HomeMy WebLinkAboutAdden 2 CAG-1 7-153,Adden#2-19 AMENDMENT NO. 2 TO AGREEMENT FOR CITY HALL MODERNIZATION PROJECT (CAG-17-153) THIS AMENDMENT, dated ilv a t Z , 2019, is by and between the City of Renton (the "City"), a Washington munici al corporation, and Stemper Architecture Collaborative, Inc. ("Consultant"), a Washington State Professional Services Corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties,this Amendment is effective as of the last date signed by both parties. Whereas,the City engaged the services of the Consultant under Agreement CAG-17-153, dated July 13, 2017, to provide necessary services for the Architectural and Engineering Services, Production of Permit and Bid Documents, Assistance with Bidding, Construction Administration and Project Close-Out(referred to herein as the"Agreement"); Whereas, the Parties wish to amend the Agreement to provide professional services necessary to replace the Emergency Generator in Renton City Hall required to provide emergency power to the elevators and other critical systems. NOW THEREFORE, It is mutually agreed upon that CAG-17-153 is amended as follows: 1. Scope of Work:Section 1,Scope of Work, is amended to add work as specified in Exhibit A-2,which is attached and incorporated herein. 2. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $82,897.00 from $365,118.00 to $448,015.00 plus any applicable state and local sales taxes.The additional compensation shall be paid based upon Work actual performed according to the rate(s) or amounts specified in Exhibit A-2 which is attached and incorporated herein. 3. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF,the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON St i F er Archite Collaborative De is Law, Mayor Enter Signer's Name Enter Signer's Title /27/ Date Date Attes 1as n A. ethurnrrrrr' 0 �ii4 Cit Clerk °`< • SFAL Approved as to Legal Form Ir Shane Moloney, City Attorney Contract Template Updated 03/12/2019 clb 07/16/19/69 PAGE 2 OF 2 Exhibit A-2 Friday,July 26,2019 Russ Woodruff Capital Project Coordinator Community Services Facilities Division Renton City Hall,6th Floor 1055 South Grady Way Renton,WA 98057-3232 Russ, Thank you for the opportunity to submit this request for professional services for the emergency generators replacement project at Renton City Hall.These services will cover all design fees, production of bid documents, bidding,and construction administration for the replacement of two generators with one generator at the Renton City Hall building in Renton,WA. Project Scope: 1. Removal of existing chain link fence to allow for access to generator space. 2. Removal of existing(2)generators and supporting equipment. 3. Installation of(1) replacement generator that would replace the load capacity of the original (2)generators. 4. Installation of supporting equipment. 5. Reuse of existing penetrations in building for adequate venting. 6. Replacement of chainlink fence with stronger fencing that includes man door. 7. Retain location of man door access to enclosure to allow for relief from requirement for remote fueling station. Design Team Scope: 1. Services for architectural, mechanical,and electrical design services. 2. Load testing for one panel served by generators. 3. Design and production of draft design documents and an opportunity for Authority Having Jurisdiction)AHJ to review and recommend revisions. 4. Design and production of final bid documents and an opportunity for Owner review and revisions. 5. Bidding assistance. 6. Construction administration and close out. 7. Punch list and Final Completion paperwork. At this time the design team has already invested some efforts to move this project forward,those amounts are also captured in this proposed. 4000 DELRIDGE WAY SW • SUITE 200 • SEATTLE,WA 98106 • 206/624-2777 • www.stemperac,com a Lacking input from AHJ,the design team's code interpretations will guide initial design.Therefore, any significant changes to project scope required by AHJ will be considered additional services to the base contract. Further, it is anticipated that existing structure will be able to support one generator where there was previously two. If additional structural work beyond review of documents and confirmation of this anticipation are required then those efforts will be considered additional services to the base contract. Design Fees: Our proposed basic services fees total$82,897. We are very excited to work with you on this project. Please feel free to contact us with any questions or concerns about this fee proposal. Thomas Hon Design Team Project Manager Stemper Architecture Collaborative ' t.. Project Title: City Hall Emergency Generator Replacement Fee Proposal For: City of Renton Date: 7/26/2019 Full design,bidding,construction administration,and close out services for the replacement of the emergency generators at Renton City Hall. Scope: Esimated MACC: TBD Design and Construction Admin Architectural Services $38,983 SubConsultant Mechanical $12,540 Electrical $24,200 Structural $600 SubConsultant Total $37,340 Mark-Up(10%) $3,734 Subtotal $80,057 Reimbursables Reprographics $200 Load testing $2,640 Reimbursables Sub-total $2,840 Total $82,897 Project Title: City Hall Emergency Generator Replacement Fee Proposal For: City of Renton Date: 7/26/2019 Consultant: Stemper Architecture Collaborative Scope: Full design,bidding,construction administration,and close out services for the replacement of the emergency generators at Renton City Hall. Hours Rate Extension Work Already Completed Nov 2017-Drawing editing,site visit,coordination 11 $135.00 $1,485 March 2018-Pricing generator and coordination 2.75 $135.00 $371 June 2018-Site visit and coordination 10.25 $135.00 $1,384 Remainder 2018-Drawings,coordination,Cummins rev 19 $135.00 $2,565 March-May 2019-Meeting,coordination and review 5 $135.00 $675 May 2019-Meeting 1.5 $135.00 $203 Subtotal $6,683 75%Design Phase Kick-off Meeting and site visit 6 $135.00 $810 Materials research 6 $135.00 $810 Design to 75% 10 $135.00 $1,350 Design to 75%-Principal 4 $175.00 $700 Drawings to 75%-(3)24"x36" 18 $135.00 $2,430 Develop cost estimate 4 $135.00 $540 Develop project schedule 2 $135.00 $270 Daily Team Coordination 10 $135.00 $1,350 Full Team QC/QC 2 $135.00 $270 Full Team QC/QC-Principal 3 $175.00 $525 Drawings to AHJ 1 $135.00 $135 75%Specs-Technical 10 $135.00 $1,350 Subtotal $10,540 Construction Documents CD Drawings(3)24"x36" 18 $135.00 $2,430 Spec Divisions 00&01 2 $135.00 $270 CD Specs-Technical 8 $135.00 $1,080 Submittal for Owner review 1 $135.00 $135 CD review meeting 4 $135.00 $540 Meeting minutes 2 $135.00 $270 Cost Estimate update 2 $135.00 $270 Document Pick-ups 2 $135.00 $270 AHJ coversheet 3 $135.00 $405 Permit Intake Appointments 1 $135.00 $135 Submittal for Owner Contracts Review 1 $135.00 $135 Revisions per comments 2 $135.00 $270 Daily Team Coordination 8 $135.00 $1,080 Subtotal $7,290 Instruction to Bidders Instruction to Bidders 1 $135.00 $135 Subtotal $135 Print Bid Sets Plot final set 1 $135.00 $135 Subtotal $135 Pre Bid Conferene Telecon Meeting and MM 2 $135.00 $270 Subtotal $270 Bidding Questions Respond to telephone questions 2 $135.00 $270 Respond to telephone questions-Principal Architect 1 $175.00 $175 Provide(1)addenda 2 $135.00 $270 Provide(1)addenda-Principal Architect 1 $135.00 $135 Subtotal $850 Bid Opening Review bid opening 1 $135.00 $135 Subtotal $135 Pre-Con meeting and Submittal List Develop submittal list and letter 0 $135.00 $0 Pre-Con meeting w/minutes 2 $135.00 $270 Pre-Con meeting-Principal 0 $135.00 $0 Review project sched.and sched.of values 3 $135,00 $405 Subtotal $675 Construction Meetings Meetings(4)w/minutes 20 $135.00 $2,700 Meetings(1)-Principal 0 $175.00 $0 Site Visits(2)w/notes 0 $135.00 $0 Site Visits(1)-Principal 0 $175.00 $0 Subtotal $2,700 Construction Coordination Day-to-day coordination(2hr/week x 8 weeks) 16 $135.00 $2,160 Day-to-day coordination-Principal 0 $175.00 $0 Subtotal $2,160 Review Submittals Review architectural submittals 6 $135.00 $810 Review architectural submittals-Principal 1 $175.00 $175 Coordinate engineering submittals 2 $135.00 $270 Subtotal $1,255 RFIs Respond/process RFIs(3) 6 $135.00 $810 Respond/process RFIs-Principal 1 $175.00 $175 Subtotal $985 COPs and Change Orders Review/process(2)COPs 4 $135.00 $540 Review/process COPs-Principal 1 $175.00 $175 Review/process(1)COs 0 $135.00 $0 Review/process COs-Principal 0 $175.00 $0 Subtotal $715 Contractor Payment Requests Review Schedule of Values 2 $135.00 $270 Review I process(2)Pay Apps 4 $135.00 $540 Review/process Pay Apps-Principal 0 $175.00 $0 Subtotal $810 Substantial Completion SC inspection and list 4 $135.00 $540 SC inspection and list-Principal 0 $175.00 $0 Substantial completion form&letter 1 $135.00 $135 Subtotal $675 Final Completion Punchlist inspection 4 $135.00 $540 Punch list 2 $135.00 $270 Final punchlist inspection-construction 0 $135.00 $0 Final punchlist inspection-warranty period 0 $135.00 $0 Final review-Principal 0 $175.00 $0 Subtotal $810 Final Documentation O&M review 4 $135.00 $540 As-built coordination 3 $135.00 1 $405 As-built drafting 8 $135.00 $1,080 As-built repro and docs to Owner 1 $135.00 $135 Subtotal $2,160 Architectural Total 285.5 $38,983 a, Project Title: City Hall Emergency Generator Replacement Fee Proposal For: City of Renton Date: 7/26/2019 Consultant: Sazan Group(Mechanical) Scope: Full design,bidding,construction administration,and close out services for the replacement of the emergency generators at Renton City Hall. Task Hours Rate Extension 75%Design See attached proposal from Sazan $6,280 100%Design See attached proposal from Sazan $3,370 Construction Administration See attached proposal from Sazan $2,890 Mechanical Total $12,540 Satan Group,Inc. Renton City Hall Generator Upgrade 600 Stewart Street,Suite 1400 Renton,WA Seattle,Washington 98101 1055 S.Grady Way Date: 07/26/19 ENGINEERING FEE CALCULATION-MECHANICAL By: CEM DESIGN AND CONSTRUCTION ADMINISTRATION Constriction Documents(751) Mechanical PRIN. SR. ENGR/SR ACAD ADMIN. TOTAL TASK TASK ENG. DESN. TECH ASST. HOURS AMOUNT Field Investigation(1 Site Visit) 4 4 $640 Review record documents 2 2 4 $510 Fuel Piping Design/Drawing Layout 6 10 2 18 $2,060 Controls/Sequence of Operations 3 3 $480 Specifications 6 6 $960 Coordination with AHJ 2 2 $320 Coordination with Generator Manufacturer 1 1 $160 Cost Estimate 2 2 $320 Internal Coordination 2 2 4 $510 Internal QA,QC,PM and Admin. 2 2 $320 Total Electrical Hours: 30 14 2 46 $6,280 Rates: $225 $160 $125 $95 $75 Ca-..ryAmount: $4,800 $1,330 $150 TOTAL: $8,280 Construction Documents/Permit Set(100%) Mechanical PRIN. SR. SR. ACAD. ADMIN. TOTAL TASK TASK ENG. DESN. TECH ASST. HOURS AMOUNT Finalize drawings 2 2 4 $510 Finalize Specifications 2 3 5 $545 Coordination with Others 3 2 5 $670 Design Team Meetings(Assume 1 @ Renton) 4 4 $640 Cost Estimate 1 1 $160 Internal QA,QC,PM and Admin. 1 2 4 7 $845 Total Electrical Hours: 1 14 4 7 26 $3,370 Rates: $225 $160 $125 $95 $75 Ca=: Amount: $225 $2,240 $380 $525 TOTAL: $3,370 Construction Administration Mechanical PRIN. SR. SR. ACAD. ADMIN. TOTAL TASK TASK ENG. DESN. TECH ASST. HOURS AMOUNT Submittal Review 2 1 3 $395 Field Questions and Changes 2 1 3 $395 Phone Meetings/Coordination 3 3 $480 Punchlist and Site Visit 5 5 $800 As-Built Drawings 1 2 1 4 $425 Project Administration and Management 2 1 3 $395 Total Electrical Hours: 15 2 4 21 $2,890 Rates: $225 $160 $125 $95 $75 Ca ;tit Amount: $2,400 $190 $300 TOTAL: $2,890 Mechanical Total Fee $12,540 Project Title: City Hall Emergency Generator Replacement Fee Proposal For: City of Renton Date: 7/26/2019 Consultant: Sazan Group(Electrical) Scope: Full design,bidding,construction administration,and close out services for the replacement of the emergency generators at Renton City Hall. Task Hours Rate Extension 75%Design See attached proposal from Sazan $16,130 100%Design See attached proposal from Sazan $3,470 Construction Administration See attached proposal from Sazan $4,600 Electrical Total $24,200 Satan Group,Inc. Renton City Hall Generator Upgrade 600 Stewart Street,Suite 1400 Renton,WA Seattle,Washington 98101 1055 S.Grady Way Date:07/26/19 ENGINEERING FEE CALCULATION-ELECTRICAL By.CEM DESIGN AND CONSTRUCTION ADMINISTRATION Construction Documents(75%) Electrical PRIN. SR. ENGR/SR ACAD ADMIN. TOTAL TASK TASK ENG. DESN. TECH ASST. HOURS AMOUNT Pre-generator design coordination 15 15 $2,400 Pre-Design Meeting and Site Assessment/Measure-up 4 4 $640 Generator size confirmation and calculations 2 2 $320 Layout/Dimensional coordination 2 2 4 $510 Coordination with generator manufacturer 4 4 $640 Record Documents Review 2 2 $320 Revise existing one-line to single generator 3 4 7 $860 Demolition Drawings 6 8 14 $1,720 Panel S Metering-Review/Interpretation/Coordination 3 1 4 $555 Engineering/Plan and Layout Drawings 8 8 16 $2,040 Panel Schedules.Load Calm,Fault Current Calculations 6 8 14 $1,720 Cost Estimate(ROM) 3 3 $480 Specification 10 10 $1,600 Miscellaneous Code Assessments 3 3 $480 Coordination with AHJ 2 2 $320 Cost Estimate 2 2 $320 Internal QA,QC,PM and Admin. 1 4 2 2 9 $1,205 Total Electrical Hours: 1 79 32 3 115 $18,130 Rates: $225 $160 $125 $95 $75 Ca:%Li Amount $225 $12,640 $3,040 $225 TOTAL: $16,130 Construction Documents/Pennit Set(100%) Electrical PRIN. SR. SR. ACAD. ADMIN. TOTAL TASK TASK ENG. DESN. TECH ASST. HOURS AMOUNT Finalize drawings 2 4 6 $700 Finalize Specifications 2 2 4 $510 Coordination with Others 4 2 6 $830 Cost Estimate 2 2 $320 Design Team Meetings(Assume 1 n@ Renton) 4 4 $640 Internal QA,QC,PM and Admin. 2 2 4 $470 Total Electrical Hours: 16 8 2 $3,470 Rates: $225 $160 $125 $95 $75 Ca: Amount $2,560 $760 $150 TOTAL: $3,470 Construction Administration Electrical PRIN. SR. SR. ACAD. ADMIN. TOTAL TASK TASK ENG. DESN. TECH ASST. HOURS AMOUNT Submittal Review 1 3 1 5 $610 Field Questions and Changes 1 3 1 5 $610 Phone Meetings/Coordination 3 3 $480 Punc hlist and Site Visit 5 5 $800 As-Built Drawings 1 2 1 4 $125 Project Administration and Management 10 1 11 $1,675 Total Electrical Hours: 21 6 2 4 33 $4,600 Rates: $225 $160 $125 $95 $75 Ca,-'. Amount $3,360 $750 $190 $300 TOTAL: $4,600 Electrical Total Fee S24,200 v *.. ., Project Title: City Hall Emergency Generator Replacement Fee Proposal For: City of Renton Date: 7/26/2019 Consultant: Peterson Strehle Martinson(Structural) Scope: Review of existng deck for capacity to carry generator loads. Task Hours Rate Extension 75%Design See attached proposal from Sazan $600 Structural Total 0 $600 November 15,2018 Thomas Horton S.M. Stemper Architects RE: Structural Engineering Fee Proposal Renton City Hall Elevator Modernization Check Slab for New Generator Dear Thomas: As you requested,we are sending you a fee proposal for the above referenced project. SCOPE: Structural Engineering Review of the capacity of an existing slab for a new generator, which replaces an earlier installation. FEES: We propose to complete this work on a fixed fee basis for$600. TERMS AND CONDITIONS: II ft Please-review-this-proposal-and,if a eat ta-yoursign--be10 ---Thank you far asking project:-Please-call--ify . Sincerely, Accepted-by;. Peterson Strehle Martinson,Inc. S.MrStemper-Architects v ) Cr ") I VAk," a t/j.a 11/15/18 Ronald E.Martinson,P.E.,S.E. Date Date President .1200 6 . t :fit'. =f;C; i ,e,t i'y E t_ z. :,,; d`r .622 4.m 1 li SztATTII. \A, A , c,( 1 (.),, 4: ; e I t X ?i (1 P22..(>.:S?'