Loading...
HomeMy WebLinkAboutCO 08 CAG-17-174, CO #8-19 CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Renton Hill Utility Replacement CAG-17-174 C.O.# 8 CONTRACTOR: Laser Underground & Earthworks, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment,subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price Total Price A07. DECREASED QUANTITY: Ton (138.23) $20.00 ($2,764.60) Select Imported Trench Backfill A08. INCREASED QUANTITY: SY 1296.00 $35.00 $45,360.00 Hot Mix Asphalt Patch A09. INCREASED QUANTITY: SY 32.00 $125.00 $4,000.00 Remove and replace sidewalk and driveway A10. DECREASED QUANTITY: LF (276.50) $50.00 ($13,825.00) Remove and replace concrete curb&gutter Al2. DELETED ITEM: Ton (150.00) $30.00 ($4,500.00) Remove&Replace Unsuitable Foundation Material A13. DECREASED QUANTITY: LF (19.00) $4.00 ($76.00) CCTV Inspection • A14. DECREASED QUANTITY: EA (14.00) $500.00 ($7,000.00) Site Specific Utility Potholing A16. DECREASED QUANTITY: EST (0.10) $30,000.00 ($2,966.54) Stormwater Minor Changes All. DECREASED QUANTITY: FA (0.03) $20,000.00 ($631.82) Resolution of Conflicts with Stormwater A18. DELETED ITEM: SY (460.00) $1.00 ($460.00) Construction Geotextile for Separation A19. INCREASED QUANTITY: LF 14.00 $100.00 $1,400.00 Storm Drain,6-Inch Diameter(CPEP) A20. INCREASED QUANTITY: LF 10.00 $100.00 $1,000.00 Storm Drain,8-Inch Diameter(CPEP) A21. INCREASED QUANTITY: LF 24.00 $110.00 $2,640.00 Storm Drain,8-Inch Diameter(DI) A22. DECREASED QUANTITY: LF (19.00) $75.00 ($1,425.00) Storm Drain,12-Inch Diameter(PPP) A23. DECREASED QUANTITY: LF (5.00) $200.00 ($1,000.00) Storm Drain,12-Inch Diameter(DI) A25. INCREASED QUANTITY: EA 3.00 $2,000.00 $6,000.00 Connect Existing lateral to New Storm Pipe A26. INCREASED QUANTITY: EA 3.00 $3,000.00 $9,000.00 Connect New Storm Pipe to Existing Catch Basin H:\File Sys\WIR-Drinking Water Utility\WrR-27-Water Project Files\WTR-27-03824-2015 Water Main Replacement\Pay ESRmateACh,nge Orders\CO#8(Storm)Sch A\C.O.#8-STORM 1 of 3 A28. DECREASED QUANTITY: EA (3.00) $2,000.00 ($6,000.00) Catch Basin Type 1 MO. INCREASED QUANTITY: EA 1.00 $4,500.00 $4,500.00 Catch Basin Type 2,48-inch Diameter A31. DECREASED QUANTITY: CY (3.25) $100.00 ($325.00) Control Density Fill A32. DELETED ITEM: EA (6.00) $500.00 ($3,000.00) Sewer Service Relocation for Stormwater Conflict A35. INCREASED QUANTITY: EA 18.00 $1,070.00 $19,260.00 Additional Storm Monitoring visits for Construction Stormwater Permit Requirements A39. INCREASED QUANTITY: Ton 53.50 $114.90 $6,147.15 Additional HMA Overlay due to City approved deeper Road Grinding 300&400 block Renton Ave$ A41. NEW ITEM: LS 1.00 $25,135.46 $25,135.46 Additional unforeseen work items associated with"Bid Schedule A—Storm"as described below: Contractor Daily Report# Date Description&Cost -- Adjust grade to avoid PSE line near. $2,402.61 15771 11.28.18 CB#5 required phone line to be relocated as well 15471 1.31.19 Install New Storm around existing $4,613.95 valve can with bends 15479 2.18.19 Relocation of Trench Drain created $5,268.26 conflict with existing power and • phone conduit 15485 2.20.19 Trench Drain conflict with exisiting $2,380.90 gutter and asphalt 15493 2.22.19 Trench Drain relocation conflict $4,748.53 with existing utilities 15500 3.1.19 Existing 6"drain conflict with new $4,316.64 6"PRV 13240 4.24.19 City requested existing storm $1,404.57 manhole repair A42. NEW ITEM: LS 1.00 $3,650.00 $3,650.00 Additional Landscape materials and labor due to raised grade of rebuilt roadways Sub Total $84,118.65 Sales Tax(10%)on Items A35,A41&A42 $4,804.55 Total $88,923.20 H:\File Sys\WTR-Drinking Water Utility\WTR-27-Water Project Files\WTR-27-03824-2015 Water Main Replacement\Pay Estimates\Change Orders\CO 148(Storm I Soh A\C.0.88-STORM 2 of 3 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT lSTtMAfED NET CHANtaE ESTIMATED CONTRACT TOTAL AFTER CHANGE THIS ORDER 55,048,703.20 $6,658,997.33 $88,923.20 $6,747,920.53 SIGNATURES: Contractor: /6.J.1 / � 5, Date: QJ_zp_) q Project Engineer: Date: Approved By: Cituted — Date: q_ /7_`c Ronald Straka,Utility Syne s actor Approved By: f Date: Gregg Zimme W Administrator Approved By: ; ` Date: 4' �/ l Denis Law,Mayor !!! Approved By: Date: (/ //y)/7 Shane Mo ey,Renton City Attorn ///(��� Attest: CA. t Date: v/ 1 /? Jason Se ,City Clerk 1 \\`\001111111/J44r .� O F jqF ,),, ; 2 ; 'YEA : '/,'7,/741-ED1SE? 6�.•`�� n'.Vae Sys Wm•Drinting Water Ulitty\WTR,27-Water Pmlea net\WTR.2r-03824.2015 Water Main Replacemenl1Pay EstlnuteAChange OrderACO n815taten I Sch*',co. 0•STORM 3 of 3