Loading...
HomeMy WebLinkAboutContract M AWashington oq5 Local Agenc Agreement Supplement Washington State Department of Transportatio Supplemen amber Agency Federal Aid Project Number City of Renton CM - 1276(003) Date Agreement Number March 27,2000 LA 2502 The Local Agency of City of Renton desires to supplement the agreement entered into and executed on June 15, 1994 as identified above. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name SR-167/SW 27th Street HOV/Strander Boulevard Length 1.35 miles Termini SR-167 to SR-181 Description of Work Work consists of the first phase preliminary engineeering for the construction of an HOV interchange at SR-167 and SW 27th Street,and HOV lanes(each direction)along SW 27th Street,and new arterial connection from Oakesdale Avenue to SR-181. Reason for Supplement Additional funding of$746,000 received from Puget Sound Regional Council,Renton Project Number: 17 REN-04,and project scope change. Estimate of Funding Type Of Work (1) (2) (3) (4) (5) yP Previous Supplement Estimated Total Estimated Agency Estimated Agreement/Suppl. Project Funds Funds Federal Funds PE a.Agency Work 43,468.00 5,000.00 48,468.00 6,543.00 41,925.00 b.Other 351,445.00 857,428.00 1,208,873.00 163,198.00 1,045,675.00 c. State Services 2,775.00 0.00 2,775.00 375.00 2,400.00 d.Total PE Cost Estimate(a+b+c) 397,688.00 862,428.00 1,260,116.00 170,116.00 1,090,000.00 Right of Way e.Agency Work f. Other g.State Services h.Total R/W Cost Estimate (e+f+g) Construction i.Contract J.Other k.Other 1.Other m.Total Contract Costs(i+j+k+I) Construction Engineering n.Agency Work o.Other p. State Forces q.Total Construction Engineering(n+o+p) r.Total Construction Cost Estimate(m+q) s.Total Project Cost Estimate (d+h+r) 1 397,688.00 862,428.00 1,260,116.001 170,116.00 1,090,000.00 Federal participation in Constrcution Engineering(line q)is limited to 15%of the Total Contract Costs(line m,column 5). The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal funds obligated,it accepts and will comply with the applicable provisions. AGENCY OF AL WASHINGTON STATE DEPARTMENT OF TRANSPORTATION By Local Agency Official Title Jesse Tanner, Mayor By Assistant Secretary for TransAid Date Date DOT Form 140-041 EF Date Executed Revised 10/97 Attest: Marily J.Ntersen,City Clerk Local Agency Agreement Supplement � ROUTING SLIP &� SFe°F Supplement rtber 4d T � Federal Aid Project Number CM- 1276(003) AD SS MAIL STOP Agreement Number LA 2502 FROM AIL STOP s�.� // /� desires to supplement the agreement entered into PHONE l�r� FAx dentified above. All provisions in the basic agreement remain in ❑ For Action ❑ Per Your Request Per Our Conversation ❑ For Approval ❑ Read and Return Read&Route to Files Length 1.35 miles ❑ For Signature ❑ For Your Information ❑ For Your Comments Len g O r ©r►% - _d1,t=cQ, _ u6cQc-s __ Right of Way e.Agency Work i f.Other g.State Services h.Total R/W Cost Estimate(e+f+g) Construction `- i.Contract J.Other ,. ` : k.Other L Other '-,-�5.(-�P/VLCii!f.-�� Y\- m.Total Contract Costs(i+j+k+l) 1 J Construction Engineering -- ^, �V_�.1� =, rZ`Z©O©�,-_--� n.Agency Work I o.Other -- - _ -- - p.State Forces q.Total Construction Engineering(n+o+p) -- -- r.Total Construction Cost Estimate(m+q) s.Total Project Cost Estimate (d+h+r) 397,688 - Federal participation in Constrcution Engineering(line q)is limited to 1 The Local Agency further stipulates that pursuant to said Title 23 to payment of the Federal funds obligated,it accepts and will conrNlyTwia,TtncaPpucavrc°prvvt�rcn�a- — -- AGENCY OF AL WASHINGTON STATE DEPARTMENT OF TRANSPORTATION By Local Agency orfidal Title Jesse Tanner, Mayor By Assistant Secretary for TransAid Date Date Date Executed DOT Form 140-041 EF Revised 10/97 Attest: IkAaTitv 1 tersen. City Clerk