Loading...
HomeMy WebLinkAboutContract CAG-15-218 �X � ,�� a � � �i�f *��'�V xQ� CITY OF RENTON CONTRACT AGREEMENT � i F� 9I THIS AGREEMENT is made as of the �� day of�V ���`( �, 201�, between the CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as "CITY" and Straiqht Line Fence 8�Construction Inc , hereinafter referred to as "CONTRACTOR,"to provide services for the 2015 Dog Park Fence Replacement ProJect as described in Attachment"A." . The City antl Contractor agree as set forth below. 1. Scoae of Services. The Contractor will provide all material and labor necessary to perform all work described in the Proposal which is included with this Agreement as Attachment"A." 2. Chanaes in Scope of Services. The City, without invalidating the Contract, may order changes in the Services consisting of additions, deletions or modifications, the Contract Sum being adjusted accordingly. Such changes in the work shall be authorized by written Change Order signed by the City and the Contractor. 3. Time of Performance. The Contractor shall commence performance of the Contract no later than ten (10) calendar days after Contract's final execution, and shall complete the full performance of the Contract no later than December 24, 2015 as described in Attachment"A." 4. Term Of Contract. The Term of this Agreement shall end at completion of the enclosed scope of work. This Agreement may be extended to accomplish change orders, if required, upon mutual written agreement of the City and the Contractor. 5. Contract Sum. The total amount of this Contract is the sum of $7478.85 which includes Washington State Sales Tax. 6. Retaina4e in Lieu of Bond. In lieu of a performance bond, the City will retain 50%of the contract amount for a period of 45 days after Final Acceptance of the work. 7. Method of Pavment. Payment by the City for the Services will only be matle after the Services have been performed and a voucher or invoice is submitted in a form acceptable to the City. Payment of the initial 50% will be made in the next pay cycle of the Renton Finance Department after receipt of such voucher or invoice (pay cycles are bi-weekly). The remaining 50%will be paid 45 days after Final Acceptance. The City shall have the right to withhold payment to the Contractor for any work not completed in a satisfactory manner until such time as the Contractor motlifies such work so that the same is satisfactory. 8. Emplovment. The Contractor's employees are not employees of the City of Renton. 9. Assianment and Subcontract. The Contractor shall not assign or subcontract any portion of this Contract without express written consent of the City of Renton. 10. Record Keepina and Reaortina. The Contr�tor shall maintain accounts and records whicn properfy reflect ail direct and indirect costs expended and services provided in the performance of this Agreement. The Contractor agrees to provide access to any records req�ired by the City. 17. Hold Harmless. The Contractor shall indemnify,defend and hold harmless the City, its officers, agents, employees and valunteers, from and against any and all claims,including claims from third parties, losses or liabilEfy,or any portion�tereof, including attomeys fees and costs,arising from injury or death to persans, including injuries,sickness,disease or death to Contractor�s own employees,or damage ta property occasioned by a neg[igent act,omission or failure of the Contractor. 12. Insurance. The Contracfor shall maintain thraughout the duration of this contract the foflowing insurance requiremen#s: General Liability insurance in the amount of$1,000,000 per occurrencel$2,0OO,OQO aggregate; Professional Liabiiity insurance in the amount of$1,000,000 per cEaim;Automobile Liability in the amount af $1,Od0,000 per accident; and proof of Workers' Compensation coverage. The City of Renton will be name as a Primary and Non-Contributory Additional lnsured on the insurance policy and an endorsement stating such shall be provided. 13. Compliance with Laws. The Contractor and all of the Con#ractor's employees shal!perform the services in accordance with aH applicable federal,state,county and city laws,cades and ordinances. 14. Conflicts. in the event of any inconsistencies between contrac#or proposals and this contract, the City of Renton contract shali prevail. 15. Prevailinq Waqe Rates. The Contractor must camply with the SEate prevailing wage requirements. The Con#ractor must�ile an Intent To Pay Prevailing Wage at the beginning of the project and an Affidavit of Wages Paid at the end of the praject with the Washington State Department of Labor and Industries, . _ �. , . - ' . .'. . . ... , .'.'.... . '.., ..,. ,:.��� This Agreement is en#ered into as of the day and year written above. �; r�; y CC�NT�2ACTOR CiTY OF RENTQN � i�' �,,j �,�' 9��4 ,fJ'��„/Y.:I 4=. �„�':...��Mf���#✓�' � — : `• <- ' 9 $I �Id�Ul2 '�'� �.`,� � 9 ,� Signalure 1, . . :F ��?.,��'�i '� i `��.. �`�'F t�v'3��� � �'',.�. Terrv Hiqashiyama, Communitv Services Administrator Printed Name and TiUe ��;" Printed Name and TiUe , �" s g�-� ,,�j f V�`+�i���+P��+'r,i�✓9�✓ �Y",tl!1 a�"'�7 �':..-f31/!�s' ����1�.�.-. BuSiness Ndrne .�'��,�J�� s ?y�'�,C�. `B�1 ��-� t��r- ��� Mailing Address ���'"7 e��� tG"!�i �,�+'� ,����'��� Clty,,.,) Sfate Zip w��S� ��"' `y � ,� -y �%,,,J^l �✓ {�i.� ,..,.,�..i.J ��,'�J��a��+..d �.ti'i� �'S/�`� �i��� ���� Teleph�e £'d 0�LO LE9£9Z � a�ua�eui�}yBiea;s d�O�Z l 5 6 Z L �oN ATTACHMENT A CITY OF RENTON 2015 DOG PARK FENCING REPLACEMENT SCOPE OF WORK i The City of Renton is pleased to affer an opporttanity far an experienced fencing contractar to provide fencing repiacement at the foilowing locatian: Cedar Riuer Dag Park(acated at 1500 Nauser Way(adjacent ta the Cedar River Trait at the Narca Site) • Fence repiacement project must occur prior to December 24, 2015. • Once a 'Notice ta Proceed' has been given, and access details have been coardinated the project must be completed within 10 working days. Far additional information, contact Steve Brown, Parks Manager at 425-430-&628. Cedar River pog Park Fence Replacement Contractor to supply ail material and labor ta complete the folEowing: • Instal! appraximately 2185 lineal feet of 2" x 3" x 42"tali viny! coated welded wire mesh on existing posts and rai(s. The City of Renton Parks Division wil! supply all materia! and labor to complete the following: • Removal of existing viny!coated fence + Removal of existing vegetation a(ong fenceline • Grading alang fenceline to accommodate fence installation • Installation of canstruction fencing to enclose a portion of the dag park allowing the park ta remain open during the project Additional details to include: • Caardination with Parks Supervisor regarding access tca the site • L'rmiting vehicie traffic an the trail • Securing the main gate ta the property CI?Y OF RENTON/2Q15 Dog Park Fence Replacement SCOPE OF WORK(ATfACHMENT A) Page 1 of 1 To: City of Renton Parks Department Date: 10/24/2015 Attn: Stefanie Coleman By: Dan Flanary Email: scoleman@rentanwa.gov Reference: Cedar River pog Park Descrip#iag: Fence Uptian #1: City to take off and haul away a112 inch by 3 inch wire, eut brush back and prepare for Straight Line Fence to install new green 2 inch by 3 inch,42 inch high welded wire on exiting posts and rails. Appraxi- mately 2,1 SS feet, excluding gates. Labor+Materials=$6,830+Sales tax(9.5°to}$648,85=�7,478,85 Option#2: City to remove and haul away all ald fencing and make ready ta install all new 42"high green chain link fencing with 2 3/8"terrninal posts, 2 7/8"gate posts and 1 7!8" line posts. All pasts to be set in concrete. Continuous 1 5/8"tap rail and 7 gauge battam tension wire. All green framework and wires. Price in- cludes (2)4 foot high by 42"walk gates, hinges, and butterfly latches. Labar+Materials=$23,676.00+ Sales tax(9.5%) $2,249.22=$25,925.22 Option#3: City does no work and Straight Line Fence removes and installs atl new green chain link fencing de- scribed abave. Labar+Materials=27,676.00+Sales Tax(9.5%) $2,629.22= $30,305.22 Signatnre; Date: Print Name: Standard Exclusions: Layout,clearing,grading,staking,blockouts,sleeves,coredrilling,asphalt patching,ternporary fence, slats,ornamental iron fenec,traffic control,engineering,testing,permits,bonds,union dues and paperwork,fence remaval, electricat graunding,underground utility Iocation,mowstrips,curbs,bollards,sona tube,backfill,extra mob'rlizations,painting, guardrail,pipe gates,wire mesh,eost incurred for drug testing,removal of spails from site. Qualify: Sur�ey and grade hubs supplied by ottters priar to us mobilizing. We must haG�e access to fence line u�ith digger and concrete truck. Terms: Balance due upon completion Conditions: Price good for 30 days from date of quote and subject to avai(ability, .---- 23821 152nd Ave SE Businezs Cicense#:91-i708075 Pbane: 253-b3t-5685 Kent,WA 98042 Expiration Date:8/T/i� Fax: 253-631-4144