Loading...
HomeMy WebLinkAboutContract �+✓ "%1-AG-08-201 =. :- Document A101 - 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the e day of MW64,in the year o 9 (In words, indicate day,month and year) ADDITIONS AND DELETIONS: The author of this document has BETWEEN the Owner added information needed for its (Name,address and other information) completion.The author may also have revised the text of the original City of Renton AIA standard form.An Additions and 1055 South Grady Way Deletions Report that notes added Renton,WA 98057 information as well as revisions to the standard form text is available from the author and should be reviewed.A vertical line in the left and the Contractor: margin of this document indicates (Name, address and other information) where the author has added Service Electric Company,Inca necessary information and where P.O.Box 1489 the author has added to or deleted Snohomish,WA 98291 from the original AIA text. This document has important legal consequences.Consultation with an attorney is encouraged with respect to its completion or modification. for the following Project: (Name,location AIA Document A201 TM-2007,and detailed description) General Conditions of the Contract for Construction,is adopted in this Liberty Park Ballfeld Lights&Poles document by reference.Do not use Liberty Park with other general conditions unless 110 1 Bronson Way North Trenton,WA 98057 this document is modified. The Architect: (Name,address and other information) Cierra Electrical Group,Inc. 2201-6h Avenue,Suite 1100 Seattle,WA„98121 The Owner and Contractor agree as follows. Init. AIA Document A101 nA—2007.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This A10 Document is protected by U.S.Copyright Law and International Treaties. 1 Unauthorized reproduction or distribution of this AIO Document,or any portion of it,may result In severe civil and criminal penalties,and will be / prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02/09/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM` 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION;OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions),Drawings,Specifications,Addenda issued prior to execution of this Agreement,other documents listed in this Agreement and Modifications issued after execution of this Agreement,all of which form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein.The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements,either written or oral.An enumeration of the Contract Documents,other than a Modification,appears in Article g. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents,except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement if it differs from the date of this Agreement or, if applicable,state that the date will be fixed in a notice to proceed.) If,prior to the commencement of the Work,the Owner requires time to file mortgages and other security interests, the Owner's time requirement shall be as follows: 31 The Contract Time shall be measured from the date of commencement. §3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than forty-five days(45) days from the date of commencement,or by April 10,2009. (Insert number of calendar days.Alternatively,a calendar date may be used when coordinated with the date of commencement.If appropriate, insert requirements for earlier Substantial Completion of certain portions of the Work.) Init. AIA Document A101 Tr—2007.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This AIAs'Document is protected by U.S.Copyright Law and international Treaties. 2 Unauthorized reproduction or distribution of this A10 Document,or any portion of it,may result in severe civil and criminal penalties,and will be / prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02/09/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) Portion of Work Substantial Completion Date subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any,for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.) ARTICLE CONTRACT SUM §4,1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract.The Contract Sum shall be Two Hundred Thirty Four Thousand and Five Hundred Sixty Seven Dollars and 89/100 which includes sales tax.($234,567.89),subject to additions and deductions as provided in the Contract Documents. o / §4.2 The Contract Sum is based upon the following alternates,if any, which are described in the Contract Documents and are hereby accepted by the Owner: In addition,Liquidated Damages in the amount of Two Hundred Dollars($200.00)will be assessed for each calendar day that the Contractor exceeds the"FINAL COMPLETION DATE. (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement,attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) §4.3 Unit prices,:if any: (Identify and state the unit price;state quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price Per Unit None §4.4 Allowances included in the Contract Sum,if any: (Identify allowance and state exclusions, if any,from the allowance price.) Item Price None ARTICLE 5 PAYMENTS §5.1 PROGRESS PAYMENTS.. §5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect,'the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. §5,1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of 'the month,or as follows`: The City,of Renton operates on a two-week cycle according to the 2009 Accounts Payable Calendar,a copy of ;Which will be provided to the Contractor. Applications for payment must be received by the Owner a minimum of one week prior to any Purchase Order cut-off date to be processed in that run. §5.1.3 Provided that an Application for Payment is received by the Architect not later than the day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the day of the same month.If an Application for Payment is received by the Architect after the application date fixed above,payment shall be made by the Owner not later than ( )days after the Architect receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) Init. AIA Document A101 TM—2007.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This AIA*Document is protected by U.S.Copyright Law and International Treaties. 3 Unauthorized reproduction or distribution of this AIA'Document,or any portion of it,may result in severe civil and criminal penalties,and will be / prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02/09/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) 14000, '"Now §5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the various portions of the Work.The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require.This schedule,unless objected to by the Architect,shall be used as a basis for reviewing the Contractor's Applications for Payment. §5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. §5.1.6 Subject to other provisions of the Contract Documents,the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values,less retainage of Five percent(5%). Pending final determination of cost to the Owner of changes in the Work,amounts not in dispute shall be included as provided in Section 7.3.9 of AIA Document A201 TM-2007,General Conditions of the Contract for Construction; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction(or,if approved in advance by the Owner,suitably stored off the site at a location agreed upon in writing),less retainage of Five per cent per pay request.(5%); - .3 Subtract the aggregate of previous payments made by the Owner;and .4 Subtract amounts,if any,for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A201-2007. §5.'1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: .1 Add,upon Substantial Completion of the Work,a sum sufficient to increase the total payments to the full amount of the Contract Sum,less such amounts as the Architect shall determine for incomplete Work,retainage applicable to such work and unsettled claims;and (Section 9.8.5 of AIA Document A201-2007 requires release of applicable retainage upon .Substantial Completion of Work with consent of surety, if any.) .2 Add,if final completion of the Work is thereafter materially delayed through no fault of the Contractor,any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201-2007. §5.1.8 Reduction or limitation of retainage,if any,shall be as follows: (If it is intended,prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.61 and 5.1.6.2 above, and this is not explained elsewhere in the Contract Documents,insert here provisions for such reduction or limitation.) None §5.1.9 Except with the Owner's prior approval,the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. §5.2 FINAL PAYMENT §5.2.1 Final payment,constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201-2007,and to satisfy other requirements, if any,which extend beyond final payment;and 2 The Renton City Council has approved an Agenda Bill for final payment. .3 The State Revenue Department and Department of Labor have filed releases,the statutory retainage run without claims or the claims against retainage have been released,fully litigated,or bonded. Init. AIA Document A101 TM—2007.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This AIA'Document is protected by U.S.Copyright Law and International Treaties. 4 Unauthorized reproduction or distribution of this AIA'Document,or any portion of it,may result in severe civil and criminal penalties,and will be / prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02/09/2009 under Order No.1000347448_I which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) §5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment,or as follows: ARTICLE 6 DISPUTE RESOLUTION §6.1 INITIAL DECISION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007,unless the parties appoint below another individual,not a party to this Agreement,to serve as Initial Decision Maker. (If the parties mutually agree,insert the name,address and other contact information of the Initial Decision Maker, if other than the Architect.) §6.2 BINDING DISPUTE RESOLUTION For any Claim subject to,but not resolved by,mediation pursuant to Section 15.3 of AIA Document A201-2007,the method''of binding dispute resolution shall be as follows: (Check the appropriate box.If the Owner and Contractor do not select a method of binding dispute resolution below,or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.) [ X 1 Arbitration pursuant to Section 15.4 of AIA Document A201-2007 [ Litigation in a court of competent jurisdiction [ ] Other(Specify) ARTICLE 7 TERMINATION OR SUSPENSION §7,1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-2007. §7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2007. ARTICLE'8 MISCELLANEOUS PROVISIONS §8.'I Where reference is made in this Agreement to a provision of AIA Document A201-2007 or another Contract Document,the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. §8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below,or in the absence thereof,at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) per annum §8.3 The Owner's representative: (Namex address and other information) Todd B`% ASLA Cap><tat;?roject.Coordinator City,of Renton 1055 Booth Grady Way Renton,WA 98057 Telephone: 425-430-6571 Fax: 425-430-6603 Init. AIA Document A101 TM—2007.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties. 5 Unauthorized reproduction or distribution of this AIA'Document,or any portion of it,may result in severe civil and criminal penalties,and will be / prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02/09/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) NOW, r.rY §8.4 The Contractor's representative: (Name, address and other information) Todd Kottsick Principal Service Electric Company,Inc. P,O.Box 1489 Snohomish,WA 98192 Telephone: 360-568-6966 Fax: 350-568-9283 §8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. §8.6 Other provisions: None ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS §9.1 The Contract Documents,except for Modifications issued after execution of this Agreement,are enumerated in the sections below. §9.1.1 The Agreement is this executed AIA Document A101-2007,Standard Form of Agreement Between Owner and Contractor. §9.1.2 The General Conditions are AIA Document A201-2007,General Conditions of the Contract for Construction. §9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages §9.1.4 The Specifications: See 9.1.5 the drawings.None. Title of Specifications exhibit: (Table deleted) None. §9.1.5 The Drawings: (Either lis,#the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit: E1.0 Site Plan 11/13/08 E1.1 Schedules&Details 11/13/08 E1.2 Riser Diagrams 11/13/08 I.3 Details 11/13/08 1314 Details 11/13/08 t.5 Details 11/13/08 E2.0 Electrical Specifications 11/13/08 E2.1 Electrical Specifications 11/13/08 Init. AIA Document A101 TM—2007.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This AIA'Document is protected by U.S.Copyright Law and international Treaties. 6 Unauthorized reproduction or distribution of this AIO Document,or any portion of it,may result in severe civil and criminal penalties,and will be / prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02/09/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) `*ape §9.1.6 The Addenda,if any: Number Date Pages 1 1/12/09 1 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. §9.1.7 Additional documents,if any,forming part of the Contract Documents: .1 AIA Document E201TM-2007,Digital Data Protocol Exhibit,if completed by the parties,or the following: .2 Other documents,if any,listed below: (List here any additional documents that are intended to form part of the Contract Documents.AIA Document A201-2007 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders,sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A201-2007, (State bonding requirements,if any,and limits of liability for insurance required in Article 11 of AJA Document A201-2007) 6 IL Type of insurance or bond Limit of liability or bond amount($234,567.89) American Fire&Casualty Company One Hundred Per Center of the amount of the contract or Two Ohio Casualty Insurance Company Hundred Thirty Four Thousand Five Hundred Sixty Seven Dollars and 89/100($234,567.89) This A ent entered into as of the day and year first written above. r OW (Signature) CO TRACTOR( ignature) Denis haw,Mayor Zeelct�otZ7 c7C, rincipal Za— 4ek#$e+ °- Donnie Walton,City Clerk Init. AIA Document A101Tm—2007.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This AIA"Document is protected by U.S.Copyright Law and International Treaties. 7 Unauthorized reproduction or distribution of this AIO Document,or any portion of it,may result in severe civil and criminal penalties,and will be / prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02/09/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) *ftwl Additions and Deletions Report for AIA®Document A 101-rM—2007 This Additions and Deletions Report,as defined on page 1 of the associated document,reproduces below all text the author has added to the standard form AIA document in order to complete it,as well as any text the author may have added to or deleted from the original AIA text.Added text is shown underlined.Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document.This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 16:07:27 on 02/09/2009. PAGE 1 City of Renton 1055 South Grady Way Renton,WA 98057 Service Electric Company,Inc. P.O.Box 1489 Snohomish,WA 98291 Liberty Park Ballfteld Lights&Poles Liberty Park 1101 Bronson Way North Renton,WA 98057 (Name, address and other information) Cierra Electrical Group,Inc. 2201-6 Ih Avenue,Suite 1100 Seattle,WA 98121 PAGE 2 §3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than(-- forty-five days(45) days from the date of commencement,or as"lows by Aaril 10,2009. PAGE 3 §4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract.The Contract Sum shall be -Two Hundred Thirty Four Thousand and Five Hundred Sixty Seven Dollars and 89/100 which includes sales tax.($234.567.89),subject to additions and deductions as provided in the Contract Documents. §4.2 The Contract Sum is based upon the following alternates,if any,which are described in the Contract Documents and are hereby accepted by the Owner: In addition.Liquidated Damages in the amount of Two Hundred Dollars($200.00)will be assessed for each calendar day that the Contractor exceeds the"FINAL COMPLETION DATE. Additions and Deletions Report for AIA Document A101TM—2007.Copyright©1915,1 918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987, 1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law 1 and International Treaties.Unauthorized reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02/09/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) ..r' None None The City of Renton operates on a two-week cycle according to the 2009 Accounts Payable Calendar,a copy of which will be provided to the Contractor. Applications for payment must be received by the Owner a minimum of one week prior to any Purchase Order cut-off date to be processed in that run. §5.1.3 Provided that an Application for Payment is received by the Architect not later than the day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the day of the same month.If an Application for Payment is received by the Architect after the application date fixed above,payment shall be made by the Owner not later than ( )days after the Architect receives the Application for Payment. PAGE 4 1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values,less retainage of(—)-Five percent(5%).Pending final determination of cost to the Owner of changes in the Work,amounts not in dispute shall be included as provided in Section 7.3.9 of AIA Document A201TM-2007,General Conditions of the Contract for Construction; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction(or,if approved in advance by the Owner,suitably stored off the site at a location agreed upon in writing),less retainage of(—);Five per cent per pay request.(5%); None .2 a final Geoifieate f.Payfnew has been issued by the ^_Ghite...,The Renton City Council has approved an Agenda Bill for final payment. .3 The State Revenue Department and Department of Labor have filed releases,the statutory retainage run without claims or the claims against retainage have been released, fully litigated,or bonded. PAGE 5 [ X] Arbitration pursuant to Section 15.4 of AIA Document A201-2007 per annum Todd Black,ASLA Capital Project Coordinator City of Renton 1055 South Grady Way Additions and Deletions Report for AIA Document A101 TM—2007.Copyright®1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987, 1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law .2 and International Treaties.Unauthorized reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02/09/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) Renton.WA 98057 Telephone: 425-430-6571 Fax: 425-430-6603 PAGE 6 Todd Kottsick Principal Service Electric Company,Inc. P.O.Box 1489 Snohomish,WA 98192 Telephone: 360-568-6966 Fax: 350-568-9283 None §9.1.4 The Specifications: See 9.1.5 the drawingsWone. Title of Specifications exhibit: SestleA Title Bata stages None. Title of Drawings exhibit: E1.0 Site Plan 11/13/08 E1.1 Schedules&Details 11/13/08 E1.2 Riser Diagrams 11/13/08 Numbef Title Bata E1.3 Details 11/13/08 El A Details 11/13/08 E1.5 Details 11/13/08 E2.0 Electrical Specifications 11/13/08 E2.1 Electrical Specifications 11/13/08 PAGE 7 1 1/12/09 1 Type of insurance or bond Limit of liability or bond amount($-4,84#1$234.567.891 American Fire&Casualty Company One Hundred Per Center of the amount of the contract or Two Ohio Casualty Insurance Company Hundred Thirty Four Thousand Five Hundred Sixty Seven Dollars and 89/100($234,567.89) Additions and Deletions Report for AIA Document A101 Tw—2007.Copyright ©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987, 1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This AIA® Document is protected by U.S.Copyright Law 3 and International Treaties.Unauthorized reproduction or distribution of this AIA®Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02109/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255) Denis Law.Mayor sick Princi al Q Bonnie Walton,City Clerk Additions and Deletions Report for AIA Document A101 TM—2007.Copyright m 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987, 1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING:This AIA® Document is protected by U.S.Copyright Law 4 and International Treaties.Unauthorized reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:07:27 on 02109/2009 under Order No.1000347448_1 which expires on 3/11/2009,and is not for resale. User Notes: (1666025255)