Loading...
HomeMy WebLinkAboutAdden 4 CAG-17-124,Adden etv AMENDMENT NO. 4 TO AGREEMENT FOR ADDITIONAL CONSTRUCTION ADMINISTRATION SERVICES FOR GENE COULON MEMORIAL BEACH PARK STRUCTURAL REPAIRS THIS AMENDMENT, dated /tiC v ( , 2019, is by and between the City of Renton (the "City"), a Washington municipal eorporation, and PND Engineers, Inc. ("Consultant"). The City and the Consultant are referred to collectively in this Amendment as the "Parties!' Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-17-124, dated June 13, 2017, to provide necessary services for the Gene Coulon Memorial Beach Park Structural Repairs (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to change the scope of work, change the time for performance, and change the compensation in order to provide additional construction administration and support professional services for additional site visits, inspections/observations, submittals, construction record drawings, and project closeout. NOW THEREFORE, It is mutually agreed upon that CAG-17-124 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-4, which is attached and incorporated herein. 2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit A-4. All Work shall be performed by no later than August 31, 2019. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $ 28,000.00 from $ 257,655.00 to $ 285,655.00 , plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actual performed according to the rate(s) or amounts specified in Exhibit A-4 of the Agreement. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT 4. By: 4Ail' / '7� B K er Jim ampbel Community Services Administrator Pre ident C/031/ .S - (OM Zd r 4 Date Date Approved as to Legal Form By: Shane Moloney Renton City Attorney Contract Template Updated 03/12/2019(clb 30) PAGE 2 OF 2 I ® D EXHIBIT A-4 ENGINEERS, INC. Engineering Services: March 18, 2019 Civil PND No. 174041 Planning Surveying Alan Wyatt, Capital Project Coordinator Structural Parks Planning& Natural Resources Permitting City of Renton Ilydrology 1055 South Grady Way Gcotechnical EnvironmentalRenton,WA 98057-3232 Transportation marine Facilities Subject: Gene Coulon Park Facility Structural Repairs Coastal Engineering Amendment#4—Additional Construction Administration Support Contract Administration Construction Engr.Support Dear Alan: Offices: Seattle Please consider the following amendment to the original agreement between PND 1736 Fourth Avenue S Engineers, Inc. (PND) and the City of Renton (City)signed June 13, 2017 for the Seattle,Washington 98134 Gene Coulon Park Structural Repairs construction administration support.The Phone:206.624.1387 project is in construction by Quigg Bros., Inc. As of 12/18/2018 PND had expended all budget in the construction support tasks of the contract with Portland previously scoped site visits, inspections/observations, submittals,construction 220 NW 8's Avenue record drawings and project closeout tasks yet to be completed. Portland,Oregon 97209 Phone:503.915.9337 This request for amendment is based on the following items which required Anchorage additional effort: 1506 West 36th Avenue Anchorage,Alaska 99503 1. Unforeseen conditions: Phone:907.561.1011 a. G-Line piling interferences, phasing coordination, concrete filled pilings, memo &design changes, and utility location impacts. Juneau 2.Additional rounds of submittal reviews: 9360 Glacier I Iwy,Suite 100 a. Contractor oversights(Ivar's Deck railings wave skirt,steel framing too Juneau,Alaska 99801 Phone;907.586.2093 short,gangway attachment coordination), and moorage floats. 3. Additional requested site visits: Ilouston a. Requests to view unforeseen conditions and their resolution,fit-up issues 19500 State I lighway 249 due to construction on existing facilities, and supplemental quality Suite 655 assurance of work due to issues arising from items missed in the design Ilouston,Texas 77070 drawings. Phone:832.930.4830 Deliverables—Assumptions—Schedule: www.pndengineers.eom The contract deliverables, assumptions and schedule will remain unchanged. Page 2 March 18, 2019 Fee: The total compensation for the work on this project shall be adjusted with this amendment and shall be completed under the current contract terms.The remaining budget amount for the bulkhead CA will be reallocated as part of this amendment.The amended amount considers work to continue through the end of May and is split for the above noted items and projected effort through project completion. Should the project be completed prior to the end of May,fee remaining at completion would be unspent. Base Contract+Amends 1,2&3(Hourly,Not-to-Exceed NTE) $257,655.00 Amendment No.4-Additional CA(Hourly, NTE) $28,000.00 Total Fee $285,655.00 We look forward to performing this work for the City. If there are any questions regarding this Amendment proposal, please call anytime. Sincerely, PND Engineers, Inc. I Seattle Office 4( Jo Ru , P.E. Ji Campbe I, P.E. Senior Engineer President