Loading...
HomeMy WebLinkAboutContract CAG-10-147 D City of CONTRACT AGREEMENT THIS AGREEMENT is made as of the o?S day of , 2010, between the CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as "CITY"and Lake Tapps Construction Unlimited hereinafter referred to as"CONTRACTOR,"to remove existing wood top rails and install new wood top rails in Gene Coulon Memorial Park. The City and Contractor agree as set forth below. I. Scope of Services. The Contractor will provide all material and labor necessary to perform all work described in the Scope of Work which is included with this Agreement as Attachment "A." 2. Changes in Scope of Services The City, without invalidating the Contract, may order changes in the Services consisting of additions, deletions or modifications, the Contract Sum being adjusted accordingly. Such changes in the work shall be authorized by written Change Order signed by the City and the Contractor. 3. Time of Performance. The Contractor shall commence performance of the Contract no later than ten (10)calendar days after the Notice to Proceed, and shall complete the full performance of the Contract not later than 30 calendar days from the date of commencement. 4. Term Of Contract. The Term of this Agreement shall end at completion of the enclosed scope of work. This Agreement may be extended to accomplish change orders, if required, upon mutual written agreement of the City and the Contractor. 5. Contract Lump Sum. The total lump sum of this Contract is the sum of$29,346.00 which includes Washington State Sales Tax. Written approval shall be sought by the Contractor prior to proceeding beyond this budget maximum. 6. Method of Payment. Payment by the City for the Services will only be made after the Services have been performed and a voucher or invoice is submitted in the form specified by the City. Payment will be made thirty(30)days after receipt of such voucher or invoice. The City shall have the right to withhold payment to the Contractor for any work not completed in a satisfactory manner until such time as the Contractor modifies such work so that the same is satisfactory. 7. Employment. The Contractor's employees are not employees of the City of Renton. 8. Assignment and Subcontract The Contractor shall not assign or subcontract any portion of this Contract without express written consent of the City of Renton. 9. Record Keeping and Reporting The Contractor shall maintain accounts and records which properly reflect all direct and indirect costs expended and services provided in the performance of this Agreement. The Contractor agrees to provide access to any records required by the City. 10, Hold Harmless. The Contractor shall indemnify, defend and hold harmless the City, its officers, agents, employees and volunteers,from and against any and all claims, including claims from third parties, losses or liability, or any portion thereof, including attorneys fees and costs, arising from injury or death to persons, including injuries, sickness, disease or death to Contractor's own employees, or damage to property occasioned by a negligent act, omission or failure of the Contractor. The parties have negotiated a waiver of Title 51 RCW and the immunities of that title are hereby waived, for the purposes of this section only, should an employee of either party make a claim sue or pursue a cause of action against the other party. 11. Insurance. The Contractor shall maintain throughout the duration of this contract the following insurance requirements: General Liability insurance in the amount of$1,000,000 per occurrence/$2,000,000 aggregate;Automobile Liability in the amount of$1,000,000 per accident; and proof of Workers' Compensation coverage. The City of Renton will be named as a Primary and Non-Contributory Additional Insured on the insurance policy and an endorsement stating such shall be provided. 12. Compliance with Laws. The Contractor and all of the Contractor's employees shall perform the services in accordance with all applicable federal, state, county and city laws, codes and ordinances. 13. Conflicts. In the event of any inconsistencies between Contractor proposals and this contract, the City of Renton contract shall prevail. 14. Prevailing Wage Rates. By executing this Contact, the Contractor agrees to comply with the State prevailing wage requirements as set forth in the Contract Documents. M This Agreement is entered into as of the day and year written above. CONTRACTOR CITY OF RENTON Signature Signa re L 11E E ar-si Pc-OT Igas iyamr Printed Name and Title MMtor Printed Name and Title Business Name 0 . �3l8 Ma�iling Address Kr--j4 i city state Zip L -gu a Telephone City of �Y Exhibit'A' Gene Coulon Memorial Park—Wood Top Rail Replacement-Scope of Work Lake Tapps Construction Unlimited will complete the removal and replacement of approximately 1,458 linear feet of wood top rail located on five bridges and the fishing pier at Gene Coulon Memorial Park. The new rail is dimensioned at 1-1/2"x 6-3/4". The lump sum fee for this work is Twenty-Nine Thousand Three Hundred Forty-Six Dollars ($29,346.00), and includes WSST. RENTON AHEAD OF THE CURVE CITY OF RENTON DEC 0 7 2010 CITY CLERKS OFFICE CITY OF RENTON C.O.# Community Services Department Page 1 of 1 CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Gene Coulon Memorial Park-Wood Top Rail Replacement CAG-10-147 CONTRACTOR: Lake Tapps Construction Unlimited CHANGE ORDER: No.1 SUMMARY OF PROPOSED CHANGE: Reason/Justification: Contract amount above$25,000 Contract Change: Addition ofa Performance&Payment Bond Description: Item Qty. I Units I Description Unit Price Am No. - 1 1 Performance&Payment Bond $ 925.55 $ 92545 Total this Change Order: $925.55 Additional Working Days: None(No additional days) All work,materials and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINAL CONTRACT CURRENT CONTRACT NETCHANGE CONTRACT AMOUNT(W/WS! I AMOUNT THIS ORDER(W/WSSTj TOTAL AFTER CHANGE $ 29,346.00 $29,346.00 $925.55 $30,271.55 I SIGNATURES: ...-' Corrtractor: t - ..�Ck-`l..•``+..5:. ",'_s�.�-�'n-- nap 0 Project Manager. Approved By: {Ccmmuniry lewices AOminirirator) CITY OF RENTON NOV 0 3 2010 RECEIVED CITY CLERK'S OFFICE CITY OF RENTON C.o.a; Community Services Department Page 1 of t CONTRACTCHANGE ORDER AGREEMENT CONTRACT: Gene Coulon Memorial Park-Wood Top Rail Replacement CAG-10-147 CONTRACTOR: Lake Tapps Construction Unlimited CHANGE ORDER: No.1 SUMMARY OF PROPOSED CHANGE: Reason/Justification: Contract amount above$25,000 Contract Change:Addition of Performance&Payment Bond Description: Item Qty. Units Description Unit Price Amount No. — 1 1 Performance&Payment Bond $ 925.55 $ 925.55 Total this Change Order: $925.55 Additional Working Days: None(No additional days) All work,materials and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINALCONTRACT CURRENT CONTRACT NETCHANGE CONTRACT AMOUNT(W/WSST) AMOUNT THIS ORDER(W/WSST) TOTAL AFTER CHANGE $ 29,346.00 $29,346.00 I $925.55 $30,271.55 SIGNATURES: Cord actor. Project Manages Approved ay: �+ li"----�- oars: Nil' Z l(U Y (t�rnmun�ty s,•are,a;mtnla�aioit 12/09/2010 14:13 FAX 2538636450 LAKE TAPPS CONSTRUCTION 0002 CITY OF RENTON N%W� 140W OEC 14 2010 RECEIVED CITY CLERK'S OFFICE CITY OF RENTON Community Services Department —�� CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Gene Coulon Memorial Park-Wood Top Rall Replacement 12/e/2010 CAG-10-147 CONTRACTOR: Lake Tapps Construction Unlimited CHANGE ORDER: No.2 SUMMARY OF PROPOSED CHANGE: Reason/Justification: Request by Parks Planning&Natural Resources staff Contract Change: Installation of additional 132 lineal feet of wood top rail by Creekside shelter Descrl tion: Item qty_ Units Description p Unit Price Amount No. _ 1 1 w/WSST Addition of 132 If of To Rail $2 600.00 $2847.00 Total this Change Order., $2,847.00 ORIGINALCONTRACT CURRENT CONTRACT NET CHANGE CONTRACT AMOUNT W WSST) AMOUNT THIS ORDER W WSST TOTAL AFTER CHANGE $ 29,346.00 $30,271.55 $2,847.00 $33,119.55 Additional Working Days: Five additional days,with a new Substantial Completion Date of December 20,2010. All other conditions of the original contract are a pert of this change order.The payments and/or additional time specified and agreed to In this change order include every claim by the contractor for any extra payment or extension of time with respect to the work described herein,including delays to the overall project.The work covered by this change order must be performed under the same terms and conditions as that included in the original contract. SIGNATURES: JjJL Contractor, Date: 12 Pro ect Mona er: ! p Approved By: t Date ��t 3 I C I�ommunity SerWees Adminlstretor)