HomeMy WebLinkAboutCO 06 CITY OF RENTON CAG-17-174, CO #6-19
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: Renton Hill Utility Replacement CAG-17-174 C.O.i# 6
CONTRACTOR: Laser Underground& Earthworks,Inc.
SUMMARY OF PROPOSED CHANGE:
Provide all labor,equipment,subcontracting,bonding, insurance for the complete work required for the
installation of a concrete roadway on S 7th St between Cedar Ave S and Renton Ave S as outlined below:
ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price Total Price
A40, NEW ITEM: LS 1 $34,913.47 $34,913.47
Surface Water Utility portion of additional costs to rebuild S 7'"St between Cedar Ave S
and Renton Ave S.Work to include removal of existing asphalt roadway,placement and
compaction of CSTC subbase,adjustment of utility covers,forming,pouring and finishing
new concrete roadway per Laser Underground&Earthworks,Inc.April 9,2019 proposal.
B39. NEW ITEM: LS 1 $34,913.47 $34,913.47
Wastewater Utility portion of additional costs to rebuild S 7s"St between Cedar Ave S and
Renton Ave S.Work to include removal of existing asphalt roadway,placement and
compaction of CSTC subbase,adjustment of utility covers,forming,pouring and finishing
new concrete roadway per Laser Underground&Earthworks,Inc.April 9,2019 proposal.
C35. NEW ITEM: LS 1 $34,913.48 $34,913.48
Water Utility portion of additional costs to rebuild S 7'"St between Cedar Ave S and
Renton Ave S.Work to include removal of existing asphalt roadway,placement and
compaction of CSTC subbase,adjustment of utility covers,forming,pouring and finishing
new concrete roadway per Laser Underground&Earthworks,Inc.April 9,2019 proposal.
Sub Total $104,740.42
Sales Tax for Schedules B&C(10.0%) $10,474.04
Total $115,214.46
ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT
THIS ORDER TOTAL AFTER CHANGE
$5,048,703.20 $6,498,650.63 $115,214.46 $6,613,865.09
SIGNATURES: ]� 7�
Contractor: j -�i" ""u Date: 5"ate'/7
it er L,,r•�t
Project Engineer: �,% Date: 5-2-I- i 9
xd,,,a
Approved By: Date: 5%21 _.I1
Ron Straka,Utility SysDirector
Approved By: Date:
Gregg Zim r an,PW Admi is 4forr C�
Approved By: C/wtA7 it"" ```\�������tttitrirtrrrr D/z 3//ft 6 rV 4400 Date:
Denis Law,Mayor ������l'•. NJ 4. \������iiiii,.,,�04,"i�.
s.
Approved 8 '%� Date:
��
Shane Mo V.Renton City Att Pf.j
Attest: / = 4, ' ���Y = Date:
Jason Set Cler S i
H:\Fite Sys\WTR-Drinki g Water Utility\ TR-27-Water Projec i ��:KIV#;47,084�3�42.01i$Water Main Replacement\Pay
Estimates\Change Orde s\CO#6(Concrete Road)Sch A,B&C\ChaS��G t�s c gti Road.doc\JHmc
''rrfiiII iitwo o'