Loading...
HomeMy WebLinkAboutCO 06 CITY OF RENTON CAG-17-174, CO #6-19 Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Renton Hill Utility Replacement CAG-17-174 C.O.i# 6 CONTRACTOR: Laser Underground& Earthworks,Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor,equipment,subcontracting,bonding, insurance for the complete work required for the installation of a concrete roadway on S 7th St between Cedar Ave S and Renton Ave S as outlined below: ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price Total Price A40, NEW ITEM: LS 1 $34,913.47 $34,913.47 Surface Water Utility portion of additional costs to rebuild S 7'"St between Cedar Ave S and Renton Ave S.Work to include removal of existing asphalt roadway,placement and compaction of CSTC subbase,adjustment of utility covers,forming,pouring and finishing new concrete roadway per Laser Underground&Earthworks,Inc.April 9,2019 proposal. B39. NEW ITEM: LS 1 $34,913.47 $34,913.47 Wastewater Utility portion of additional costs to rebuild S 7s"St between Cedar Ave S and Renton Ave S.Work to include removal of existing asphalt roadway,placement and compaction of CSTC subbase,adjustment of utility covers,forming,pouring and finishing new concrete roadway per Laser Underground&Earthworks,Inc.April 9,2019 proposal. C35. NEW ITEM: LS 1 $34,913.48 $34,913.48 Water Utility portion of additional costs to rebuild S 7'"St between Cedar Ave S and Renton Ave S.Work to include removal of existing asphalt roadway,placement and compaction of CSTC subbase,adjustment of utility covers,forming,pouring and finishing new concrete roadway per Laser Underground&Earthworks,Inc.April 9,2019 proposal. Sub Total $104,740.42 Sales Tax for Schedules B&C(10.0%) $10,474.04 Total $115,214.46 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $5,048,703.20 $6,498,650.63 $115,214.46 $6,613,865.09 SIGNATURES: ]� 7� Contractor: j -�i" ""u Date: 5"ate'/7 it er L,,r•�t Project Engineer: �,% Date: 5-2-I- i 9 xd,,,a Approved By: Date: 5%21 _.I1 Ron Straka,Utility SysDirector Approved By: Date: Gregg Zim r an,PW Admi is 4forr C� Approved By: C/wtA7 it"" ```\�������tttitrirtrrrr D/z 3//ft 6 rV 4400 Date: Denis Law,Mayor ������l'•. NJ 4. \������iiiii,.,,�04,"i�. s. Approved 8 '%� Date: �� Shane Mo V.Renton City Att Pf.j Attest: / = 4, ' ���Y = Date: Jason Set Cler S i H:\Fite Sys\WTR-Drinki g Water Utility\ TR-27-Water Projec i ��:KIV#;47,084�3�42.01i$Water Main Replacement\Pay Estimates\Change Orde s\CO#6(Concrete Road)Sch A,B&C\ChaS��G t�s c gti Road.doc\JHmc ''rrfiiII iitwo o'