetative cover, and at least one of the following additional criteria. a) Enhancement of wetlands is provided at a ratio of one-half acre enhanced for one acre delineated within the Urban Separator pursuant to Section 4-3-050M 12b. Evaluation Criteria, and Section 4-3- 050M 12.c. Wetlands Chosen for Enhancement. Enhancement proposed for a density bonus may not also be used for a_mitigation for other wetland alterations. h) Legal Non -conforming uses are removed from the site and/or brought into conformance with Renton standards. c) Natural surface pedestrian and/or equestrian trails with pjLblic access H:IEDNSP1Title IV1R-1 Custering14-2-110 Mcvised2-3.doc N Laureen Nicola5 - 4-2-140 DRevised2-3.doc � � P Pa e 2' are provided as part of an adopted trail system or, where there is no planned trail system, in a configuration approved by the Reviewing Official. In the absence of either wetlands or legal non -conforming uses on the site, public access and trails shall be required to the satisfaction of the Reviewing Official. b. The area of individual lots shall not be less than 10,000 sq. ft. d. Eaves: Eaves and cornices may project up to 24" into any required setback. 5. In order to be considered detached, a structure must be sited a minimum of 6' from any residential structure. 6. A front yard setback of less than 20' is allowed if equal to or greater than the average of the front yard setback of the existing, abutting primary structures; however, in no case shall a minimum setback of less than 20' be allowed for garages which access from the front yard strect(s). C. 7. For pre-existing legal lots having less c than the minimum lot width required by this Section, the following chart shall apply for determining the required minimum side yard width along a street: 4. Allowed Projections into Setbacks: a. Fireplace Structures, Windows: Fireplace structures, bay or garden windows, enclosed stair landings, and similar structures as Zoning Administrator may project 24" into any setback; provided, such projections are: (i) Limited to 2 per fagade. (ii) Not wider than 10'. b. Fences: See RMC 4-4-040. c. Steps and Decks: Uncovered steps and decks not exceeding 18" above the finished grade may project to any property line. Uncovered steps and decks having no roof covering and not exceeding 42" high may be built within the front yard setback. WIDTH OF EXISTING LEGAL LOT MINIMUM SIDE YARD WIDTH ALONG A STREET RC ZONE 150 feet or less 1 25 ft. R 1 ZONE Less than or equal to 50 ft. 10 ft. 50.1 to 51 ft. 11 ft. 51.1 to 52 ft. 12 ft. 52.1 to 53 ft. 13 ft. 53.1 to 54 ft. 14 ft. 54.1 to 55 ft. 15 ft. 55.1 to 56 ft. 16 ft. 56.1to57ft. 17ft. 57.1 to 58 ft. 18 ft. 58.1 to 59 ft. 19 ft. 59.1ft. and greater 19 ft. R-4 or R-8 ZONE Less than or equal to 50 ft, 10 ft. 50.1 to 52 ft. 11 ft. 52.1 to 54 ft. 12 ft. 54.1 to 56 ft, 13 ft. 56.I to 58 ft. 14 ft. H:TDNSPITitle IVIR-1 Clustering14-2-110 DRevised2-3.doc -2- Lau —re en Nicola y - 4-2-110"DRevised2-3.—do c 58.1 ft, or geater 1 15 ft. However, in no case shall a structure over 42" in height intrude into the 20' clear vision area defined in RMC 4-11- 030. 8. 1n no case shall building height exceed the maximum allowed by the Airport Related Height and Use Restrictions, for uses located within the Federal Aviation Administration. Airport Zones designated under RMC 4-3-020. 9. "Public Suffix" (P) properties are allowed the following height bonus: Publicly owned structures shall be permitted an additional 15' in height above that otherwise permitted in the zone if "pitched roofs," as defined herein, are used for at least 60% or more of the roof surface of both primary and accessory structures. In addition, the height of a publicly owned structure may be increased as follows, up to a maximum height of 75' to the highest point of the building: a. When abutting a public street, 1 additional foot of height for each additional 1-1/2' of perimeter building setback beyond the minimum street setback required; and/or b. When abutting a common property line, 1 additional foot of height for each additional 2' of perimeter building setback beyond the minimum required along a common property line. 10. In order to serve as a transition between the lower density R4 zone and the higher density .R-8 zone "small lot clusters" of up to a maximum of 50 lots shall be allowed within 600 feet of an R- S zone when at least 30% of the site is permanently set aside as "significant open space." Such open space shall be situated to act as a visual buffer between small lot clusters and other development in the zone. The percentage of open space required may be reduced by the reviewing official to 20% of the site when: a) Public access is provided to open space, b) Soft surface trails are provided within wetland buffers, and c) Store water ponds are desig ed to eliminate engineered slopes requiring fencing and enhanced to allow passive and/or active recreation. 11. a) Lot size width and depth may be reduced by the reviewing official when, due to lot configuration or access, 4- dwelling units per net acre cannot be achieved. The reduction shall be the minimum needed to allow 4-dwelling units per net acre and shall be limited to the following minimum dimensions: Lot size - 7,200 sq. ft Lot depth — 70 feet Lot width - 60 feet 12. When lot size is reduced for the purpose of achieving maximum density, setbacks may also be reduced. Setback reductions shall be limited to the following: Front — 20 feet. Side yard along a street --15 feet primary structure, 20 feet attached garage with access from the side yard. Minimum side yard combined setback — 15 feet. Minintum for one yard — 5 feet. 13. For properties vested with a complete plat H:IEDNSnTitle IV1R-1 Clustering14-2-110 DRevised2-3.doc -3- i Laureen Nicola - 4.2-11a DRevised2-3.doc' Page 4 application prior to Nov. 10, 2004, and for the Mosier IL Maplewood East and Anthone, the following standards apply. Vested plats must be developed within 5 years of preliminary plat approval and/or annexation. Maximum Density - 5 dwelling units per net acre Minimum Lot Size - 7,200 sq. R Minimum Lot Width - 60 feet for interior lots, 70 feet for corner lots Minimum Lot Depth - 70 feet Minimum Front Yard - 15 feet for the primary structure, 20 feet for an attached or detached garage. For a unit with alley access garage, the front yard setback for the primary structure may be reduced to 10 feet if all parking is provided in the rear yard of the lot with access from a public right of way or alley. Minimum Side Yard Along a Street - 15 feet Minimum Side Yard - 5 feet (Amd. Ord. 4963, 5-13-2002) H.- EDNSP1Tide IVUt-1 Clustering*2-110 DRevised2-3.doc 151 Lau reen Nicola - Urban Separator Overla 8 Feb-3.doc Pa e 1 Proposed New City of Renton Code Creating an Overlay District Amendments Responding to 1) Planning and Development Committee and 2)Public Comment 3) In House Staff Comments 4) Planning Commission recommendation (Shown in bold) February 3, 2005 4-3-110 Urban Separator Overlay Regulations A. Purpose: The pgWose of this section is to implement the Urban Separators policies in the Community Design Element of the Comprehensive Plan and the King Coun Countywide Planning Policies. The intent is to provide physical and visual distinctions between Renton and adjacent communities define Renton's boundaries and create contiguous open space corridors within and between urban communities, which provide environmentalvisual recreational and wildlife benefits. Urban Separators shall be permanent low -density lands, that protect resources and environmentally sensitive areas. B. Applicability: This section shall applygpply to subdivisions and building permits on lands within designated Urban Separators as shown in the Urban Separators Map. C. Urban Separators Maps D. Administration: 1. Review Process: Annlications subiect to Urban Separator Regulations shall be processed as a component of the governing land use _process. 2. Authority: The Reviewing Official shall have the authority to approve with conditions, or denim+ proposals based on the provisions of the Urban Separator Overlay Regulations. E. Urban Separator Overlay RegWations 1. ContigKous Qpen Space Corridor Established. A designated contiguous o ens ace corridor is established as shown on the Urban Se arators Overla Mqp in Section 4-3-110J. 2. Dedication of Open Space Required. a. Aimroval of a plat, and/or building permit on an undeveloped legal lot in the Urban Separator Overlay shall require dedication of 50% of the gross land area of the parcel or parcels included in the land use action as a non -revocable open space tract retained by orooerty owner, or dedicated to a homeowners Be H:IEDNSP\Title IVUR-I Clustering\Urban Separator Overlay$ Feb-ldoc Laureen Nicola .: Urban Se arator Overla 8 Feb-3.doc Pa e 2 association or other suitable organization as determined by the Reviewing Official. Acreage in tracts may include critical areas and/or critical area buffers. b. Existing residences existing accessory uses and structures, and existing above ground utilities Iocated in the tract at the time of designation shall not count toward the 50% gross land area calculation except for un-fenced stormwater ponds enhanced per techniques and landscape requirements set forth in the publication the "Integrated Pond" King County Land and Water Resources Division. L. Approval of a buildins permit for an addition of 300 square feet for primary use structure or 500 square feet for an accessory structure shall require dedication of a conservation easement, protective easement or tract and deed restriction pursuant to Section 4-3-050G. Native Growth Protection Areas, on critical areas and critical area buffers located within the Contiguous Open Space Corridor. d. hand dedicated, as open space, shall be located within the mapped Contiguous Open Space Corridor unless a modification is approved pursuant to Section 4- 3-110B6.. 3. Uses Allowed In Contiguous Open Space a. Passive Recreation with no development of recreation facilities b. Natural surface pedestrian and equestrian trails c. Animal husbandry (small, medium and large) provided that fencing is subject to the conditions in 4-3-1103g, d. Existing residences and accessory uses and structures e. Underground utilities (small, medium, and Iarg_e) f. Access Easements. fD Utilities easements and emergency service access roads may be located within Contiguous Open Space Corridors for the limited purpose of providing service to parcels platted after March 2005, for which there is no practical alternative way to Rrovide service. Utilities and emergency_ service easements shall be developed with permeable surface treatment. Private access easements for ingress and egress may be located within Contiguous Open Space in the limited instance where there is no altemative access to a pre-existing legal lot, but shall not serve lots platted after March 2005. g Fencing or similar structures and/or hedges or similar landscape features on portions of properties abutting and within the Contiguous Open Space Corridor shall not create a solid barrier. Where required to protect wetlands pursuant to Section 4-3-050Mc., fencing shall be the minimum necessary. -2- HAMNSI'M le IVIR-1 Clustering\Urban Separator Overlay8 Feb-3.doc Laureen Nicola - Urban Se arator Overly 8 Feb-3.dac • Page 3 4- Uses in Portions of the Urban Separator Outside the Established Contiguous Open Space Corridor a. Uses shall be consistent with Section 4-2-060 and 4-2-070B., Residential- I Zone One Dwelling unit per net acre. b. Development shall be clustered outside the Contiguous Open Space Corridor mapped in 2-3-110J. 5. Standards Within Entire Urban Se arator a. Forest/veeetation clearing shall be limited to a maximum of 35% of the gross acreage of the site except: (1). The percentage of forest/vegetation coverage may be increased to quaIi for the density bonus allowed in Section 4-2-11OD. (2). The Reviewing Official mAy modify the percentage of forest/ve etation retention if determined necessary to meet the surface water retention/detention standards of Section 4-3-110 E.7. b. If the existing cleared area of a site, as of March, 2005 is greater than 35% approval of a plat shall require re -planting of forestive etative cover . c. Forest/ye etation cover mLiy include a combination of native vegetation including conifer, deciduous trees and shrubs sufficient to provide water retention and erosion control functions as determined qppLopriate by the Reviewing Official. The Reviewing Official shall determine whether existing vegetation provides functions to meet forest/vegetation coverage standards, and shall require additional plantinp if existing vegetation is found to be insufficient. d Stonnwater management shall comply with the 2005 King County_ Surface Water Design Manual Conservation Flow Control Area Level 2 flow control standards e Private access easements and improvements shall be established at the minimum standard needed to meet public safety requirements. f Landscape plans required in Section 4-4-070 shall include retention/re- planting lans as applicable, consistent with standards and lant lists in Kin County Department of Natural Resources and Parks Water and Land Resources Division Publication "Going Native" 6. Modification of Mapped Contiguous Open Space: The Reviewing Official may modify the open space configuration where: a. Site specific data confirms that the adapted Contiguous Open Space Corridor mpp includes more than the required goss area for any parcel,or b. The applicant can demonstrate a configuration of contiguous open space that provides better orequal provision of the open sace requirement. At a minimum, open space shall be connected to another contiguous open space parcel by a fift foot corridor. Modifications to the Contiguous Open Space Corridor shall be re -mapped during the City's annual Title IV review_ process. -3- H:%EDNSP\Title lVR-1 Clustering\Urban SeparatorOverlayS Feb-lduc I.Laureert, Nicola - Urban Se arator Overla 8 Feb-3.doc Pa e 4 Proposed De inition Open space, contiguous, Urban Separator: Land permanently set aside as open space loeated in recorded tracts. Contiguous open space lands may include critical areas, such as wetlands and steep slopes, and wetland buffers, as well as stormwater ponds enhanced per the techniques and landscape requirements set forth in The Integrated Pond, King County Water and Land Resources Division. Cross references to Other Sections of City Code Section 4-4-040 Fences and Hedges Need to discuss further with development services Need to reference the Urban Separator Overlay requirements Section 4-4-130 C Allowable Tree Cutting Activities Tree cutting and associated use of mechanical equipment is permitted as follows, except as provided in subsection D2 of this Section, restrictions for Critical Areas, and in Section 4-3-110 E. 5b. Urban Separator Overlay Reaulations (section text continues) Do we need to add something in the section referencing the land development permit or will the standards in the overlay automatically take care of that? Section 4-6-030 F. Drainage Plan Design Criteria Drafting Standards and Contents The drainage plan shall be prepared in conformance with the Department's construction plan drafting standards and contents, the City's Standard Specifications for Municipal Construction and Standard Detail documents, and the design criteria, construction materials, practices and standard details contained in chapters 3, 4, and 5 of the current King County Surface water design manual; provided that the Department's standards and design criteria will take precedent and prevail in any interpretation of conflicting contradictory standards and design criteria, and provided that within_ designated Urban Separators regulated in Section 4-4-110 the 2005 King County Surface Water Design Manual Conservation Flow Control Area Level 2 flow control standards are required. -4- H:IEDNSPITitle IV1R-1 Clustering\Urban Separator Overlay$ Feb-ldoc 2��JD 5 ��;��� �� _ 1�� � � � . ��� •..�, r-- �..�� _�_ _� A � __ .�� �� ._ ��� -- __ � ., ��� � :` � ■ BA1MA & HOLMBERG INC. C-'Ity of Rrc,,into a �lanr�in hive. ;icn TECHNICAL INFORMATION REPORT D; -, �. ; �:• ,: fo r Wilson Park May 5, 2009 1 CIO x 133'� SIGNAL Baima & Holmberg, Inc. Job No. 2687-001. Prepared For Robert Wilson 720 South 55th Street Renton, WA 98055 100 FRONT STREET SOUTH • ISSAQUAH WASHINGTON • 98027-3817 • (425) 392-0250 • (425) 391-3055 TABLE OF CONTENTS SECTION TITLE PROJECT OVERVIEW 2 CONDITIONS AND REQUIREMENTS SUMMARY 3 OFFSITE ANALYSIS 4 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN 5 CONVEYANCE SYSTEM ANALYSIS AND DESIGN G SPECIAL REPORTS AND STUDIES 7 OTHER PERMITS 8 ESC ANALYSIS AND DESIGN 9 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT 10 OPERATIONS AND MAINTENANCE MANUAL Street Address 720 South 551h Street King County Tax Parcel No. 312305-9125 Project Overview This project involves developing a 2.5-acre parcel into 13 single-family lots. The site currently is occupied with a single residence, lawn and wooded areas. The site is located about 250' north of South 55'h Street, about 150' east of the east terminus of South 53rd Place, on the slope overlooking SR 167, about %z mile to the west. The site generally slopes down to the west at an average slope of approximately 20%, Per the SCS soil maps, the site is underlain with Alderwood soil, sandy loam over glacial till. Upstream Tributary Drainage A portion of the parcel to the east of the site drains onto the site. No problems related to this runoff was noted. Level 1 Downstream Drainage Analysis In general, runoff from the site flows west into lots in the adjacent development, Geneva Court (A). The majority of these runoff flows apparently collect in the drain behind an 8'± rockery (B) constructed along the back yards of the west -most lots of said development or in area drains in the back yards, then flow into the storm system in South 53rd Place (C & D). This flow collects in a stormwater pond/bioswale facility located at the intersection of South 53rd Place and Talbot Road South (E), about 750' downstream from the site. This facility outfalls through an 18" pipe to the west side of Talbot Road South into a shallow, poorly defined channel flowing west through the woods (F). The flows pass through a short 12" culvert (H) under a walking path then disappear into thick woods/brush, continuing to flow west to a wooded wetland area (1) beyond'/4 mile downstream from the site. This wetland apparently drains to a 10' X 5'± box culvert crossing under SR-167 (Q), about '/z mile downstream from the site. A small area of the south part of the site drains southwest across the south property line of the site into the adjacent parcel to the south (Z). These runoff flows through woods, collecting in a ditches along South 55'h Street (K)(about 350' downstream from the site) and/or Talbot Road South (L)( about 800' downstream from the site). Flows into the ditch along South 55th Street (K) continue west in a 6"-12" rock -lined ditch channel OVERLAP 15 9.56' F AT N PROP U- - T3� SE 1/4, PORTION OF THE SE-1/4 OF SEC. 31, TWIN. 23 N., RNG 5 E., Wit FOONO 5/3_ RE-W A CAP CITY OF RENTON, WASH INGTON SET REBAR FOUND 5/8' RF��i W.0 d CAP CPS 72330 0. 14' N 9 N. LINE, .5 525', S.E I/4, Sf 1/1 Lso tt3 zo'4 CRONES 2 W" 0.39- K 9.1 1 ' C OF PROP COP 388 �6 Jul 525 of d 015' E OF PRCP GOR I 16 PER GENEVA COURT 'I TRAIC I7II I A I OPEN 5F'AEE/ 13 $ I12 _-- I 10 ----- -- STORM DETrx TION - 5,11 sq Ft 49,1 Sq Ft 0,324 Sq FI R-1) L2,t TI sq Fi R-,4) -- 7.5 , 1ell y�o`_______g4 �nr ------------ 3 !_ -- FUONO 513' RFBAR 'CPS 22VO 056' N ,F 13 Jodi' £ OF PROP CGN 0F_RL4P R 1046' AT S PROP SINE O 11' I I I f I i 51T ROAD ANO 0TUTr EASEMENT RFC NO 2080J2700-f118 I 11 I 1 I I i I 1 *6 2638'N 1t674''• +S 2I3203 S 55TH ST, $ 7 11 8 10 $ g f e 5.257 Sq Ft 5,112 Sq Ft 5,}12 Sq T1 x - pp� 5,11E So it 5.333 5q rt 105.]9' 28 PRIVATE g I L.,3, 14' ACCESS ' 6' R�50.p0' S UTILI TT EA ..' 6,512 5q FI .50' S8.00' 44.19 c tY 15 I / = 'a ROAD A I J12Jos-RrzS [�" of [%� - 1p `.. �° 916..51' 254ACRES TT 36 B7 RA lE,105 Sq Ft��'Ny �D• f�, L 704 51.51- 80.00' 60.m 43 m- t-Sr a g s TA D 6.358 59 Ft pa° TR C 4.319 5R Ft } a 1 OPEN SPACE OPEN sq R 2 R 4,839 Sq Ft 4.770 Sq T, n.,�15' 4,32, sq F1 YA, -`� Fl /-' R "' 5.gw 5q FI B59L R 4 8yi I.E6. 129 1 s 3 e 4 S' Ft S t J.2 AIR Ob 38-K 51555 1g5.00' L1NC, x 2CT, S.E L/e, IF 114 � 7A4Z_[IF.E1 1N 7fON5 o ' r1 STE. O—AM TRACT, P ,,6LE , I{ N1L4E ACCESS FOii MWEP1110 y nORiFI-OIKJCONARiTAINEO 9Y NOA 1RACF'B' i�. I i, tl1111GL AREA TEAM I$TEEP 1 gOPES)-tR1NEpJF1NNTMM6} Ov !! MAU V LOT I f 'r ` ;' UK 5ACE _ 0x /--T—Eo BT xOA ' ,A RENTW 9P 1 059-85 �I TRACE TV I ^ OPEN SPACE - OMNEC/MAINTAWEO eT ROA R /J12JC5-YN9 MW8 l SO FT II 30' INGNCS;, EORE59�" =I 221 ACRES A OWR EASfWKT REC RO 791022M LOT ; it I it RENTGN SP 1054-85 -------- I � 1 o I SCALEALE V -J30 'p R ALT focc MU 263" 26164J PEAS) %1 WJ ,-`fi I 5 Xa)'H iSJ6.40 RX.S 11 _ _ FOUND CONCREIWNWE J Cj�W1L POw 75 �At SE SEC COR Site Flan III =805 N AT i-NI r I i s ' E ;e Vicinity Map r 16� icv� V F� I AgC 451 G!S 1 � WO Ur f a � _ e= � • �� � IAgC � JJ/ + fu f v e t 'Aid ig' Agb M,� AmB •a ml 17Py 77 Pu W o • •S A' ' Wo a, s•. I3M 194 I . u" °� . ; S ? 7 , Ag$, .• ns AgG • •+ . ..� :. ..e .•• . r. . ' I PY,Am6., '..'. a a� Ur gQ se ' WQ 4.. ggCf e Q ff. MA2 AgS s : 9•; a a Ng .. Br Re Po ' °:` War Ur r. No C d a Tank . � •n AgC ° e "• rn Ur Fy Q! a . s �I n, o so So q AgC �i o Agi a Ada !� ' 89'i •S , . FfAYSs Ng V 'm ti • I .a ,o .`y•• �➢ '.p . ,' C AgC, TU r U r 1 •' ° Pu a I AMC; • .. ' Uri 1 �• AkF AgC AgP 5` Ur Drive- er q sNg Nc • 1 ••-; CAS g °•� .5� e , P 1 �j A WO Agc Q0 PIQ PIo� Re Uri QS AmC Qe i• a " ..: �p Iva o \—�- ! • g. • • AgC - is Ur �' AgC �ta —� WO WO Amp 5 �.yU. AmC . •- = b"' �f! Os �lJr AMC, - sk Agc 0 ffis AmC 1 . y.....�• .' AmC �•• AgC • .'••�....•�=1 ' Pu Amf( "..: " r " WO� Py 'A� � AgG � .,.. AmC• � Os I! I Br i so _ Nc Jr r 12 Pk - 31 nr s� K 'rH S .. AmC Re x rt . irk•. a s;. Ur •mile• AkF Ag6, m Re I Ur I p Ur •. Ds• , AkF . AgC — Os ; Qs na : Re p?oW' AkF AgC :. Os y AS SCS Soil Map T Ur f .. Ur1' * �� r I * _ AgD __ Pu Sm AkF King County Department of Development and, Environmental Services TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part l ' PROJECT OWNER -AND PROJECT ENGINEER Project Owner Address im hurt-+ 55nk c;r Phone Project 5ngineer • Company K Address/Phone t • L APP.UCATION -' )c Subdivison Short Subdivision Grading Commercial Other Part 2 PROJECT LOCATION AND �DESCRIPTlON Project Name Wi,LeiPIQ FfV-- Location Township Range -5 ...J? .....Section 31 U Part'4 :OTHER R1=ICEEWS ANp PERM]TS ' DIFW HPA COE 404 DOE Dam Safety FEMA Floodplain COE Wetlands Shoreline Management Rockery Structural Vaults Other Pert 6 STTE:CHARACTERISTICS' River Floodplain Wetlands Stream Seeps/Springs Critical Stream Reach High Groundwater Table Depressions/Swales Groundwater Recharge Lake Other Steep Slopes Part 7. SOILS Soil Type Slopes Erosion Potential Erosive Velcoties A Oftwgo �t!j&vr rat ? Additional Sheets Attached Part8-. DEVELOPMENT LIMITATIONS REFERENCE LIMITATIONISITE CONSTRAINT Ch. 4--wDownstream Analysis L,a E)— )AM J15 Additional Sheets Attached MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION AFTER CONSTRUCTION Sedimentation Facilities ►'stabilize Exposed Surface Stabilized Construction Entrance Remove and Restore Temporary ESC Facilities ✓Perimeter Runoff Control Clean and Remove All Silt and Debris ✓Clearing and Graing Restrictions !/ Ensure Operation of Permanent Facilities vCover Practices Flag Limits of SAO and open space (/Constructian Sequence preservation areas Other Other Part i o '. SURFACE WATER`SYSTEM Grass Lined Tank Infiltration Method of Analysis Vr , ±y i `�- Channel ✓Vault Depression .,"Pipe System Compensation/Mitigati Energy Dissapator Flow Dispersal on of Eliminated Site Open Channel Wetland Waiver Storage Dry Pond Stream Regional Wet Pond Detention Brief Description of System Operation 51)_& M04DC? 'prriyym Facility Related Site Limitations Reference Facility Limitation "—tast in Place Vault '✓Retaining Wall Mockery > 4' High Structural on Steep Slope Other .Part 13 _-SIGNATURE O1= PROFE8SIONAL.,ENGINEER ...:. , I or a civil engineer under my supervision my supervision have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attachments. To the best of my knowledge the information provided here is accurate. SECTION 2 CONDITIONS AND REQUIRMENTS SUMMARY PREAPPLICATION MEETING FOR WILSON PARK 720 S 55TH ST CITY OF RENTON Department of Community and Economic Development Current Planning Division PRE09-012 February 26, 2009 Contact Information: Planner Gerald Wasser Phone: 425.430.7382 Public Works Reviewer Rick Moreno Phone: 425.430.7278 Fire Prevention Reviewer; Dave Pargas Phone: 425.430.7023 Building Department Reviewer: Craig Burnell Phone: 425.430,7290 Please retain this packet throughout the course of your project as a reference. Consider giving copies of it to any engineers, architects, and contractors who work on the project. You will need to submit a copy of this packet when you apply for land use and/or environmental permits. Pre-screening: When you have the project application ready for submittal, call and schedule an appointment with the project manager to have it pre-screened before making all of the required copies. The pre -application meeting is informal and non -binding. The comments provided on the proposal are based on the codes and policies in effect at the time of review, The applicant is cautioned that the development regulations are regularly amended and the proposal will be formally reviewed cinder the regulations in effect at the time of project submittal. The information contained in this summary is subject to modification and/or concurrence by official decision -makers (e.g., Hearing Examiner, Planning Director, Development Services Director, Department of Community and Economic Development Administrator, Public Works Administrator and City Council). FIRE & EMERGENCY SERVICES # DEPARTMENT �� lO% M E M Q R A N D U M DATE: February 24, 2009 TO_ Rick Moreno, Plan Reviewer FROM: David Pargas, Assistant Fire Marshal, Community Risk Reduction SUBJECT: PRE-APP 09-012 Wilson Park Project A review of the plans and material regarding the Vasquez Short Plat has been conducted and completed. Please review the Renton Fire & Emergency Services Fire Code and Policy comments and. concerns. 1, FIRE FLOW: Structures up to 3,600 square feet (including garage and basement areas) shall require a minimum fire flow of 1,000 gallons per minute for two hours. Structures in excess of 3,600 square feet shall meet a minimum fire flow of 1,500 gallons per minute for two hours. A water availability certificate shall be required. 2. REQUIRED HYDRANTS: As in accordance with Renton Fire & Emergency Services Department standards, one (1) hydrant shall be required for structures up to 3,600 square feet and requiring a minimum fire flow of 1,000 gallons per minute. For structures over 3,600 square feet and requiring a minimurn fire flow of 1,500 gallons per minute or more shall require a minimum of two (2) hydrants. The number of hydrants shall also be based on spacing, which shal l be in accordance with sound engineering practices. All hydrants servicing the Wilson Park project shall be equipped with five inch Storz fittings on the main ports. 3. HYDRANT SPACING: Residential spacing requires hydrants to be located no greater than 300 feet to the front of any structure. 1n this case, the existing hydrants are located much greater than the 300 feet to the existing structures, Therefore, a minimum of two (2) new hydrants shall be required in order for the Wilson Park project to meet the 300 foot spacing. 4. FIRE APPARATUS ACCESS: The minimum fire apparatus road access shall be no less than 20 feet wide and on a surface capable of sustaining the weight of a fire apparatus. The turning radius shall be 45 feet to the outside and 25 feet to the inside. Rick Moreno, Plan Reviewer Febniary 24, 2009 Page 2 of 3 At this time, 1 am concerned about the minimum 20 foot access off of South 192"d as a private access. Private accesses are difficult to regulate and to prevent parking in fire apparatus access roadways that are 20 to 28 feet wide. If this access cannot be designed as a public street, there are some possible options that could be considered, but would need to be reviewed and approved by the Fire Marshal. The options I am proposing as a possibility to mitigate the access issues are as follows: A) The�gated access would require it to be the type operated of a radio frequency and known as a Click To Enter system. B) The 20 foot road access would require to be naarked on both sides of the road as "NO PARKING AT ANY TIME ". The siznage would need to be provided by the developer and maintained by the Home Owners Association. C) All of the proposed 16 lots would have to be equipped with a residential fire sprinkler system. The fire sprinkler systerns would not aide in mitj3Zating,the steep rade issue. 5. FIRE APPARATUS ACCESS — GRADE: It appears that the access into the Wilson Park neighborhood may be greater than a 15 percent grade. It is important to note that we strongly require the grade to be no greater than 15 percent for Renton Fire & Emergency Services to recommend a project. Using fire sprinkler systems to mitigate an access to allow for it to be greater than 15 percent is not an option, 6. FIRE SPRINKLER: Residential fire sprinklers are not applicable to this project unless used as an option to mitigate insufficient fire flow or an access issue other than grade. 7. FIRE MITIGATION FEES: Fire mitigation fees shall be $488.00 per unit and shall be paid prior to final plat recording. Credit would be given for the one home that has been dedicated to be removed. RECOMMENDATION: LADDER/AERIAL ACCESS: Ladder access for a 35 foot ground ladder set at a 70 degree angle shall be provided on all four sides of any structure two stories or greater in height. DP/kc hAced\planninglcwTent plarm inglpreapps\09-012.jeny'�fire comments pre09-012 wilson park.doc Rick Moreno, Plan Reviewer February 24, 2009 Page 3 of 3 c; Jerry Wasser, Associate Planner hAcedlplanninglcurrent planninglpreapps109-012.jerrylfire comments pre09-012 wiison park.doc n�R DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT MEMO RANDU M DATE; February 23, 2009 TO: Jerry Wasser 42 FROM: Rick Moreno SUBJECT: Utility and Transportation Comments for Wilson Park Short Plat P RE09-012 NOTE, The applicant is cautioned that infonnation contained in this summary is preliminary and non -binding and may be subject to modification and/or concurrence by official city decision -makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. We have completed a preliminary review fax the above -referenced development proposal. The following comments are based on the fare -application submittal made to the City o f Renton by the applicant. WATER 1. This site is within the Reuton service area. .However, due to elevation of the site, Renton ca.nilot provide sufficient sustainable water pressure. It is recommended that the owner receive a certificate of water availability through Soos G�-cck eater District. The City will be able to release the service area upon evidence that Soos Creek can service this parcel. This certificate will be submitted to the City prior to release of service area. TRANSPORTATION 1, Street improvements are required including, but not limited to paving, sidewalks, curb and gutter, storm drainage, street fighting and landscaping along street frontage. 2. Traffic mitigation fees of $75 per additional daily trip shall be assessed per single family home at a rate of 9.57 trips per day. 3. All wire utilities shall be installed underground per City of Renton Ordinance, 4. A dedication of roadway to adjacent northern property is required prior to recording. It appears that Tract A is set up for this application, (See Stoma Utility issues), 5. ratfr may, xtcltg.situ tiisive evluatan sh.l)! be required for roadway b. The proposed 32 ft. right-of-way with curb, gutter and sidewalk on one side does not meet current code. An approved variance is required with this proposal. PRE 09-012 PRCommenis.doc 7. Dedicated right-of-way, meeting City of Renton Street Standards including curb, gutter and sidewalk improvements fronting all lots shall be required prior to recording. Current proposal is not acceptable for lots 6 through 9. 8. Maximum road slopes shall be 15% in all cases. Maximum angle of approach is 8 degrees and maximum angle of departure is 10 degrees. 9. Secondary access roadways are sometimes required as specified by the Fire Marshall_ Secondary access roadways are also required by the City of Renton Street Standards (Title 4, Chapter 6, Section 60G). If streets are over 500 feet, but not over 700 ft, long, dwellings shall either provide a secondary access road or provide an approved residential fire sprinkler system shall be installed, If streets are over 700 ft., a secondary access road is required. Any proposed access -gating system requires approval from the Renton Fire Department. 10. Sidewalk, curb and gutter shall abut S 192"a St with radius curb per City of Renton standards. SANITARY SEWER 1. This site is within the City of Renton Sewer area. The owner shall extend an 8- inch sanitary sewer main within the proposed right -of way from S 55"' St. and extend to the frontage of each proposed lot. A 15-foot utility easement shall be required to extend to the easterly boundary of lot 6, or lot 9. 2. All system development fees shall apply based on the size of the water meter services. SURFACE WATRER The project is required to do a drainage analysis and meet the design criteria in accordance with the 1990 King County Surface Water Design Manual with conservation flow control criteria or current city standard. The 2005 KCSWDM criteria may be required subject to submitted calculations by the engineer. The Surface Water System Development Charge (SDC) is S1,012 per new single- family residence. This is payable at the time the utility construction permit is issued_ if the proposed Tract A is dedicated for detention, and a right-of-way dedication is used to connect to the northern lot, traffic bearing lid(s) will be required to any proposed stonrr vault. GENERAL COMMENTS 1. All utility and street improvements will require separate plan submittals prepared according to City of Renton drafting standards by a licensed Civil Engineer. 2_ If fire sprinkler systems are necessary, then a separate fire sprinkler permit will be required. 3. Permit application must include an itemized cost of construction estimate for these improvements. 4. The fee for review and inspection of these improvements is 6% of the first $150,000 of the estimated construction costs 5% of anything over $150,000 but less than $300,000, and 4% of anything over $300,000. Half the fee must be paid upon application. PRE 09�O12 PRComments.doc CITY OF RENTON Planning{Building/Public Works MEMORANDUM DATE: February 26, 2009 TO: Pre -Application File No. 09-012 FROM: Gerald Wasser, Associate Planner, (425) 430-7382 SUBJECT: Wilson Park General, We have completed a preliminary review of the pre -application for the above -referenced development proposal. The following comments on development and permitting issues are based on the pre -application submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision -makers (e.g., Hearing Examiner, Planning Director, Public Works Administrator, Development Services Director and City Council). Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development Regulations are available for purchase for $50.00 plus tax, from the Finance Division on the first floor of City Hall, Project Proposal: The subject property is located north of S. 55'h St_ and east of Talbot Rd. S. at 720 S. 55`h St. The proposal is to subdivide a 108,884 sq. ft. (2.5 acre) parcel into 16 lots and one tract, for future development of detached single-family houses. There is one existing home on the parcel, which would be removed. The site has three different zoning designations, R-1, R-8, and R- 14, and the applicant is proposing a zone change to R-8 for the entire site. The proposed lots range from approximately 4,500 sq. ft. to 6,243 sq. ft, in size. The preliminary plat would be accessed via a 50 ft. wide access easement running from S. 55;" St. over a neighboring parcel to the south. Secondary access would be provided via a 30 ft. ingress, egress, & utility easement over a neighboring property to the south. The site contains protected slopes and a number of significant trees. Zoning/Density Requirements: The subject property encompasses three different zoning designations. Staff estimates that approximately 75,300 sq. ft. (1.73 ac) are zoned R-8, 31,200 sq. ft (0.72 ac) are zoned R-1, and 2,384 sq. ft. (0.06 ac) are zoned R-14. These are only approximations. Density is calculated by first subtracting the area of any access easements and critical areas from the gross site acreage, and then dividing the number of units by the net acreage. The applicant did not submit a density worksheet for the proposal. Based on the breakdown of haw much land is located in each zoning designation, staff has estimated that up to 13 units could be built on the R-8 portion of the lot, no units could be built on the 0.72 acre portion in the R-1, and no units could be built on the R-14 portion of the lot. The R-8 zone permits a minimum of 4.0 units per acre and a maximum of 8.0 units per acre. The applicant's submittal is predicated on a rezone of the R-1 and R-14 portions of the site to R-8 zoning. Note: While the applicant may request a rezone to R-8, staff is not supportive of this change of zone. The R-1 zone was applied in this general area to aid in the protection of critical areas. The R-1 zone designation on this property is part of a larger continuous area which Includes wetlands, steep slopes, landslide areas, and coal mine areas. This rezone would also require a Comprehensive Plan Amendment from Residential Low Density (RLD) to Residential Single Family (RSF). Development Standards: Because the only developable part of the lot is the R-8 portion, unless a rezone and Comprehensive Plan Amendment are approved, staff has only reviewed compliance with the development standards for that part of the site. Wilson Park Pre -Application Meeting February 26, 2009 Page 2 of 3 The R-8 zone permits one residential unit per lot. Detached accessory structures are permitted at a maximum number of two per lot at 720 square feet each, or one per lot at 1,000 square feet in size. No accessory structures are allowed on lots without a primary structure. Minimum Lot Size, Width and Dooth — The minimum lot size permitted in the R-8 zone is 4,500 square feet for tots greater than 1 acre in size and 5,000 square feet for lots 1 acre or less in size. A minimum lot width of 50 feet for interior lots and 60 feet for corner lots, as well as a minimum lot depth of 65 feet, is also required. The total area of the proposed subdivision is greater than 1 acre, so the minimum rat size is 4,500 square feet. All of the proposed lots in the R-8 portion of the site would far exceed this minimum. Note. Since this may be a Hillside Subdivision, lots may be required to be larger than the minimums prescribed in the zone. Building Standards — The R-8 zone allows a maximum building coverage of 35% of the lot area or 2,500 square feet, whichever is greater for lots over 5,000 square feet in size, Building height is restricted to 30 feet and 2-stories. Detached accessory structures must be below a freight of 15 feet and one-story. The gross floor area must be less than that of the primary structure. Accessory structures are also included in building lot coverage calculations. Given the proposed lot configuration, it appears that building standards could be satisfied. Setbacks — Setbacks are the minimum required distance between the building footprint and the property line or private access easement. The required setbacks in the R-8 zone are 15 feet in front for the primary structure and 20 feet in front for the attached garage, 20 feet in the rear, 5 feet for interior side yards, and 15 feet for side yards along streets (including access easements) for the primary structure and 20 feet for side yards along streets (including access easements) for attached garages. Given the proposed lot configuration, it appears that setbacks could be satisfied. Access/Parking' The site has no street frontage, but has existing access easements to South 55"' Street and SE 192"a Street, The applicant is proposing to access the project via 50-foot road and utility easement. Road A would have to be a dedicated public right-of-way. Secondary access is proposed via a 30-foot ingress, egress, and utility easement, Additionally, the City would require that the extension of Road A at proposed Lots 8, 9 and 10 be developed to the same standards as the rest of Road A (including width, sidewalk, curb and gutter) to the northern property line. Subdivisions with five or more internal lots must provide a public road to serve the new homes, Curb, gutter and sidewalk improvements would be required. Public rights -of -way must be a minimum of 42 ft. wide. Reductions in public right -of width and street improvements would require a street modification. Sidewalks on both sides of the street within the plat and on one side of the southwest access from South 55th Street would be required. Each lot must allow for the parking of two vehicles on the property. Landscaping: The applicant would be required to plant at least two trees of a City approved species with a minimum caliper of 1 1/2 inches in the front yard or planting strip of each lot of the short plat and a 5-foot strip along the new right-of-way. The trees and landscaping must be planted prior to final inspection of the new homes. In addition, the stormwater pond must also be landscaped. Critical Areas: The site contains two small areas of protected steep slopes. There is also an area of high landslide hazard on the parcel. A geotechnical report will be required at the time of submittal for a preliminary plat which should include recommendations by the geotechnical engineer on location and footings of future homes on the site. Due to the fact that there are known wetlands in the area, a wetlands study must also be submitted. The wetlands study must be conducted according to the City of Renton Critical Areas regulations, a copy of which is included in the packet of information given to the applicant at the pre -application meeting. Secondary review of the wetlands study, at the applicant's expense, may be required. if wetlands are found, appropriate buffers and Natural Growth Protection Easements must be established. Hillside Subdivisions: Hillside Subdivisions are subdivisions in which the average slope is 20% or in which any street in the subdivision has grades greater than 15% at any point. RMC 4-7-220 PRE09.032 Wilson Park PP (R-8, 36-lot, accoss,new street, slopcs).doc Wilson Park Pre -Application Meeting February 26, 2009 Page 3 of 3 establishes the regulations for Hillside Subdivisions including application requirements, grading information, street requirements, lot size and erosion control requirements. Significant Tree Retention: A tree inventory and a tree retention plan shall be provided with the formal land use application. The tree retention plan must show preservation of at least 30% of significant trees (6-inches and greater). A tree retention worksheet will also be required at the time of formal application. The submitted tree plan must indicate how proposed building footprints will be sited to accommodate preservation of significant trees that will be retained, Consistency with the Comprehensive Plan: The R-8 portion of the site is located within the Residential Single Family (RSF) Comprehensive Plan Land Use designation, The following proposed policy is applicable to the proposal: Land Use Element Policy L.U-158. Net development densities should fall within a range of 4.0 to 8.0 dwelling units per acre in Residential Single Family neighborhoods. Permit Requirements: Because staff is not supportive of the proposed Comprehensive Plan Amendment and rezone, the applicant may wish to redesign the project utilizing the R-8 portion of the site only for residential lots. A redesign of the project would affect permit requirements. The following permit fees assume that a rezone will not be pursued by the applicant, To subdivide the parcel, the applicant must make formal submittal for Hearing Examiner Preliminary Plat Review. A submittal checklist, listing the items that must be included in the submittal packet to the City, is included in the packet of information given the applicant at the pre - application meeting. The applicant will be required to install a public information sign on the property and the City will send out information on the plat to neighboring property owners. There is a $2,000,00 Tee for preliminary plat review. The plat will also require Environmental Review with an additional fee of $500.00. The time frame for processing the environmental review and preliminary plat is approximately 12 weeks to the end of the appeal period. Once approval is received, the applicant must complete any required improvements, such as sewer and water stubs, surface water management facilities, fire hydrant and grading. A separate utilities construction permit is required for these improvements. The applicant must also satisfy any conditions of the preliminary approval from the Hearing Examiner before the plat can be recorded. The newly created lots may be sold only after the plat has been recorded. The applicant may submit for building permit review for the new houses before the plat is recorded, but the City can only issue the building permits when the plat has been recorded. A demolition permit would be required for the demolition of the existing house on the subject property. Fees: In addition to the fees for review of the land -use, construction and building permits, the following mitigation fees would be required prior to recording of the short plat. A Parks Mitigation Fee based on $530,76 per new single family residence; A Transportation Mitigation Fee based on $75.00 per each new average daily trip attributable to the project; and, A Fire Mitigation Fee based on $488.00 per new single-family residence. A handout listing all of the City's Development related fees in attached for your review. Expiration: Upon preliminary plat approval, the preliminary plat approval is valid for 5 years with a possible one-year extension. cc: Jennifer Henning PREp9-012 Wilson Park PP (R-8, Ib-lot, access,new street, slopes) -doe ZONING P1i' TLCHNICALSFRVICE5 07115M -"-I - ov IY.01V m0rL 1L JUL J3 - 06 T22N RSE E 1/2 13 rr� ° 200 400 31 T23N R5E E 1/2 Feel 1:4,8D0 5331 1� SECTION 3 OFFSITE ANALYSIS BAIMA & HOLMBERG INC. LEVEL I DOWNSTREAM DRAINAGE REPORT for Wilson Plat .January 23, 2009 Raima & Holmberg, Inc. Job No. 2687-001 Prepared For Robert Wilson 720 South 55th Street Renton, WA 98055 100 FRONT STREET SOUTH • ISSAQUAH WASHINGTON • 98027-3817 • (425) 392-0250 • (425) 391-3055 Street Address 720 South 55th Street King County Tax Parcel No. 312305-9125 Project Overview This project involves developing a 2.5-acre parcel into 13 single-family lots. The site currently is occupied with a single residence, lawn and wooded areas. The site is located about 250' north of South 55`h Street, about 150' east of the east terminus of South 53rd Place, on the slope overlooking SR 167, about Yz mile to the west. The site generally slopes down to the west at an average slope of approximately 20%. Per the SCS soil maps, the site is underlain with Alderwood soil, sandy loam over glacial till. Upstream Tributary Drainage A portion of the parcel to the east of the site drains onto the site. No problems related to this runoff was noted. Level 1 Downstream Drainage Analysis In general, runoff from the site flows west into lots in the adjacent development, Geneva Court (A). The majority of these runoff flows apparently collect in the drain behind an 8'f rockery (B) constructed along the back yards of the west -most lots of said development or in area drains in the back yards, then flow into the storm system in South 53rd Place (C & D). This flow collects in a stormwater pond/bioswale facility located at the intersection of South 53rd Place and Talbot Road South (E), about 750' downstream from the site. This facility outfalls through an 18" pipe to the west side of Talbot Road South into a shallow, poorly defined channel flowing west through the woods (F). The flows pass through a short 12" culvert (H) under a walking path then disappear into thick woods/brush, continuing to flow west to a wooded wetland area (I) beyond'/4 mile downstream from the site. This wetland apparently drains to a 10' X 5':L box culvert crossing under SR-167 (Q), about 1/2 mile downstream from the site. A small area of the south part of the site drains southwest across the south property line of the site into the adjacent parcel to the south (Z). These runoff flows through woods, collecting in a ditches along South 551h Street (K)(about 350' downstream from the site) and/or Talbot Road South (L)( about 800' downstream from the site). Flows into the ditch along South 55th Street (K) continue west in a 6"-12" rock -lined ditch channel along the north side of the street, passing through a couple of 12" driveway culverts on the way to the intersection of South 55th Street and Talbot Road South (M). This ditch is eroded in areas and shows signs of overtopping and flowing into the street, presumably during the recent storms that caused widespread flooding in Western Washington. Flows from this ditch collect in an 18" storm system (M). Flows from the ditch along Talbot Road South (L) collect in the same storm system, about 850' downstream from the site. The 18" storm system continues west under Talbot Road South and west along the north side of South 192"a Street (N) to about 1200' downstream from the site where it apparently discharges into another shallow roadside ditch (0)(because of heavy vegetation the pipe outlet was not located). This ditch is poorly defined with flows drifting west along the road, where they enter Springbrook Creels at about 1800' downstream from the site (P). Springbrook Creek, with a channel generally about 5' wide and 3' deep (water depth of about 1') continues west to about '/2 mile downstream from the site (J) where it enters the aforementioned 10' X 5'± box culvert crossing under SR-167 (Q). The creek continues plowing west on the west side of SR-167. Other than the overtopping ditch noted along South 55th Street, there were no apparent downstream drainage problems. A check of King County drainage complaints on their IMAP website yielded no reported complaints along this downstream drainage path. S 4M ST Vicinity Map 168 491 I WO Ur I . �- o lAgC u 1PA I a o ��J ITu�e• I �' Ami iy -rr� 4 . //•. Inc Agt3 Nam' y `� so Kt�7 Ag❑ e M 4 rOB . ,a rr17 ° Py Psi ------ I • II'° }r , Wo 194 a,' R I Agg. •� j AgC PY f a;, $ y -q c 4 `cl Arr{B •.e •' ti.• Ur .�� WOI a AgC ` A f e -I S � ° M& '.. AgB Ng a Br Re' as a Wad, eD� Ur • VVo C 4 ! # "yti Tank.. ` s 6-^• Ur Py Gs V ~f AgC m1 W S O So So Ff f 45 A•; '•Y • AgC 1:.�.• •• � AgE :.HAYE,9 Mg Ng . d • `• I u •m. Pu O I AmC t Uri " o AkF AgC ,4gF3 Ur Ar cc) er - n . �.f.. ..y ti f: •••! ti. •� �m Ai \,fir 01 Ns Pc uy .: f •jl+jp , Y AgC / AmC �. +No q! T�R�ey Ure e Y 'y Re Y AmC $' Os 0 AmC �• Ur :-AgC ��- AgC Tu No .�.. !No " 1' ' � �:• f • ti .... -.•�-• �� .. Sd•'e . II �"1g+3 A �� ��~ ��— It5• 0 •yvC AmC .l.m•r .. .ap. Os �Ur AmC ■,a 4 . a Ur c Agd �.,. ,AgC Q BID 0 ... ,, AmCPu .y....• __ AmC AgC _ r •P a ' ••• AmC• 'No u i AgC v -- Gs II I Br #vo , jr II I . l+Io �Z Pk I { 31 I�� d •s AmC Re i N r - n r� • ' �• / � AmC, ,q • � -_ Ur raiseg e + AkF A \ yy r • Cn� Inc m Re Ur AgC � i Q � . �...it Re Ur, •. d. AkF 0 AgC' m AgC Os Qs R4 Re p�rw' AkFOs - . I Ur I ,� UrP r aye r 4! SCS Soil Map �- Pu Sm AkF { 1 Ur 9MQs -� •����. � y+ 'll.�l�. \ Ifs SECTION 4 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN BAIMA & HOLMBERG, INC. 100 Front Steet South ISSAQUAH, WASHINGTON 98027-3817 (425) 392-0250 FAX (425) 391-3055 SHEET NO. OF CALCULATED 6Y 1 --- DATE CHECKED BY DATE SCALE BAIMA & HOLMBERG, INC. 100 Front Steet South ISSAQUAH, WASHINGTON 98027-3817 (425) 392-0250 FAX (425) 391-3055 JOB Z (0 SHEET NO. OF CALCULATED BY f DATE CHECKED BY DATE crAI c Pondcale Worksheef 1 Enter site information in the yellow highlighted cells 2 Verify no error message is displayed 3 Results are displayed in Green Box ote: pondcalc will not work for negative landcover conversions. pondcalc does not handle existing El or TG very well. Disclaimer: This spreadsheet is provided without warranty of any kind. Use this spreadsheet at your own risk. All facility sizes should be verified using KCRTS software. Rainfall Region ST Scale Factor: 1.00 FC Level: 2 acres ,f 205 TF= till forest, T {either ST or LA see rainfall regions map} { 0.8 - 1.2 see rainfall regions map} { 1, 2, or 3 see flow control app map} type acres TF�z TP rsh��il+ �I��N�If y. yyqq i§ �l TG 0.8 El 1.7 = till pasture, TG = till grass, Adjusted Acres Error Messages converted cover 2.5 0.8 1.7 =1 = effective impervious Acreage Check: post pre gross 2.5 2.5 adjusted 2.5 2.5 Existing Conditions 100-yr SBUH Peak (offsite Roadway) -------------------------------------------------------------------------- ******************** S.C.S. TYPE-1A DISTRIBUTION ********* 100-YEAR 24-HOUR STORM **** 3.90" TOTAL PRECIP. ********* ----------_---------------------------------------------------------------- DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .3 .3 81.0 .0 98.0 20.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .14 7.83 2576 Developed Conditions 100-yr SBUH Peak (offsite Roadway) ----------------_--------------------------------_---------------------- ******************** S.C.S. TYPE-1A DISTRIBUTION ******************** ********* 100-YEAR 24-HOUR STORM **** 3.90" TOTAL PRECIP. ********* DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .3 .0 86.0 .3 98.0 2.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .41 7.67 4658 J06 BAIMA & HOLMBERG, INC. 100 Front Steet South ISSAQUAH, WASHINGTON 98027-3817 (425) 392-0250 FAX (425) 391-3055 SHEET NO. OF CALCULATED BY ❑ATE 41� CHECKED BY DATE SCALE SECTION 5 CONVEYANCE SYSTEM ANALYSIS AND DESIGN SECTION 6 SPECIAL REPORTS AND STUDIES Altmann Oliver Associates, LLC PO Kox 57.4 (..111,11is,ii, 11.198011 0(hcc ( [23) 313-15,0 ELN January 21, 2009 Steve Beck 4735 NE 4th Renton, WA 98059 Environnwmal Planning Landscape ArchiiC_C.'Lur AOA-3796 SUBJECT: Wetland Reconnaissance for Wilson Property (Parcel 312305-9125) 720 So. Se Street, Renton, WA Dear Steve: On January 15, 2009 1 conducted a wetland and stream reconnaissance on the subject property and the adjacent new 50-foot wide access easement utilizing the methodology outlined in the 1997 Washington State Wetlands Identification and Delineation Manual. No wetlands or streams were identified on or immediately adjacent to the properly or the new access easement during the reconnaissance. The south-central portion of the subject property is currently developed with an existing single-family residence and associated maintained lawn area_ The remainder of the property consists of a mostly coniferous forest that generally slopes moderately down from east to west. Vegetation on the site included western red cedar (Thuja plicata), Douglas fir (Pseudotsuga menziesh), big -leaf maple (Acer macrophyllum), hazelnut (Corylus comuta), Indian plum (Oemleria cerasiformis), snowberry (Symphoricarpos albus), tall Oregongrape (Mahonia equifolium), Himalayan blackberry (Rubus discolor), trailing blackberry (Rubus ursinus), sword fern (Polystichum munitum), and English ivy (Hedera helix). The plant community within the undeveloped new access easement consisted of a mix of trees and brush including black cottonwood (Populus trichocarpa), big -leaf maple, Himalayan blackberry, snowberry, sword fern, and English ivy. No hydrophytic plant communities were observed on the site. Borings taken throughout the property revealed high chroma non-hydric soils and there was no observation or evidence of prolonged soil saturation. Steve Beck January 21, 2009 Page 2 If you have any questions regarding the reconnaissance, please give me a call. Sincerely, ALTMANN OLIVER ASSOCIATES, LLC John Altmann Ecologist LIU & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology Earth science February 20, 2009 Mr. Robert Wilson 720 South 551h Street Renton, WA 98055 Dear Mr. Wilson: Subject: Geotechnical Engineering Study Wilson Plat 720 South 551h Street Renton, Washington L&A Job No. 9AO06 INTRODUCTION We have completed a geotechnical engineering study for the site of the subject plat, located at the above address in Renton, Washington. The general location of the project site is shown on Plate 1 — Vicinity Map. We understand that the proposed development for the site is to plat it into 16 single-family residential lots, with supporting infrastructure. The purpose of this study is to characterize the subsurface conditions of the site and provide geotechnical recommendations for grading, slope stabilization, erosion mitigation, surface and ground water drainage control, foundation design and construction, etc., for the proposed development of the site. Presented in this report are our findings, conclusions and recommendations. PROJECT DESCRIPTION For our use in this study, you provided us with a set of topographic survey and plat plan of the proposed development for the site. According to this plan, the subject site is an rectangle -shaped land about 526 feet wide (east -west) by about 207 feet deep (north -south), lying to the north of South 55th Street. The platted building lots are to be accessed from 55`h Avenue South to the south side of the site via a new roadway entering the site near its southwest corner and an existing gravel driveway at about 120 feet west of the southeast corner. These roadway/driveway 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 • Fax (425) 486-2746 February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 2 are to connect a paved road running mainly east -west down the middle of the site. kdivi" '•t t}�a r � �qR! �¢ < :x cu'y !� ".5": a, Y,.. t ,^ ui:"s i� �'S4 ..�� � }�*�_... is to be located at the northwest corner of the site to store storm runoff collected over the impervious surfaces of the proposed development. We understand that grading for the proposed development of the site willUMMyt; im . Retaining walls and/or rockery walls may be required to support or line the cut banks and/or fill embankments along the cast, west and part of the south boundaries of the site. SCOPE OF SERVICES Our scope of services for this study comprises specifically the following: I Review the geologic and soil conditions at the site based on a published geologic map. 2. Explore the site for subsurface conditions with backhoe test pits to a firm bearing soil stratum or to the maximum depth (about 12 feet) capable by the backhoe used in excavating the test pits, whichever occurs first. 3. Perform necessary geotechnical analyses and provide geotechnical recommendations for grading, slope stabilization, erosion mitigation, surface and ground water drainage control, design and construction for building foundations and stormwater detention vault, etc., based on subsurface conditions encountered in the test pits and results of our geotechnical analyses. 4. Prepare a written report to present our findings, conclusions, and recommendations for the proposed development of the subject plat site. SURFACE CONDITIONS SITE CONDITIONS LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AOO6 Page 3 The subject site is situated on a broad, moderate to steep, westerly -declining hillside. It is backed into undeveloped wooded lands to the north and east, and adjoined by a single-family residence and undeveloped land to the south and a subdivision to the west. The site generally slopes down t portions of the site generallyliewesterl at grades from 13 to percent. The '*"`y within the eastern 100 to 120 feet and the western 150 to 200 feet of the site, while the more moderate area lies in about the middle third of the site where the building pad and the yard of an existing residence are located. The existing residence is accessed from South 55th Street via a long gravel driveway. The ,;.�. unpaved area around the existing house is covered with lawn grass. The g 4 castem and western areas of the site is dotted with tall, mature evergreen trees with few mature deciduous trees mixed in between. The eastern steeper area is covered with thick brush, while the western steeper area is covered by sporadic brush and dense ivy. GEOLOGIC SETTING The Geologicp of the Lake Stevens Quadrangle, Snohomish County, Washington, by James P. Minard, published by U. S. Geological Survey in 1985, was referenced for the geologic and soil conditions of the subject site. According to this publication, the surficial soil units at and in the vicinity of the site are mapped as Kame Terrace (Qit) deposits underlain by Ground Moraine (Qgt). The geology of the Puget Sound Lowland has been modified by the advance and retreat of several glaciers in the past and subsequent deposits and erosion. The latest glacier advanced to the Puget Sound Lowland is referred to as the Vashon Stade of the Fraser Glaciation, which has occurred during the later stages of the Pleistocene Epoch and retreated from the region some 14,500 years ago. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 4 The Kame terrace deposits were laid down by ice -marginal streams flowing between higher ground on one side and an ice margin on the other side during the last glaciation. They consist mostly of silty sand and gravel to cobble. The Kame terrace deposits also contain lenses and pods of till and beds of sand, silt and clay locally. The Kame terrace deposits are of moderately - high to high permeability and can provide good foundation support to structures in their native undisturbed state. The ground moraine soil unit, underlying the Kame deposits, is composed of a thin layer of ablation till over lodgmont till sediments, deposited by Puget glacial lobe of the Vashon Stade of the Fraser Glaciation. The lodgmont till is generally a compact mixture of unsorted clay, silt, sand, gravel and cobble, commonly referred to as "hard pan". The ablation till is similar to lodgmont till, but is much less compact and coherent. The thickness generally varies from 2 to 4 feet for the ablation till deposit, and 5 to 30 feet for the lodgmont till deposit. The lodgmont till deposit is practically impervious, except local lenses of sand and gravel. It has a compressive strength comparable to that of low-grade concrete and can stand in steep natural or cut slopes for a long period. The lodgmont till can provide excellent foundation support with little settlement expected to structures. The overlying ablation till is generally in a loose to medium -dense state, and is more compressible and permeable. SOIL CONDITIONS Subsurface conditions of the site were explored with seven test pits excavated within the site. These test pits were excavated on February 4, 2009, with a tract -mounted backhoe to depths from 6.5 to 9.5 feet. The approximate locations of the test pits are shown on Plate 2 - Site and Exploration Location Plan. The test pits were located with either a tape measure or by visual reference to existing topographic features in the field and on the topographic survey map, and their locations should be considered only accurate to the measuring method used. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 5 A geoteehnical engineer from our office was present during subsurface exploration, who examined the soil and geologic conditions encountered and completed logs of test pits. Soil samples obtained from each soil unit in the test pits were visually classified in general accordance with United Soil Classification System, a copy of which is presented on Plate 3. Detailed descriptions of soils encountered during site exploration are presented in test pit logs on Plates 4 through 7. The test pits encountered a layer of loose, organic topsoil, from about 10 to 24 inches thick, mantling the site. In Test Pits 1 and 2, located in the eastern high ground area, the layer of topsoil was found underlain by a layer of ablation till of brown, medium -dense, silty, fine to medium sand with a trace of gravel, from 2.3 to 3.5 feet thick. This ablation till is underlain to the depths explored by a lodgmont till deposit of brown to brown -gray, dense, silty fine sand, with some gravel and occasional cobble. Test Pits 3 and 4, located at the downhill fringe of the moderately -sloped middle section of the site, encountered a Kame terrace deposit underlying the topsoil. The top 1.7 to 2.0 feet of this Kame terrace deposit is weathered to a loose to medium -dense state and is composed of brown, fine to medium sand, locally with some silt and/or gravel. The fresh Kane terrace deposit underneath is medium -dense to dense, and is composed of brown -gray to light -gray, line to medium sand with a trace of gravel. This clean sandy deposit should be of high permeability. Test Pits 5, 6 and 7. Located near at the west end of the site, encountered a weathered and/or fresh Kame terrace deposit, up to about 9.1 feet thick, underlying the topsoil. The Kame terrace deposits were found underlain by a lodgmont till deposit in Test Pits 5 and 7 at a depth of 5.0 and 9.0 feet, respectively. GROUNDWATER CONDITION LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 6 Groundwater seepage was not encountered by any of the seven test pits excavated on the subject plat site. The topsoil, ablation till, and weathered and fresh Kame terrace deposits are loose to medium -dense, and would allow some storm runoff to seep into the ground. The underlying dense to weakly -cemented lodgmont till deposit is of extremely low permeability and would perch stormwater infiltrating into the more permeable surficial soils. The amount of and the depth to this perched groundwater would fluctuate seasonally, depending on precipitation, surface runoff, ground vegetation cover, site utilization, and other factors. The perched groundwater may dry up completely during the dryer summer months and accumulate and rise in the wet winter months. The test pits excavated in the heart of winter did not encountered any groundwater. Therefore, it is our opinion that groundwater �"'K. " under the subject g p 3' g J plat site �_� :1� should be minimal and minor even in the winter months of the year. P $�; " " Y DISCUSSIONS AND RECOMMENDATIONS GENERAL Based on the soil conditions encountered by the test pits excavated on the site, it is our opinion that the site is suitable for the proposed development from the geotechnical engineering viewpoint, provided that the recommendations in this report are fully implemented and observed during construction. Due to moisture -sensitive fine-grained soils mantling the site and the local tuge` tc tt areas within the site, we recommend that grading and foundation construction work for the proposed development be carried out and completed during the dryer period from April 1 through October 31. If grading work has to proceed beyond the above dryer period, the measures for slope stabilization, erosion mitigation, and surface and ground water drainage control recommended in this report should be in place and operational on a daily basis during construction. Surf vial unsuitable soils, including topsoil and loose to medium -dense weathered soils mantling the site, should be stripped down to the medium -dense to dense, fresh Kame terrace and/or lodgmont till soils within the building pads of the lots and the roadways. The underlying fresh LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 7 Kame terrace and/or lodgmont till soils are of high to moderately -high to high strength and are capable of providing adequate foundation support to the proposed residential buildings, roadways and stormwater detention vault. Conventional footing foundations constructed on or into the above competent basal soils may be used to support the proposed residential building and stormwater detention vault. Structural fill, if required for site grading, should be placed on proof -rolled, underlying undisturbed, competent basal soils following the stripping of the surficial unsuitable soils. GEOLOGIC HAZARDS AND REMEDIATIN Landslide Hazard The medium -dense to dense, fresh Kame terrace and lodgmont till soils underlying the site at shallow depth are of moderately -high to high shear strength and have good to excellent resistance against slope failures. Therefore, it is our opinion that the potential for deep-seated landslides to occur on the site should be minimal, provided the recommendations in this report are fully implemented and complied with during construction. Erosion Hazard The topsoil and loose to medium -dense weathered soils are of low resistance against erosion. Erosion may occur in the weaker surficial soils over theh4,irdiept areas of the site if they are devoid of vegetation cover and overly saturated. Progressive erosion can lead to shallow, skin -type mudflows in the galmf areas of the site. To mitigate such erosion hazard, vegetation outside of construction limits should be preserved and maintained. Unpaved exposed ground within the site resulted from construction activities should be re -seeded and re -vegetated as soon as possible. Concentrated stormwater should not be discharged uncontrolled onto the ground within the site. Stormwater over impervious surfaces, such as roofs and paved roadways and driveways, should be captured by underground drain line systems connected to roof downspouts or by catch basins installed in paved roadways and driveways. Water collected by these drain line systems should be tightlined to discharge into a storm sewer or a suitable LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&.A .lob No. 9AO06 Page 8 stormwater disposal facility. Areas devoid of vegetation cover should be re -seeded and re - vegetated as soon as possible, and should be covered with clear plastic sheets until the vegetation is fully established. Seismic Hazard and Design Consideration The Puget Sound region is in an active seismic zone. The subject site is underlain at shallow depth by medium -dense to dense, fresh Kame terrace and lodgmont till soils of moderately -high to high shear strength. There is a lack of continuous, extensive, static groundwater table at shallow depth under the site. The combination of the above makes it rather unlikely for seismic hazards, such as landslides, liquefaction or soil lateral spreading, to occur on the site during strong earthquakes. Therefore, the seismic hazard of the site should be minimal. The residential buildings to be constructed on the site, however, should be designed to withstand seismic forces induced by strong earthquakes. Based on the soil conditions encountered by the test pits, it is our opinion that Seismic Use Group I and Site Class D should be used in the seismic design of the proposed residential buildings in accordance with the 2006 International Building Code (IBC). SITE PREPARATION AND GENERAL GRADING Vegetation within construction limits should be cleared and grubbed. Loose surficial soils, including topsoil and loose weathered soils, should be completely stripped down to the medium - dense to dense, fresh Kame terrace and/or lodgmont till soils within the building pads of the proposed residential buildings and roadways. The exposed soils should be compacted to a non - yielding state with a vibratory compactor and proof -rolled with a piece of heavy earthwork equipment. TEMPORARY EROSION CONTROL The onsite surficial soils contain a high percentage of fines, and are sensitive to moisture and can be disturbed easily by construction traffic when saturated. A layer of clears, 2-to-4-inch, quarry LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 9 spalls should be placed over excavated areas and areas of frequent traffic, such as the entrance to the site, as required, to protect the subgrade soils from disturbance by construction traffic. Silt fences should be installed along the downhill sides of construction areas to prevent sediment from being transported onto adjoining properties or streets by storm runoff. The bottom edge of silt fences should be folded inward and ballasted with onsite soils. Ditches or interceptor trench drains should be installed on the uphill sides of construction areas, as required, to intercept and drain away storm runoff and near -surface groundwater seepage. Water captured by such ditches or interceptor trench drains should be discharged into onsite detention/settling ponds or nearby storm inlets. The storm inlets, if into which stormwater is to be to be discharged, should be covered with a filter sock to prevent sediment from entering the storm sewer system. The filter socks should be cleaned frequently during construction to prevent clogging, and should be removed after completion of construction. EXCAVATION AND FILL SLOPES Under no circumstance should excavation slopes be steeper than the limits specified by local, state and federal safety regulations if workers have to perform construction work in excavated areas. Unsupported temporary cuts greater than 4 feet in height should be no steeper than 1 H:1 V in topsoil, loose to medium -dense weathered Kame terrace and ablation till soils, no steeper than 3/4H:1 V in medium -dense to dense Kame terrace deposits and may be vertical in lodgment till soils if the overall depth of excavation is no more than 15 feet. Otherwise, temporary cut in lodgment till should be no steeper than 1/2H:IV. Unsupported permanent cuts should be no steeper than 211: I V in topsoil, loose to medium -dense weathered Kame terrace and ablation till soils, no steeper than 1-3/4H:1V in medium -dense to dense Kame terrace deposits, and no steeper than 1-1/211:1 V in lodgment till soils. A 5-foot-wide level bench should be built into temporary or permanent cut slopes to keep the vertical rise between the benches no more than 15 feet. The soil units into which cut slopes and LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No, 9A006 Page 10 the stability of the cut slopes are to be made should be verified by a geotechnical engineer during excavation. Permanent fill embankments required to support structural or traffic load should be constructed with compacted structural fill placed over undisturbed, proof -rolled, firm, native, fresh Kame terrace and/or lodgment till soils after the surficial unsuitable soils are completely stripped. Permanent fill to be placed over slopes steeper than 15 percent grade should be retained structurally. The exposed ground exceeding 15 percent grade should be benched with vertical steps not exceeding 4 feet tall after stripping of surficial unsuitable soils and prior to placing structural fill. The slope of permanent rill embankments should be no steeper than 214:1 V. Upon completion, the sloping face of permanent fill embankments should be thoroughly compacted to a non -yielding state with a hoe -pack. The above recommended cut and fill slopes are under the assumption that groundwater seepage would not be encountered during construction. if groundwater is encountered, the cut and fill earthwork should be immediately halted and the slope stability re-evaluated. The slopes may have to be flattened and other measures taken to stabilize the slopes. Stormwater should not allowed to flow uncontrolled over cut and fill slopes. Permanent cut slopes or fill embankments should be seeded and vegetated as soon as possible for erosion protection and long-term stability, and should be covered with clear plastic sheets, as required, to protect them from erosion until the vegetation is fully established. STRUCTURAL FILL Structural fill is the fill that supports structural or traffic load. Structural fill should consist of clean granular soils free of organic, debris and other deleterious substances and with particles not larger than three inches. Structural fill should have a moisture content within one percent of its optimum moisture content at the time of placement. The optimum moisture content is the water LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 11 content in the soils that enable the soils to be compacted to the highest dry density for a given compaction effort. Onsite clean silty sand to gravelly sand soils, meeting the above requirements, may be used as structural fill. Imported material to be used as structural fill should be clean, free -draining, granular soils containing no more than 5 percent by weight finer than the No. 200 sieve based on the fraction of the material passing No. 4 sieve, and should have individual particles not larger than three inches. The ground over which structural fill is to be placed should be prepared in accordance with recommendations in the SITE PREPARATION AND GENERAL GRADING and EXCAVATION AND FILL SLOPES sections of this report. Structural fill should be placed in lifts no more than 10 inches thick in its loose state, with each lift compacted to a minimum percentage of the maximum dry density determined by ASTM D1557 (Modified Proctor Method) as follows: Application Within building pads and under foundations Roadway/driveway subgrade Retaining/foundation wall backfill Utility trench backfill % of Maximum Da Dmaity 95% 95% for top 3 feet and 90% below 92% 95% for top 4 feet and 90% below STORMWATER DETENTION VAULT An underground concrete detention vaultis to be constructed at the northwest corner of the site to store stormwater collected over impervious surfaces of the proposed development of the site. Two test pits (Test Pits 5 and 6) were excavated within the footprint of the proposed vault, and these test pits encountered dense LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9A006 Page 12 lodgment till soils and/or medium -dense to dense fresh Kame terrace deposit at depths about 4.0 to 5.0 feet. The vault may be supported on footings founded on these competent basal soils. An allowable soil bearing pressure not exceeding 3,500 psf may be used for the design of the vault footing foundations. A drain line consisting of perforated, rigid PVC, drain pipe or slotted, corrugated ADS, drain pipe, at least 6 inches in diameter, should be installed at a few inches below bottom of the perimeter footings of the vault walls to intercept and drain away groundwater which may flow towards the vault. The drain line should have sufficient slope (0.5% minimum) to generate flow by gravity, and water collected in the drain line should be tightlined to discharge into a storm sewer or a suitable stormwater disposal facility. The vault footing drain line should be completely embedded in washed gravel wrapped in a layer of non -woven filter fabric, such as 140N by Miraf Inc. or approved equal. A vertical drainage blanket at least 12 inches thick horizontally, consisting of clean 3/4 to 1-1/2-inch washed gravel or crushed rock, should be placed against the perimeter vault walls. The remaining backfill should be constructed of structural fill. Alternatively, a vertical drain mat, such as Miradrain 6000 by Mirafi Inc. or equivalent, may be placed against the perimeter vault walls as the vertical drainage blanket. The vertical drainage blanket or drain mat should be hydraulically connected to the drain line at the base of the vault perimeter walls. Sufficient number of cleanouts at strategic locations should be installed for periodical cleaning of the vault wall drain line to prevent clogging. The perimeter walls of the detention vault would also serve as retaining walls to support cut banks and backfill. The perimeter walls of the vault capped with a lid would be restrained at their top from horizontal movement and should be designed for at -rest lateral soil pressure. For the condition that groundwater behind the perimeter vault walls can be fully drained by the drain line provided at the base of the walls, we recommend an at -rest soil pressure of 50 pcf equivalent fluid density (EFD) be used for the design of vault perimeter walls. To counter the at -rest soil pressure, a passive lateral soil pressure of 375 pcf EFD may be used, except that the passive LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L.&A Job No. 9A006 Page 13 pressure within the top 12 inches of the finish subgrade should be ignored. The above passive pressure assumes the backslope of the walls is level or ascending away from the walls. The at - rest soil pressure may also be resisted by the friction force between the footings and the subgrade soils based on a coefficient of friction of 0.55. If the site grades are such that it is not feasible to completely drain groundwater behind the vault walls with a gravity drain line system, the hydrostatic pressure on the perimeter vault walls should also be taken into consideration for the design of the vault perimeter walls. For the condition that a perimeter drain line has to be placed higher than the footing level, the perimeter vault walls should be designed for a lateral soils pressure of 50 pcf EFD above the drain line level and a combined lateral soil and hydrostatic pressure of 80 pcf EFD below the drain line level. The above lateral pressures on the walls may be countered by a passive soil pressure of 375 pcf EFD above the drain line and 210 pcf EFD below. The detention vault should also be designed for seismic loading based on a 100-year seismic event. For seismic design of the detention vault walls, a pseudo static soil pressure diagram of inverted triangle from the finished ground level to the bottom of the foundations should be used. Based on the soil conditions in the detention vault area, we recommend the lateral soil pressure at the top of the triangle be 8H psf for a 100-year seismic event, where H is the height from finish grade over top of the vault to bottom of footings in feet. A one-third increase in the above recommended allowable soil bearing pressure may be used when considering the seismic loading condition. The above design parameters are unfactored ultimate values. Proper factors of safety should be applied for the design of the vault walls against sliding and overturning failures. PAVED ROADWAYS AND DRIVEWAYS LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9A006 Page 14 Performance of roadway and driveway pavement is critically related to the conditions of the underlying subgrade soils. We recommend that the subgrade soils under the roadways/driveways be treated and prepared as described in the SITE PREPARATION AND GENERAL EARTHWORK section of this report. Prior to placing base material, the subgrade soils should be compacted to a non -yielding state with a vibratory roller compactor and proof -rolled with a piece of heavy construction equipment, such as a fully -loaded dump truck. Any areas with excessive flexing or pumping should be over -excavated and re -compacted or replaced with structural fill or crushed rock placed and compacted in accordance with the recommendations provided in the STRUCTURAL FILL section of this report. We recommend that a layer of compacted, 7/8-inch crushed rock base (CRB), be placed for the roadways/driveways. This crushed rock base should be at least 6 inches for the public roadways and 4 inches for the private driveways. The crushed rock base should be overlain with a 3-inch asphalt treated base (ATB) topped by a 2-inch-thick Class B asphalt concrete (AC) surficial course for public roadways and overlain by a 3-inch-thick Class B asphalt concrete (AC) surficial course for the private driveways. BUILDING SETBACK The purpose of building setback from the top or toe or an overly steep portion of a slope is to establish a safe buffer such that if a slope failure should occur the stability of the structure can be maintained and damages to the structure minimized. In general, the greater the setback, the lower the risk for the structure to sustain damages from a slope failure. To maintain stability, the residential buildings to be constructed on the site should be sufficiently setback from the top or toe of slopes of 40% gradient or more. We recommend the buildings be set back at least 15 feet from top or toe of slopes with grades 40% or more. If footing foundations are used to support the new residences of future development, the footing foundations should be embedded at least one foot into the underlying, medium -dense to dense, LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A .lob No. 9AO06 Page 15 fresh Kame terrace or lodgment till soils. if the buildings are to be constructed on the slopes with grades 40% or more, the footing foundations should be extended downward to such elevation that the horizontal distance from the edge of footings to the face of slopes should be at least 15 feet, and that a plane drawn from the edge of footings to the toe of slopes of 40% or more gradient should be no steeper than 2.5H:1 V. BUILDING FOUNDATIONS Conventional footing foundations may be used to support the residential buildings to be constructed on the site. The footing foundations should be placed on or into the underlying, medium -dense to dense, fresh Kame terrace or lodgmont soils, or on structural fill placed over these undisturbed competent basal soils. Water should not be allowed to accumulate in excavated footing trenches. Disturbed soils in footing trenches should be completely removed down to undisturbed, competent basal soils and the basal soils should be thoroughly compacted to a non -yielding state with a vibratory mechanical compactor prior to pouring concrete for the footings. If the above recommendations are followed, our recommended design criteria for footing foundations are as follows: • The allowable soil bearing pressure for design of footing foundations, including dead and live loads, should be no greater than 3,000 psf if constructed on or into native, undisturbed, competent basal soils, and no greater than 2,500 psf if constructed on structural fill placed over competent basal soils. The footing bearing soils should be verified by a geotechnical engineer after the footing trenches are excavated and before the footings poured. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 16 + The minimum depth to bottom of perimeter footings below adjacent final exterior grade should be no less than 18 inches. The minimum depth to bottom of the interior footings below top of floor slab should be no less than 12 inches. • The minimum width should be no less than 16 inches for continuous footings, and no less than 24 inches for individual footings, except those footings supporting light -weight decks or porches. A one-third increase in the above recommended allowable soil bearing pressure may be used when considering short-term, transitory, wind or seismic loads. For footing foundations designed and constructed per recommendations above, we estimate that the maximum total post - construction settlement of the buildings should be 3/4 inch or less and the differential settlement across building width should be 1/2 inch or less. Lateral loads on the proposed residential buildings may be resisted by the friction force between the foundations and the subgrade soils or the passive earth pressure acting on the below -grade portion of the foundations. For the latter, the foundations must be poured "neat" against undisturbed soils or backfilled with a clean, free -draining, compacted structural fill. We recommend that an equivalent fluid density (EFD) of 325 pef (pounds per cubic foot) for the passive earth pressure be used for lateral resistance. The above passive pressure assumes that the backfill is level or inclines upward away from the foundations for a horizontal distance at least 1.5 times the depth of the foundations below the final grade. A coefficient of friction of 0.55 between the foundations and the subgrade soils may be used. The above soil parameters are unfactored values, and a proper factor of safety should be used in calculating the resisting forces against lateral loads on the new garage. SLAB -ON -GRADE FLOORS Slab -on -grade floors, if used for the residential buildings to be constructed on the site, should be placed on firm subgrade soils prepared as outlined in the SITE PREPARATION AND LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9A006 Page 17 GENERAL EARTHWORK and the STRUCTURAL FILL sections of this report. Where moisture control is critical, the slab -on -grade floors should be placed on a capillary break which is in turn placed on the compacted subgrade. The capillary break should consist of a minimum four -inch -thick layer of clean, free -draining, 7/8-inch crushed rock, containing no more than 5 percent by weight passing the No. 4 sieve. A vapor barrier, such as a 6-mil plastic membrane, may be placed over the capillary break, as required, to keep moisture from migrating upwards. BASEMENT AND CIP CONCRETE RETAINING WALLS Building basement walls would be required to support backfill. Cast -in -place concrete walls may be used to retain fill embankments along the west and part of the south boundaries of the site. Basement walls restrained horizontally at the top are considered unyielding and should be designed for a lateral soil pressure under the at -rest condition; while cast -in -place concrete retaining walls free to move at the top should be designed for active lateral soil pressure. We recommend that a lateral soil pressure of 55 pcf EFD be used for the design of basement walls restrained at the top; and 40 pef EFD for retaining walls unrestrained at the top. These lateral soils pressures are applicable to walls with level backslope. With a backslope rising away from the walls, an additional pressure of 0.75 pcf per degree of angle of the backslope above horizontal should be added to the above pressures. To counter the active soil or at -rest pressure, a passive lateral soil pressure of 300 pcf EFD may be used, except that the passive pressure within the top 12 inches of the finish subgrade should be ignored. The above passive pressure is applicable to walls with level backslope. The above lateral soil pressures are under the assumption that groundwater behind the walls is fully drained. To resist against sliding, the friction force between the footings and the subgrade soils may be calculated based on a coefficient of friction of 0.55. The above soil parameters are ultimate values, and proper factors of safety should be used in the design of the basement and retaining walls against sliding and overturning failures. Basement walls or retaining walls may be supported on footing foundations seated on or into the underlying, medium -dense to dense, fresh Kame terrace or lodgment till soils, with an allowable soil bearing pressure not to exceed 3,000 psf. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 18 A drain line consisting of perforated, rigid PVC, drain pipe or slotted, corrugated ADS, drain pipe, at least 4 inches in diameter, should be installed at a few inches below bottom of basement or retaining walls to intercept and drain away groundwater flowing towards the walls. The drain lines should have sufficient slope (0.5 percent minimum) to generate flow by gravity, and water collected in the drain line should be tightlined to discharge into a storm sewer or a suitable stormwater disposal facility. The drain lines should be completely embedded in washed gravel wrapped in a layer of non -woven filter fabric, such as 140N by Mirafi Inc. or approved equal. A vertical drainage blanket at least 12 inches thick, consisting of clean, 3/4 to 1-1/2-inch, washed gravel or crushed rock, should be placed against the walls. Alternatively, a vertical drain mat, such as Miradrain 6000 by Mirafi Inc. or equivalent, may be placed against the walls as the vertical drainage blanket. The vertical drainage blanket or drain mat should be hydraulically connected to the drain lines at the base of the perimeter walls. ROCKERY WALLS General Rockery walls may be used to line the cut banks along the east boundary of the site. Rockery by nature is not an engineered retaining wall, such as a reinforced concrete wall. Although a rockery wall can provide some degree of retention capability, its main function is to serve as a protective facing to retard weathering and erosion process to the earth bank behind the rockery. To achieve a satisfactory rockery wall, the earth bank behind the wall must be stable by itself on a long -terra basis. In addition, the rockery wall should be constructed in a proper way to assure long -terra stability of the cut bank or fill embankment. The medium -dense to dense, fresh Kame terrace and/or lodgment till deposit underlying the site at shallow depth is of moderately -high to high shear strength. It is our opinion that cut banks in these soil deposits will be able to maintain long-term stability if lined by properly constructed rockery. Our design of rockery walls lining cut banks in these competent deposits is shown on Plate 8 attached hereto. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9A006 Page 19 Rockery Material and Construction Rock material used for rockery construction should be hard, well -cemented, sound, durable and free of cracks, fissures, joints, air holes and other defects. Construction of rockery walls should be in compliance with the Standard Rockery Construction Guidelines published by the Association of the Rockery Contractors. Subgrade and Keyway Trench Preparation Construction of the rockery walls should start immediately following completion of cut banks and keyway trenches. The keyway trenches should be cut into medium -dense to dense, fresh Kame terrace and/or lodgment till soils capable of rendering an allowable bearing capacity of at least 3,000 psf. The keyway trenches should be at least 12 inches deep below the finish grade in front of the rockery wall and should be wide enough such that the heel of the keyway trenches would be at least 12 inches from the back of the base -course facial stones. Keyway trenches should be free of loose disturbed soils or standing water and the exposed soils at bottom of keyway trenches should be compacted to a non -yielding state with a vibratory mechanical compactor prior to rockery installation. Groundwater Drainage Control A drain line should be placed in the keyway trenches behind the base -course facial stones to collect and drain away groundwater flowing toward the rockery walls. The drain lines should consist of minimum 6-inch, perforated, rigid, PVC pipes, wrapped in a filter fabric sock. The bottom of the keyway trench and the drain line should have sufficient slope (0.5 percent minimum) to generate flow by gravity. Water collected in the drain lines should be tightlined to discharge into a storm sewer or a suitable stormwater disposal facility. Facial Stones Facial stones of the rockery walls should be as nearly rectangular as possible with the long dimension of the stones placed perpendicular to the wall alignment. Facial stones should be LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 20 stacked tightly against one another to minimize voids between the stones. Excessive openings between the facial stones should be chinked with smaller rock from behind. The rockery walls should be constructed such that the facial stones of each successive course would be staggered over and firmly supported on stones of the previous course. Facial stones of the rockery walls should be tilted back at an inclination no steeper than 6V:1 H. Drain Rock Course A drain rock course, consisting of 2-to-4-inch rock spalls, should be installed between the facial stones and the cut bank in lifts as each course of the facial stones is completed. The horizontal thickness of the drain rock course should be at least 12 inches. The purpose of the drain rock course is to retain soils in place while allowing groundwater to bleed out. PRECAST CONCRETE BLOCK WALLS General Precast concrete block walls may be used to support fill embankments to be constructed along the west and part of the south boundaries of the site. These walls may be constructed with commercially available precast concrete blocks, such as by Keystone, Lock Block or Redi Rock. Loose topsoil and loose to medium -dense weathered soils within the keyway trenches of the walls should be over -excavated down to medium -dense to dense, fresh Kame terrace and/or lodgment till soils. The block walls should be constructed with geogrid mesh reinforcement anchored to the block walls and embedded in the wall backfill. The wall should be founded on a minimum 4-inch layer, 7/8-inch crushed rock, leveling base, placed over firm undisturbed bearing soils capable of rendering an allowable bearing capacity of at least 3,000 psf. A vertical drainage blanket should be placed against the back of the concrete block facing and hydraulically connected to the drain lines at the base of the walls. The remaining wall backfill behind the vertical drainage blanket should consist of compacted structural fill consisting of clean granular soils. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 21 Design Soil Parameters We recommend that the precast concrete block walls to be constructed to support fill embankments be designed for a fully drained condition in accordance with the following soil perimeters: Reinforced Retained Foundation Leveling Soils Soils Soils Rock Base Unit Weight, r, pef 130 120 135 135 Angle of Internal Friction, 36 33 36 40 O, degrees Cohesion, c, psf 0 0 0 0 The block walls should be designed for a minimum factor of 1.5 against sliding failure and 1.7 against overturning failure under the static loading condition. The Puget Sound region is in an active seismic zone and the block walls should also be designed under the seismic loading condition for a 100-year seismic event. The peak ground acceleration is about 0.3g (g = gravity force) for such an event in the Puget Sound region. The block walls, however, are built with interlocking concrete blocks with relatively high flexibility, and the blocks do not move in unison during earthquakes. Therefore, for design of the block wail under the seismic loading condition, the ground acceleration may be reduced to 0.2g. The block walls should designed for a factor of safety of at least 1.15 against sliding and overturning failures under the seismic loading condition. Heavy equipment or material storage should not be allowed within 10 feet of the block walls; otherwise, the walls should be designed for 250 psf of uniform load. Construction of Precast Concrete Block Walls Vegetation within construction limits of the block walls and its backfill should be cleared and roots thoroughly grubbed. Unsuitable surficial soils, such as topsoil and loose to medium -dense weathered sand soils within the block walls and backfill footprint should be stripped down to the LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 22 medium -dense to dense, fresh Kame terrace and/or lodgment till soils. Over -excavation down to these competent basal soils should be backfilled with structural fill. The keyway trench for the block walls should be cut into native, undisturbed, medium -dense to dense, fresh Kame terrace and/or lodgment till soils, capable of rendering an allowable bearing pressure of at least 3,000 psf. The soils exposed at bottom of the keyway trench should be compacted to a non -yielding state with a vibratory compactor. A minimum 4-inch layer of 7/8- inch-minus crushed rock leveling base, compacted to a non -yielding state, should be placed over firm subgrade soils supporting the block walls. The base -course blocks are to be placed on this crushed rock base with an embedment at least 10 inches below the adjacent finish grade in front of the block wall. The precast concrete blocks should be stacked tightly against one another. A minimum 6-inch perforated, rigid, PVC drain line fitted in a non -woven filter fabric sock should be laid in the keyway trenches behind the base -course blocks. The bottom of keyway trenches and the drain line should have sufficient slope (0.5 percent minimum) to generate flow by gravity. The drain pipes should be tightlined to discharge into a storm sewer or a suitable stormwater disposal facility. A minimum 10-inch-thick (horizontally) vertical drainage blanket, constructed of clean 1/4 to 1-1/2-inch washed gravel crushed rock, should be placed against the back of the block wall facing. The vertical drainage blankets should be hydraulically connected to the drain lines at the base behind the block walls. The wall backfill behind the vertical drainage blankets should consist of structural fill. The vertical drainage blanket and structural fill should be constructed in lifts after each course of blocks is completed. Each layer of geogrid mesh should be laid on level backfill surface, with one end securely anchored between two rows of concrete blocks, stretched tight, and the other end staked down prior to the placement of the next lift of wall backfill. Overlaps of geogrid mesh in the direction of the wall alignments should be at least 12 inches, overlaps in the direction perpendicular to the wall alignments should not be allowed. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 23 DRAINAGE CONTROL Onsite Stormwater Disposal The moderately -sloped mid -section and the low-lying western portion of the subject plat site are underlain by fresh Kame terrace deposit of clean, gravelly, fine to medium sand deposit and infiltration of stormwater into this soil stratum is feasible for the residential buildings to be constructed in these areas. The impervious lodgmont till deposit, however, was found underlying "Tract A", located at the northwest corner of the site, at a depth as less as 5 feet below the existing grade. Therefore, we do not recommend a concentrated infiltration facility in "Tract A" to dispose a large amount of stormwater into the ground. This is because the large amount of concentrated disposed stormwater in this tract may increase the potential of groundwater seepage downhill off the subject site where the lodgmont till may be exposed or near the ground surface. Increased groundwater seepage may elevate the possibility of erosion, sloughing and landlside. Appendix C — Small Project Drainage Requirements, of the Kin County, Washington Surface Water Design Manual, January 24, 2005, allows stormwater collected on 2,000 or more but not more than 10,000 square feet of impervious surfaces of small residential projects to be disposed onsite with infiltration or dispersion method. The "full infiltration" method specified in Section C.2.2 — Full Infiltration of the above design manual can be used on sites underlain by medium sand or coarse sand or gravel and cobble. The moderately -sloped mid -section and the low-lying western portion of the subject plat site are underlain by fresh Kame terrace deposit of clean gravelly, fine to medium sand deposit and are qualified for using Full Infiltration method to dispose stormwater for the residential buildings in these areas. According to the above design manual, infiltration trenches installed into clean gravelly sand soils should be designed to be at least 30 feet long for every 1000 s.f. of impervious surface served (with a 2-foot-wide trench). The length of infiltration trenches may be shortened proportionally with increased trench width. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9A006 Page 24 The infiltration trenches should be set back at least 10 feet from adjacent buildings and 5 feet from property lines. The schematic presentation of an infiltration trench with a single dispersion pipe to serve the residential buildings is shown on Plate 9. The infiltration trenches should be at least 24 inches wide. The bottom of infiltration trenches should be excavated at least 6 inches into the underlying clean, fresh, gravelly sand Kame terrace deposit. The side walls of the trenches should be lined with a layer of non -woven filter fabric. The trench is then filled with clean 3/4 to 1-1/2-inch washed gravel or crushed rock to within about 8 inches of the finish grade. The' dispersion pipes should be constructed of 4-inch rigid or 6-inch flexible perforated PVC pipes and laid level in the gravel or crushed rock filled trenches at about 16 inches below the top of trenches. The top of the gravel or crushed rock fill should also be covered with the filter fabric liner. The remaining trench should then be filled with compacted on -site soils. Stormwater captured over impervious surfaces should be routed into a sediment control structure/oil-water separator structure before being released into the infiltration trenches. Building Footprint Excavation Building footprint excavation for the proposed residential buildings, if encountering groundwater seepage, should have the bottom of excavation sloped and ditches excavated along bases of the cut banks to direct collected groundwater into sump pits from which water can be pumped out. A layer of 2-inch crushed rock should be placed over footing bearing subgrade soils, as required, to protect the soils from disturbance by construction traffic. This crushed rock base should be built to a few inches above groundwater level, but not less than 6 inches thick. The crush rock base should be compacted in 12-inch lifts to a non -yielding state with a vibratory mechanical compactor. Runoff over Impervious Surfaces Storm runoff over impervious surfaces, such as roofs and paved roadways/driveways, should be collected by underground drain line systems connected to downspouts and by catch basins LIU &. ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AOO6 Page 25 installed in paved roadways/driveways. Stormwater thus collected should be tightlined to discharge into a storm sewer or suitable stormwater disposal facilities. Building Footing Drains A subdrain should be installed, around the perimeter footings of each of the residential buildings. The subdrains should consist of a 4-inch-minimum-diameter, perforated, rigid, drain pipe, laid a few inches below bottom of the perimeter footings of the buildings. The trenches and the drain lines should have a sufficient gradient (0.5% minimum) to generate flow by gravity. The drain lines should be wrapped in a non -woven filter fabric sock and completely enclosed in clean washed gravel. The remaining trenches may be backfilled with clean onsite soils. Water collected by the perimeter footing subdrain systems should be tightlined, separately from the roof and surface stormwater drain lines, to discharge into a storm sewer or suitable stormwater disposal facility. Surface Drainage Water should not be allowed to stand in any areas where footings, on -grade slabs, or pavement is to be constructed. Finish ground surface should be graded to direct surface runoff away from the residential buildings. We recommend the finish ground be sloped at a gradient of 3 percent minimum for a distance of at least 10 feet away from the buildings, except in the areas to be paved. Cleanouts Sufficient number of cleanouts at strategic locations should be provided for underground drain lines. The underground drain lines should be cleaned and maintained periodically to prevent clogging. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat I..&A Job No. 9AO06 Page 26 RISK EVALUATION STATEMENT The subject site is underlain at shallow depth by medium -dense to dense Kame terrace and/or lodgmont till soils. These soils are of moderately -high to high shear strength and gutaer was not Jenctiun a etl . iy the test ;fits excav to ;vn lthe site r Therefore, the bite should be quite stable. The key to maintain site stability during and after completion of construction is to have proper and adequate erosion and drainage controls. It is our judgment that provided the recommendations in this report are fully implemented and observed during construction, the areas disturbed by construction will be stabilized and will not increase the potential for soil movement. In our opinion, the risk of damage to the proposed development and from the development to adjacent properties due to soil instability should be minimal. LIMITATIONS This report has been prepared for the specific application to this project for the exclusive use by Mr: kabert wilson `kid his associates, consultants and contractors. We recommend that this report, in its entirety, be included in the project contract documents for the information of the prospective contractors for their estimating and bidding purposes and for compliance with the recommendations in this report during construction. The conclusions and interpretations in this report, however, should not be construed as a warranty of the subsurface conditions. The scope of this study does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except as specifically described in this report for design considerations. Our recommendations and conclusions are based on the geologic and soil conditions encountered in the test pits, and our experience and engineering judgment. The conclusions and recommendations are professional opinions derived in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. No warranty, expressed or implied, is made. LIU & ASSOCIATES, INC. February 20, 2009 Wilson Plat L&A Job No. 9AO06 Page 27 The actual subsurface conditions of the site may vary from those encountered by the test pits excavated on the site. The nature and extent of such variations may not become evident until construction starts. If variations appear then, we should be retained to re-evaluate the recommendations of this report, and to verify or modify them in writing prior to proceeding further with the construction of the proposed development of the site. CLOSURE We are pleased to be of service to you on this project. Please feel free to call us if you have any questions regarding this report or need further consultation. Nine plates attached Yours very truly, LIU & ASSOCIATES, INC. J. S. (Julian) Liu, Ph.D., P.E. Consulting Geotechnical Engineer LIU & ASSOCIATES, INC. SECTION 7 OTHER PERMITS SECTION 8 ESC ANALYSIS AND DESIGN SECTION 9 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL STORMWATER FACILITY SUMMARY SHEET Development Date Location ENGINEER DEVELOPER Name Name Firm Firm Address Address Phone Phone Developed Site: Acres Number of lots Number of detention facilities on site: Number of infiltration facilities on site: ponds ponds vaults vaults tanks tanks Flow control provided in regional facility (give location) No flow control required Exemption number Downstream Drainage Basins Immediate Major Basin Basin A Basin B Basin C Basin D. Number & type of water quality facilities on site: biofiltration Swale (regular/wet/ or continuous inflow?) combined detention.1WQ pond (WQ portion basic or large?) combined detention/wetvault compost filter filter strip flow dispersion farm management plan landscape management plan oil/water separator (baffle or coalescing plate?) catch basin inserts: Manufacturer pre -settling pond pre -settling structure: Manufacturer flow-splitter catchbasin sand filter (basic or large?) sand filter, linear (basic or large?) sand filter vault (basic or large?) stormwater wetland wetpond (basic or large?.) wetvault DESIGN INFORMATION INDIVIDUAL BASIN A B C D Water Quality design flow -Water_Quality treated volume or wet and Vr 1998 Surface Water Design Manual 91119' KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL DESIGN INFORMATION, cont'd TOTAL INDIVIDUAL. BASIN Drainage basin(s) Onsite area A B C D Offsite area Type of Storage Facility Live Storage Volume Predenj ed Runoff Rate 2-year 10- ear 100- ear Developed runoff rate 2-year I0- ear 100 ear T e of restrictor Size of orificelrestriction No. 1 No. 2 No. 3 No. 4 FLOW CONTROL & WATER QUALITY FACILITY SUMMARY SHEET SKETCH All detention, infiltration and water quality facilities must include a sketch per the following criteria: Heading for the drawings should be located at the top of the sketch (top right-hand corner). The heading should contain: • North arrow (point up or to left) * D9# • Plat name or short plat number • Address (nearest) • Date drawn (or updated) • Thomas Brothers page, grid number 2. Label CBs and MHs with the plan and profile designation. Label the control structure in writing or abbreviate with C_S. Indicate which structures provide spill control. 3. Pipes --indicate: Pipe size Pipe length Flow direction Use s single heavyweight line 4. Tanks-- use a double, heavyweight line and indicate size (diameter) 5. Access roads • Outline the limits of the road • Fill the outline with dots if the road is gravel. Label in writing if another surface. 6. Other Standard Symbols: * Bollards: 0 0 0 0 is tr Q a • Rip rap 000000 000000 Fences --x--- x---x---x--- x--- x--- • Ditches—D---}D----D--}D 7. Label trash racks in writing. S. Label all streets with the actual street sign designation. If you don't know the actual street name, consult the plat map. 9. Include easements and lot lines or tract limits when possible. 10. Arrange all the labeling or writing to read from left to right or from bottom to top with reference to a properly oriented heading. 11. Indicate driveways or features that may impact access, maintenance or replacement. 911199 1998 Surface Water Design Manual 2 SECTION 10 OPERATIONS AND MAINTENANCE MANUAL U} � �u Z FOUND 518" REBAR & CAP L „CPS 223M" 0.55' N. & 10, 44' E. OF PROP. COR. OVERL4F )S 10.46' AT S. PROP. VNE - I �104,65' R=96,50' [[ L=20.40' A=2'06338" Ln L�K 5 I 64 5,909+/-S`Q�. FT. I 1 U1.51 ASEMENT 'ARK; 1002018 L LOT 4 DEDICATION 5,905+/--SQ. FT. o I I o I 102.51' I a � co Ln 3 I I _ I }LOT 5,905+/-SQ. FT. t' � Q col '3G5--9080 o ` 102.51' I I c-" LOT 2 ai I o 5,905+/-SQ. FT, 102.51' I I LOT 1 riJ I V 5,775+/-SQ. FT. r 15 0..� -f Of PROP. W. ! !NE R=25' L=90'3458" 77.25 t� _ _ CD (�nNIC'TC)I 10TInKi I c / mod - - - - - - - - - ._-,-----o_-_-a,. -- I r �t N882638"W 31 , IN88 26'MW 526 01 ' �i01.13' LOT 6 5,587+/-SQ. FT. 101.11' 0 LOT 7 5,560+/-SQ. FT. Ln a � Q 101.09' CD LOT 8 FT. Ln 5,560+/-S�. o 101.08' Ln Cn LOT 9 Ln 5,559+/-SQ. CD a / 101.06' 4 LOT 10 6,778+/-SQ. FT. cn R=106.50' � WCvt S. LINE N. 207', S. 2, 5.1- f/1, S.E. 1/" i0T 1 Q REN TON SP 059-85 iZHp. No. 1: 10220,,`85 °�' 80'�'