Loading...
HomeMy WebLinkAboutContract CAG-15-211 SMALL WORKS AGREEMENT Zv OGT• THIS AGREEMENT ("Agreement") is made as of the .87 day of ,Seth-' , 2015, (the "Effective Date") by and between the City of Renton, a non-charter code city under RCW 35A, and a municipal corporation under the laws of the State of Washington ("Renton"), through its Transportation Department and Pioneer Cable , ("Contractor"), who are collectively referred to as the "Parties", to Install new or replace bad loops at 21 intersections in Renton Renton and Contractor agree as set forth below. 1. Scope of Services: Contractor will provide all material and labor necessary to perform all work described in the Proposal which is attached and fully incorporated into this Agreement by reference as Attachment "A." 2. Changes in Scope of Services: Renton, without invalidating this Agreement, may order changes to the Scope of Services consisting of additions, deletions or modifications, the Agreement Sum being adjusted accordingly by Parties mutual agreement. Such changes in the work shall be authorized by written Change Order signed by the Parties. 3. Time of Performance: Contractor shall commence performance of the Agreement no later than 90 days calendar days after the Agreement's Effective Date. 4. Term of Agreement: The Term of this Agreement shall end at completion of the Scope of Services. This Agreement may be extended to accomplish change orders, if required, upon mutual written agreement of Renton and Contractor. 5. Agreement Sum: The total amount of this Agreement is the sum of $ 68,429.71 which includes Washington State Sales Tax. This amount may be adjusted to a mutually agreed amount based on changes to the Scope of Services. 6. Consideration: In exchange for Contractor's performance of the items and responsibilities identified in the Scope of Services, Renton agrees to make payment of the amount identified as the Agreement Sum. 7. Method of Payment: Payment by Renton for the Services will only be made after the Services have been performed and a voucher or invoice is submitted in a form acceptable to Renton. Payment of the initial 95% will be made in the next pay cycle of the Renton Finance Department after receipt of such voucher or invoice (pay cycles are bi-weekly). The remaining 5% will be retained for the purpose of completion of the project and fulfillment of claims and liens. Renton shall have the right to withhold payment to Contractor for any work not completed in a satisfactory manner until such time as Contractor modifies such work so that the same is satisfactory. 8. Hold Harmless: Contractor shall indemnify, defend and hold harmless Renton, its elected officials, officers, agents, employees and volunteers, from and against any and all claims, losses or liability, or any portion of the same, including but not limited to reasonable attorneys' fees, legal expenses and litigation costs, arising from injury or death to persons, including injuries, sickness, disease or death of Contractor's own employees, agents and volunteers, or damage to property caused by Contractor's negligent act or omission, except for those acts caused by or resulting from a negligent act or omission by Renton and its officers, agents, employees and volunteers. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, (Validity of agreement to indemnify against liability for negligence relative to construction, alteration, improvement, etc., of structure or improvement attached to real estate...) then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the contractor and Renton, its officers, officials, employees and volunteers, Contractor's liability shall be only to the extent of Contractor's negligence. It is further speci?ically and expressly understood that the indemnification provided in this Agreement constitute Contractor's waiver of immunity under the Industrial Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually negotiated and agreed to this waiver. The provisions of this section shall survive the expiration or termination of this Agreement. 9. Insurance: Contractor shall secure and maintain: a. Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. b. Professional liability insurance, in the minimum amount of $1,000,000 for each occurrence, shall also be secured for any professional services being provided to Renton that are excluded in the commercial general liability insurance. c. Workers' compensation coverage, as required by the Industrial Insurance laws of the State of Washington, shall also be secured. d. It is agreed that on Contractor's commercial general liability policy, the City of Renton will be named as an Additional Insured on a non-contributory primary basis. Renton's insurance policies shall not be a source for payment of any Contractor liability. e. Subject to Renton's review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to Renton before executing the work of this Agreement. f. Contractor shall provide Renton with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. 10. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational qualification, the Contractor agrees as follows: a. Contractor, and Contractor's agents, employees, representatives, and volunteers with regard to the services performed or to be performed under this Agreement, shall not discriminate on the basis of race, color, sex, religion, nationality, creed, marital status, sexual orientation or preference, age (except minimum age and retirement provisions), honorably discharged veteran or military status, or the presence of any sensory, mental or physical handicap, unless based upon a bona fide occupational qualification in relationship to hiring and employment, in employment or application for employment, the administration of the delivery of services or any other benefits under this Agreement, or procurement of materials or supplies. b. The Contractor will take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, national origin, sex, age, sexual orientation, physical, sensory or mental handicaps, or marital status. Such action shall include, but not be limited to the following employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training. c. If Contractor fails to comply with any of this Agreement's non- discrimination provisions, Renton shall have the right, at its option, to cancel the Agreement in whole or in part. d. Contractor is responsible to be aware of and in compliance with all federal, state and local laws and regulations that may affect the satisfactory completion of the project, which includes but is not limited to fair labor laws and worker's compensation. 11. Independent Contractor: Contractor's employees, while engaged in the performance of any of Contractor's services under this Agreement, shall be considered employees of the Contractor and not employees, agents, representatives of Renton and as a result, shall not be entitled to any coverage or benefits from the City of Renton. Contractor's relation to Renton shall be at all times as an independent contractor. Any and all Workman's Compensation Act claims on behalf of Contractor employees, and any and all claims made by a third-party as a consequence of any negligent act or omission on the part of Contractor's employees, while engaged in services provided to be rendered under this Agreement, shall be the solely Contractor's obligation and responsibility. 12. Prevailing Wage Rates: Contractor must comply with the State of Washington prevailing wage requirements. Contractor must file an Intent To Pay Prevailing Wage at the beginning of the project and an Affidavit of Wages Paid at the end of the project with the Washington State Department of Labor and Industries, http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp. 13. Record Keeping and Reporting: Contractor shall maintain accounts and records which properly reflect all direct and indirect costs expended and services provided in the performance of this Agreement. Contractor agrees to provide access to any records required by Renton. 14. Other Provisions: a. Administration and Notices. Each individual executing this Agreement on behalf of Renton and Contractor represents and warrants that such individuals are duly authorized to execute and deliver this Agreement on behalf of Renton or Contractor. Any notices required to be given by the Parties shall be delivered at the addresses set forth below. Any notices may be delivered personally to the addressee of the notice or may be deposited in the United States mail, postage prepaid, to the address set forth below. Any notice so posted in the United States mail shall be deemed received three (3) calendar days after the date of mailing. This Agreement shall be administered by and any notices should be sent to the undersigned individuals or their designees. b. Amendment and Modification. This Agreement may be amended only by an instrument in writing, duly executed by both Parties. c. Assignment and Subcontract. Contractor shall not assign or subcontract any portion of this Agreement without the City of Renton's prior express written consent. d. Compliance with Laws. Contractor and all of the Contractor's employees shall perform the services in accordance with all applicable federal, state, county and city laws, codes and ordinances. Additionally, for contracts that will be either partially or fully funded with federal grants and exceed Twenty-Five Thousand Dollars ($25,000), all Contractors shall verify the federal suspension and debarment status of any subcontractor or third-party working on the behalf, request, direction, or under the authority of the Contactor. A copy of this language must be made a part of any contractor or subcontractor agreement. e. Conflicts. In the event of any inconsistencies between contractor proposals and this contract, the terms of this contract shall prevail. f. Governing Law. This Agreement shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. g. Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. h. Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King County Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King County, Washington, or its replacement or successor. Severability. A court of competent jurisdiction's determination that any provision or part of this Agreement is illegal or unenforceable shall not cancel or invalidate the remainder of this Agreement, which shall remain in full force and effect. j. Sole and Entire Agreement. This Agreement contains the entire agreement of the Parties and any representations or understandings, whether oral or written, not incorporated are excluded. k. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be construed to give any rights or benefits in the Agreement to anyone other than the Parties, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the Parties and no one else. I. Waivers. All waivers shall be in writing and signed by the waiving party. Either party's failure to enforce any provision of this Agreement shall not be a waiver and shall not prevent either Renton or Contractor from enforcing that provision or any other provision of this Agreement in the future. Waiver of breach of any provision of this Agreement shall not be deemed to be a waiver of any prior or subsequent breach unless it is expressly waived in writing. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of Effective Date. CITY OF RENTON - CONTRACTOR ;1&tat)0 v 141/1— Denis Law, Mayor 1055 South Grady Way Renton, Washington 98057 l a 2 L�5 Date Date Attest: —Al ° I i, ���u�,a���au �wa�d�/�,�i Jason A. eth� 0 ti G City Jerk �, Y(°Y f Dat $_ Approved as to Legal Form: , `. $- �/tib or Lawrence J. Warren City Attorney Date LOOP REPLACEMENT ICU 35 - 43rd & 167 (2) • P38 (WB) REPLACE 2 LOOPS @ 180' ICU 52 - GRADY WAY & OAKSDALE (5) • P33 SB STOP BAR CENTER LANE - REPLACE 1 LOOP @ 26' (IN CONCRETE) • P37 NB REAR ADV - REPLACE 2 LOOPS @ 214' (IN CONCRETE) • P37 NB FRONT ADV - RE-SEAL 2 LOOPS @ 94' ICU 68 - MAPLE VALLEY HWY & MONROE (4) • P31 EB LEFT TURN - REPLACE 3 LOOPS @ 22' 38' 54' • P36 EB CURB LANE - REPLACE 1 LOOP @ 38' ICU 71 - GRADY WAY & SHATTUCK (5) • WB LEFT TURN - ADD 1 LOOP @ 52' • WB STOP BAR - ADD2LOOPS@ 10' • WB STOP BAR - ADD 2 LOOPS @ 24' ICU 72 - GRADY WAY & LAKE (12) • WB LEFT TURN - ADD 1 LOOP @ 58' • WB STOP BAR - ADD 2LOOPS @ 10' • WB STOP BAR - ADD 2 LOOPS @ 24' • WB ADV - ADD 2 LOOPS @ 150' • EB LEFT TURN -ADD 1 LOOP @ 43' • EB STOP BAR - ADD 2 LOOPS @ 10' • EB STOP BAR - ADD 2 LOOPS @ 24' ICU 77 - N 8th ST & HOUSER AVE (5) • P37 NB STOP BAR - REPLACE 4 LOOPS • P41 SB ADV - REPLACE 1 LOOP @ 123' ICU 78 - N 6TH & GARDEN (1 ) • P36 NB ADV - REPLACE 1 LOOP @ 230' ICU 115 - SE CARR RD & 106TH PL (2) • WB CURB LANE - REPLACE 1 LOOP @ 246' • WB CENTER LANE - REPLACE 1 LOOP @ 246' ICU 121 - SE 128TH & 156TH AVE SE (3) • L3 WB - REPLACE 1 LOOP @ 83' • L3 WB - REPLACE 2 LOOPS @ 257' ICU 76 - BENSON DR. & S 21st (5) • P33 SB STOP BAR - REPLACE 1 LOOP @ 23' • P34 SB ADVANCE - RE-SEAL 2 LOOPS • P31 NB ADVANCE - RE-SEAL 2 LOOPS ICU 126 - SR 515 & BENSON (4) • SB ADV - RE-SEAL 2 LOOPS • SB MID - RE-SEAL 2 LOOPS ICU 119 - 140th WAY SE & SE 158th ST (1 ) • EB STOP BAR - REPLACE 1 LOOP @ 42' ICU 118 - 128th & PETROVITSKY (1 ) • NB STOP BAR - REPLACE 1 LOOP @ 29' ICU 117 - 116th AVE & PETROVITSKY (2) • L13 NB STOP BAR - REPLACE 1 LOOP @ 41' • L07 WB STOP BAR - REPLACE 1 LOOP @ 43' ICU 108 - NE 21st & DUVALL AVE NE (2) • L44 SB ADVANCE - REPLACE 1 LOOP @ 286' • L84 NB ADVANCE - REPLACE 1 LOOP @ 264' ICU 74 - TALBOT RD S & PUGET DR (1 ) • L61 SB - REPLACE 1 LOOP @ 223' ICU 44 - SW 16th & LIND AVE (12) • EB STOP BAR - RE-SEAL 6 LOOPS • WB STOP BAR - RE-SEAL 6 LOOPS ICU 43 - SW 39th & LIND AVE (3) • P34 EB - RE-SEAL 3 LOOPS ICU 42 - SW 41st & LIND AVE (2) • P32 WB - RE-SEAL 2 LOOPS ICU 23 - N 3rd ST & GARDEN (1 ) • P33 EB - REPLACE 1 LOOP @ 12' ICU 34 - CARR & SMITHERS (1 ) • L61 - REPLACE 1 LOOP @ 56' ,. . icu: 35 I II II IIINEN SW43rdSt II P32 NII II I 2 Bad SR 167 IIBad Bad `O II 6 6 222Ft L01ql II I 209Ft I II I ' I Bad II ___._ I 95Ft ** = Both Rear P3P- I —79Ft Loops Bad P3 ** -- Qil I —64Ft 42Ft •fit• I n II i 47Ft 60Ft 39Ft 1. 17Ft I ..r Phi02 Ph 05 ... • • z � 2 P35 P36 No Destroyed Ph 06 O--.- 27Ft 0 0 0 II F[T- pI43Ft _._ _ 58Ft H mom* 74Ft II PP I Sys. Loops not hooked up in cabinet I I II I I II I I II jaw 180Ft II Pr II 1 , y P35 0 C ' II 246Ft II II ICU: 52 II II N 0 Grady Way SW 1,4Ft it II II Oaksdale Ave NI P31 H 41 Ft I t. d ` I 40Ft C 24Ft I H i 26Ft 47Ft 107Ft 228Ft f Ph 06 i i01 /C�-P33 '! p �1 _ ifir a P36 -1,ZJa ;.; rai • o • re V V Ph 05 Ph 02 214Ft 94Ft 32Ft 19FtII ±--- -- 30Ft 4 Cab 147 inr II in -I- to D trt j II P34 I !►7 II I IN II IIar-° I II II II II II II pro 26?r i II II P32 -. ! 2 II II ICU: 68 P33 II II-4,1021=2411 , 0-6 Maple Va I l e y II II II II ! & N P32 II II onroe 169 Ft • . H H ( 'k* II ! I II 9 ! P35 ! P32 551 _ .1 0 II ! /I •I�•J 35Ft d 018Ft ri� II 1 . 1 I! Ph 02 Ph 05 16Ft 32Ft - M- - P34 • • 7) d MbP38 Ph01 PhO 33 Ft 21 Ft II I ! -- 22 Ft II I EVP 3 38 Ft II � P36 54 Ft IIL) ; P31 IIS II H p ; 0 163 Ft II IIP36 II II ; II II O 354 Ft p P3' II 11 EV'?2 II II II II ICH 3 i II II i icu: 7'I II II i Grady Way II II 11 ; Shattuck 11 i CH 911 QIQ � C411./] II 0 I 0 0 II s 25Ft 37Ft 1)1 CH . CH d 01 • •' CH 7 •w to • IIPhO Ph 06 16F, • 24Ft i I of 10' 3 Ft II CH 1 I '-"' i 2+4' E 39F` I II i I II 0 52 k 11 11 • 11 II • U IIS CH 12 11 II I II II ! ICU: 72 1 1 II II CH 3 Grady Way II II ? & I Wmormizeio- _ r 1 I !� I! I Ii II I Lake Ave N ! � k II 1 NI 10 it .z j o 24- ' - Jk ' SLdii I Pyr 02 'Ph 05 t a -. - •••••••• 11 Inm• se MONs IN• , ,r . %kz CH 7 CH -0 CH s 4 k II Ph 01 P l 33Ft I II CH 1 I II I g IIs$ I k i II 11Jso' 110' 0 II II Video' e°' IIZI�� II CH 17 II II 1 I P42 II icu 77 208 Ft 0 I I II N8th S t & P41 Houser Ave N 123 Ft II II II P40 II OLA= 3 + 4 42 Ft - III 2.1,3Ft - Pry 4 P33 - P32 P31 a P36 P35 0 P34 (-, y Ph 3 OLA 207 Ft 113 Ft 41 Ft 29 Ft I I - 10 Ft gag mum I I _ 25 Ft II P37 (Th - _-. 104 Ft P38 1234 Ft \\P39 \ ICU: 78 N 6th St .... a : ., . Garden Ave N N . 1 II II I P31 11 I 43 Ft O 1 I11 I 1 I I Cab 23 Ft 0 0 II . 19 Ft 40 Ft 230 Ft 4P Ph 02 . r ` P36 Q i a. — N ' P32 0 0 1:1 C. . P33 0 I• i• Ph 06 I1 ! — 16 Ft 36 Ft 20 Ft 0 236 Ft 11 1 ) 46 Ft 26 Ft II • r• I I P35 i P34 II II I I I . II II II }IP 3 I II II icu: 115 I N II th Not Conn. II II ! 106 P I. In J-Box N I J6 I JV II II ' Carr Rd 1 ..\ II ! SII J1-1 114Ft II J -3 I J1-2 ! 104Ft • • II I I II I ! 0 J1-3 J1-2 J1-1 49Ft •A 1 •'4- 0' II , I 32Ft °S • , 29Ft 44Ft 75Ft 114Ft Ph 06 Ph 01 O • J6-3 • J6-3 s — e. J9-4 • J8-2 •M C. 111,,_:16-3 • Jo-2 • J6-2 u. J8-4 • J8-3 •.I 2 Ph 05 Ph 02 71 Ft 41 Ft 27Ft 33Ft II • I jI, Cali • • • 49Ft II J3-1 I J3-2 I J3-3 0 Q i . . 109Ft Disconnected II x,[13-1 J3-2 ' J3-3 ) (5______F II1isconn78Ft Dected J3-2 J3-3 Dodged II I i H I 0 I 246Ft Disconnected III No Con.-No Con. i�return L3 I icu: 121 411 257 Ft SE 128th I 157 Ft 0 0 d II 156thAve SE 104 Ft - 0 II 83 Ft 0 I I ! II L4 I I 48 Ft -_ _ i r."Ii, I I 4 33 Ft _ - - -- I I 20 Ft 36 Ft 86 Ft 151 Ft ii L8 fti • re re . L5 a Video Video Det Det L1a N ii ''' . II . „ , , icu: 76 1 ii II. P34 II Benson Dr II & S 21st St ii N I N Nil I II II P33 11 . I II . I I II i i II ..... „ . . .. • . ,.. ,4 .„.... . .. - 0 0 P35 P36 - re U 0 t . I Ito 1 .. H P32 I II II I II ) II II II ' JO ii 0 P31 1 C.Yr r H H I ICU: 126 ► Il II Il II SR 515 ; II II N Benson ► II !I ► II H P4 I Pi; II IINot 1 Not Conn Conn I SII 6 6 P36 P36 P34 70Ft- - I I II 6 Ft Q II 55Ft 41F Q" � "t 35Ft 51Ft 4 t a P37 NCNot o-Conn. 0 II II I II II p II II P311 • II II 1 • II II Q Q II II P33 II II 1 II II II II icu: 119 C3 D4 / // / / C2 140th Way SE 1:07/1/ / 1/ // , SE 158th St / ii / // N 1 / II I 1 1 C4 / C1 // 114r 4" I • I c111 / I 1 C3 I C21 i II I i r7c- did / di! I 1 I 1 I I 1 ni I ni I Hill i 1 D2 a L:1 0 0 ...•••••• A ) El 5 Fr i // G2 '---- 34 ;; , 1 11 \ 0 p \, 40 Ft 90 ,f'' \ 11 \ \ \ :Ir.', 'nr--\ I/ \ lip \P \ -•) \ \--) A3 . B3 '1G4 1 11\ \A2 \ \ 73 Ft \ \\O \ 0 \ 0 \ 0 Al 0 el -Road Hog \\ . p \ p \ 132 F 0 -Corner Loop ,\ 241 Ft L37 �._. I L18 II II L28 �o N L23 2 L27 A � t �O II # O' 6 iICU; 118 cut cut 6 I 6 Il II I 1 28th L02 I L02 0 0 i & I II I Petrovitsky L04 I L03 I L13)I 6 t O f ' IIif 0F, I I I II 22 1F3Ft L 2 1 n 1 II L21 L(5 .zc` t 86Ft Y 6 �,1 Nk L11 "F T d t c) it i o-L12 'O_ i u; 2 I ct___ "_ _-- aL10 0-.1477- / LO9 L26-0 a L30 L75 a L29� L16" e Cut/Bad 0 I a i P . rr.7 II p la jr joI II b t Lt6 Il L05 P IIL, I 4 L18 I ? II Qi C I L06 L17 L05 L06 II I II ) ( tQ Y LO6 II 11 LO6 ICU: 117 II II 116th Ave II` II I & i � SII L54 L53 L33 II L50 L39 Petrovitsky (5 6 6 6 6 i I II I i II I L54 L53 L33 II 6 1 6. 4 6 li I 1 II i I II L23 L21 L01 Q f Q l II 0 QC) 23Ft 41FFt 96Ft 1 _ O O L29 O L29 ,� L09 ro L25 0 L25 O U O O O L09 L130 L13-0 L13• 11.111.111....7.1.111.1111111.1111111111111111111.11111.1.1111 0 i II 1 1 II L17 i L05 I L07 II 9 9 1 9 L49 L37 L38 II II L55 L34 149 L37 L38 IIS i II II II ICU: 108 II NE 21 ' St L43 Cird 42IL ( i Duvall Ave NE \II II VD 3 El II fi I I Video-1 Video' Video Det_ I I Dot II IID.t Det Det -171d—o-ol Video I Video V02 1.82 Q4-0 H 183 110 4- 0 11 H L.84 C :�y II II L23I L22II icu 74 N ic . o " TaibotRdS I i II41 & Puget Dr L21 L51 2U Ft IHo ' d1i II 958E II I \ I II I N NN I I + II II ,N \ N a N , ^ `tet- I II II I II ,, 1 a , I II C`1 I II I I II L61 II 1 I II I 1 II p1p1pL10 L11 L63 L62 332 FL 1 II I LT' mu: 44 SW 16th St II H & H IIs Lind Ave SII j I P36A II t II I II I. I P36B II 0 0 0 I } P34A P34B P33A P32v, P35A - P35B 0 0 Hpto 0 II P32A II I II p±0____O ° II P32B I II SII II II II II 3 P32 icu: 43 II II II II 1 SW39tSt Q d N it N . u II ! Lind Ave 1 II % NI1 1 II P36 1dHI HI 1 1 QH f I P34 _J P33 • • P37 1 % v II p 1 II ' 1 a II P31 II I 1 II I Ik II kII II II Hp--p 11 P35 EVP4 ICU: 42 II II i P35 II II SW4IStSt Al od II II ! & II II I Lind Ave II I I NI I I P39 II I I SII ® - i I II I .fit 3 t 249F, ' , I N - P33 P32 /I P31 O /000=a P36 P37 P38 - 0 II a + i II a IIP34 I II II I II SII II II II a; ' II P40 ICU: 23 N 3rd St Garden APPO" riti• P31 P32 P33 fi I EVP 3 icu: 34 II II II II I Carr Rd II II & ► II II Smithers I,,k u ► sll L39 33 6 1 L6 1 37 L6 II II II II II 55Ft . I i ._0., II ► L42L46 23F ¢L43 4-Lt4 II 6 16 ,t-;_.� c T 1 IIca,Iq L40 L13 _ L57-0 L56' < L14_ _ 1_ J� L48 L29 L53 L61-0 0 V L64 d II [ 1 IIL05I41Q lI 1 L07 L08 II L06 QIQIQ L41 L45 L47 Ii II ) I II H I Cae. ? H II No Con. No Con. Loop replacement requirements • Loop wire shall be IMSA 51 -7 #12 or #14 AWG in orange PVC jacket • Loop install shall follow WSDOT STD plan J-50.15-00 and J-50.12-00 • Loop installation shall not take place in temperatures below 40 degrees • Loops shall not be sealed when there is moisture on the ground • The saw cuts shall be of uniform depths and any sharp edges, abrasions, or ridges shall be removed prior to placing the wire • All loops shall be installed in the final lift of asphalt designated in the contract. Loop conductors shall be held at the bottom of the saw cut by high temperature backers rod sized to fit snuggly in the saws center along the entire loop and home run(s) and at the entrance and exit of all turns greater than 45 degrees. If new loops are installed over existing loops, the old loops shall be removed by grinding and the grinding shall be enough to destroy any existing operational loop conductors. LOOP SEAL ANT LOOP SEALANT LOOP SEALANT NOTES (PER CONTRACT OR (PER CONTRACT OR (PER CONTRACT OR TOP OF EXISTING ,• AS APPROVED BY AS APPROVED BY ; . AS APPROVED By I. FBI the conduit trench to the bottom of the PAVEMENT OR_ I TOP OF OUSTMAO PAVEIiAENT.._ ; THE ENGINEER) LEVELING COURSE 1 THE ENGINEER) THE ENGINEER) `- OR tEVELMW Co1M1iE or new surfacing with CSTC,sand or controlled OF NEW PAVEMENT A OF NEW PAVEMENT density fill.See Standard Specifications T ,1/4'WIDE.,jy -.• ' 1T1AlIDE�L i UrVNDE� Seetlan2-09.3(1)E. ~._.. SAIACUT _ _ SAWCUT _ _ ____CUT_- I __ 1 i( ) r) BACI�RROD----,+ j r) IlACKERIROO --- }Vr;---'—i; r/ 2. Minor Regional variations we allowed In the soft ..__ -"4 I ¢ pocket closure.Consult with the Engineer o see Y LONG HIGH TEMP O, T LONG NIGH TEMP O maxi HIGH TEMP O the Contract for sddibonel requirements. BACKER ROD 0 24-GINS . n 1 i 0 24'CTRS , : 117^ 1 j 0 24-CTRS. i a I, R''.. 3. Conductors shell be snug to the bottom of the \ i -' �'; I �' 6 i g sawcut High tempereWre becks/rod shall be ,: \ ... zzF Is I- - I �1 t snug to the cordudors and skies of cut \ m io �i i , ;.,IA' LOOP LEAD-IN NARES. lam° ' m u') ! ""Oil?N TWISTED PAIRS -_-_- I /3,., 4. Fill the sealant to within 1/8"to 3/18'from top of LOOP WIRE (]r (014 AWG)_._-- -11, LOOP LEAD-IN NtRE• I�z�• (014 MVO) —.—�y '',o saw Mt OR(012 ANG) - __....__._t.___ (014 ANE)OR(012 AWG) i___G OR(012 AWG) MAX.3 PAIRS MAX 4 WIRES i -ONE TWISTED PAIR L l. 5. Sae Standard Plan J-10.10 for additional Junction t '111 99 -___--- Box details. 1' i, y,�a-r.... �a . C�'I i .s..- _sr _. PVC CONDUR Sumo TABLE . LOOP LEADPAIRs 1-4 5-10 11-1117.2223-2e SECTION (A) SECTION SECTION O ` AAL OF BER AND 1-r 2-r 3-214-2. 3.3• / of coNDULTs ,,ADD IIIB'TO THE SAWCUT FOR IMSA 61-7 CONDUCTORS l71 ADD Ur TO THE SAWCUT MATCH EII9TING FOR IMSA 61-7 CONDUCTORS EDGE OF PAVED SHOULDER(SHOWN) PAVING MATERIAL OR EDGE OF EXTRUDED CURB _ OR EDGE Of GUTTER PAN I LOOP STUB OUT SLEEVE(1!4'E Irl SAWCUT EXISTING (`E� OR EDGE OF TRAFFIC BARRIER (' I ,i BELOW TOP OF ASPHALT) PAVEMENT(BOTH TRENCH WI0111-SEI: '- P-r APPROx__ / -LOOP LEAD-IN SAWCUT SIDES OF TRENCH) STD.SPEC.S-25.31s) STANDARD JUNCTION FULL DEPTH_ -I`\ --�------ TOP OF DUSTING BOX _ LOOP LEAD-IN WIRES SAWCUT �� \ EAFE- I // c--._.2 Ns'MW.-3'MAX. PAVEMENT sE ..• MATCH EXISTING 1 _._.— PAIR J -;\ I 1 _LOOPWIRES TWISTED O;` LEVELING COARSE , -- c _i_._ ._- -JI r 1 ( .t OF NEW PAVEMENT , � PAVING MATERIA. _ �,.�,jE `.._ / �.l . +1._b .. 8T 0D�N <.�. '='� ` PAVEMENT j I a• ' . 'jr 1 I \ CONDUIT END BELL C� C. Ni'le I is ,(� .�• . .Ii tj °ILL S'' $4y 5 I b� BUSHING,SEAL WITH p`t`6sO VA.sp7 1, 4` IfS ' - -O' •,�- :`:'.f`�V,`w''". 11 / ,_DETEcrXxs LEAwN {f E i 1• j DUCT SEAL ',l�'L / _' 'Y.. e e 'v/.C��/ thy, , / ... ) 2C(SN) E •/. �i 8°FT_, " �q4'�,t� 1115 \Y7 ��.' y�•r,r. �// ',•; :' = 7jn i PIAT �1 JI,.. CSTC,SAND j.- �:!'"` °` i1 ler CSTC,SANDJ•' I I OR CONTROLLED . 5 •t OR CONTROLLED ...__.._.__ _ GRAVEL PAD —_ ,�L b b )t) DENSITY FILL O r5Is O E ..1I 1 DENSITY FILL _X 1 ,.ba. t IM 1/513 f H 1� ��S%DNA a l'N' 1 4 � ,i �"_ 2: •,e\� - CONDUIT p �/ COFIU T �4S7l SEE PVC CONDUIT / SIZING TABLE TO CABINET `•_CONDUIT i `�__ I __-.- lAr 1._._.r;.4. TO LOOP TO CONDUIT P'* �/• i INDUCTION LOOP DETAILS L1 a i -- A 1/._.__..1 STANDARD PLAN J-50.15-00 SEE aTl1B•OITT NAMMUNCDtIDUT PLACEMENT DETAILS SHEET 1 OF 3 SHEETS JUNCTION BOX PLACEMENT LEAD-IN CONDUIT SECTION APPROVED Fore PUBLICATION ~� SEE NOTE s 11A1 a 1O FT POCKET SECTN Pasco BakoUch 111 06-03-11' SECTION ( D J SECTION EO •'""MOMMAMMA - °"" \--' NB Wd,bsr.n SINN IE, we w M T,.Ap.tin LOOP INSTALLATION NOTES SPUCE PER STD.SPECS 11-31.12(2) 1. Install the Junction Box and the stub-out conduit with PVC sleeve. WHITE Conduit for the loop stub-out shall be as required In the conduit FOIL SHIELD , 1 COFLOICTOR PLASTIC MOLD OR HEAT size table shown on sheet 1 of this set. \ SHRINK TAPE *DRAIN WIRE -, \ SOLDERED COMPRESSION CONNECTION I Lay out loops and loop lead-ins to miss crackalioints in road, N. �� _f.l FROM-OFFSET EACH OTHER fro.; when possible.Maintain 18'minimum clearance from manholes CABLE JACKET-. �. -_,� \ WIRE and valve boxes. DETECTOR LEAD-INIIMIIIIO \NANA''',,,,,',',.",F,`-'...•,,,,,,;,,,,,.,„., " FROM LOOP - 3 The opening around the loop stub shall be patched with matching CABLE 7CIStfi WRF paving material N opened larger than PVC sleeve+2'. _ f TO LOOP .E,) JUNCTION 4 Sawcut the loop slots and the teed-in slots.Was1Vdry arts.File *GROUND DRAIN WIRE ' TOR 'Two LAYERS VINYL BOx edges to remove burr of all sew-cuts Into stub out sleeve. N 1. ELECTRICAL TAPE AT C N TRO(LER N—� (rYP.) ------ \'.� 5 Lay out the loop wire starting at the Jungbn Box,allowing 5' CABINET ONLYminimum slack. SPUCE DETAIL N. coNDINr 6 install the wire In the loon slot as shown. Oi ' SNO p R, 7 Finish laying out the wire at the Junction Box and Identity the leads with the loop number,the'S"for start and the'F'for the finish, iit___ ; the loop series number,end the loop lead-In conductor number. SEE STUB-WI CONDUIT b.r 8 Twist each pair of the lead-in wires a minimum of two times per foot PLACEMENT DETAaa,SHEET a I each foot,from the loop to the Junction Box.Reverse the direction C) ' LANEE of the twist for each succesalvs pair installed.Seal loops/sawcuts. LOOP sni6ur SLEEVE \ SAWCUTB i' Y. Construct a supplemental splice containing any series loop connect- SEE STUB-OUT COMPRI Isnip-ourSEE NOTE 14 ��- Ions In the adJacent Junction box as required In the plans.Supplemental PLACEMENT DETAILS SHEET 3 splices are subJect to the same requirements shown for the loop lead-in .. 1- ✓L----12'APPROX DETAIL"A" and the shielded cable splice. a 10. Splice the loop lead-ins to the shielded cable as noted In the Contract. FILL WITH SEALANT 7 (PER CONTRACT OR AS I /r /��`t 17 SAWC 1 11. All loop D shall he tested per Standard SpeeMdtlom APPROVED BY DIE I 1 `\. LEAD-IN 8-20.3(14)4) on0 on a Installation le complete. ER CONDUIT ... - Ur SAWCUT lx i4 RE�ouIRED 12. Existing stubouts shall he upgraded as necessary to conform � .��� o / to the corduH size table shown on sheet I. •,'^'\"�-;� --,, TO Loops-- J.G .. = >�;.s4 -t.,''''', — z—i' 17 AN loop lead-in sawcuts parallel to lane edge shall ------- -._.-... S'".,\' ''`\ ..:,� . 7 \`.,SLEEVE RST , he at least 12'from edge of pavement and within ' �, r J1111CTON BOXj + six Inches o mode of lane or fog line when poeslble. Maintain 12'separation EDGE OF PAVED SHOULDER. PAVING MATERMATCH S �--- / -�--,- between parallel cuts or pints. s OR BARRIER,OR EDGE - \ ( _�--- - C. N/ op glrTER PAN i b 14. The loop stutoout stove shall have rot PB i ! 4 ( /, an inside Altimeter 1'larger Than �'�''' I I' I'aLOFT POCKET(WIDTH EQUAL TO ` '� / E JUNCTION the outside diameter o1 the �V,', 13, 11 STUBOUT SLEEVE DIAMETER PLUS 2') / -----� BOx . End BON Bushing.Plug conduit P O '� and AN sleeve with send untlll nfpak�, CONDUIT OR / C loops ere Installed to keep -.;, ,41,1r yr:- If,,aT11aENO 9ELLa�SN11(i �/ "- CONOIHT / ` ngtAsphalt during o operations. ''s i TI°Ill�i6i!A SCI STq SA". SAWCUT AND CONDUIT CONNECTION 1 bI EDGE OF CONAL Q' 111!1I SHOULDER^I SHOULDER O 3II1Z/' ,k�`_`' A /. y �" 1 /` INDUCTION LOOP DETAILS see srus.our PlACBICNT MErT 97 urr 1-' ' IME- EDGE OF - / STANDARD PLAN J-50.15-00 _ -'-GNCUDI ,._ _--.,__..____...._._._.t SHEET 2 OF 3 SHEETS APPROVED FOR PUBLICATION DUAL"D" Pasco Bakotich III OB-03-11 + VAR v"w("M,. MR WIwW.'I",`k`a"orx"„".1 T._""r`IM. GUARDRAIL WITH POST _ .. Co- CEMENT CONCRETE CURB OR GUTTER AND BLOCK r1 SIDSVIALK 8EE STANDARD PLAN F10.12 ,_- "- CEMENT CONCRETE CURB OR GUTTER L--- T LOOP STUB-OUT SLEEVE(1/�'TO 1? SEE STANDARD PIAN F•111.12 e ' ° . '� BELOW TOP OF PAVEMENT) 1'-' e -_� T / / IT I DOP STI R-OUT SLEEVE(114 TO 12' • ° � ..` 0 ._-.,,_ i ,,.....�,`r._..-.___ BELOW TOP OF PAVEMENT) '41 - L ! LEAD-IN CONDUIT SHALL EXTEND A ' ..*l'�' `-MINIMUM OF 31!'INTO PAVEMENT _."- 1-- I r'T—_---I (PAVEMENT DEPTH VARIES) ) ' i � LEAD-IN CONDUIT SHALL EXTEND A ' I MINIMUM OF 3F1'INTO PAVEMENT ODIINTO TO ' N. (PAVEMENT DEPTH VARIES) ROAD D SURFACE(TVP) CONDUIT SECURED INTO ROAD SURFACE(TYP.) TO J _ //JUNCTION BOX / TO JUNCTION BO% -� STUB-OUT DETAIL WITH CEMENT CONCRETE CURB OR GUTTER STUB-OUT DETAIL r i WITH GUARDRAIL AND CURB CEMENT CONCRETE BARRIER- SINGLE SLOPE BARRIER SHOWNOYNN SEE CONTRACT PIANS FOR SIZE AND TYPE C. Nfs EDGE OF PAVED I� •r I OOP STUB-WT SLEEVE(1M TD VT ) - LOOP STUB-OR SLEEVE(1n'TO Err Iyg I ! yip BELOW TOP OF PAVEMENT) BELOW TOP Of PAVEMENT) Ndflip a; 1■ I1I1 I Ili -,-- ,t.---/___,--------''--,_.___ _...- ..._.—T � L.--------._..__-.----..------- -- 1 CONAL �' { 6 LEAD IN CONDUIT SHALL EXTEND A I LEAD-IN CONDUIT SHALL EXTEND A hill I MINIMUM Of 3H'INTO PAVEMENT MINIMUM OF 3N'INTO PAVEMENT (PAVEMENT DEPTH VARIES) (PAVEMENT DEPTH VARIES) S i CONDUT SECURED INTO • S CSURFACE INTO INDUCTION LOOP DETAILS ' ROAD SURFACE(TYP.) I STANDARD PLAN J-50.15-00 / SHEET 3 OF 3 SHEETS TO JUNCTION BOX L / TO JUNCTION BOX .____..L..- j APPROVED FO R PUBLICATION Poco Bakotich III 06-03-11 STUB-OUT DETAIL STUB-0UT DETAIL WITH a,c..s o��. art STUBOUT CONDUIT PLACEMENT DETAILS 016.16..1..w.16..9....41......01.6 WITH ROADWAY CEMENT CONCRETE BARRIER • JUNCTION DETAIL'S' i/_._ - `- SETA!.'A" SEE STANDARD PLAN.1-411.18 SOX / SHEET 2 JIN orm r-SEE STANDARD PLAN J40.11 CONDUIT—,.` •.�* CONDUCT-:�. t!'1 eOtt `� SNFITT2 \ ......,.....s.: , 1 EDGE OF SHOULDER oL ] • LEAD-IN&1WCUTS SAVYCUT DETNL SHOULDER - i `'. EDGE OF LANE Ii m-) - al . ; (iyp3..cr., C"-' ! 5 . '5 1 (CYP.) } l L. LI �� ME tlSfIMNCE /l ,. l W I 'MOUT DETNL ! w i C F. IR THIS SHEET(TIP.) - CIRCULAR SAWCUT(TVP.) a -__ 0 1 ._.. NOTES II A, 9� _JA„,. 1 For Inatatlation Noise and Details .- w see Standard Plan.1-60.15. r — ,:111110 5-O'DON RYP.1 v. .. :i _ NI_ .'-'`�;: a-0-DNM.(TTP) D W 2. For Sections A B,C,and D, CIRCULAR SAWCUT i I see Standard Plan J-50.16. ( ) 1L 3 Allot the loop lead-In Boos shall • �..— --.--.. return In the Junction Box. 5-0*_..;.. 5.p a-P S.C. I-C I e,-p,,�eTATIOI! StandadPtsnJ4 For Splice , 0.1 see ,. �- . ,. �- Standard Plan J-b0.16. SEE cor+rtuct PLAN 5. For Loop numbering Layout Details TYPE 3 STOP UNE LOOPS TYPE 3 ADVANCE LOOPS see sheet 3. 6 For addalonei Induction Loop Details, JUNCTION- sox see Standard Ptan J-60.16. DETAIL"A' SEF STANDARD PLAN J-10.11 01. SHEET 2 EDGE OF SHOULDER ' CONDUIT .. EDGE OF LANE LEAD-IN SEE ENTRANCE SAWCUT 1. Al SAWCUTS(TYP_)_' mk DETAIL-THIS SHEET(TVP.) I' CIRCULAR SAWCUT) 0�' , J ; T,-0" LI, I, `-''! ra.: - �Ia !1 L mP 1 33w I LEA SAWCUT ii. I I 9'-D• w e 4 1 III: C ag t ITVP.) ., LOOP SAWCUT ` Aoe ', nHs oo 4" i�Y■ tt tl 3 -_-__--- ''1 ill CHISELRLMOUT Pr TO EMENTITOSAWER Frr/ONAI. P.xG` litre' -J LENIN CUT DEPTH AND FILL yi A O O c)... 1 0 . ,`� SAWCUT NTH SEALANT(TVP) 11517 eon t - CENTER OF LOOP AND TYPE 3 INDUCTION LOOP I-P DIM.DWIt VFDiM1E LAME 2 m -.4` STANDARD PLAN J-50.12-00 ' +—�--- ___._._.— SHEET OFJSHEETS V 0 e p e d APPROVED FOR PUBUCAllON Pasco 8akotich III 0603-11 nreawm�es -M PLAN ) . E TYPE 3 SAMPLING LOOPS ENTRANCE SAWCUT DETAIL 1rr���T�+ Lr JUNCTION BOX 83 d 3Fr �� 8-SURF '+ab le o It 2 4eH)c/tB�e 1 1. F2 I ey.I F1 Q 8t ' v • LL 1 SPLICE(TYP-) 1 + L XX X , 0 1 PHASE NUMBER• 1 LOOP SERINo •♦ iC 0_� , , �..11111 (TIP) LANE NUMBER I OOP NUMPER 1 1 ii LOOP NUMBER MARKING DETAIL w 1 1 F137) NOTEs Loop numbering layout will be eknlWx to Loop ‘,....._..---,./ SPLICE(TM) Numbering Layout Detail,Sheet 3 OFFSET cRI11Pa� JUNCTION BOX i- _TRAFFIC ROW _./_�_.__..� S` 'S=START F=FINISH 1 TYPE 3 STOP UNE LOOP WIRING DIAGRAM 2GsM CABLEF1,j,.S1; WOES PUCE SHOWN 1 xINCT1oN sox • �//� FST (OPS • / /�� OFFSET CRIMPS SPLICE II 1 - ,2a „_-_.T- s.sTART _TRAFFIC FLOW -'� 1 , e g zctsro GABLE F•FMMSH �- / �� �r N�), !� gi LOOP SERIES , 4 TYPE 3 ADVANCE I ri NUMBER ,, , 4 c`_t$ ° 6 ii 1 / LOOP WIRING DIAGRAM �"�sSe A 11 11i (c--,,...\\ : TYPE 3 INDUCTION LOOP 1 K----.--"11 -4— �J// STANDARD PLAN J-50.12-00 TRAFFIC FLOW 1r..._://11/ �/ SHEET 2 OF 3 SHEETS APPROVED FOR PUBUCATION-. Pasco Bakofch I11 0141311 TYPE 3 SAMPLING LOOP WIRING DIAGRAM r•A.Fo.. rye -- ' - 11T— LIMES SPLICE SHOWN WI w..h ..Mo.SP.Mwd.l.WIl . JUNCTION DETAIL'e- . / BOX SEE STANDARD PLAN J.10.1S ° / SHEET 2 WOE OF SHOULDER COMSAT 94y4 1 EWE OF LANE- LEALMN 811YMCOT8 '__�- !MOULDER r�T t i4 m — SPLICE(TVP) 1 - ' (OFFSET CRIMPS) / , 8 -• . .' Y O' — -- FINISH ()�.) W LOOP NUMBER /! =START 3'-o u w(- 3 MARKING SLEEVE / i Maki t MUSE(TYP) , 53 �^-�� 11 _ i t <' 1 A w F / � f B . e'-O'LIIAM. 7r-----,====f.--1:271-9_ 3 F3 - .-0 �� 0 (TrP) §W 2 F!: LORD SERIES NUMBER 7 F1 81 YLI"? MARKING SLEEVE(TVP) CIRCULAR SAWCUf SI! LOOP SERIES START OR FINISH (TYP) - _ _.-L _ MARI(iN0 SLEEVE(TVP.) I. -4 I e-B^... a-Q ., _er-or ...D- — e-v_._ a-P r7o".. LOOP NUMBERING LAYOUT DETAIL PLAN TYPE 3A STOP LINE LOOPS LESS '1011 e0K PHASE NUMBER LANE NUMBER LOOP NUMBER ----.. 94 �„-y.,,�,� - LOOP NUMBER MARKING DETAIL 2C(SH)CABLE ^ "9"" "' 'xC�•C>'!`'-xz,,c'7[''X'_>K'7c`.c' ' . !.._- ___ T- ` •' IF.MEM �j i . ri .. c_ Lejcuzx.X,,cx:., k:x.xC:X:�;,3 . ,O � r +t j F ,fi 1 i P I IR. 1 LOOP SERIES o, ,Ff,C71,,s R.o ?� 11 tF ! •r'^+. ` �,-a-_� TERMER -„r� _..r....• \ E'TJ' I ITS ONAL eN�V la e '‘, . e (71/r-7\.. ,. ////y7.'-s---\‘,'\:\\\:,,. , 77/../.4"...."."\-.” in 1 -I { 2 I i `, 3 1 4 ; 1 TYPE 3 INDUCTION LOOP ,0 (�� ---..,,/,',, . \\`\'' , /! ,\\\��� J �.r STANDARD PLAN J-5O.12-00 / TRAFFIC Fl OW '',....-----::--"i"' �`..�- / s`..:�� -. SHEET 3 OF 3 SHEETS - --�' APPROVED FOR WIBLICAT1011 — TYPE 3A STOP UNE LOOP WIRING DIAGRAM _ Paico Biikotich Ill- Oe-OJ11 �R11EOFi■1 MI�Ir11 MRR emu SPLICE!MOM ' 0 WW11.01..••a.••-.•.1,.1.,,..., l_ ' J