AMENDMENT NO. 4 TO AGREEMENT FOR ADDITIONAL
CONSTRUCTION ADMINISTRATION SERVICES FOR GENE
COULON MEMORIAL BEACH PARK STRUCTURAL REPAIRS
THIS AMENDMENT, dated /tiC v ( , 2019, is by and between the City of Renton
(the "City"), a Washington municipal eorporation, and PND Engineers, Inc. ("Consultant"). The
City and the Consultant are referred to collectively in this Amendment as the "Parties!' Once
fully executed by the Parties, this Amendment is effective as of the last date signed by both
parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-17-124, dated
June 13, 2017, to provide necessary services for the Gene Coulon Memorial Beach Park
Structural Repairs (referred to herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to change the scope of work, change the
time for performance, and change the compensation in order to provide additional
construction administration and support professional services for additional site visits,
inspections/observations, submittals, construction record drawings, and project closeout.
NOW THEREFORE, It is mutually agreed upon that CAG-17-124 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-4, which is attached and incorporated herein.
2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit A-4. All Work shall be performed by no later than August
31, 2019.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $ 28,000.00 from
$ 257,655.00 to $ 285,655.00 , plus any applicable state and local sales taxes.
The additional compensation shall be paid based upon Work actual performed
according to the rate(s) or amounts specified in Exhibit A-4 of the Agreement.
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTANT
4.
By: 4Ail' / '7� B
K er Jim ampbel
Community Services Administrator Pre ident
C/031/ .S - (OM Zd r 4
Date
Date
Approved as to Legal Form
By:
Shane Moloney
Renton City Attorney
Contract Template Updated 03/12/2019(clb 30)
PAGE 2 OF 2
I ® D
EXHIBIT A-4
ENGINEERS, INC.
Engineering Services: March 18, 2019
Civil PND No. 174041
Planning
Surveying Alan Wyatt, Capital Project Coordinator
Structural Parks Planning& Natural Resources
Permitting
City of Renton
Ilydrology
1055 South Grady Way
Gcotechnical
EnvironmentalRenton,WA 98057-3232
Transportation
marine Facilities Subject: Gene Coulon Park Facility Structural Repairs
Coastal Engineering Amendment#4—Additional Construction Administration Support
Contract Administration
Construction Engr.Support Dear Alan:
Offices:
Seattle Please consider the following amendment to the original agreement between PND
1736 Fourth Avenue S Engineers, Inc. (PND) and the City of Renton (City)signed June 13, 2017 for the
Seattle,Washington 98134 Gene Coulon Park Structural Repairs construction administration support.The
Phone:206.624.1387 project is in construction by Quigg Bros., Inc. As of 12/18/2018 PND had
expended all budget in the construction support tasks of the contract with
Portland previously scoped site visits, inspections/observations, submittals,construction
220 NW 8's Avenue
record drawings and project closeout tasks yet to be completed.
Portland,Oregon 97209
Phone:503.915.9337
This request for amendment is based on the following items which required
Anchorage additional effort:
1506 West 36th Avenue
Anchorage,Alaska 99503 1. Unforeseen conditions:
Phone:907.561.1011 a. G-Line piling interferences, phasing coordination, concrete filled pilings,
memo &design changes, and utility location impacts.
Juneau
2.Additional rounds of submittal reviews:
9360 Glacier I Iwy,Suite 100
a. Contractor oversights(Ivar's Deck railings wave skirt,steel framing too
Juneau,Alaska 99801
Phone;907.586.2093 short,gangway attachment coordination), and moorage floats.
3. Additional requested site visits:
Ilouston a. Requests to view unforeseen conditions and their resolution,fit-up issues
19500 State I lighway 249 due to construction on existing facilities, and supplemental quality
Suite 655 assurance of work due to issues arising from items missed in the design
Ilouston,Texas 77070 drawings.
Phone:832.930.4830
Deliverables—Assumptions—Schedule:
www.pndengineers.eom
The contract deliverables, assumptions and schedule will remain unchanged.
Page 2
March 18, 2019
Fee:
The total compensation for the work on this project shall be adjusted with this amendment and shall be
completed under the current contract terms.The remaining budget amount for the bulkhead CA will be
reallocated as part of this amendment.The amended amount considers work to continue through the end
of May and is split for the above noted items and projected effort through project completion. Should the
project be completed prior to the end of May,fee remaining at completion would be unspent.
Base Contract+Amends 1,2&3(Hourly,Not-to-Exceed NTE) $257,655.00
Amendment No.4-Additional CA(Hourly, NTE) $28,000.00
Total Fee $285,655.00
We look forward to performing this work for the City. If there are any questions regarding this
Amendment proposal, please call anytime.
Sincerely,
PND Engineers, Inc. I Seattle Office
4(
Jo Ru , P.E. Ji Campbe I, P.E.
Senior Engineer President