Loading...
HomeMy WebLinkAbout*Request for Qualification (newspaper ad) PUBLIC WORKS DEPARTMENT TRANSPORTATION SYSTEMS DIVISION REQUEST FOR QUALIFICATIONS DESIGN ENGINEERING SERVICES SOUTH 2nd STREET CONVERSION PROJECT AND RENTON CONNECTOR PROJECT The City of Renton solicits interest from consulting firms with expertise in Civil and Structural Engineering Design. These agreements will be approximately three years in duration with the option for the City of Renton to extend them for additional time and money if necessary. Consultants will be considered for the following projects. The City of Renton reserves the right to amend terms of this "Request for Qualifications" (RFQ) to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses. Project Descriptions The work to be performed by the CONSULTANT consists of performing engineering design for the following projects: 1. South 2nd Street Conversion Project. This project will convert South 2nd Street from a four lane one- way roadway to a roadway with one through-lane in each direction. The proposed improvements include pedestrian and bicycle facilities, traffic operations improvements, and transit upgrades. This project has a 9% UDBE goal. The major features of the project are as follows: • Three new traffic signals, including one raised intersection. • A westbound bypass transit lane from just west of Logan Avenue S to just east of Lake Avenue S. • New Metro RapidRide stops and a traffic queue jump at the new traffic signal at S 2nd Street and Shattuck Avenue S. • A two-way cycle track between Shattuck Avenue S and Logan Avenue S, bike lanes between Logan and Burnett Avenues 5, and bike sharrows from Burnett Avenue S to Main Avenue S. • Frontage improvements between Burnett Avenue S and Main Avenue S. Required design services include: 1. Surveying 2. Traffic analysis 3. Preliminary design 4. Permit support 5. Pavement design 6. Signal and lighting design including geotechnical and structural analysis 7. Surface water design 8. Preparation of plans, specifications, and estimates for construction bid documents 9. Accessibility design and analysis 10. Constructability analysis 11. Risk assessment 12. Bid support DOT 140-564 Page 1 of 3 5/2019 13. Bid analysis 2. Renton Connector, S 2nd Street to S 5th Street. This project will install a continuous non-motorized facility along Burnett Avenue S between S 2nd Street and S 5th Street via separated walkways, protected bicycle lanes (cycle track), and a multi-use path. This project will also include reduced travel lanes, landscaped medians, and reconfigured public parking areas in order to provide opportunities to incorporate art, play spaces, and resting areas along the connector. This project has a 10% UDBE goal. Intersection improvements will include traffic signalization improvements and curb ramp upgrades to ADA standards. Required design services include: 1. Surveying 2. Traffic analysis 3. Preliminary design 4. Permit support 5. Pavement design 6. Signal and lighting design including geotechnical and structural analysis 7. Surface water design 8. Preparation of plans, specifications, and estimates for construction bid documents 9. Accessibility design and analysis 10. Constructability analysis 11. Risk assessment 12. Bid support 13. Bid analysis The City of Renton reserves the right to retain the services of the successful firm(s) for any subsequent phases (R/W, CN) associated with this/these project(s). Evaluation Criteria Submittals will be evaluated and ranked based on the following criteria: 1) Qualification of Proposed Project Manager and Team 2) Experience of Proposed Project Manager and Team 3) Ability to meet scope/schedule/budget 4) Approach to project 5) Ability to meet UDBE goal(s) 6) Approach to quality control 7) Past Performance/References DOT 140-564 Page 2 of 3 5/2019 Submittal For all submittal requirements, please review the complete RFQ which is available on the City of Renton web page, www.rentonwa.gov/bids/. This link will direct you to the City Clerk's "Call for Bids, Proposals, Qualifications" page. Under the "Request for Qualifications" section, select "Engineering Services—South 2nd Street Conversion and Renton Connector Projects". Submittals should include the following information: Firm name, phone and fax numbers; Name of Principal- in-Charge and Project Manager; and Number of employees in each firm proposed to project. Please submit ONE original and FOUR copies of your Statement of Qualifications to: City of Renton, 1055 South Grady Way, 5th Floor,Joey Harnden no later than 5:00 p.m. on Friday, November 1, 2019. Submittals will not be accepted after that time and date. Any questions regarding this project should be directed to Joey Harnden, at 425-430-7225. Americans with Disabilities Act (ADA) Information The City of Renton in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by emailing Joey Harnden at jharnden@rentonwa.gov or by calling collect 425-430-7225. Title VI Statement The City of Renton in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award." Jaso A. Seth, Ci Clerk Dates of publication in the Renton Reporter: October 11, 2019. Dates of publication in the Daily Journal of Commerce: October 11, 2019. DOT 140-564 Page 3 of 3 5/2019