Loading...
HomeMy WebLinkAboutCO 07 CAG-17-174, CO #7-19 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Renton Hill Utility Replacement CAG-17-174 • C.O.# 7 CONTRACTOR: Laser Underground &Earthworks, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price Total Price B07. DECREASED QUANTITY: Ton (7670.82) $20.00 ($153,416.40) Select Imported Trench Backfill BOB. INCREASED QUANTITY: SY 1116.00 $35.00 $39,060.00 Hot Mix Asphalt Patch B09. INCREASED QUANTITY: SY 123.00 $125.00 $15,375.00 Remove and replace sidewalk and driveway 810. INCREASED QUANTITY: LF 18.00 $50.00 $900.00 Remove and replace concrete curb&gutter B12. DELETED ITEM: Ton (300.00) $30.00 ($9,000.00) Remove&Replace Unsuitable Foundation Material B13. INCREASED QUANTITY: LF 627.00 $4.00 $2,508.00 Increased CCTV Inspection due to increase in sewer main replacement 814. INCREASED QUANTITY: LF 569.00 $80.00 $45,520.00 Additional 8"PVC Sanitary Sewer Main replacement on S 9th St,Grant Ave S and easement area between 1000 and 1006 B16. INCREASED QUANTITY: LF 10.00 $90.00 $900.00 Additional 10"PVC Sanitary Sewer Main B17. INCREASED QUANTITY: LF 633.00 $80.00 $50,640.00 Additional 6"PVC Sanitary Side Sewer replacement on S 9th St,Grant Ave S and easement area between 1000 and 1006 822. INCREASED QUANTITY: EA 1.00 $6,000.00 $6,000.00 Additional 54"Manhole:Grant Ave 5 9th-lath 824. INCREASED QUANTITY: EA 1.00 $800.00 $800.00 Additional 8-Inch Sewer Cleanout S 9th St B26. INCREASED QUANTITY: EA 3.00 $3,000.00 $9,000.00 Connect New Sewer to Ex Manhole 828. DELETED ITEM: LF (152.00) $100.00 ($15,200.00) 6-Inch Cured-in-Place Pipe in Easement 829. INCREASED QUANTITY: EA 3.00 $3,500.00 $10,500.00 Additional Side Sewer Connections in Easement area for 913, 1009,1015 Jones Ave S B30. DELETED ITEM: LF (152.00) $12.00 • ($1,824.00) Post-Installation Inspection of CIPP B33. INCREASED QUANTITY: EA 18.00 $1,070.00 $19,260.00 Additional Storm Monitoring visits for Construction Stormwater Permit Requirements H:\File Sys\W1R-Drinking Water Utility\WTR-27-Water Project Files\WTR-27-03824-201S Water Main Replacement\Pay Estimates\Change Orders\CO#7(Sewer Work after 6-11-18)Sch B\C.O.#7-SEWER 1 of 2 840. NEW ITEM: LS 1.00 $16,356.71 $16,356.71 Additional unforeseen work items associated with"Bid Schedule B—Sewer"as described below: Contractor Daily Report# Date Description&Cost 15753 11.8.18 Conflicts with various unlocated $12,650.00 utilities on S 7th St between High Ave S and Jones Ave S 13205 3.08.19 Installation of French Drain to $3,706.71 control groundwater seepage caused by Installation of new sewer main between 1000 and 1006 Jones Ave 5 B41. NEW ITEM: LS 1.00 $3,650.00 $3,650.00 Additional Landscape materials and $3,650.00 labor due to raised grade of rebuilt roadways Sub Total $41,029.31 Sales Tax(10%) $4,102.93 Total $45,132.24 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ES IIMArtU NET CHANGE MATED CONTRACT TOTAL AFTER CHANGE THIS ORDER $5,048,703.20 $6,613,865.09 $45,132.24 $6,658,997.33 SIGNATURES: Contractor Date: Project Engineer: Date: • Approved By: Date: 9 //i1 /9 Ronald Straka,Utility Syste Director Approved By: - Date: Gregg Zi n,PW Administra r Approved By: Date: /!e/�f Denis l ,Mayor \`\\\\UtyyuittFrJ�7J/ / REN> Approved By: `5aly\unHprr, ® '%Date: C//0)/ Shane Moto ,Renton City Attom- — 6Jga L Attest: 1 ' J A Bate: / /F � y _ v r 7 Jason Seth,c ty Clerk 4 . O' , iirnnmly5po ro• $ 'iiiiy�•j�`tjRATbl0 St?� �`\ IJlrli111i N\\5 HMCo 5y5\WtR-Drinking Water UHkly\Wnt 2/•Wale-Plated Eke Wnl-1103R19-1015 Water Main Replacement\Pay Estimates\Change O,ders\CO C7(Sower Work alter E11.18)Sch R\CO 9] SEWER 2 of 2