HomeMy WebLinkAboutCO 09 CAG-19-001 , CO #9-19 Y. O, Fkr° Change Order No. 9 Contract Title: Renton Avenue South Resurfacing Contractor: R.W.Scott Construction Contract No.: CAG-19-001 Federal Aid No.: STP(UL)-1201(023) ® Ordered by Engineer ❑ Proposed by the Contractor(VECP) ❑ Unilateral Amount Working Days Original Contract: $1,585,247.60 60 Current Contract: $1,826,600.30 83 Estimated Net Change This Order: $131,055.20 4 New Contract: $1,839,655.50 87 Prepared By: IS y: , Resident Engineer Date ' ngineer City of Renton'Transportation Date Design Manager) . Reviewed By: Consent By: -4' "Ai Ibill*42e2L6:1 En•ineer . •-cord Date Surety(Greater than 25%cost and/or 20%time Date Increase) Reviewed By: Endo la/l4 /lam /D/5h Ci of Rento roject Manager Date Cbntractor Date Reviewed By: Exec ted By: to fc1/o b e City Attorney Date City of Rena Pu is r Da Aj ministr to Mayor Change Order No.9 Contract Title:Renton Avenue South Resurfacing #� Contract No.CAG-19-001 Page 1 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Driveway Regrade at Sta. 101+80 RT: The Contractor is directed remove and dispose of approximately 62.2 SY of the recently constructed and existing cement concrete driveway pavement to a distance of 35 feet behind the back of sidewalk,and reconstruct the driveway pavement to the grades shown on the attached Driveway Profiles Sheet 21/RD-7. The Contractor is directed to protect the recently constructed driveway entrance. The driveway repair shall have a broom finish. The above changes shall be in accordance with the plans listed below and the attached License to Construct. Reason for Change: Driveway Regrade at Sta. 101+80 RT: The driveway regrade was built per plan,within the limits of the existing right of way. The property owner found that the regraded driveway was steeper and had a grade change at the back of the new driveway entrance that made it problematic to access with his trailer. The property owner agreed to allow the regrading to extend onto his private property in order to soften the grade and improve access. Materials: This change order will result in the addition of 10.37 tons of bid item 17 (Crushed Surfacing Top Course) and 62.22 square yards of bid item 39 (Cement Conc. Driveway Repair).The removal of the existing concrete driveway and preparation of subgrade will be paid by force account. Plans: Driveway Profiles Sheet 21/RD-7. Adjustment: The following payment items are added to the Contract: No. Description Quantity Unit Unit Price Total 8-17 Crushed Surfacing Top <59.96> TN $60.00 <$3,597.60> Course 9-17 Crushed Surfacing Top 70.33 TN $60.00 $4,219.80 Course Change Order No.9 Contract Title: Renton Avenue South Resurfacing Contract No. CAG-19-001 Page 2 of 3 No. Description Quantity Unit Unit Price Total 39 Cement Conc. Driveway <10> SY $150.00 <$1,500.00> Repair 9-39 Cement Conc. Driveway 72.22 SY $150.00 $10,833.00 Repair Removal of Existing 1 EST $3,100.00 $3,100.00 Driveway Pavement and Subgrade Preparation Total: $13,055.20 Extension of Time: The Time for Completion is extended 4 Working Days. Equitable Adjustment: The City and Contractor agree that this Change Order does not cause an equitable adjustment. Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees,and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order ® Plans © Field Directive ❑ Change Order Quotation Estimated Change Order Cost ❑ Project Labor List El Force Account Equipment Rate Request (DOT Form 422-010 EF) El Equitable Adjustment Determination Change Order No.9 Contract Title: Renton Avenue South Resurfacing Contract No. CAG-19-001 Page 3 of 3 G`t y o� Renton Ave S Rehabilitation Contract#CAG 19-001 Federal Aid#STPUL RF NT 0 Field Work Directive FWD#010 Date: 7/25/19 Subject: Driveway Regrade at Sta. 101+80 RT Scope: The Contractor is directed remove and dispose of approximately 42.7 SY of the recently constructed and existing cement concrete driveway pavement to a distance of 24 feet behind the back of sidewalk,and reconstruct the driveway pavement to the grades shown on the attached Driveway Profiles Sheet 21/RD-7. The Contractor is directed to remove • and dispose of approximately 14.4 SY of the recently constructed driveway entrance and reconstruct it with a reverse grade as shown on the attached Driveway Profiles Sheet 21/RD-7. The Contractor is directed to remove and dispose of approximately 26 LF of the adjacent curb and gutter and reconstructed per the Contract Provisions. Plans (attached): Driveway Profiles Sheet 21/RD-7. Measurement and Payment: Measurement and payment for the removal and disposal of the cement concrete driveway, cement concrete curb/gutter and cement concrete driveway entrance to be determined. Payment for the new cement concrete driveway will be via contract item 38 Cement Conc. Driveway Entrance. Payment for the cement concrete driveway repair will be via contract item 39 Cement Conc. Driveway Repair. Payment for the cement concrete curb and gutter will be via contract item 37 Cement Concrete Traffic Curb and Gutter. By: Sign; re Date Tani Staff rd Project Enginee C ITY OF Renton City of Renton Public Works License to Construct Project Name: • Renton Avenue South Resurfacing Project Project Parcel No. 214480-0310 Tax ID No. 214480031001 I, the undersigned property owner, do hereby grant to the City of Renton and its contractors and other parties acting on its behalf, permission to enter upon my property at 8035 S 130th St and modify: ❑ the property by changing front yard grade(s)to ensure a smooth transition to the new street, sidewalk and/or driveway improvements; ® the existing driveway(s) by changing the existing grade(s)to ensure a smooth transition to the new street improvements; ❑ the existing parking lot(s)by revising parking stall(s), driveway aisle(s), walkways, curbing and/or parking island configuration(s)and grade(s); ❑ the property by installing retaining wall(s); ❑ the existing landscape area(s) by changing grade(s)to ensure a smooth transition to the new street, sidewalk and/or driveway improvements; ❑ the property by planting tree(s), shrub(s)and/or groundcover; ❑ the property by: ❑ Installing new irrigation system(s); ❑ restoring existing irrigation system(s)to pre-construction operating condition to match new planting bed configuration(s); ❑ removing existing irrigation system encountered within work areas and capping at the limits of work(restoration of system by property owner); ❑ providing sleeve(s) under new pavement between existing irrigated area(s) and new planting areas(restoration of system by property owner); ❑ Other: ❑ the property by: ❑ relocating and/or removing and replacing existing fencing to new location and/or elevation; ❑ providing temporary fencing if necessary to isolate the work area; ❑ Other: ❑ the property by revising existing storm drainage system(s); ❑ Other: ❑ Other: Page 1 of 2 .rr"'s CITY OF Renton The City of Renton shall be responsible for repairing/restoring property disturbed during construction of said improvements;all to be accomplished at no cost to the property owner. All modifications, repairs and restorations will be completed within two years of the date of this agreement. Agreed to this .9-5 day of J , 201. City of Renton Trans 9ortation%S tems Division - Design Property Owner: roperty Owner ignat re Owner Please print the following information: Franklin & Kay Mc Cuistion 2i:3 297/C Property Owner Name Property Owner Telephone 8035 S 130th St Renton, WA 98178 Property Owner(Property)Address Renton, WA 98058 Property Owner(Mailing)Address • Page 2 of 2 Estimated Change Order Cost Change Order No. 9 Prepared By:M.Faltaous Bid Item No. Description Quantity Unit Unit Price Estimated Cost Force Account Item description Foreman 8 HR $ 75.00 $ 600.00 Operator 8 HR $ 75.00 $ 600.00 Labor 8 HR $ 55.00 _ $ 440.00 Labor Markup 29% $ 475.60 Equipment Estimate Ford F450 8 HR $ 25.00 $, 200.00 Excavator 8 HR $ 20.00 $ 160.00 Dump Truck 8 HR $ 50.00 $ 400.00 Equipment Markup 21% $ 159.60 Materials Estimate $ - Materials Markup 21% $ - Services Estimate $ - Services Markup 21% $ - Mobilization Estimate $ - Subcontractor Work Estimate $ - Subcontractor Markup 12% $ - Force Account Total: $ 3,035.20 Force Account Estimate Total: $ 3,100.00 Bid Item Change 17 CRUSHED SURFACING TOP COURSE 10 TN _ $ 60.00 $ 600.00 39 CEMENT CONC.DRIVEWAY REPAIR 65 SY $ 150.00 $ 9,750.00 Equitable Adjustment IPer attached determination I Estimate $ - Calculated Cost , $ 13,450.00 GENERAL NOTES 1"1 Oj FLOWLINE ELEVATION OBACK OF SIDEWALK - �I CEMENT CONCRETE 104.1,Y ENTRANCE - TYPE R7 2 CEMENT CONCRETE DRNEWAY ENTRANCE - TYPE RI El Z SEE STD. PLAN 104.1, SHEET 25/RD-11. , w q. I O MATCH EXISTING GROUND AT v. SEE STD. PLAN 104.1, SHEET 25/R0-11. I 0 -U, . . RIGHT-OF-WAY q. ^m my 1 ,71 +n o0 o?p +n 315 315 �7 n II Nw Q� O - 41 W j -1.53% -2.105 -1.50R -7.445CVU LioN 310 �- _ 310 g0 1111111111111111111111111111111111111 305 0 ,o - a.0- - 305 WO o.lso m �^U a 0 0 N 101+80 DRIVEWAY 102+20 DRIVEWAY z a H: 1'..5• z x H: 1•..5• CI 3 o z . 0 U Q 0 -- 4 LL 1 102i1430 0 / rn. I0 _ o I N 2 I F u z I LL' w Z 3 n 1 i I Co °°e S 130TH ST ti - . eeoe= z° 5 ?R°oe8°v°°°VI w°oa R o C. • — — I ------. iz 6 Q NgZ' \ l ( CD 0 c....1agE 0 2 I \\ I I i � z T �} __ — — �_ • 4 °I d I o Lai 7 o U. 43 --..._ A I \ L \ a I Remove and replace I j F I u. ° cement concrete ' APPROVED FOR BID j .2 ' I — I ' S• 2S' 0 —� driveway, SCALE: , =s z 'a i I CITY OF RENTON DATE F- U ; 0 r broom1 finish c� L' a 4 Z If APPROVED FOR CONSTRUCTION z w I I CITY OF RENTON DATE C Fe,'-' I I SHEET: 21/RD-7 l� I0 1• 2• OF: 70 o + z 0 TWO INCHES AT FULL SCALE. JOB NO.: 17534 IF NOT, SCALE ACCORDINGLY DWG:DRWYS